DESIGN DOCUMENT
CO PROFITABILTY ANALYSIS
AUTHOR/APPROVER
Date Document
Version
Document Revision Description Role (Author/Approver) Author/Approver Name
TABLE OF CONTENTS
1.OVERVIEW............................................................................................................................................1
2.ASSUMPTIONS.....................................................................................................................................2
3. KEY DECISIONS...................................................................................................................................2
4.DESIGN DETAILS..................................................................................................................................3
4.1MASTER DATA.......................................................................................................................................4
4.2.PLANNING...........................................................................................................................................10
4.3.ACTUAL DATA.....................................................................................................................................11
4.4.ASSESSMENTS....................................................................................................................................14
4.5.PROCESS DESCRIPTION......................................................................................................................14
4.6.VALUATION.........................................................................................................................................14
4.7.INFORMATION SYSTEMS......................................................................................................................16
4.8.RECONCILIATIONS...............................................................................................................................18
.
1. OVERVIEW
<The purpose of this document is to provide information in support of creating design documents. Each client
project team should enhance and modify this document according to specific business design requirements. This
overview section should include the purpose, scope, target audience, responsibilities etc.>
SAP’s CO-PA (Profitability Analysis Module) will support the need to analyze profitability by market segment.
These segments are defined using characteristics. Some are predefined by SAP (i.e., Company Code, Profit Center,
Material Number), others are manually defined (i.e., Product Hierarchy, Customer Hierarchy). For the transfer of
the actual and plan data from other modules (sales, production, etc.), standard SAP can be used.
The following illustration gives an overview of profitability analysis.
Reporting Dimensions
Customer
Region
Sales Office
Area
Answers
Revenue
Cost
Loss
Profit
Profit analysis
Market segments
Sales
Quantity
Sales revenue
Customer discount
Sales commission
Direct sales costs
Net revenue
Direct material costs
Variableproduction costs
Contribution marginI
Materialoverhead costs
Fixed production costs
Contribution marginII
Variances
Contribution marginIII
Overhead costs
Operating profit
Product
Basic concept of CO-PA:
2. ASSUMPTIONS
<This document is intended for the purpose of communicating and recording system design and configuration
decisions. As a result, it should not be considered as an educational tool to be referenced in place of formal SAP
R/3 training. If further clarification is required on specific SAP terminology, refer to the on-line system
documentation.>
• The module CO-PA is used to collect and deliver data for the Business Warehouse (BW).
• Main focus is the financial reporting (Hyperion report….)
• The other modules (sales, production, general ledger, etc.) provide the data, which is required for the
reports.
3. KEY DECISIONS
<Initial key decisions may be listed to assist the creator of this document in making decisions on how the system
and/or processes will support the design document. The following key decisions will most likely be removed and/or
replaced with client specific key decision information made in support of the this document. >
• Costing based vs. Account based CO-PA. The most major decision to be made in a CO-PA
implementation is the selection of costing based versus account based CO-PA implementation
methods. Account based CO-PA uses actual Cost elements as performance measures. In that sense it
can be thought of as a special ledger with a flexible selection of fields and characteristics to report on.
The disadvantage of costing based CO-PA is its inflexibility in terms of creating user defined
performance measures. The advantage of it is the ease of reconciliation with FI and PCA. Costing
based CO-PA uses flexible, user defined “value fields” as performance measures . These value fields
can be a one to one or many to one match with cost elements. They can also be declared to match a
pricing condition in SD, which indirectly represents a group of accounts in accounting. Users can also
create value fields that do not correspond to any real accounts or cost elements , and are used for
internal analysis and reporting purposes only. Value fields can even be more detailed than accounts, in
CUST.
G
RP.
Sales region North
Product Prod1
Product group Compressor
customer Cust1
Cust. grp Public
sector
Country UK
Sales rep. Miller
CharacteristicsCharacteristics
Revenues 800
Sales, discounts
and returns 100
COGS 650
Value fields RevenuesRevenues
Sales, discountsSales, discounts
and returnsand returns
COGSCOGS
Profitability
segment
ValuesValues
REGION
SNW
PRODUCT GRP
Compr.Chiller
a one to many correspondence scenario (For example splitting of fixed and variable parts of costs in the
same account into different value fields). In short, Costing based CO-PA gives much more flexibility to
the user than account based. The downside is the difficulty of reconciliation with accounting reports,
and the fact that the chart of accounts level of detail can typically not be replicated in a value field
structure (SAP limits the number of value fields used)
It is also possible to use both account and costing based methods in parallel.
• The content of the Operating Concern. The Operating concern defines the set of characteristics and (in
costing based CO-PA) value fields that are used for market segmentation and reporting.
• A contribution margin scheme to be used in the profitability analysis. This will define the income statement
structure to be used in profitability reporting. Users can create alternative schemes for analysis purposes
• Whether actual sales and sales deductions will be shown for CO-PA reporting. SAP has the ability to show
estimated or actual deductions. This is done through the standard CO-PA functionality to post incoming
orders as well as billing documents to CO-PA to estimate the future sales landscape.
• (mentioned in the first bullet.).(This is mentioned in the second bullet)
• (Mentioned in the second bullet)Standard cost (S-Price) from the product costing module will be the
valuation for delivery out of stock activity.
• One operating concern used in the global set up for CO-PA. This is the highest reporting level within CO-
PA.
• Whether standard warranty, discount or commission provisions or other accruals will be built as a factor of
revenue or other measures and actual charges will be posted against these accruals. In short, the
management of accruals on the balance sheet may be handled (estimated) in CO-PA.
• The source of data feeding each line of the contribution margin scheme within SAP.
4. DESIGN DETAILS
<The design document records the decisions and reasoning behind configuration and should show how the system
will be configured. It contains some high-level configuration values if known. In the following section, explain
what is being configured and why. List configuration values (if known) by using bullet points, tables and/or body
text.
This document is not intended to list business processes or process diagrams. For these documents, see additional
documents available (with the document type of Detail Process Description). You do not have to show all configuration
values in the Design Document, that is the purpose of the Configuration Guide (another document type), which may also
contain configuration instructions if required by the client. >
R/3 Costing based Profitability Analysis is based on a customer-designed structure of so-called value fields, in
which users can separate costs according to fixed and variable components of general overhead, sales,
administration, customer service, marketing and so on.
From SD to CO-PA:
Users can define profitability segments needed to analyze for their business. The profitability segments are user
defined combinations of characteristics, such as product groups, sales areas, orders and so on.
The system automatically assigns revenues, cost and sales deductions to individual profitability segments when the
business transactions (sales orders, invoices) are processed in the system. R/3 ensures that the reports generated
contain all the relevant business transactions , and that management information is consistent and complete. This is
accomplished thorough the assignment of sales condition types to value fields in CO-PA configuration
Users can allocate costs to profitability segments manually, for example – to assess specific overhead costs.
Users can also define key figures and performance measures, such as contribution margin, and have these
calculated automatically by the system. The report layouts can be defined quickly and easily, and offer a maximum
of flexibility. The information is displayed in spreadsheet form, and can be reformatted at any time.
Profitability analysis is also an important tool for planning and forecasting. Users can plan their sales and cost data
by accounting period or by week. They can also use formulas to link between revenues with sales quantities, and
forecast data using seasonal or probabilistic models. Planning in profitability analysis is also integrated with Sales
and Operational Planning. Users can release budgets and transfer data to Production Planning with just a few
mouse clicks.
4.1 Master Data
4.1.1 Characteristics
Characteristics represent the levels at which it is possible to create and analyze actual and plan data. There are
two types of characteristics:
• Standard characteristics, which are automatically predefined in SAP. These include the product number,
company code, customer number, and country.
• User-defined characteristics, which can be created to provide additional client specific information.
To derive values for these characteristics, it is necessary to create derivation rules or table lookup rules unless they
are readily available in the sender application (For example, in SD data flow to CO-PA, fields on the billing
document, such as sales org, sales group, customer, etc. are readily available to the CO-PA line item if such fields
are selected as CO-PA characteristics in the operating concern).
Characteristic derivation makes it possible for the system to automatically derive unknown characteristic values
(especially for user-defined characteristics) if these are dependent on characteristics whose values are known.
