This document contains the resume of Mohamed Hassan Touhamy, who has over 11 years of experience in project management, electrical engineering, and construction management in the UAE. He currently works as a Project Manager for Arison Gulf in Abu Dhabi, where he is responsible for managing all aspects of projects including planning, design, budgeting, procurement, and handover. Prior to this, he held roles as an Electrical Resident Engineer and Site Engineer for other companies, where he managed electrical infrastructure projects and ensured compliance, safety, and quality standards.
A results-oriented professional with over 21 years of diversified experience in areas including:
Document Administrator-Engineering & Vendor / CAD Coordinator-CAD & PDS / Commercial Analyst
Experience in managing a large team of engineers & coordination with project managers on all running projects. Supervise and manage all shop drawings of company projects & Co-ordination, monitoring and controlling all RFQ/ TQ and Vendor data review activities.
Knowledge of document control processes and systems on Major Capital Projects.
Responsible for Engineering/Vendor Documentation, Review & Approval of all NMR Documentation by coordinating with Engineering, Procurement & Vendors, Knowledge of document control processes and systems on Major Capital Projects; preparation of PRB (Project Record Books) as well as experience of CAD for preparation of IFC – Construction, RED lines, Temporary Site Facilities, 3D & As-Built Drawings for EPC Projects.
SUMMARY OF QUALIFICATIONS
Rolando has over 28 years of professional experience in the field of construction which currently employed as an Architect in KEO International Consultants., He has almost nine (9) years experienced in Multinational Design and Consulting Companies and have worked as Interior designer in U.A.E. and was a Proprietor/General Manager of construction company in the Philippines for almost fifteen (15) years. Having an extensive experience at all types of finishes, external cladding works, landscaping, fabrications, water proofing, Dry wall Partition, Interior Design/fit outs and other related finishing etc. He has initiative to learn, flexible, directed, hardworking and congenial. Ability to work under pressure and within minimum supervision. Possess good work relationship, possess strong leadership skills. Knowledgeable in AUTOCAD, Microsoft excel/word.
A results-oriented professional with over 21 years of diversified experience in areas including:
Document Administrator-Engineering & Vendor / CAD Coordinator-CAD & PDS / Commercial Analyst
Experience in managing a large team of engineers & coordination with project managers on all running projects. Supervise and manage all shop drawings of company projects & Co-ordination, monitoring and controlling all RFQ/ TQ and Vendor data review activities.
Knowledge of document control processes and systems on Major Capital Projects.
Responsible for Engineering/Vendor Documentation, Review & Approval of all NMR Documentation by coordinating with Engineering, Procurement & Vendors, Knowledge of document control processes and systems on Major Capital Projects; preparation of PRB (Project Record Books) as well as experience of CAD for preparation of IFC – Construction, RED lines, Temporary Site Facilities, 3D & As-Built Drawings for EPC Projects.
SUMMARY OF QUALIFICATIONS
Rolando has over 28 years of professional experience in the field of construction which currently employed as an Architect in KEO International Consultants., He has almost nine (9) years experienced in Multinational Design and Consulting Companies and have worked as Interior designer in U.A.E. and was a Proprietor/General Manager of construction company in the Philippines for almost fifteen (15) years. Having an extensive experience at all types of finishes, external cladding works, landscaping, fabrications, water proofing, Dry wall Partition, Interior Design/fit outs and other related finishing etc. He has initiative to learn, flexible, directed, hardworking and congenial. Ability to work under pressure and within minimum supervision. Possess good work relationship, possess strong leadership skills. Knowledgeable in AUTOCAD, Microsoft excel/word.
Planning and scheduling of works at site to meet the dead lines.
Supervising and monitoring the labor force through General foreman or Supervisor.
To attend the meeting with the consultant.
Ensuring the quality control and safety precautions at site.
Check the drawings and documents used at site for approval and compliance with project requirements.
Ensure that all works are carried out as per the approved method statements and drawings.
