Training requires time , energy and money. Therefore an 
organization needs to know whether the investment 
made in training is being effectively and is worth the 
effort. Top management is concerned with evaluation as 
a process by which the effectiveness of the 
organizations programs and operating procedures are 
demonstrated. Supervisors are concerned more with 
the “results” of training as compared by changes in 
workers on the job performance. 
Contd… 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
Evaluation is a planned process which provides specific 
information about a selected session, program for the 
purpose of determining value and or decision making. 
Related to training evaluation is concerned with 
providing information on the effectiveness of the 
training activity to decision-makers who will make 
decisions based on the information. There are various 
models that have been developed to describe the role 
of evaluation in the training process. It is important that 
evaluation be a planned or systematic effort that is 
built-in from the start of the training process. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
Ascertaining Reactions Of the Participants 
As the programme gets over, it is important to ascertain the 
participants views and observations about its various 
components both in terms of the contents and the training 
process. The evaluation can either focus on a session-by-session 
review or on the programme as a whole. The formal 
format that the trainers choose to adopt for eliciting end-term 
appraisal of the participants’ ranges from the relatively 
simple “highlight the best and worst aspects” to a detailed 
response through a properly devised questionnaire or 
instrument. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
Areas for Ascertaining Reactions of the Participants 
An important decision that the training team takes prior 
to the programme is about the specific elements it 
would like to include in the evaluation exercise. 
Course Objective 
• How far the programme objectives are realistic. 
• Clarity 
• Individual understanding and response 
• How far the training objectives are realized. 
Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
Trainers Performance 
• Effectiveness of the presentations. 
• Skill of the trainers to use the training methods 
• Trainers expertise in responding to the questions of the 
participants. 
• Whether the trainers attitude was supportive and 
helpful. 
• Their relationship with the training group. 
Training Methods 
• Their appropriateness tot the programme and the 
modules. 
• The extent to which they facilitated learning. Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
Training Group 
• Its size and composition 
• Selection procedure 
• Level of the group and quality of its participation. 
Time Schedule 
• Duration of the programme 
• Allocation of time to each module 
• Was the daily schedule hectic. 
• Sequencing the topics 
• General flow and momentum of the programme 
Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
Training Facilities 
• Suitability of the sitting arrangement 
• General ambience 
• Appropriateness and quality of the equipment used 
• General learning environment at the venue. 
Physical Arrangements 
• Appropriateness of the accommodation 
• Arrangement for food etc. 
Training Support Materials 
• Usefulness and quality of the materials 
• Their timely distribution. Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
Sources for Ascertaining Participants’ Reactions 
• Structured Questionnaire 
• Tests 
• Open Forum 
• Personal interviews 
• Program committee meetings for ongoing evaluation 
of the contents and process of the programme. 
• Observations of the trainers 
• Comments of the participation 
Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
Purposes and Uses of Evaluation 
The definition of evaluation implies 2 purposes: 
1. Making decisions about improvements to be 
made in the training program itself. 
2. Making decisions about the value of the 
training program in terms of whether to 
continue to conduct the program. 
Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
Specifically, evaluation can be used: 
a) To determine whether the training program is accomplishing 
its assigned objectives and if they were the “right” 
objectives. 
b) To Identify the strengths and weaknesses of training 
activities. 
c) To determine the cost/Benefit Ratio of the Training Program. 
d) To Establish a Data base which Organization Leaders can use 
to Demonstrate the Productivity and Efficiency of their 
operational Procedures. 
e) To Establish a Data Base which can assist Organization 
Managers in Making Decision. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
Evaluation of Training 
After the training program has been completed and the 
current training record filled in, the performance of 
trainees can be evaluated and the attention of the 
training staff drawn towards specific action for 
improvement. Thus evaluation of training should help 
to: 
• Isolate areas of difficulty and suggest strategies for 
overcoming them. 
• Modify unrealistic training targets in the light of 
actual group performance Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
• Determine whether motivation of trainees is of the 
required level e.g. financial incentives for greater 
output during training. 
