Professional profile
A confident and experienced Mechanical Engineer with extensive project work throughout the United Arab
Emirates. Well versed in design, installation & supervision for heating, ventilation and air conditioning – as well as
water supply, Drainage and fire fighting including all kind of calculation – is well suited to work with a wide scope of
responsibility in both mechanical & electrical services for different types of building projects. Has executed projects
with the Federal National Council, as well as schools, universities, hotels, banks, hospitals, clinics and executive
towers. Competent with reporting, reviewing and supervising, stands ready to bring immense value to either a
challenging commercial or residential engineering project- have well knowledge in all local authorities requirement
& regulations – have well knowledge in different international standards such as ASHRAE, NFPA, Plumbing British
standards, SMACNA and others – also experiences in some other special trades & systems such us elevators,
sanitary fixtures & BMS.
Objective
To apply my vast skill set for the good of a project, and help it all come together. To calculate, design, and draw
the component parts of a great project, and bind them together with expertise. To work hard, learn a lot, and
achieve great results.
Career summary
Jul 2013 – Dec 2015 MEP PROJECT MANAGER (OMIS Contracting) (Beside being the MEP Executive
Manager)
Al Ossaimi Hotel & Resort, Palm Jumeirah
 Following up day-to-day MEP activities & coordinating between client, consultant, main contractor, and all
sub-contractors.
2010 – Present MEP EXECUTIVE MANAGER
OMIS CONTRACTING
 Following up project testing, commissioning, handovers, OMIS AC under-construction projects, and liaising
with clients
 Designing and coordinating with other MEP services, and with architectural & structure, and reviewing
contracts
 Preparing full design for HVAC systems with equipment selection for in-house projects, as well as quantity
estimation
 Pricing for tendering, as well as following up day-to-day affairs in terms of all contracts, clients, customers and
projects
 Executing in-house & outside project (residential, commercial, clinic & shopping mall)
2007 – 2010 SENIOR MECHANICAL ENGINEER & MEP COORDINATOR
Ramboll Whitby & Bird Engineers
 Leading the MEP design team, designing mechanical services including fuel, steam, LPG, HVAC, and water
supply for Al Ghurair Shopping mall complex extension including as well hotel building, hotel services,
residential building & offices building.
 Supervising the site on a part time basis, including reviewing technical submissions, and sending them for
Page 2
approval for Al Ghurair Shopping mall complex extension
Key Achievements
 Provided a study report for replacing the 31 year old chillers in Al Ghurair mall – followed up with suppliers &
contractors & supervise the works executed
 Worked as a mechanical lead for Abu Dhabi Shining Towers – reviewed and approved drawings, inspections
& reports
 Coordinate with structural engineers, architects, and specialists – followed up day-to-day issues with client &
contractors
2006 – 2007 MEP DESIGN MANAGER & MEP COORDINATOR
Meecon – Middle East Engineering Consultancy
 Completing HVAC design, including heat load calculators, ducting, CHW piping, ESP calculations & CHW
pressurization
 Designing heat exchangers using district cooling chilled water & smoke management (stairwell pressurization
& smoke relief)
 Designing plumbing in accordance with UPC, DM & DEWA Water Division, as well as fire alarm design &
coordination
 Designing Telecoms (Etisalat & Du compliant), as well as preparing & reviewing specifications & schedules of
project work rate
 Obtaining all NOCs and local authority approvals concerning MEP works & building permits – maintaining
high regulatory knowledge
 Low voltage power distribution in accordance with British Standards and local authority regulations (DEWA
compliant)
Projects Executed