Ensuring the materials supplied are se per the specification & proper maintenance of materials.
Making document for daily activities at the site.
Reporting the progress of work to project manager.
Preparation of document for completion of work & As Built drawing to get it approved by the consultant.
Done quantity take-off for LVMDB’s, SMDB’s, Cables, ELV system, Fire Alarm system and Wiring Accessories etc.
Sent enquires to different supplier and reviewed their quotations for price comparison and compliances with specification and BOQ.
Monitoring quality control program, including site inspection for compliance with control document and approved submittal.
Ensure that all equipment used are calibrated and with valid certificates.
Preparation of testing & commissioning method statements with coordination with vendors, QA/QC engineers.
Ensure that electrical worked at site is done as per the approved drawing.
To Conduct inspection of all ongoing activities for electrical installation.
To conduct inspection of all Quality Control checking of Laying E.L.V, L.V, M.V and H.V respective testing of cables.
To conduct inspection of DB, SMDB, MDB & Transformers in Electrical rooms As per the regulation of ADDC requirements.
To prepare RFIA & ITR as per consultant remarks.
To conduct inspections for all electrical materials deliveries.
1. Mohamed Hassan Touhamy
Abu Dhabi, UAE
Mobile : +971 55 355 1344
E Mail : mohammed000t@yahoo.com
Project Management & Electrical Engineering Professional
Quantifiable experience in Project Management, Project Planning & Execution,
Design Review and Coordination and Construction Management
PROFESSIONAL SYNOPSIS CORE COMPETENCIES
Accomplished and result oriented professional with 11
years of experience with global organizations in the
electrical, ELV Systems, Telecom & Water domains
Qualified Electrical Engineer (Power)
Trained Project Management Professional
Demonstrated excellence in independently handling
Project Management activity and driving Operations
Presently associated as Project Manager with Arison
Gulf (L.L.C) in Abu Dhabi, UAE
Acknowledged project leader with excellent proficiency
in handling project management activities
Proven abilities in
o Handling entire project cycle from design,
bidding, negotiation, monitoring, execution &
delivery of projects
o Determining projects specifications by studying
product design, customer requirements, and
performance standards; completing technical
studies; preparing cost estimates
o Handling erection & commissioning activities
involving resource planning, team building and
co-ordination with internal / external
departments
o Designing, engineering and consulting in the
electrical domain
Versatile and multi-skilled with ability to manage
multiple responsibilities simultaneously, achieve defined
goals & objectives, an effective communicator with
strong analytical, problem solving & organizational skills
Experience in managing and driving diversified and multi
cultural work environments
Project Management Life Cycle (PMLC)
Program Coordination|Progress Monitoring
Project Planning, Scoping & Scheduling
Budgeting – Estimation & Cost Management
Design Review & Coordination
Construction Management
Erection|Installation|Testing|Commissioning
Operations & Maintenance
Procurement & Vendor Management
Proposal Preparation|Contract Administration
Sub Contractor Management
Asset Life Cycle Management
Risk/Gap Analysis|Process Enhancements
Quality Assurance & Standards|HSE Processes
Client Relationship Management
Change Management
Stakeholder Management
Cost & Resource Optimization
Client Relationship Management
Capability Building Initiatives
Liaisoning – Govt. Agencies, Consultants & Clients
Coaching & Mentoring
MANAGERIAL SKILLS
C level authority interface
Analytical & logical skills|Time driven delivery ability
Conflict management & resolution skills
Collaborative skills|Negotiation skills
Good communication & interpersonal skills
BUSINESS SKILLS
Handling project management & program coordination – Executing major electrical, power supply, ELV etc. projects
Expertise in budget planning including framing KPI Metrics and reporting
Strategic interfacing within engineering and financial aspect of the business
Identifying/documenting project roles, responsibilities, required skills and reporting relationships
Devising & implementing strategies and processes for ensuring operational efficiencies
Conceptualizing plans and scheduling activities and providing various inputs to business planning
Ensuring cost & resource Optimization to control activities in line with budget forecasting
Analysing cost benefit of projects: feasibility studies, requirements assessment, procurement, installation and