• Compare initial selection to actual performance 
rating 
• Highlight causes of absenteeism and labour turnover 
during training 
• Evaluate and modify instruction for future training 
programme 
• Formalized management training programme have a 
vital role to play in the development of management 
skills. Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
Evaluation can be four-pronged attempt. 
1. Evaluation of reaction 
2. Evaluation learning 
3. Evaluation behavior 
4. Evaluation results 
Implementation of Kirkpatrick-Phillips Model 
Level 1 in which evaluation is used by most organizations through 
questionnaires 
Level 2 evaluations can be accomplished by written or oral tests 
Level 3 is Application 
Level 4 is tying training to organizational impact 
Level 5 A new approach, measuring returns on investment 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
Measuring Training Effectiveness and Impact 
I. Prior to training 
• The number of people that say they need it during the needs 
assessment process. 
• The number of people that sign up for it. 
II. At the end of training 
• The number of people that attend the session. 
• The number of people that paid and attended. 
• Customer satisfaction at the end of training 
• A measurable change in knowledge 
• Ability to solve a “mock” problem at the end of training 
• Willingness to try to use the skill at the end of training. Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
III. Delayed Impact (non-job) 
• Customer satisfaction at X weeks after the end of 
training 
• Customer satisfaction at X weeks after the training when 
customers know the actual costs of training 
• Retention of knowledge at X weeks after the end of 
training. 
• Ability to solve a “mock” problem at X weeks after the 
end of training. 
• Willingness to try the skill at X weeks after the training. 
• The three systems followed are: 1. 360 degree 
2. Performance DNA system 3. Janus performance 
Management System 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
IV. On the job behavior change 
• Trained individuals that self-report that they 
changed their behavior , used the skill on the 
job after the training. 
• Trained individuals who’s managers report 
that they changed their behavior or used the 
skill after training. 
• Trained individuals that actually are observed 
to change their behavior or use the skill after 
the training. 
Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
V. On the job performance change 
• Trained individuals who self-report that their actual 
job performance changed as a result of their 
changed behaviour, skill. 
• Trained individuals who’s manager’s report that their 
actual job performance changed as a result of their 
changed behaviour/ skill. 
• Trained individuals whose manager’s report that 
their job performance changed either through 
improved performance appraisal scores or specific 
notations about the training on the performance 
appraisal forms. Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
• Trained individuals that have observable / 
measurable improvement in their actual job 
performance as a result of their changed 
behaviour. 
• The performance of employees that are managed 
by individuals that went through the training. 
• Departmental performance in departments with 
X % of employees that went through training ROI 
of return on training dollar spent. 
Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
(a) Other measures 
• CEO / top management knowledge of/ approval of/ 
or satisfaction with the training program. 
• Rank of training seminar in forced ranking by 
managers of what factors contributed most to 
productivity/ profitability improvement. 
• Number of referrals to the training by those who 
have previously attended the training 
• Additional number of people who were trained by 
those who have previously attended the training. 
• Popularity of the program compared to others. 
Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
(b) What to evaluate 
One way to approach the issue of what to evaluate is to 
identify what kind of information is needed. Dr. 
Kirtpatrick developed four levels of evaluation. Reaction 
1. Learning 
2. Behaviour 
3. Results 
1. Reaction 
Reaction is what a trainee thought of a particular 
program. There are some guidelines for determining 
participant reaction. Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
1. Design a questionnaire based on information 
obtained during the need assessment phase. 
2. Design the instrument so that the response can be 
tabulated and quantified. 
3. To obtain more honest opinions provide for the 
anonymity of the participants. 
4. Provide space for opinions about items that are not 
covered in the questionnaire. 
5. Pretest the questionnaire n a sample of participants 
to determine its completeness. 
Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
2. Learning 
The trainer is concerned with measuring the 
learning of principles, facts, techniques and 
attitudes that were specified as training objectives. 