The following characteristics are typical examples of required fields for reporting and/or planning:
Area Characteristics
Product View • Product number
• Product hierarchy (all available levels) – Franchise,
Brand, Product Category, Product Group
• Plant
• Material type
Customer View • Customer number
• Account group (3rd
party, Inter company, Intra group)
• Commission sale
Market/Country View • Customer group 1 (Market code)
• Profit center
• Country
• Region
Other • Posting period
• Legal entity/company code
• Order type
• Record type
• Item Category
• Cost center
• Use (sales order)
Most characteristics already exist in other R/3 applications and it is possible to pick them up from SAP tables.
Derivation rules / table lookups have to be defined.
4.1.2. Characteristic Values
For the characteristic values, companies may choose to use the existing master data tables in SAP.
Fixed characteristics:
• Company code
• Profit center
• Material number
• Customer (Possible party roles: sold-to party, shipped-to-party, and payer)
• Country
• Region
• District (State or County)
• Sales office
• Branch
• Distribution channel (Equipment, Service, Contracting, Parts, Marine)
• Division (YRG, UPG, ESG, Inter company)
• (Sales person) – open action item
Company Specific Characteristics:
• Product hierarchy
• Customer hierarchy/group
• Vendor source (plant)
The following table gives an example of user-defined characteristics:
Characteristic Description
WW001 SKU
WW002 International Product
WW003 Segment
WW004 Indication
WW005 Minor Product Group (Brand)
WW006 Therapeutic Group
WW007 Therapeutic
Class
WW008 Major
Product Group
WW009 Sub-Franchise
WW010 Franchise
WW011 World Wide
Franchise
WW012 Region Sales
WW013 Customer
WW014 NTC
WW015 IND Customer
4.1.3. Derivation Rules
The following are examples of derivation rules:
• Automatically from the system: profit center (from material master, plant view) and company code (from
the accounting transaction).
• From the sales order: material number, customer, country, region, district, sales office, distribution channel,
division and sales person.
• From material master data: product hierarchy.
• From customer master data: customer hierarchy.
• Derivation rule from sales offices: Branch.
• Vendor source will be derived from material master data, plant or vendor number.
4.1.4. Value Fields
(This statement is misleading) For each row of the contribution margin scheme there has to be at least one value
field. Values fields are the fields that contain the currency amounts and quantities in CO-PA. There are two types
of value fields:
• Value fields that contain amounts in currencies (amount fields).
• Value fields that contain quantities (quantity fields).
Value fields that are used frequently are predefined in the standard R/3 System. These include fields for revenue,
sales quantity, freight, and others.
In the following areas, value fields will be necessary to display performance figures for profitability segments:
Area Value Fields
Sales quantity Sales Quantity
Equivalent Units (Sales Quantity X Unit Per Vial)
Gross sales Revenue fields
Discount, rebate, freight, commission,
packaging,
Transport insurance
Fields assigned to SD-conditions, SD-Interface
Fields for calculated values in CO-PA
COGS manufactured products Cost component fields
COGS merchandise Cost of goods field
COSS Cost of services sold
Other corporate COGS Global Manufacturing Standard (Full Standard Cost)
Global Manufacturing Standard less Markup
Manufacturing Conversion Standard Cost
Settlement orders
Sales orders
(Make to order manufacturing)
Revenue fields, cost fields
Direct postings from FI Fields for direct posted primary costs
Manual postings Liability fields for rebate, rebate in kind, allowance, commission
CO-PA will not perform any inter company and intra group profit elimination. (I think it is misleading.) The
following table gives some examples of the source of value fields.
Source Description Value Fields
SD Billing Document (Sales and Service
Order)
Quantity
Sales Revenues
Sales Deductions
Costs of Goods Sold
CO-PC Cost Estimate (Standard Price) Variable Cost of Goods Mfd
Fixed Cost of Goods Mfd
FI General Ledger Posting Bonuses
Freight Costs
Source Description Value Fields
CO-OM Cost Center
Internal Order
Sales and Administration Costs
Marketing Costs
Variances
PS WBS Element
Network Operation
Contracting, project revenue , project
costs
CO-PA Additional Costs Costed Discounts
Costed Bonuses
The following table gives an example of user-defined value fields:
Value Field Description Type
VV001 Gross Sales Value
VV002 Spillover (OBI Only) ???? Value
VV003 Rebates Value
VV004 Non-government Chargebacks Value
VV005 Cash Discounts Value
VV006 Other NTS Value
VV007 Medicaid Value
VV008 Government Chargebacks Value
VV009 Other Revenue Value
VV010 Intco Sales Value
VV011 Standard Cost Value
VV012 Manufacturing Variances Value
VV013 Inventory Adjustments Value
VV015 Royalty Expense Value
VV016 Interco COGS Value
VV017 Carrying Cost Value
VV018 Freight Value
VV019 Total Comp Salary Value
VV020 Direct Benefits Salary Value
VV021 Indirect Benefits Salary Value
VV022 Total Comp Wage Value
VV023 Direct Benefits Wage Value
VV024 Indirect Benefits Wage Value
VV025 Travel Exp General Value
VV026 Business Meals Value
VV027 Entertainment Value
VV028 External Training Courses Value
Value Field Description Type
VV029 Internal Training Courses Value
VV031 Automobile Expense Value
VV032 Petty Cash Expenditure Value
VV033 Employee Moving Value
VV034 Recruiting Costs Value
VV035 Other Exp Related To Emp Act Value
VV036 Departmental Supplies Value
VV037 Work Order Supplies Value
VV038 Prod Development Supplies Value
VV039 Equip Prch Non IM Value
VV040 Equip Prch IM Value
VV041 Mechanical Stock Supplies Value
VV042 Equip Rental Non IM Value
VV043 Equip Rental IM Process Value
VV044 Space Rental Value
VV045 Telephone,Telex & Telegraph Value
VV046 Utilities Value
VV047 Building & Grounds R&M Value
VV048 Equip&Parts Non IM R&M Value
VV049 Equip&Parts IM R&M Value
VV050 Waste Removal Value
VV051 Moving & Alteration Value
VV052 Project Maintenance Value
VV053 Bank & Credit Card Fees Value
VV054 Misc Postage Value
VV055 Misc Insurance Value
VV056 Oth Prch Goods & Services Value
VV057 External Legal Services Value
VV058 External Audit Fees EB Value
VV059 Selling Expense Value
VV060 R&D Value
VV061 Marketing Management Value
VV062 Marketing Expense Value
VV063 Other Income EB Value
VV064 Other Expenses EB Value
VV065 CurrGain/LossTransact Value
Value Field Description Type
VV066 CarryCostRec&InvBTOffset Value
VV067 Allocated Corp Exp BT Value
VV068 Profit Sharing for JV BT Value
VV069 Interest Income BT EB Value
VV070 Interest Expense BT EB Value
VV071 Top-down Distribution Qty
VV072 Units Qty
VV073 Taxes Value
4.2. Planning
CO-PA allows planning at detailed levels such as product and customer. The planning will consist of sales
quantities, revenues, cost of goods and profit margin. The system will be used to transfer planned sales quantities
from Sales and Operations Planning (S&OP) to CO-PA.
The following are examples of business requirements:
• Revenue and Cost is planned at the SKU level by month for each combination of:
o Legal Entity Source (legal entity that ships the product and receives the legal revenue).
o Market/Franchise (Market/Franchise that receives management revenue).
• The global requirement for planning is to plan values for:
1. Sales Quantity (Units) Input
2. Equivalent Units Input
3. Conversion Factor Calculated (1 / 2)
4. Revenue Input or Calculated (Price * Quantity)
5. Average Selling Price Input
6. Local Standard Cost (Future Price) Derived from Material Master
• The following additional value fields will be planned based on local requirements:
o Freight / Insurance
o Packaging for shipment
o Royalties
The following diagram depicts the process transfer from plan data into CO-PA:
Copy, revalue and use top down distributions as planning aids. The copy function can be used for data transfer to
CO-PA. Revaluation and top down distribution functions use predefined percentages and factors to re-state a plan.
4.3. Actual Data
The following tables provide examples of value flows.
This next table is too obviously a copy and paste from an equipment manufacturer (I bet it was synopsis) I am not
going to touch it now, let me know if you want me to come up with something more generic all together.