commissioning
Studying scope of work, engineering deliverables, technical specifications etc. for construction and commissioning
2. Planning day-to-day strategies, budgets, schedules etc. along with resource allocation for optimum output
Developing and
o Applying project specific engineering working standards and procedures for efficient and effective work practices
o Maintaining project reference planning and activity based cost model for the Operations and Engineering team
Overseeing technical/commercial bid evaluation of projects and project material - Asset & integrity Management
Supervising the installation & commissioning of equipment; reviewing technical specifications, cost estimates for erection &
commission as agreed in scope of supply; reviewing & analyzing contractor's change order proposals and submittals
Conducting root cause, gap analysis and variance analysis; Identifying area of improvements
Proposal preparation and contracts management; Reviewing contractor's submittals and change order proposals
Procurement of project material, coordinating process for timely procurement at cost-effective prices
Managing on-site construction activities effectively to ensure completion of projects
Project completion and handover
CAREER SUMMARY
Arison Gulf (L.L.C), Abu Dhabi, UAE|Project Manager Jan’15 till date
CODE Contracting Company (L.L.C), Abu Dhabi, UAE Apr’08 – Dec’14
Electrical Resident Engineer Apr’10 – Dec’14
Electrical Site Engineer Apr’08 – Apr’10
AL ABOOR for Development and Contracting Co., Abu Dhabi, UAE Feb’06 – Apr’08
Site Engineer Aug’06 – Aug’08
Design Engineer Feb’06 – Aug’06
AL FOAAD Electrical Services, Egypt|Electrical Engineer Aug’05 – Feb’06
Oriental Weaver, Egypt|Electrical Engineer Aug’04 – Aug’05
PROFESSIONAL RESPONSIBILITIES
Arison Gulf (L.L.C), Abu Dhabi, UAE|Project Manager Jan’15 till date
Key Accountabilities
Mainline responsibility for projects objectives by reviewing projects proposals and plans; Conferring with management
Be responsible for determining projects
o By identifying project phases and elements; Assigning personnel to phases & elements
o Specifications by studying product design, customer requirements, and performance standards
o Schedules by studying projects plans/specifications, calculating time requirements & sequencing projects elements
Responsible for
o Conducting technical studies; preparing cost estimates and reviewing bids from contractors
o Verifying/tracking product performance by designing and conducting tests
o Maintaining projects schedules by monitoring projects progress, coordinating activities and resolving problems
o Controlling projects plans by reviewing design, specifications, plan and scheduling changes
o Controlling projects costs by approving expenditures and administering contracts
o Maintaining projects data base by writing computer programs; Entering and picking up data
o Ensuring safe and clean working environment by enforcing appropriate HSE procedures, rules and regulations
Generate projects status reports by collecting, analyzing, and summarizing information and trends for review
ACADEMIC CREDENTIALS / CERTIFICATIONS
Bachelor of Electrical Engineering (Power) Honors, El Shorouk Academy, Cairo, Egypt, 2004
Competency Certificate from ADDC (Abu Dhabi Distribution Company), Abu Dhabi, UAE
PERSONAL PROFILE
Date of Birth : 30
th
September 1982
Marital Status : Married
Linguistic Abilities : English & Arabic
Passport Details : Egyptian Passport
Driving License : Valid UAE driving license
Location Preferences : UAE Projects details/responsibilities in Annexure
3. ANNEXURE
PROJECTS HANDLED
CODE Contracting Company (L.L.C), Abu Dhabi, UAE Apr’08 – Dec’14
Electrical Resident Engineer Apr’10 – Dec’14
Projects handled
22 & 11 KV Cable Test & Termination inside 132/22 KV Substation
22 KV Infrastructure, AL RAHA Beach Development
11 KV Infrastructures, BANI YASS (Role : Project Manager)
Key Responsibilities
Responsible for project management of the Power and HV Public Realm Substations
Be responsible for
o Complying with the weekly and daily programmed issued by Project Manager
o Obtaining approvals (NOC) from Consultants, Government statutory bodies, dealing with Consultants and Clients
o Entire 22kV Electric Power Reticulation to plots of Independent Developers like ADCB/ADNIC as per the latest
Master Plan
o Obtaining Permits from Consultants and Government Statutory bodies ADDC / TRANSCO / ADSSC / Civil Defense)
for the self-sufficient township (Ultimate Water Front City) having many buildings, Bridges, Light Rail Transport,
Water fountains (Wet Design, USA), District Cooling Plant, Energy Transfer Stations, Road Furniture’s etc.