There are many different measures of learning 
performance including paper-and-pencil test, 
learning curves etc. The objectives determine the 
choice of the most appropriate measure. There are 
several guideposts used in establishing a procedure 
for measuring the amount of learning that takes 
place. Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
1. The learning of each participant should be measured 
so that quantitative results can be determined. 
2. A before-and-after approach should be use so that 
learning can be related to the program. 
3. Learning should be measured in an objective basis. 
4. A group not receiving training should be compared 
with the group receiving training. 
5. Where possible the evaluation results should be 
analyzed statistically. 
Where principles and facts are taught rather than 
skills, it is more difficult to evaluate learning. Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
3. Behaviour 
The term is used in reference to the measurement of 
job performance. There are several guideposts in 
evaluating training programs in terms of behaviour 
changes. 
1. A systematic appraisal should be made on-the-job 
performance on a before-and-after basis. 
2. The appraisal of performance should be made by 
one or more of the following groups: 
a. The person receiving the training. b. The persons 
supervisor. c. The persons subordinates. 
d. The persons peers. Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
3. A statistical analysis should be made to compare 
the performance before and after and to relate 
changes to the training program. 
4. The post training appraisal should be made three 
months or more after the training so that 
trainees have an opportunity to put into practice 
what they have learnt. 
5. A group not receiving the training should be used 
for comparison. 
Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
4. Results 
Evaluations in this level are used to relate the results 
of the training program to organizational objectives. 
Some of the results that could be examined are 
costs, turnover, grievances and morale. Where the 
objectives of the training program are closely tied to 
specific organizational objectives effort should be 
made to show a link between the training and the 
changes called for in the organization objective. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
The process of Evaluation---Measuring Change 
One way of visualizing a process of evaluation is to set the 
four levels of evaluation against a backdrop of a training 
program. Evaluation should start before the training 
program is designed. The next step is to plan the evaluation, 
how is the data to be gathered. Who will perform the 
evaluation? What techniques will be used? When will the 
evaluation be conducted? The evaluation design needs to be 
used on the objectives of the program and the criteria to be 
measured. Once the plan is completed and the training 
program begins, the data collection phase is initiated. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
Validity and Reliability 
Validity is a concept that means the degree to which an 
evaluation technique or instrument measures what it 
was intended to measure. Its a measure of accuracy. 
Reliability is the degree to which evaluation techniques 
and instruments measure a given characteristic 
consistently. In order to get a long term view of a 
training programs effectiveness, an instrument must 
measure reliably for each session of the training 
program. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
Types of Evaluation Techniques and Instruments 
The process of Training Evaluation 
A training programme, like design, development, and 
manufacture of a product passes through several 
stages. 
1. Pre-Training Evaluation 
This is prior to the course and should cover an analyses 
of the expectations of the trainee and his superior 
officer. The existing level of knowledge and skills are 
reassessed. It is carried out through discussions, 
workshops etc. Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
2. Input and Delivery Evaluation 
This is done concurrent to the training. It involves long 
term management programme. It is done individually or 
in group. Each topic, module is evaluated in terms of its 
content, presentation, relevance and applicability. Using 
a questionnaire, soon after the course, invariably on the 
last day the participants reaction is obtained which 
generally elicits information about the course inputs 
and the impressions about the course. 
Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
3. Post Training Evaluation 
The objectives of training is to enhance individual 
effectiveness which helps in improving organizational 
performance. Thus the process of post-evaluation must 
have reference to job improvement plan. This cannot be 
done when the person is training , he needs to go back 
to his job and demonstrate his newly acquired 
knowledge and skills. After a lapse of 6-12 months the 
results obtained are used for evaluating the applicability 
of training. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
Evaluation Of The Training Institutes 
It is believed that organization climate is known to 
contribute or hinder the transfers of learning to the job, the 
training centre itself is expected to contribute towards 
acquiring the required knowledge and skills by the trainees. 
Its climate, facilities faculty resources, library are some 
factors which would differentiate one centre from the other. 