COCO--
PAPA
COCO--
PAPA
QuantityQuantity ++ AverageAverage priceprice ((oneone
internalinternal,, oneone externalexternal custcust .) on.) on
productproduct groupgroup andand LELE--levellevel oror
manuallymanually-->> RevenueRevenue ..
SS--PricePrice oror averageaverage percentagepercentage ofof
GM onGM on productproduct groupgroup andand LELE--levellevel
= COGS
COCO--
OPAOPA
COCO--
CCACCA
PSPS
SOPSOP
SettlementSettlement
AssessmentAssessment
TransferTransfer
SettlementSettlement
CostCost Center PlanCenter Plan
(OH)(OH)
InternalInternal OrderOrder
(OH)(OH)
Planned
Planned
Quantity
Quantity
Project planProject plan
CSCS
SettlementSettlement
ContractContract plan/plan/
service planservice plan
RevenueRevenue andand costscosts
RevenueRevenue andand costscosts
ManualManual PlanningPlanning ::
if necessaryif necessary
CostsCosts
CostsCosts
To get this information from other modules to CO-PA we use the following methods:
1. Settlement of make-to-order sales orders, service orders/contracts and projects (Work break down structure
= WBS):
Margin at STD
Total Cost of Sales - STD
Delivery out of stock: S-Price or V-Price
Make-to-order sales orders: Settlement of the sales order result analysis cost element for the all costs
Contracting: Settlement of the WBS, results analysis cost element for all costs
Service/Repair: Settlement of the service order or contract, primary or results analysis cost element for all costs
Parts: S-Price or V-PriceCost Intercompany
Delivery out of stock: S-Price or V-Price
Make-to-order sales orders: Settlement of the sales order result analysis cost element for the all costs
Contracting: Settlement of the WBS, results analysis cost element for all costs
Service/Repair: Settlement of the service order or contract, primary or results analysis cost element for all costs
Parts: S-Price or V-Price
Direct posting for adjustments
Std cost of Outside Sales (incl.
deduction + sales costs like freight,
packaging)
Total Sales
Delivery out of stock: Condition from the sales order
Make-to-order sales orders: Settlement of the sales order result analysis cost element for the revenues XXXX
Contracting: Settlement of the WBS, results analysis cost element for the revenues XXXX
Service/Repair: Settlement of the service order or contract, primary or results analysis cost element for the revenues
Parts: Condition from the sales orderSales - Intercompany
Direct Posting for revenue adjustmentsTotal Sales - Outside
Service/Repair: Settlement of the service order or contract, primary or results analysis cost element for the revenues
Parts: Condition from the sales orderSales – Service / Parts
Delivery out of stock: Condition from the sales order
Make-to-order sales orders: Settlement of the sales order result analysis cost element for the revenues XXXX
Contracting: Settlement of the WBS, results analysis cost element for the revenues XXXXSales - Equipment
Margin at STD
Total Cost of Sales - STD
Delivery out of stock: S-Price or V-Price
Make-to-order sales orders: Settlement of the sales order result analysis cost element for the all costs
Contracting: Settlement of the WBS, results analysis cost element for all costs
Service/Repair: Settlement of the service order or contract, primary or results analysis cost element for all costs
Parts: S-Price or V-PriceCost Intercompany
Delivery out of stock: S-Price or V-Price
Make-to-order sales orders: Settlement of the sales order result analysis cost element for the all costs
Contracting: Settlement of the WBS, results analysis cost element for all costs
Service/Repair: Settlement of the service order or contract, primary or results analysis cost element for all costs
Parts: S-Price or V-Price
Direct posting for adjustments
Std cost of Outside Sales (incl.
deduction + sales costs like freight,
packaging)
Total Sales
Delivery out of stock: Condition from the sales order
Make-to-order sales orders: Settlement of the sales order result analysis cost element for the revenues XXXX
Contracting: Settlement of the WBS, results analysis cost element for the revenues XXXX
Service/Repair: Settlement of the service order or contract, primary or results analysis cost element for the revenues
Parts: Condition from the sales orderSales - Intercompany
Direct Posting for revenue adjustmentsTotal Sales - Outside
Service/Repair: Settlement of the service order or contract, primary or results analysis cost element for the revenues
Parts: Condition from the sales orderSales – Service / Parts
Delivery out of stock: Condition from the sales order
Make-to-order sales orders: Settlement of the sales order result analysis cost element for the revenues XXXX
Contracting: Settlement of the WBS, results analysis cost element for the revenues XXXXSales - Equipment
Value Field Data Source
Value Field Data Source
EBIT
Direct posting
OperatingExpenses
Affiliates
Royalty,gain/loss fixed assets, commission income, Direct Posting or cost center assessmentOther Income/Expenses
Direct Postingfrom FIIntangiblesAmortization
Allocationof all admin cost centers + direct postingAdministrativeExpense
Allocationof all sales and marketing costcenters(balance between actual costsand creditedhours), credit memo
(UPG) + bad debt reserve (direct posting)Selling Expense
Allocationof all engineeringcost centers(Balancebetween costs and possiblecreditedhours) without
capitalization of intangiblefixed assets and project system settlementEngineerExpense
Margin at Actual
Total Cost of Sales
Total Other Costs
Direct postingfrom FIOperatingFX
Allocation of all service office cost centers(Variancebetweenactual costs and creditedhours)Total variances
Settlementfrom the productionorders, direct posting and cost center assessment for contracting engineer
Delivery out ofstock: CostCenter assessement
Make-to-order sales orders: Settlementof the sales order result analysiscost elementfor the all costs
Contracting: Settlementof the WBS, resultsanalysiscost elementfor all costs
Service/Repair: Settlementof the serviceorder or contract, primary or results analysiscost elementfor all costs
Parts: S-Price or V-PriceWarrantyExpense
Direct postingfrom FI, Cost center assessmentDirect Charges
Allocationof all serviceoverheadcost centers(Not includedin the rates of the service engineers)Serviceoverhead
To get the revenue and the COGS from the monthly results analysis, the result analysis cost elements have
to be linked to the appropriate value field (revenue internal/external or COGS internal/external). Warranty
estimated and actual will be assigned to a separate value field estimated or actual.
2. Set-up data transfer from the make-to-stock sales revenues during the invoice process.
Transfer with a link of the conditions in the sales order with the appropriate value field (revenue
internal/external, COGS internal/external, etc.). Automated transfer of the data with each invoice valuated
with the standard cost (S-Price) of this product.
3. Settlement of variances from production orders.
After the monthly variance calculation the variances will be settled to CO-PA. Therefore the variance
categories (price variance, quantity variance etc.) have to be assigned to the value field “variances”.
4. Assessment cycles for allocation of the cost center costs.
The last step in the period end process of cost center accounting is the assessment of the overhead costs to
CO-PA. In an assessment cycle it has to be defined which sender (which cost center or cost center group
and which cost element or cost element group) is assigned to which profitability segment. E.g. for the cost
centers of the sales offices, the information “sales office” in the characteristic is necessary to get the P&L
of each sales office.
5. Settlement of the internal orders.
To get the costs and potential revenues of the internal orders, which are not settled to a cost center, a month
end settlement has to be run. The cost elements have to be linked to the appropriate value field here as well.
6. Direct posting from the General Ledger with the profitability segment as cost object.
With data entry on special GL accounts (these accounts have to be defined after finishing the chart of
accounts) the controlling object is the profitability segment as a combination of the characteristic values.
These costs do not appear on cost centers or internal orders. They are only visible in CO-PA and profit
center accounting.
4.3.1. Transferring Billing Documents Online
Transferring billing documents from the SAP Sales and Distribution (SD) module simultaneously to FI, CO-PCA
and CO-PA. The billing documents provide the base data for populating the value fields in CO-PA. The system
must transfer billing documents from SAP SD simultaneously to FI, CO-PCA and CO-PA.
I don’t understand what this means Transferring Incoming Sales Orders Online
Valuate incoming sales orders (as expected revenues) and transfer them from SD to CO-PA in order to obtain an
early estimate of anticipated profits and to get information about the expected loss on pending orders. By analyzing
this data, users can obtain early contribution margins for business segments. The system must transfer sales
incoming orders from the SD module to Profitability Analysis.