Jumairah Lake Tower 3B+P+G+1MECH+34 OFFICES, JLT, DUBAI
Lafi Real State 2B+G+2P+16H.C Res, INTERNATIONAL CITY
Dunes Silicon Oasis Res. Building B+G+8 STORY RES. BUILDING, SILICON OASIS
Mr. Mohammed Aii Alshafar Hotel Apartments 3B+G+17 STORY BUILDING, ALBARSHA
Apricot Silicon Oasis Offices Building 2B+G+2P+14 STORY, SILICON OASIS
Dubai Autism Center G+4 CLASSROOMS & CLINICS BUILDING, DUBAI
IMPZ Hotel 2B+G+18 STORY HOTEL BUILDING, TECOM, DUBAI
2005 - 2006 SENIOR MECHANICAL ENGINEER
Meecon – Middle East Engineering Consultancy
 Completing HVAC designs and smoke management for different types of villas; small & high rise residential
buildings
 Preparing and obtaining Dubai Municipality approval for all projects, including complete design for district
cooling systems
 Designing & drawing drainage, fire fighting & domestic water supply, including calculations (as per DM,
DEWA & DC regulations)
Projects Executed
DM Annex Building 2B+G+2 DUBAI MUNICIPALITY HEADQUARTERS
Jumairah Lake Tower 2B+P+G+34 RES BUILDING, (JLT), DUBAI
Algoze Land 49 RES BUILDINGS G+4 & 5, ALGOZE, DUBAI
International City 3 RES BUILDINGS G+4, INTERNATIONAL CITY
Gulf Properties Tecom Tower 3B+G+7P+37 STORY OFFICE BUILDING, DUBAI
GMP Tower 3B+G+10P+40 STORY, OFFICES BUILDING, DUBAI
Mr. Ali Abdullah Alshafar Tower B+G+7P+17 STORY OFFICES BUILDING, TECOM
Business Bay Executive Towers 5/11 TOWERS 29 TO 48 STOREY, B+G+M PODIUM
2002 - 2005 SENIOR MECHANICAL ENGINEER
ARENCO – Architectural & Engineering Consultant
 Completing HVAC design, including head load & ESP calculations, ducting, piping, CHW Pressurization and
Page 3
CHW pumps
 Supervising, reviewing and approving complete HVAC design and drawings done by branches in Manila,
Sharjah & Abu Dhabi
Selected Projects: (PTO)
Selected Projects: (Carried Over)
Dubai Police General Headquarters B+G+5 POLICE GENERAL HQ, AL-TWAR FIRST
Dubai Internet City LUXURY VILLAS COMPOUND, 40VILLA + CLUB
National Bank of Umm Al Qaiwain G+5 BANK HEADQUARTER BUILDING
Dubai Islamic Bank Properties DUBAI ISLAMIC BANK COMPOUND, 154 VILLA
Jumairah Beach Residence, Sector-3 JBR-3, (6) TOWERS 31 TO 44 STORY BLDGS
Hilton Fujairah REFURBISHMENT OF HOTEL SUITES, FUJAIRAH
Jafza Container Terminal JAFZA CONTAINER TERMINAL, G+2 OFFICES
Abu Hail Development Project (G+1) 4 VILLAS ABU HAIL DEVELOPMENT
For HH Al Shaikh Mohammed Bin Khalifa Bin Zayed B+G+45 STORY, COMM & RES TOWER, DUBAI
Jafza CHINAMEX AT JEFZA SOUTH, JABAL ALI
Federal National Council Dubai G+4 NEW HQ OF FEDERAL NATIONAL COUNCIL
Golden Sands-12 3B+G+7 STORY RES BUILDING AT MANKHOOL
Dubai American University G+1 EXTENSION TO AMERICAN UNIVERSITY
International American School EXTENSION TO DUBAI AMERICAN ACADEMY
Container Terminal Operation G+8 STORY, CONTAINER TERMINAL BUILDING
1998 – 2002 PROJECTS ENGINEER
Mousa Industrial Co., Abu Dhabi, UAE
 Ducting and piping erection, installing different kinds of air conditioning equipment, and testing and
commissioning
 Fire fighting, chiller commissioning, preparing progress reports, and daily follow-up with consultants, suppliers
& contractors
1997 – 1998 AIR CONDITIONING ENGINEER
Engineering Consultancy Bureau, Baghdad, Iraq
 Designing ducts and chilled water pipes, external static pressure and heat load calculations using carrier E-20
(Block load)
Key skills
 Heating & Ventilation  Heat Load Calculations
 Air Conditioning Work  Smoke Management
 Following Up & Liaising  Plumbing Design
 Strong Communicator  NOCs & Approvals
 Preparing Reports  Interpreting Schematics
 Compliance Knowledge  Reviewing & Approval
 Capable Troubleshooter  CHW Pressurization
 Steam, Fuel & LPG  Ducting and Piping
 Water Supply Services  Chilled Pipe Design
Education and qualifications
BSc: Mechanical Engineering, Al Nahrain University, Baghdad, Iraq - 1997
Personal details
Languages: Fluent English and Arabic
Other: Driver; full clean UAE licence
Professional Memberships
Page 4
Include: Iraqi Engineering Union, UAE Engineering Society, and member of ASHRAE

Omar Kalamchi-CV-Rev2

  • 1.