The Study 
To study the effectiveness of the training of the in-house 
training Institutes in public enterprises detailed 
investigations using structured, protested questionnaires are 
undertaken. Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
Three sets of questionnaires: 
1. For the trainees 
2. To the superior officers of trainees and 
3. To the training centers are prepared and 
administered. 
These questionnaires contain information such as 
relevance of the course inputs, extent of its fulfillment, 
perceptions of organizations climate for effective 
transfers of learning to the job, possible hindrances, 
positive as well as negative factors for training in the 
organization. The variables identified as relevant are 
1. organizational variable. 2. Behavioral variables 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
Transfer of Learning 
Individual Gains 
To evaluate the effect of training on the individual after 
6-12 months, the training persons stated the significant 
areas where the individual development had taken 
place. They were: 1. State of art knowledge on the 
subject2. Development of the analytical skills. 3. 
Refined interpersonal skills. 4. Innovation/ creativity. 5. 
Management of stress. 
Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
Transfer of learning to the organization 
To evaluate whether in-house training has resulted in 
enhanced organization performance, trainees were 
requested to indicate the resultant benefits to public 
enterprises. The non-tangible benefits are: 1. Better 
management practices. 2. improved problem solving. 3. job 
improvement plans. 4. better systems. 
There is general evidence that systematic in-house training 
has contributed to individual growth in public enterprises, 
while the same level of organization improvement has not 
taken place because of organization climate, PE systems and 
Lack of motivation in PEs 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
Alternate approach in post-course evaluations 
New approaches to post-course evaluation are being 
explored. One such recent development is monitoring the 
progress of the participant through post-course project 
work. In this approach participants at the time of 
nomination to the course in consultation with their 
departmental heads identify a proble, of practical value to 
the organization. During the program participants discuss, 
reformulate and identify approaches to its solution in the 
light of the knowledge and skill inputs in the training 
sessions. This way they related the learning to work 
situations and made innovating solutions. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
Evaluation of in-house training institutes 
In order to make training a continuous activity 
addressing itself to specific training needs of the 
organization, public enterprises have established large 
number of in-house training institutes/ Centers. 
There are 5 factors considered important for evaluating 
the institute and methods of assigning point rating to 
each. 
a) Faculty Resources: The number of qualified faculty 
members on full time basis at the centre, years of 
experience in training are considered. Contd. 
We Learn – A Continuous Learning Forum
Welingkar’s Distance Learning Division 
b) Infrastructure: This covers all infrastructure facilities 
other than library, such as class rooms, syndicate rooms, 
hostel, recreation facilities etc. 
c) Library: This is the “brain” of any training institution/ 
Centre. Relevant books, journal, cases, audio, video etc. 
d) In-house Research / Consultancy: The in-house 
centers suffer from under exposure to research 
development and consultancy work. Such 
research/consultancy may be both internal or external. 
e) Financial Support: The annual budget allocation, unit 
cost per training are items under this factor. 
We Learn – A Continuous Learning Forum

evaluating of training

  • 1.
    Welingkar’s Distance LearningDivision CHAPTER-06 Evaluating of Training We Learn – A Continuous Learning Forum
  • 2.
    Welingkar’s Distance LearningDivision Introduction Training requires time , energy and money. Therefore an organization needs to know whether the investment made in training is being effectively and is worth the effort. Top management is concerned with evaluation as a process by which the effectiveness of the organizations programs and operating procedures are demonstrated. Supervisors are concerned more with the “results” of training as compared by changes in workers on the job performance. Contd… We Learn – A Continuous Learning Forum
  • 3.
    Welingkar’s Distance LearningDivision Evaluation is a planned process which provides specific information about a selected session, program for the purpose of determining value and or decision making. Related to training evaluation is concerned with providing information on the effectiveness of the training activity to decision-makers who will make decisions based on the information. There are various models that have been developed to describe the role of evaluation in the training process. It is important that evaluation be a planned or systematic effort that is built-in from the start of the training process. We Learn – A Continuous Learning Forum
  • 4.