Consideration - Transferring of incoming orders will only apply to legal entities/sales organizations that will be
implementing the SD module.
4.3.2. Settlement of Service Orders
Sales Orders will be used for Service Sales in some cases. These service sales orders will be used to collect both
revenues and costs associated with the service. For period end closing and reporting purposes it is essential to settle
these sales orders to profitability segments. The costs/revenues will be settled to cost elements as specified in the
settlement structure of the order. The system must be able to settle revenues and costs from service orders to
specific cost elements. These cost elements will be linked value fields in Profitability Analysis.
4.3.3. Direct and manual postings
By using the post document function in FI to assign sales deductions and costs directly to profitability segments
(e.g. customers, products) in CO-PA it is possible to post sales deductions or actual costs that are first accrued at
the end of the period for the purposes of estimating profits to the appropriate profitability segments at a later point
in time. This makes it possible to compare your anticipated costs with the final actual costs. Both of these can be
displayed in profitability reports.
A requirement would be the ability to post to a profitability segment when entering an FI document for the
following GL accounts.
• Revenue accounts that allow manual postings (e.g. liabilities for allowance, rebate, rebate in kind,
commission).
• COGS at Standard accounts that allow manual postings.
Consideration - Revenue and COGS at standard accounts that allow manual posting must be assigned to a field
status group that requires postings to profitability segments.
4.4. Assessments
Assessments are used to transfer cost center costs at the end of the period to Profitability Analysis. Assessments
move costs using secondary cost elements meaning these allocations are only reflected in the Controlling Module,
not in the general ledger in the Financial Module. Assessments are broken down into cycles. An Assessment Cycle
is a collection of rules for cost allocation. A given cycle can contain a number of segments. A segment consists of
the following elements:
• Sender objects whose values to be allocated are computed using the same rules.
• Receiver objects whose allocation bases are computed using the same rules.
The sender-receiver relationships defined in a cycle are processed iteratively. Iteration processing is generally used
when a sender object is also a receiver object. The cycle processing continues iteratively (repeatedly) until the
sender/receiver object is fully credited. This can increase the amount of time needed to process the cycle.
If users want to process hierarchies separately, they must define a cycle for each level of the hierarchy. Then they
process the cycles in succession.
4.5. Process Description
4.5.1. Global Settings
One operating concern will be created, costing-based. Data is stored and can be reported in 2 currencies:
• Company code currency
• Operating concern currency (currency = US$).
All Controlling areas assigned to an operating concern will have the same fiscal year variant. In defining the data
structure, assign all required characteristics and values to the operating concern. These characteristics are now
valid for all operating concerns. Harmonized global decision and maintenance of the characteristics and values is
necessary. Avoid frequent changes because of impact on the table structure.
4.6. Valuation
Valuation can be used for the invoice process of standard products with standard costs (S-Price). During the
invoicing, the revenue and sales quantity will be posted to CO-PA. At the same time, the valuation will add the
calculated standard costs (split by material, labor, overhead) to the appropriate revenue. The use of further possible
valuation e.g. imputed commissions will be decided in the specific deployments.
Valuation enables companies to calculate cost of goods manufactured/sold, as well as anticipated costs and sales
deductions. These valuations can be used in Profitability Analysis for actual postings as well as for planning
purposes.
The following are examples of valuation requirements:
1. Valuation of Cost of Goods sold for manufactured products:
• Product cost estimate will be used to determine the cost of goods. The cost will be transferred to
Profitability Analysis and assigned to value fields based on the cost component split and will use
the current standard cost estimate.
• All other sites: the standard cost stored in the material master will be used to determine the cost of
goods sold.
2. Valuation of Cost of Goods Sold for merchandise/services (trading goods, raw materials, packaging
materials). For all sites the standard cost stored in the material master will be used to determine the cost of
goods sold.
3. Valuation of rebate, commission, royalties, freight: Will use conditions in CO-PA to calculate anticipated
business costs that are not yet known at the time a sales invoice is processed. These conditions will be
defined as either fixed rates for percentages.
4. Valuation of management standard costs: Will use conditions in CO-PA to record the following
management standards for corporate analysis purposes:
• Global Manufacturing Standard
• Global Manufacturing Standard less Plasma Markup
• Manufacturing Conversion Standard
• Global Manufacturing Plasma Capacity
5. Plan Valuation for Cost of Goods: Future Price from Material Master.
For all saleable produced products, a standard cost estimate has to be established. Use standard cost accounting for
manufactured products.
4.7. Information Systems
The diagram listed below illustrates typical controlling area tasks report option and questions.
4.7.1. Reporting and Analysis
Companies require a management tool for the purpose of sales reporting and analysis. It has to support the analysis
and controlling of the profitability of market segment structures according to the following parameters:
• Market/Franchise/Profit Center.
• Product/Product hierarchy.
• Customer.
• Country.
It must also allow summarization of these parameters by organizational units, for example summarization by legal
entity/company code.
The goal of this reporting and analysis tool is to provide the sales, marketing, planning, and management
organizations with decision-support from a market-oriented point of view. Specifically, the tool should provide
profit margin analysis (Revenue, Cost of Goods at Standard, Margin).
The most important benefit of CO-PA is the flexible analyzing structure. The CO-PA information system is an
online reporting tool. It allows evaluating the data collected in profitability analysis. The system will be used to
analyze data using any of the characteristics in the CO-PA system. When using the dynamic drilldown facility,
management can draw on any important business ratios (so-called key figures). They can display several
profitability segments for any key figure, or several key figures for any profitability segment.
Companies may require the ability to:
1. Display sales / contribution margin / performance figures on different levels.
2. Navigate through a multidimensional "data cube" (drilldown or switching hierarchies).
3. Report in local (company code currency) and global (USD) currency.
4. Answer ad hoc inquiries according to sales key figures.
5. Run reports that compare actual fiscal year data.
6. Run reports that compare budget/forecast versions.
Profit
Center
Accounting
Profit
Center
Accounting
Overhead Cost
Controlling
Overhead Cost
Controlling
Product Cost
Controlling
Product Cost
Controlling
Profitability
Analysis
Profitability
Analysis
CostElement
Accounting
CostElement
Accounting
 How can we reduce our
overhead costs?
Are the areas of
responsibility effective?
 How high are the costs
- of a product?
- of a manufacturing order?
- of a project?
 How profitable are
individual
market segments?
 How effective are the sales
organizations?
Whichexpenses
arealsocosts?
How
efficient
are my
enterprise
areas
(profit
centers)
-
7. Run reports that compare budget/forecast versions for actual.
8. Generate an intercompany profit report per article/package and country/market code.
9. Evaluate expected losses on pending orders.
10. Depreciations to the realized selling price.
11. Determine commission for products sold.
12. Run weekly sales report by product/market.
Considerations –
• Conversion of data from the missing periods January – March for YXXXX.
• Reporting requirements are met.
• Work with costing based profitability analysis.
• Sales reporting will be done based on standard costs.
• Revenue accounts will need to be created in CO as cost elements with type 11 or 12 (amendments in
current controlling and FI account field status necessary).
4.8.2. Contribution Margin
The following illustrations are examples of a Contribution Margin scheme:
Sales – Equipment
Sales – Service/Parts
Sales - Contracting
Margin at STD
Total Cost of Sales - STD
Cost Intercompany
Std cost ofOutside Sales (incl. sales costs likefreight only if invoiced
(recoverable) to customer, packaging)
Total Sales
Sales - Intercompany
Total Sales - Outside (incl. Deductions and freight revenue)
EBIT
Operating Expenses
Operating Income
Affiliate
Other Income/Expenses
Intangibles Amortisation
AdministrativeExpense
Selling Expense
Engineering Expense
Margin at Actual
Total Cost of Sales
TotalOtherCosts
Operating FX
Variances
Warranty Expense
DirectCharges (freight costs not billed to the customer – non-recoverable)
Service overhead
Value Field Value Field
Revenue
Cost of sales std
Margin at std
Warranty
Variances
Service OH/FX
Margin at Actual
Engineering
Selling
Admin
EBIT
X
X
X
X
(X)
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
(X)
X
Product /
Customer
Sales Office Profit Center
Company
Code
X
X
X
X
X
X
X
X
X
X
X
4.8. Reconciliations
To verify the correctness of performance figures, valuation and data in Profitability Analysis it is required to
reconcile the posted totals with total results in financial accounting and PCA on an aggregated monthly level.