o Managing approvals (NOC) from Govt. utility depts.. including temporary/ permanent power supply, telecom &
water installations
o Obtaining approvals (NOC) from Consultants
Electrical Site Engineer Apr’09 – Apr’10
Projects handled
Cooling Plant T–07, Swehan, Abu Dhabi
Cooling Plant T–08, Swehan, Abu Dhabi
Key Responsibilities
Comply with weekly and daily programmed issued by Consultant & Client.
Execute all verbal and / or written instruction issued by Consultant & Client
Supervise & check every activity within project/contract scope
Address/resolve all problems encountered in coordination with the Consultant
Ensure only approved drawings, method statements & materials are being implemented
Control and supervise directly the general foremen and subcontractors within the area
Allocate manpower and assign tasks; Material and labor management
Electrical Site Engineer Apr’08 – Apr’09
Projects handled
Switching Substation in Sea Palace
Key Responsibilities
Responsible for site operations (civil, electrical & mechanical)
Obtain permits from Consultants and Government Statutory bodies Viz. ADDC / TRANSCO / ADSSC / Civil Defense
Obtain approvals (NOC) from Consultants and Govt. Statutory Agencies; Deal with Consultants and Clients
Ensure all activity is done under supervision as per project plan and drawings; Material and labor management
AL ABOOR for Development and Contracting Co., Abu Dhabi, UAE Feb’06 – Apr’08
Site Engineer Aug’06 – Aug’08
Project : AD Higher College of Technology; 13 different area and floors
Project Scope : Installation of 3 nos transformers, 3 nos M.B.D, 35 nos of SMDB, 315 nos of FDB, Generator Room, Access
Control System, Sound System, CCTV System, Fire Alarm System, Data & Telephone
4. Key Responsibilities
Comply with weekly and daily program issued by Consultant
Execute all verbal and / or written instruction issued by Consultant
Supervise & check every activity within his scope
Address/resolve all problems encountered to Consultant and assist him to resolve
Allocate manpower and assign tasks on a daily basis
Ensure only approved drawings, method statements & materials are implemented
Ensure no activity is being carried out without supervision
Control and supervise directly the general foremen and subcontractors within his area
Material and labor management
Design Engineer Feb’06 – Aug’06
Projects handled
40 Villas in Abu-Dhabi City
Medical Center for Military Camp
AD Higher College of Technology
AL FOAAD Electrical Services, Egypt|Electrical Engineer Aug’05 – Feb’06
Key Highlights
Compressors maintenance
Fixing and operating of its control panels
Making & Installing STAR/DELTA panels
Oriental Weaver, Egypt|Electrical Engineer Aug’04 – Aug’05
Key Highlights
Responsible for functioning as Project Director
Installation of 2000A and bus bar riser, 1500 KVA transformer, 1500 KVA diesel generator, MDBS, MCCS and
sub‐distribution boards and 22/11 KV electrical system and all related sub systems
Construction of electrical works (power, light, telephone)
Construction of low current system including
o SMATV system – I.F. distribution
o Video intercom system
o Pole barrier system
o Fire alarm system
Coordination with consultants and other depts.. (Civil, Plumbing & HVAC)