    Welingkar’s Distance LearningDivision Ascertaining Reactions Of the Participants As the programme gets over, it is important to ascertain the participants views and observations about its various components both in terms of the contents and the training process. The evaluation can either focus on a session-by-session review or on the programme as a whole. The formal format that the trainers choose to adopt for eliciting end-term appraisal of the participants’ ranges from the relatively simple “highlight the best and worst aspects” to a detailed response through a properly devised questionnaire or instrument. We Learn – A Continuous Learning Forum
  • 5.
    Welingkar’s Distance LearningDivision Areas for Ascertaining Reactions of the Participants An important decision that the training team takes prior to the programme is about the specific elements it would like to include in the evaluation exercise. Course Objective • How far the programme objectives are realistic. • Clarity • Individual understanding and response • How far the training objectives are realized. Contd. We Learn – A Continuous Learning Forum
  • 6.
    Welingkar’s Distance LearningDivision Trainers Performance • Effectiveness of the presentations. • Skill of the trainers to use the training methods • Trainers expertise in responding to the questions of the participants. • Whether the trainers attitude was supportive and helpful. • Their relationship with the training group. Training Methods • Their appropriateness tot the programme and the modules. • The extent to which they facilitated learning. Contd. We Learn – A Continuous Learning Forum
  • 7.
    Welingkar’s Distance LearningDivision Training Group • Its size and composition • Selection procedure • Level of the group and quality of its participation. Time Schedule • Duration of the programme • Allocation of time to each module • Was the daily schedule hectic. • Sequencing the topics • General flow and momentum of the programme Contd. We Learn – A Continuous Learning Forum
  • 8.
    Welingkar’s Distance LearningDivision Training Facilities • Suitability of the sitting arrangement • General ambience • Appropriateness and quality of the equipment used • General learning environment at the venue. Physical Arrangements • Appropriateness of the accommodation • Arrangement for food etc. Training Support Materials • Usefulness and quality of the materials • Their timely distribution. Contd. We Learn – A Continuous Learning Forum
  • 9.
    Welingkar’s Distance LearningDivision Sources for Ascertaining Participants’ Reactions • Structured Questionnaire • Tests • Open Forum • Personal interviews • Program committee meetings for ongoing evaluation of the contents and process of the programme. • Observations of the trainers • Comments of the participation Contd. We Learn – A Continuous Learning Forum
  • 10.
    Welingkar’s Distance LearningDivision Purposes and Uses of Evaluation The definition of evaluation implies 2 purposes: 1. Making decisions about improvements to be made in the training program itself. 2. Making decisions about the value of the training program in terms of whether to continue to conduct the program. Contd. We Learn – A Continuous Learning Forum
  • 11.
    Welingkar’s Distance LearningDivision Specifically, evaluation can be used: a) To determine whether the training program is accomplishing its assigned objectives and if they were the “right” objectives. b) To Identify the strengths and weaknesses of training activities. c) To determine the cost/Benefit Ratio of the Training Program. d) To Establish a Data base which Organization Leaders can use to Demonstrate the Productivity and Efficiency of their operational Procedures. e) To Establish a Data Base which can assist Organization Managers in Making Decision. We Learn – A Continuous Learning Forum
  • 12.
    Welingkar’s Distance LearningDivision Evaluation of Training After the training program has been completed and the current training record filled in, the performance of trainees can be evaluated and the attention of the training staff drawn towards specific action for improvement. Thus evaluation of training should help to: • Isolate areas of difficulty and suggest strategies for overcoming them. • Modify unrealistic training targets in the light of actual group performance Contd. We Learn – A Continuous Learning Forum
  • 13.
    Welingkar’s Distance LearningDivision • Determine whether motivation of trainees is of the required level e.g. financial incentives for greater output during training. • Compare initial selection to actual performance rating • Highlight causes of absenteeism and labour turnover during training • Evaluate and modify instruction for future training programme • Formalized management training programme have a vital role to play in the development of management skills. Contd. We Learn – A Continuous Learning Forum
  • 14.