Financial analysts will perform this reconciliation based on SAP reports and their own analysis.
It may be required to reconcile COPA to SD, FI and PCA in the following areas:
• Sales (gross and net) accounts with value fields gross sales by company code and market.
• COGS (standard costs) from financial accounts with value fields COGS (cost components) for
manufactured products and value field COGS for merchandise by company code and market.

Copa implementation

  • 1.
    DESIGN DOCUMENT CO PROFITABILTYANALYSIS AUTHOR/APPROVER Date Document Version Document Revision Description Role (Author/Approver) Author/Approver Name TABLE OF CONTENTS 1.OVERVIEW............................................................................................................................................1 2.ASSUMPTIONS.....................................................................................................................................2 3. KEY DECISIONS...................................................................................................................................2 4.DESIGN DETAILS..................................................................................................................................3 4.1MASTER DATA.......................................................................................................................................4 4.2.PLANNING...........................................................................................................................................10 4.3.ACTUAL DATA.....................................................................................................................................11 4.4.ASSESSMENTS....................................................................................................................................14 4.5.PROCESS DESCRIPTION......................................................................................................................14 4.6.VALUATION.........................................................................................................................................14 4.7.INFORMATION SYSTEMS......................................................................................................................16 4.8.RECONCILIATIONS...............................................................................................................................18 .
  • 2.
    1. OVERVIEW <The purposeof this document is to provide information in support of creating design documents. Each client project team should enhance and modify this document according to specific business design requirements. This overview section should include the purpose, scope, target audience, responsibilities etc.> SAP’s CO-PA (Profitability Analysis Module) will support the need to analyze profitability by market segment. These segments are defined using characteristics. Some are predefined by SAP (i.e., Company Code, Profit Center, Material Number), others are manually defined (i.e., Product Hierarchy, Customer Hierarchy). For the transfer of the actual and plan data from other modules (sales, production, etc.), standard SAP can be used. The following illustration gives an overview of profitability analysis. Reporting Dimensions Customer Region Sales Office Area Answers Revenue Cost Loss Profit Profit analysis Market segments Sales Quantity Sales revenue Customer discount Sales commission Direct sales costs Net revenue Direct material costs Variableproduction costs Contribution marginI Materialoverhead costs Fixed production costs Contribution marginII Variances Contribution marginIII Overhead costs Operating profit Product
  • 3.
    Basic concept ofCO-PA: 2. ASSUMPTIONS <This document is intended for the purpose of communicating and recording system design and configuration decisions. As a result, it should not be considered as an educational tool to be referenced in place of formal SAP R/3 training. If further clarification is required on specific SAP terminology, refer to the on-line system documentation.> • The module CO-PA is used to collect and deliver data for the Business Warehouse (BW). • Main focus is the financial reporting (Hyperion report….) • The other modules (sales, production, general ledger, etc.) provide the data, which is required for the reports. 3. KEY DECISIONS <Initial key decisions may be listed to assist the creator of this document in making decisions on how the system and/or processes will support the design document. The following key decisions will most likely be removed and/or replaced with client specific key decision information made in support of the this document. > • Costing based vs. Account based CO-PA. The most major decision to be made in a CO-PA implementation is the selection of costing based versus account based CO-PA implementation methods. Account based CO-PA uses actual Cost elements as performance measures. In that sense it can be thought of as a special ledger with a flexible selection of fields and characteristics to report on. The disadvantage of costing based CO-PA is its inflexibility in terms of creating user defined performance measures. The advantage of it is the ease of reconciliation with FI and PCA. Costing based CO-PA uses flexible, user defined “value fields” as performance measures . These value fields can be a one to one or many to one match with cost elements. They can also be declared to match a pricing condition in SD, which indirectly represents a group of accounts in accounting. Users can also create value fields that do not correspond to any real accounts or cost elements , and are used for internal analysis and reporting purposes only. Value fields can even be more detailed than accounts, in CUST. G RP. Sales region North Product Prod1 Product group Compressor customer Cust1 Cust. grp Public sector Country UK Sales rep. Miller CharacteristicsCharacteristics Revenues 800 Sales, discounts and returns 100 COGS 650 Value fields RevenuesRevenues Sales, discountsSales, discounts and returnsand returns COGSCOGS Profitability segment ValuesValues REGION SNW PRODUCT GRP Compr.Chiller
  • 4.
    a one tomany correspondence scenario (For example splitting of fixed and variable parts of costs in the same account into different value fields). In short, Costing based CO-PA gives much more flexibility to the user than account based. The downside is the difficulty of reconciliation with accounting reports, and the fact that the chart of accounts level of detail can typically not be replicated in a value field structure (SAP limits the number of value fields used) It is also possible to use both account and costing based methods in parallel. • The content of the Operating Concern. The Operating concern defines the set of characteristics and (in costing based CO-PA) value fields that are used for market segmentation and reporting. • A contribution margin scheme to be used in the profitability analysis. This will define the income statement structure to be used in profitability reporting. Users can create alternative schemes for analysis purposes • Whether actual sales and sales deductions will be shown for CO-PA reporting. SAP has the ability to show estimated or actual deductions. This is done through the standard CO-PA functionality to post incoming orders as well as billing documents to CO-PA to estimate the future sales landscape. • (mentioned in the first bullet.).(This is mentioned in the second bullet) • (Mentioned in the second bullet)Standard cost (S-Price) from the product costing module will be the valuation for delivery out of stock activity. • One operating concern used in the global set up for CO-PA. This is the highest reporting level within CO- PA. • Whether standard warranty, discount or commission provisions or other accruals will be built as a factor of revenue or other measures and actual charges will be posted against these accruals. In short, the management of accruals on the balance sheet may be handled (estimated) in CO-PA. • The source of data feeding each line of the contribution margin scheme within SAP. 4. DESIGN DETAILS <The design document records the decisions and reasoning behind configuration and should show how the system will be configured. It contains some high-level configuration values if known. In the following section, explain what is being configured and why. List configuration values (if known) by using bullet points, tables and/or body text. This document is not intended to list business processes or process diagrams. For these documents, see additional documents available (with the document type of Detail Process Description). You do not have to show all configuration values in the Design Document, that is the purpose of the Configuration Guide (another document type), which may also contain configuration instructions if required by the client. > R/3 Costing based Profitability Analysis is based on a customer-designed structure of so-called value fields, in which users can separate costs according to fixed and variable components of general overhead, sales, administration, customer service, marketing and so on. From SD to CO-PA:
  • 5.
    Users can defineprofitability segments needed to analyze for their business. The profitability segments are user defined combinations of characteristics, such as product groups, sales areas, orders and so on. The system automatically assigns revenues, cost and sales deductions to individual profitability segments when the business transactions (sales orders, invoices) are processed in the system. R/3 ensures that the reports generated contain all the relevant business transactions , and that management information is consistent and complete. This is accomplished thorough the assignment of sales condition types to value fields in CO-PA configuration Users can allocate costs to profitability segments manually, for example – to assess specific overhead costs. Users can also define key figures and performance measures, such as contribution margin, and have these calculated automatically by the system. The report layouts can be defined quickly and easily, and offer a maximum of flexibility. The information is displayed in spreadsheet form, and can be reformatted at any time. Profitability analysis is also an important tool for planning and forecasting. Users can plan their sales and cost data by accounting period or by week. They can also use formulas to link between revenues with sales quantities, and forecast data using seasonal or probabilistic models. Planning in profitability analysis is also integrated with Sales and Operational Planning. Users can release budgets and transfer data to Production Planning with just a few mouse clicks. 4.1 Master Data 4.1.1 Characteristics Characteristics represent the levels at which it is possible to create and analyze actual and plan data. There are two types of characteristics: • Standard characteristics, which are automatically predefined in SAP. These include the product number, company code, customer number, and country. • User-defined characteristics, which can be created to provide additional client specific information. To derive values for these characteristics, it is necessary to create derivation rules or table lookup rules unless they are readily available in the sender application (For example, in SD data flow to CO-PA, fields on the billing document, such as sales org, sales group, customer, etc. are readily available to the CO-PA line item if such fields are selected as CO-PA characteristics in the operating concern). Characteristic derivation makes it possible for the system to automatically derive unknown characteristic values (especially for user-defined characteristics) if these are dependent on characteristics whose values are known. The following characteristics are typical examples of required fields for reporting and/or planning:
  • 6.