    Page 1 Omar Kalamchi address:Dubai, Dubai 92019, United Arab Emirates telephone (home): 00971 4 283 87 09 mobile: 00971 56 606 11 03 email: omar.kalamchi@yahoo.com nationality: British date of birth: 26/04/1975 place of birth: Bedford, United Kingdom marital status: Married Professional profile A confident and experienced Mechanical Engineer with extensive project work throughout the United Arab Emirates. Well versed in design, installation & supervision for heating, ventilation and air conditioning – as well as water supply, Drainage and fire fighting including all kind of calculation – is well suited to work with a wide scope of responsibility in both mechanical & electrical services for different types of building projects. Has executed projects with the Federal National Council, as well as schools, universities, hotels, banks, hospitals, clinics and executive towers. Competent with reporting, reviewing and supervising, stands ready to bring immense value to either a challenging commercial or residential engineering project- have well knowledge in all local authorities requirement & regulations – have well knowledge in different international standards such as ASHRAE, NFPA, Plumbing British standards, SMACNA and others – also experiences in some other special trades & systems such us elevators, sanitary fixtures & BMS. Objective To apply my vast skill set for the good of a project, and help it all come together. To calculate, design, and draw the component parts of a great project, and bind them together with expertise. To work hard, learn a lot, and achieve great results. Career summary Jul 2013 – Dec 2015 MEP PROJECT MANAGER (OMIS Contracting) (Beside being the MEP Executive Manager) Al Ossaimi Hotel & Resort, Palm Jumeirah  Following up day-to-day MEP activities & coordinating between client, consultant, main contractor, and all sub-contractors. 2010 – Present MEP EXECUTIVE MANAGER OMIS CONTRACTING  Following up project testing, commissioning, handovers, OMIS AC under-construction projects, and liaising with clients  Designing and coordinating with other MEP services, and with architectural & structure, and reviewing contracts  Preparing full design for HVAC systems with equipment selection for in-house projects, as well as quantity estimation  Pricing for tendering, as well as following up day-to-day affairs in terms of all contracts, clients, customers and projects  Executing in-house & outside project (residential, commercial, clinic & shopping mall) 2007 – 2010 SENIOR MECHANICAL ENGINEER & MEP COORDINATOR Ramboll Whitby & Bird Engineers  Leading the MEP design team, designing mechanical services including fuel, steam, LPG, HVAC, and water supply for Al Ghurair Shopping mall complex extension including as well hotel building, hotel services, residential building & offices building.  Supervising the site on a part time basis, including reviewing technical submissions, and sending them for
  • 2.
    Page 2 approval forAl Ghurair Shopping mall complex extension Key Achievements  Provided a study report for replacing the 31 year old chillers in Al Ghurair mall – followed up with suppliers & contractors & supervise the works executed  Worked as a mechanical lead for Abu Dhabi Shining Towers – reviewed and approved drawings, inspections & reports  Coordinate with structural engineers, architects, and specialists – followed up day-to-day issues with client & contractors 2006 – 2007 MEP DESIGN MANAGER & MEP COORDINATOR Meecon – Middle East Engineering Consultancy  Completing HVAC design, including heat load calculators, ducting, CHW piping, ESP calculations & CHW pressurization  Designing heat exchangers using district cooling chilled water & smoke management (stairwell pressurization & smoke relief)  Designing plumbing in accordance with UPC, DM & DEWA Water Division, as well as fire alarm design & coordination  Designing Telecoms (Etisalat & Du compliant), as well as preparing & reviewing specifications & schedules of project work rate  Obtaining all NOCs and local authority approvals concerning MEP works & building permits – maintaining high regulatory knowledge  