    Welingkar’s Distance LearningDivision Evaluation can be four-pronged attempt. 1. Evaluation of reaction 2. Evaluation learning 3. Evaluation behavior 4. Evaluation results Implementation of Kirkpatrick-Phillips Model Level 1 in which evaluation is used by most organizations through questionnaires Level 2 evaluations can be accomplished by written or oral tests Level 3 is Application Level 4 is tying training to organizational impact Level 5 A new approach, measuring returns on investment We Learn – A Continuous Learning Forum
  • 15.
    Welingkar’s Distance LearningDivision Measuring Training Effectiveness and Impact I. Prior to training • The number of people that say they need it during the needs assessment process. • The number of people that sign up for it. II. At the end of training • The number of people that attend the session. • The number of people that paid and attended. • Customer satisfaction at the end of training • A measurable change in knowledge • Ability to solve a “mock” problem at the end of training • Willingness to try to use the skill at the end of training. Contd. We Learn – A Continuous Learning Forum
  • 16.
    Welingkar’s Distance LearningDivision III. Delayed Impact (non-job) • Customer satisfaction at X weeks after the end of training • Customer satisfaction at X weeks after the training when customers know the actual costs of training • Retention of knowledge at X weeks after the end of training. • Ability to solve a “mock” problem at X weeks after the end of training. • Willingness to try the skill at X weeks after the training. • The three systems followed are: 1. 360 degree 2. Performance DNA system 3. Janus performance Management System We Learn – A Continuous Learning Forum
  • 17.
    Welingkar’s Distance LearningDivision IV. On the job behavior change • Trained individuals that self-report that they changed their behavior , used the skill on the job after the training. • Trained individuals who’s managers report that they changed their behavior or used the skill after training. • Trained individuals that actually are observed to change their behavior or use the skill after the training. Contd. We Learn – A Continuous Learning Forum
  • 18.
    Welingkar’s Distance LearningDivision V. On the job performance change • Trained individuals who self-report that their actual job performance changed as a result of their changed behaviour, skill. • Trained individuals who’s manager’s report that their actual job performance changed as a result of their changed behaviour/ skill. • Trained individuals whose manager’s report that their job performance changed either through improved performance appraisal scores or specific notations about the training on the performance appraisal forms. Contd. We Learn – A Continuous Learning Forum
  • 19.
    Welingkar’s Distance LearningDivision • Trained individuals that have observable / measurable improvement in their actual job performance as a result of their changed behaviour. • The performance of employees that are managed by individuals that went through the training. • Departmental performance in departments with X % of employees that went through training ROI of return on training dollar spent. Contd. We Learn – A Continuous Learning Forum
  • 20.
    Welingkar’s Distance LearningDivision (a) Other measures • CEO / top management knowledge of/ approval of/ or satisfaction with the training program. • Rank of training seminar in forced ranking by managers of what factors contributed most to productivity/ profitability improvement. • Number of referrals to the training by those who have previously attended the training • Additional number of people who were trained by those who have previously attended the training. • Popularity of the program compared to others. Contd. We Learn – A Continuous Learning Forum
  • 21.
    Welingkar’s Distance LearningDivision (b) What to evaluate One way to approach the issue of what to evaluate is to identify what kind of information is needed. Dr. Kirtpatrick developed four levels of evaluation. Reaction 1. Learning 2. Behaviour 3. Results 1. Reaction Reaction is what a trainee thought of a particular program. There are some guidelines for determining participant reaction. Contd. We Learn – A Continuous Learning Forum
  • 22.
    Welingkar’s Distance LearningDivision 1. Design a questionnaire based on information obtained during the need assessment phase. 2. Design the instrument so that the response can be tabulated and quantified. 3. To obtain more honest opinions provide for the anonymity of the participants. 4. Provide space for opinions about items that are not covered in the questionnaire. 5. Pretest the questionnaire n a sample of participants to determine its completeness. Contd. We Learn – A Continuous Learning Forum
  • 23.