    Area Characteristics Product View• Product number • Product hierarchy (all available levels) – Franchise, Brand, Product Category, Product Group • Plant • Material type Customer View • Customer number • Account group (3rd party, Inter company, Intra group) • Commission sale Market/Country View • Customer group 1 (Market code) • Profit center • Country • Region Other • Posting period • Legal entity/company code • Order type • Record type • Item Category • Cost center • Use (sales order) Most characteristics already exist in other R/3 applications and it is possible to pick them up from SAP tables. Derivation rules / table lookups have to be defined. 4.1.2. Characteristic Values For the characteristic values, companies may choose to use the existing master data tables in SAP. Fixed characteristics: • Company code • Profit center • Material number • Customer (Possible party roles: sold-to party, shipped-to-party, and payer) • Country • Region • District (State or County) • Sales office • Branch • Distribution channel (Equipment, Service, Contracting, Parts, Marine) • Division (YRG, UPG, ESG, Inter company) • (Sales person) – open action item
  • 7.
    Company Specific Characteristics: •Product hierarchy • Customer hierarchy/group • Vendor source (plant) The following table gives an example of user-defined characteristics: Characteristic Description WW001 SKU WW002 International Product WW003 Segment WW004 Indication WW005 Minor Product Group (Brand) WW006 Therapeutic Group WW007 Therapeutic Class WW008 Major Product Group WW009 Sub-Franchise WW010 Franchise WW011 World Wide Franchise WW012 Region Sales WW013 Customer WW014 NTC WW015 IND Customer 4.1.3. Derivation Rules The following are examples of derivation rules: • Automatically from the system: profit center (from material master, plant view) and company code (from the accounting transaction). • From the sales order: material number, customer, country, region, district, sales office, distribution channel, division and sales person. • From material master data: product hierarchy. • From customer master data: customer hierarchy. • Derivation rule from sales offices: Branch. • Vendor source will be derived from material master data, plant or vendor number.
  • 8.
    4.1.4. Value Fields (Thisstatement is misleading) For each row of the contribution margin scheme there has to be at least one value field. Values fields are the fields that contain the currency amounts and quantities in CO-PA. There are two types of value fields: • Value fields that contain amounts in currencies (amount fields). • Value fields that contain quantities (quantity fields). Value fields that are used frequently are predefined in the standard R/3 System. These include fields for revenue, sales quantity, freight, and others. In the following areas, value fields will be necessary to display performance figures for profitability segments: Area Value Fields Sales quantity Sales Quantity Equivalent Units (Sales Quantity X Unit Per Vial) Gross sales Revenue fields Discount, rebate, freight, commission, packaging, Transport insurance Fields assigned to SD-conditions, SD-Interface Fields for calculated values in CO-PA COGS manufactured products Cost component fields COGS merchandise Cost of goods field COSS Cost of services sold Other corporate COGS Global Manufacturing Standard (Full Standard Cost) Global Manufacturing Standard less Markup Manufacturing Conversion Standard Cost Settlement orders Sales orders (Make to order manufacturing) Revenue fields, cost fields Direct postings from FI Fields for direct posted primary costs Manual postings Liability fields for rebate, rebate in kind, allowance, commission CO-PA will not perform any inter company and intra group profit elimination. (I think it is misleading.) The following table gives some examples of the source of value fields. Source Description Value Fields SD Billing Document (Sales and Service Order) Quantity Sales Revenues Sales Deductions Costs of Goods Sold CO-PC Cost Estimate (Standard Price) Variable Cost of Goods Mfd Fixed Cost of Goods Mfd FI General Ledger Posting Bonuses Freight Costs
  • 9.
    Source Description ValueFields CO-OM Cost Center Internal Order Sales and Administration Costs Marketing Costs Variances PS WBS Element Network Operation Contracting, project revenue , project costs CO-PA Additional Costs Costed Discounts Costed Bonuses The following table gives an example of user-defined value fields: Value Field Description Type VV001 Gross Sales Value VV002 Spillover (OBI Only) ???? Value VV003 Rebates Value VV004 Non-government Chargebacks Value VV005 Cash Discounts Value VV006 Other NTS Value VV007 Medicaid Value VV008 Government Chargebacks Value VV009 Other Revenue Value VV010 Intco Sales Value VV011 Standard Cost Value VV012 Manufacturing Variances Value VV013 Inventory Adjustments Value VV015 Royalty Expense Value VV016 Interco COGS Value VV017 Carrying Cost Value VV018 Freight Value VV019 Total Comp Salary Value VV020 Direct Benefits Salary Value VV021 Indirect Benefits Salary Value VV022 Total Comp Wage Value VV023 Direct Benefits Wage Value VV024 Indirect Benefits Wage Value VV025 Travel Exp General Value VV026 Business Meals Value VV027 Entertainment Value VV028 External Training Courses Value
  • 10.
    Value Field DescriptionType VV029 Internal Training Courses Value VV031 Automobile Expense Value VV032 Petty Cash Expenditure Value VV033 Employee Moving Value VV034 Recruiting Costs Value VV035 Other Exp Related To Emp Act Value VV036 Departmental Supplies Value VV037 Work Order Supplies Value VV038 Prod Development Supplies Value VV039 Equip Prch Non IM Value VV040 Equip Prch IM Value VV041 Mechanical Stock Supplies Value VV042 Equip Rental Non IM Value VV043 Equip Rental IM Process Value VV044 Space Rental Value VV045 Telephone,Telex & Telegraph Value VV046 Utilities Value VV047 Building & Grounds R&M Value VV048 Equip&Parts Non IM R&M Value VV049 Equip&Parts IM R&M Value VV050 Waste Removal Value VV051 Moving & Alteration Value VV052 Project Maintenance Value VV053 Bank & Credit Card Fees Value VV054 Misc Postage Value VV055 Misc Insurance Value VV056 Oth Prch Goods & Services Value VV057 External Legal Services Value VV058 External Audit Fees EB Value VV059 Selling Expense Value VV060 R&D Value VV061 Marketing Management Value VV062 Marketing Expense Value VV063 Other Income EB Value VV064 Other Expenses EB Value VV065 CurrGain/LossTransact Value
  • 11.
    Value Field DescriptionType VV066 CarryCostRec&InvBTOffset Value VV067 Allocated Corp Exp BT Value VV068 Profit Sharing for JV BT Value VV069 Interest Income BT EB Value VV070 Interest Expense BT EB Value VV071 Top-down Distribution Qty VV072 Units Qty VV073 Taxes Value 4.2. Planning CO-PA allows planning at detailed levels such as product and customer. The planning will consist of sales quantities, revenues, cost of goods and profit margin. The system will be used to transfer planned sales quantities from Sales and Operations Planning (S&OP) to CO-PA. The following are examples of business requirements: • Revenue and Cost is planned at the SKU level by month for each combination of: o Legal Entity Source (legal entity that ships the product and receives the legal revenue). o Market/Franchise (Market/Franchise that receives management revenue). • The global requirement for planning is to plan values for: 1. Sales Quantity (Units) Input 2. Equivalent Units Input 3. Conversion Factor Calculated (1 / 2) 4. Revenue Input or Calculated (Price * Quantity) 5. Average Selling Price Input 6. Local Standard Cost (Future Price) Derived from Material Master • The following additional value fields will be planned based on local requirements: o Freight / Insurance o Packaging for shipment o Royalties The following diagram depicts the process transfer from plan data into CO-PA:
  • 12.