Low voltage power distribution in accordance with British Standards and local authority regulations (DEWA compliant) Projects Executed Jumairah Lake Tower 3B+P+G+1MECH+34 OFFICES, JLT, DUBAI Lafi Real State 2B+G+2P+16H.C Res, INTERNATIONAL CITY Dunes Silicon Oasis Res. Building B+G+8 STORY RES. BUILDING, SILICON OASIS Mr. Mohammed Aii Alshafar Hotel Apartments 3B+G+17 STORY BUILDING, ALBARSHA Apricot Silicon Oasis Offices Building 2B+G+2P+14 STORY, SILICON OASIS Dubai Autism Center G+4 CLASSROOMS & CLINICS BUILDING, DUBAI IMPZ Hotel 2B+G+18 STORY HOTEL BUILDING, TECOM, DUBAI 2005 - 2006 SENIOR MECHANICAL ENGINEER Meecon – Middle East Engineering Consultancy  Completing HVAC designs and smoke management for different types of villas; small & high rise residential buildings  Preparing and obtaining Dubai Municipality approval for all projects, including complete design for district cooling systems  Designing & drawing drainage, fire fighting & domestic water supply, including calculations (as per DM, DEWA & DC regulations) Projects Executed DM Annex Building 2B+G+2 DUBAI MUNICIPALITY HEADQUARTERS Jumairah Lake Tower 2B+P+G+34 RES BUILDING, (JLT), DUBAI Algoze Land 49 RES BUILDINGS G+4 & 5, ALGOZE, DUBAI International City 3 RES BUILDINGS G+4, INTERNATIONAL CITY Gulf Properties Tecom Tower 3B+G+7P+37 STORY OFFICE BUILDING, DUBAI GMP Tower 3B+G+10P+40 STORY, OFFICES BUILDING, DUBAI Mr. Ali Abdullah Alshafar Tower B+G+7P+17 STORY OFFICES BUILDING, TECOM Business Bay Executive Towers 5/11 TOWERS 29 TO 48 STOREY, B+G+M PODIUM 2002 - 2005 SENIOR MECHANICAL ENGINEER ARENCO – Architectural & Engineering Consultant  Completing HVAC design, including head load & ESP calculations, ducting, piping, CHW Pressurization and
  • 3.
    Page 3 CHW pumps Supervising, reviewing and approving complete HVAC design and drawings done by branches in Manila, Sharjah & Abu Dhabi Selected Projects: (PTO) Selected Projects: (Carried Over) Dubai Police General Headquarters B+G+5 POLICE GENERAL HQ, AL-TWAR FIRST Dubai Internet City LUXURY VILLAS COMPOUND, 40VILLA + CLUB National Bank of Umm Al Qaiwain G+5 BANK HEADQUARTER BUILDING Dubai Islamic Bank Properties DUBAI ISLAMIC BANK COMPOUND, 154 VILLA Jumairah Beach Residence, Sector-3 JBR-3, (6) TOWERS 31 TO 44 STORY BLDGS Hilton Fujairah REFURBISHMENT OF HOTEL SUITES, FUJAIRAH Jafza Container Terminal JAFZA CONTAINER TERMINAL, G+2 OFFICES Abu Hail Development Project (G+1) 4 VILLAS ABU HAIL DEVELOPMENT For HH Al Shaikh Mohammed Bin Khalifa Bin Zayed B+G+45 STORY, COMM & RES TOWER, DUBAI Jafza CHINAMEX AT JEFZA SOUTH, JABAL ALI Federal National Council Dubai G+4 NEW HQ OF FEDERAL NATIONAL COUNCIL Golden Sands-12 3B+G+7 STORY RES BUILDING AT MANKHOOL Dubai American University G+1 EXTENSION TO AMERICAN UNIVERSITY International American School EXTENSION TO DUBAI AMERICAN ACADEMY Container Terminal Operation G+8 STORY, CONTAINER TERMINAL BUILDING 1998 – 2002 PROJECTS ENGINEER Mousa Industrial Co., Abu Dhabi, UAE  Ducting and piping erection, installing different kinds of air conditioning equipment, and testing and commissioning  Fire fighting, chiller commissioning, preparing progress reports, and daily follow-up with consultants, suppliers & contractors 1997 – 1998 AIR CONDITIONING ENGINEER Engineering Consultancy Bureau, Baghdad, Iraq  Designing ducts and chilled water pipes, external static pressure and heat load calculations using carrier E-20 (Block load) Key skills  Heating & Ventilation  Heat Load Calculations  Air Conditioning Work  Smoke Management  Following Up & Liaising  Plumbing Design  Strong Communicator  NOCs & Approvals  Preparing Reports  Interpreting Schematics  Compliance Knowledge  Reviewing & Approval  Capable Troubleshooter  CHW Pressurization  Steam, Fuel & LPG  Ducting and Piping  Water Supply Services  Chilled Pipe Design Education and qualifications BSc: Mechanical Engineering, Al Nahrain University, Baghdad, Iraq - 1997 Personal details Languages: Fluent English and Arabic Other: Driver; full clean UAE licence Professional Memberships
  • 4.
    Page 4 Include: IraqiEngineering Union, UAE Engineering Society, and member of ASHRAE