    Welingkar’s Distance LearningDivision 2. Learning The trainer is concerned with measuring the learning of principles, facts, techniques and attitudes that were specified as training objectives. There are many different measures of learning performance including paper-and-pencil test, learning curves etc. The objectives determine the choice of the most appropriate measure. There are several guideposts used in establishing a procedure for measuring the amount of learning that takes place. Contd. We Learn – A Continuous Learning Forum
  • 24.
    Welingkar’s Distance LearningDivision 1. The learning of each participant should be measured so that quantitative results can be determined. 2. A before-and-after approach should be use so that learning can be related to the program. 3. Learning should be measured in an objective basis. 4. A group not receiving training should be compared with the group receiving training. 5. Where possible the evaluation results should be analyzed statistically. Where principles and facts are taught rather than skills, it is more difficult to evaluate learning. Contd. We Learn – A Continuous Learning Forum
  • 25.
    Welingkar’s Distance LearningDivision 3. Behaviour The term is used in reference to the measurement of job performance. There are several guideposts in evaluating training programs in terms of behaviour changes. 1. A systematic appraisal should be made on-the-job performance on a before-and-after basis. 2. The appraisal of performance should be made by one or more of the following groups: a. The person receiving the training. b. The persons supervisor. c. The persons subordinates. d. The persons peers. Contd. We Learn – A Continuous Learning Forum
  • 26.
    Welingkar’s Distance LearningDivision 3. A statistical analysis should be made to compare the performance before and after and to relate changes to the training program. 4. The post training appraisal should be made three months or more after the training so that trainees have an opportunity to put into practice what they have learnt. 5. A group not receiving the training should be used for comparison. Contd. We Learn – A Continuous Learning Forum
  • 27.
    Welingkar’s Distance LearningDivision 4. Results Evaluations in this level are used to relate the results of the training program to organizational objectives. Some of the results that could be examined are costs, turnover, grievances and morale. Where the objectives of the training program are closely tied to specific organizational objectives effort should be made to show a link between the training and the changes called for in the organization objective. We Learn – A Continuous Learning Forum
  • 28.
    Welingkar’s Distance LearningDivision The process of Evaluation---Measuring Change One way of visualizing a process of evaluation is to set the four levels of evaluation against a backdrop of a training program. Evaluation should start before the training program is designed. The next step is to plan the evaluation, how is the data to be gathered. Who will perform the evaluation? What techniques will be used? When will the evaluation be conducted? The evaluation design needs to be used on the objectives of the program and the criteria to be measured. Once the plan is completed and the training program begins, the data collection phase is initiated. We Learn – A Continuous Learning Forum
  • 29.
    Welingkar’s Distance LearningDivision Validity and Reliability Validity is a concept that means the degree to which an evaluation technique or instrument measures what it was intended to measure. Its a measure of accuracy. Reliability is the degree to which evaluation techniques and instruments measure a given characteristic consistently. In order to get a long term view of a training programs effectiveness, an instrument must measure reliably for each session of the training program. We Learn – A Continuous Learning Forum
  • 30.
    Welingkar’s Distance LearningDivision Types of Evaluation Techniques and Instruments The process of Training Evaluation A training programme, like design, development, and manufacture of a product passes through several stages. 1. Pre-Training Evaluation This is prior to the course and should cover an analyses of the expectations of the trainee and his superior officer. The existing level of knowledge and skills are reassessed. It is carried out through discussions, workshops etc. Contd. We Learn – A Continuous Learning Forum
  • 31.
    Welingkar’s Distance LearningDivision 2. Input and Delivery Evaluation This is done concurrent to the training. It involves long term management programme. It is done individually or in group. Each topic, module is evaluated in terms of its content, presentation, relevance and applicability. Using a questionnaire, soon after the course, invariably on the last day the participants reaction is obtained which generally elicits information about the course inputs and the impressions about the course. Contd. We Learn – A Continuous Learning Forum
  • 32.