    Copy, revalue anduse top down distributions as planning aids. The copy function can be used for data transfer to CO-PA. Revaluation and top down distribution functions use predefined percentages and factors to re-state a plan. 4.3. Actual Data The following tables provide examples of value flows. This next table is too obviously a copy and paste from an equipment manufacturer (I bet it was synopsis) I am not going to touch it now, let me know if you want me to come up with something more generic all together. COCO-- PAPA COCO-- PAPA QuantityQuantity ++ AverageAverage priceprice ((oneone internalinternal,, oneone externalexternal custcust .) on.) on productproduct groupgroup andand LELE--levellevel oror manuallymanually-->> RevenueRevenue .. SS--PricePrice oror averageaverage percentagepercentage ofof GM onGM on productproduct groupgroup andand LELE--levellevel = COGS COCO-- OPAOPA COCO-- CCACCA PSPS SOPSOP SettlementSettlement AssessmentAssessment TransferTransfer SettlementSettlement CostCost Center PlanCenter Plan (OH)(OH) InternalInternal OrderOrder (OH)(OH) Planned Planned Quantity Quantity Project planProject plan CSCS SettlementSettlement ContractContract plan/plan/ service planservice plan RevenueRevenue andand costscosts RevenueRevenue andand costscosts ManualManual PlanningPlanning :: if necessaryif necessary CostsCosts CostsCosts
  • 13.
    To get thisinformation from other modules to CO-PA we use the following methods: 1. Settlement of make-to-order sales orders, service orders/contracts and projects (Work break down structure = WBS): Margin at STD Total Cost of Sales - STD Delivery out of stock: S-Price or V-Price Make-to-order sales orders: Settlement of the sales order result analysis cost element for the all costs Contracting: Settlement of the WBS, results analysis cost element for all costs Service/Repair: Settlement of the service order or contract, primary or results analysis cost element for all costs Parts: S-Price or V-PriceCost Intercompany Delivery out of stock: S-Price or V-Price Make-to-order sales orders: Settlement of the sales order result analysis cost element for the all costs Contracting: Settlement of the WBS, results analysis cost element for all costs Service/Repair: Settlement of the service order or contract, primary or results analysis cost element for all costs Parts: S-Price or V-Price Direct posting for adjustments Std cost of Outside Sales (incl. deduction + sales costs like freight, packaging) Total Sales Delivery out of stock: Condition from the sales order Make-to-order sales orders: Settlement of the sales order result analysis cost element for the revenues XXXX Contracting: Settlement of the WBS, results analysis cost element for the revenues XXXX Service/Repair: Settlement of the service order or contract, primary or results analysis cost element for the revenues Parts: Condition from the sales orderSales - Intercompany Direct Posting for revenue adjustmentsTotal Sales - Outside Service/Repair: Settlement of the service order or contract, primary or results analysis cost element for the revenues Parts: Condition from the sales orderSales – Service / Parts Delivery out of stock: Condition from the sales order Make-to-order sales orders: Settlement of the sales order result analysis cost element for the revenues XXXX Contracting: Settlement of the WBS, results analysis cost element for the revenues XXXXSales - Equipment Margin at STD Total Cost of Sales - STD Delivery out of stock: S-Price or V-Price Make-to-order sales orders: Settlement of the sales order result analysis cost element for the all costs Contracting: Settlement of the WBS, results analysis cost element for all costs Service/Repair: Settlement of the service order or contract, primary or results analysis cost element for all costs Parts: S-Price or V-PriceCost Intercompany Delivery out of stock: S-Price or V-Price Make-to-order sales orders: Settlement of the sales order result analysis cost element for the all costs Contracting: Settlement of the WBS, results analysis cost element for all costs Service/Repair: Settlement of the service order or contract, primary or results analysis cost element for all costs Parts: S-Price or V-Price Direct posting for adjustments Std cost of Outside Sales (incl. deduction + sales costs like freight, packaging) Total Sales Delivery out of stock: Condition from the sales order Make-to-order sales orders: Settlement of the sales order result analysis cost element for the revenues XXXX Contracting: Settlement of the WBS, results analysis cost element for the revenues XXXX Service/Repair: Settlement of the service order or contract, primary or results analysis cost element for the revenues Parts: Condition from the sales orderSales - Intercompany Direct Posting for revenue adjustmentsTotal Sales - Outside Service/Repair: Settlement of the service order or contract, primary or results analysis cost element for the revenues Parts: Condition from the sales orderSales – Service / Parts Delivery out of stock: Condition from the sales order Make-to-order sales orders: Settlement of the sales order result analysis cost element for the revenues XXXX Contracting: Settlement of the WBS, results analysis cost element for the revenues XXXXSales - Equipment Value Field Data Source Value Field Data Source EBIT Direct posting OperatingExpenses Affiliates Royalty,gain/loss fixed assets, commission income, Direct Posting or cost center assessmentOther Income/Expenses Direct Postingfrom FIIntangiblesAmortization Allocationof all admin cost centers + direct postingAdministrativeExpense Allocationof all sales and marketing costcenters(balance between actual costsand creditedhours), credit memo (UPG) + bad debt reserve (direct posting)Selling Expense Allocationof all engineeringcost centers(Balancebetween costs and possiblecreditedhours) without capitalization of intangiblefixed assets and project system settlementEngineerExpense Margin at Actual Total Cost of Sales Total Other Costs Direct postingfrom FIOperatingFX Allocation of all service office cost centers(Variancebetweenactual costs and creditedhours)Total variances Settlementfrom the productionorders, direct posting and cost center assessment for contracting engineer Delivery out ofstock: CostCenter assessement Make-to-order sales orders: Settlementof the sales order result analysiscost elementfor the all costs Contracting: Settlementof the WBS, resultsanalysiscost elementfor all costs Service/Repair: Settlementof the serviceorder or contract, primary or results analysiscost elementfor all costs Parts: S-Price or V-PriceWarrantyExpense Direct postingfrom FI, Cost center assessmentDirect Charges Allocationof all serviceoverheadcost centers(Not includedin the rates of the service engineers)Serviceoverhead
  • 14.
    To get therevenue and the COGS from the monthly results analysis, the result analysis cost elements have to be linked to the appropriate value field (revenue internal/external or COGS internal/external). Warranty estimated and actual will be assigned to a separate value field estimated or actual. 2. Set-up data transfer from the make-to-stock sales revenues during the invoice process. Transfer with a link of the conditions in the sales order with the appropriate value field (revenue internal/external, COGS internal/external, etc.). Automated transfer of the data with each invoice valuated with the standard cost (S-Price) of this product. 3. Settlement of variances from production orders. After the monthly variance calculation the variances will be settled to CO-PA. Therefore the variance categories (price variance, quantity variance etc.) have to be assigned to the value field “variances”. 4. Assessment cycles for allocation of the cost center costs. The last step in the period end process of cost center accounting is the assessment of the overhead costs to CO-PA. In an assessment cycle it has to be defined which sender (which cost center or cost center group and which cost element or cost element group) is assigned to which profitability segment. E.g. for the cost centers of the sales offices, the information “sales office” in the characteristic is necessary to get the P&L of each sales office. 5. Settlement of the internal orders. To get the costs and potential revenues of the internal orders, which are not settled to a cost center, a month end settlement has to be run. The cost elements have to be linked to the appropriate value field here as well. 6. Direct posting from the General Ledger with the profitability segment as cost object. With data entry on special GL accounts (these accounts have to be defined after finishing the chart of accounts) the controlling object is the profitability segment as a combination of the characteristic values. These costs do not appear on cost centers or internal orders. They are only visible in CO-PA and profit center accounting. 4.3.1. Transferring Billing Documents Online Transferring billing documents from the SAP Sales and Distribution (SD) module simultaneously to FI, CO-PCA and CO-PA. The billing documents provide the base data for populating the value fields in CO-PA. The system must transfer billing documents from SAP SD simultaneously to FI, CO-PCA and CO-PA. I don’t understand what this means Transferring Incoming Sales Orders Online Valuate incoming sales orders (as expected revenues) and transfer them from SD to CO-PA in order to obtain an early estimate of anticipated profits and to get information about the expected loss on pending orders. By analyzing this data, users can obtain early contribution margins for business segments. The system must transfer sales incoming orders from the SD module to Profitability Analysis. Consideration - Transferring of incoming orders will only apply to legal entities/sales organizations that will be implementing the SD module. 4.3.2. Settlement of Service Orders Sales Orders will be used for Service Sales in some cases. These service sales orders will be used to collect both revenues and costs associated with the service. For period end closing and reporting purposes it is essential to settle these sales orders to profitability segments. The costs/revenues will be settled to cost elements as specified in the settlement structure of the order. The system must be able to settle revenues and costs from service orders to specific cost elements. These cost elements will be linked value fields in Profitability Analysis. 4.3.3. Direct and manual postings By using the post document function in FI to assign sales deductions and costs directly to profitability segments (e.g. customers, products) in CO-PA it is possible to post sales deductions or actual costs that are first accrued at the end of the period for the purposes of estimating profits to the appropriate profitability segments at a later point
  • 15.