    Welingkar’s Distance LearningDivision 3. Post Training Evaluation The objectives of training is to enhance individual effectiveness which helps in improving organizational performance. Thus the process of post-evaluation must have reference to job improvement plan. This cannot be done when the person is training , he needs to go back to his job and demonstrate his newly acquired knowledge and skills. After a lapse of 6-12 months the results obtained are used for evaluating the applicability of training. We Learn – A Continuous Learning Forum
  • 33.
    Welingkar’s Distance LearningDivision Evaluation Of The Training Institutes It is believed that organization climate is known to contribute or hinder the transfers of learning to the job, the training centre itself is expected to contribute towards acquiring the required knowledge and skills by the trainees. Its climate, facilities faculty resources, library are some factors which would differentiate one centre from the other. The Study To study the effectiveness of the training of the in-house training Institutes in public enterprises detailed investigations using structured, protested questionnaires are undertaken. Contd. We Learn – A Continuous Learning Forum
  • 34.
    Welingkar’s Distance LearningDivision Three sets of questionnaires: 1. For the trainees 2. To the superior officers of trainees and 3. To the training centers are prepared and administered. These questionnaires contain information such as relevance of the course inputs, extent of its fulfillment, perceptions of organizations climate for effective transfers of learning to the job, possible hindrances, positive as well as negative factors for training in the organization. The variables identified as relevant are 1. organizational variable. 2. Behavioral variables We Learn – A Continuous Learning Forum
  • 35.
    Welingkar’s Distance LearningDivision Transfer of Learning Individual Gains To evaluate the effect of training on the individual after 6-12 months, the training persons stated the significant areas where the individual development had taken place. They were: 1. State of art knowledge on the subject2. Development of the analytical skills. 3. Refined interpersonal skills. 4. Innovation/ creativity. 5. Management of stress. Contd. We Learn – A Continuous Learning Forum
  • 36.
    Welingkar’s Distance LearningDivision Transfer of learning to the organization To evaluate whether in-house training has resulted in enhanced organization performance, trainees were requested to indicate the resultant benefits to public enterprises. The non-tangible benefits are: 1. Better management practices. 2. improved problem solving. 3. job improvement plans. 4. better systems. There is general evidence that systematic in-house training has contributed to individual growth in public enterprises, while the same level of organization improvement has not taken place because of organization climate, PE systems and Lack of motivation in PEs We Learn – A Continuous Learning Forum
  • 37.
    Welingkar’s Distance LearningDivision Alternate approach in post-course evaluations New approaches to post-course evaluation are being explored. One such recent development is monitoring the progress of the participant through post-course project work. In this approach participants at the time of nomination to the course in consultation with their departmental heads identify a proble, of practical value to the organization. During the program participants discuss, reformulate and identify approaches to its solution in the light of the knowledge and skill inputs in the training sessions. This way they related the learning to work situations and made innovating solutions. We Learn – A Continuous Learning Forum
  • 38.
    Welingkar’s Distance LearningDivision Evaluation of in-house training institutes In order to make training a continuous activity addressing itself to specific training needs of the organization, public enterprises have established large number of in-house training institutes/ Centers. There are 5 factors considered important for evaluating the institute and methods of assigning point rating to each. a) Faculty Resources: The number of qualified faculty members on full time basis at the centre, years of experience in training are considered. Contd. We Learn – A Continuous Learning Forum
  • 39.
    Welingkar’s Distance LearningDivision b) Infrastructure: This covers all infrastructure facilities other than library, such as class rooms, syndicate rooms, hostel, recreation facilities etc. c) Library: This is the “brain” of any training institution/ Centre. Relevant books, journal, cases, audio, video etc. d) In-house Research / Consultancy: The in-house centers suffer from under exposure to research development and consultancy work. Such research/consultancy may be both internal or external. e) Financial Support: The annual budget allocation, unit cost per training are items under this factor. We Learn – A Continuous Learning Forum