    in time. Thismakes it possible to compare your anticipated costs with the final actual costs. Both of these can be displayed in profitability reports. A requirement would be the ability to post to a profitability segment when entering an FI document for the following GL accounts. • Revenue accounts that allow manual postings (e.g. liabilities for allowance, rebate, rebate in kind, commission). • COGS at Standard accounts that allow manual postings. Consideration - Revenue and COGS at standard accounts that allow manual posting must be assigned to a field status group that requires postings to profitability segments. 4.4. Assessments Assessments are used to transfer cost center costs at the end of the period to Profitability Analysis. Assessments move costs using secondary cost elements meaning these allocations are only reflected in the Controlling Module, not in the general ledger in the Financial Module. Assessments are broken down into cycles. An Assessment Cycle is a collection of rules for cost allocation. A given cycle can contain a number of segments. A segment consists of the following elements: • Sender objects whose values to be allocated are computed using the same rules. • Receiver objects whose allocation bases are computed using the same rules. The sender-receiver relationships defined in a cycle are processed iteratively. Iteration processing is generally used when a sender object is also a receiver object. The cycle processing continues iteratively (repeatedly) until the sender/receiver object is fully credited. This can increase the amount of time needed to process the cycle. If users want to process hierarchies separately, they must define a cycle for each level of the hierarchy. Then they process the cycles in succession. 4.5. Process Description 4.5.1. Global Settings One operating concern will be created, costing-based. Data is stored and can be reported in 2 currencies: • Company code currency • Operating concern currency (currency = US$). All Controlling areas assigned to an operating concern will have the same fiscal year variant. In defining the data structure, assign all required characteristics and values to the operating concern. These characteristics are now valid for all operating concerns. Harmonized global decision and maintenance of the characteristics and values is necessary. Avoid frequent changes because of impact on the table structure. 4.6. Valuation Valuation can be used for the invoice process of standard products with standard costs (S-Price). During the invoicing, the revenue and sales quantity will be posted to CO-PA. At the same time, the valuation will add the calculated standard costs (split by material, labor, overhead) to the appropriate revenue. The use of further possible valuation e.g. imputed commissions will be decided in the specific deployments. Valuation enables companies to calculate cost of goods manufactured/sold, as well as anticipated costs and sales deductions. These valuations can be used in Profitability Analysis for actual postings as well as for planning purposes. The following are examples of valuation requirements: 1. Valuation of Cost of Goods sold for manufactured products:
  • 16.
    • Product costestimate will be used to determine the cost of goods. The cost will be transferred to Profitability Analysis and assigned to value fields based on the cost component split and will use the current standard cost estimate. • All other sites: the standard cost stored in the material master will be used to determine the cost of goods sold. 2. Valuation of Cost of Goods Sold for merchandise/services (trading goods, raw materials, packaging materials). For all sites the standard cost stored in the material master will be used to determine the cost of goods sold. 3. Valuation of rebate, commission, royalties, freight: Will use conditions in CO-PA to calculate anticipated business costs that are not yet known at the time a sales invoice is processed. These conditions will be defined as either fixed rates for percentages. 4. Valuation of management standard costs: Will use conditions in CO-PA to record the following management standards for corporate analysis purposes: • Global Manufacturing Standard • Global Manufacturing Standard less Plasma Markup • Manufacturing Conversion Standard • Global Manufacturing Plasma Capacity 5. Plan Valuation for Cost of Goods: Future Price from Material Master. For all saleable produced products, a standard cost estimate has to be established. Use standard cost accounting for manufactured products.
  • 17.
    4.7. Information Systems Thediagram listed below illustrates typical controlling area tasks report option and questions. 4.7.1. Reporting and Analysis Companies require a management tool for the purpose of sales reporting and analysis. It has to support the analysis and controlling of the profitability of market segment structures according to the following parameters: • Market/Franchise/Profit Center. • Product/Product hierarchy. • Customer. • Country. It must also allow summarization of these parameters by organizational units, for example summarization by legal entity/company code. The goal of this reporting and analysis tool is to provide the sales, marketing, planning, and management organizations with decision-support from a market-oriented point of view. Specifically, the tool should provide profit margin analysis (Revenue, Cost of Goods at Standard, Margin). The most important benefit of CO-PA is the flexible analyzing structure. The CO-PA information system is an online reporting tool. It allows evaluating the data collected in profitability analysis. The system will be used to analyze data using any of the characteristics in the CO-PA system. When using the dynamic drilldown facility, management can draw on any important business ratios (so-called key figures). They can display several profitability segments for any key figure, or several key figures for any profitability segment. Companies may require the ability to: 1. Display sales / contribution margin / performance figures on different levels. 2. Navigate through a multidimensional "data cube" (drilldown or switching hierarchies). 3. Report in local (company code currency) and global (USD) currency. 4. Answer ad hoc inquiries according to sales key figures. 5. Run reports that compare actual fiscal year data. 6. Run reports that compare budget/forecast versions. Profit Center Accounting Profit Center Accounting Overhead Cost Controlling Overhead Cost Controlling Product Cost Controlling Product Cost Controlling Profitability Analysis Profitability Analysis CostElement Accounting CostElement Accounting  How can we reduce our overhead costs? Are the areas of responsibility effective?  How high are the costs - of a product? - of a manufacturing order? - of a project?  How profitable are individual market segments?  How effective are the sales organizations? Whichexpenses arealsocosts? How efficient are my enterprise areas (profit centers) -
  • 18.
    7. Run reportsthat compare budget/forecast versions for actual. 8. Generate an intercompany profit report per article/package and country/market code. 9. Evaluate expected losses on pending orders. 10. Depreciations to the realized selling price. 11. Determine commission for products sold. 12. Run weekly sales report by product/market. Considerations – • Conversion of data from the missing periods January – March for YXXXX. • Reporting requirements are met. • Work with costing based profitability analysis. • Sales reporting will be done based on standard costs. • Revenue accounts will need to be created in CO as cost elements with type 11 or 12 (amendments in current controlling and FI account field status necessary). 4.8.2. Contribution Margin The following illustrations are examples of a Contribution Margin scheme: Sales – Equipment Sales – Service/Parts Sales - Contracting Margin at STD Total Cost of Sales - STD Cost Intercompany Std cost ofOutside Sales (incl. sales costs likefreight only if invoiced (recoverable) to customer, packaging) Total Sales Sales - Intercompany Total Sales - Outside (incl. Deductions and freight revenue) EBIT Operating Expenses Operating Income Affiliate Other Income/Expenses Intangibles Amortisation AdministrativeExpense Selling Expense Engineering Expense Margin at Actual Total Cost of Sales TotalOtherCosts Operating FX Variances Warranty Expense DirectCharges (freight costs not billed to the customer – non-recoverable) Service overhead Value Field Value Field Revenue Cost of sales std Margin at std Warranty Variances Service OH/FX Margin at Actual Engineering Selling Admin EBIT X X X X (X) X X X X X X X X X X X X X X X (X) X Product / Customer Sales Office Profit Center Company Code X X X X X X X X X X X
  • 19.
    4.8. Reconciliations To verifythe correctness of performance figures, valuation and data in Profitability Analysis it is required to reconcile the posted totals with total results in financial accounting and PCA on an aggregated monthly level. Financial analysts will perform this reconciliation based on SAP reports and their own analysis. It may be required to reconcile COPA to SD, FI and PCA in the following areas: • Sales (gross and net) accounts with value fields gross sales by company code and market. • COGS (standard costs) from financial accounts with value fields COGS (cost components) for manufactured products and value field COGS for merchandise by company code and market.