Construction Technology and
Management Department
College of Engineering and
Technology
Course out line
Course Title: Specification and Quantity surveying
Course Number: COTM 3211
Credit Hours: 3
Academic year: 2016/17, Semester II
Pre-requisites : Building construction II
Program: III Year Regular BSc, Construction Technology and Management
Instructor: Sintayehu G.
cont’d
Chapter 1. Introduction
◦ General Introduction
◦ Stages in Construction
Chapter 3. Specifications
◦ Introduction
◦ Types of Specifications
◦ Specification Writing
cont’d
Chapter 4. Quantity surveying
◦ Introduction
◦ Materials Take Off Preparation and Measuring of
Quantities
◦ Quantity Take Off
◦ Types of Takeoff
Chapter 5. project cost estimation
◦General
◦Types of costing or estimating
cont’d
Evaluation
Quiz & assignment .
…………...20%
Test
……………………………….….
..10%
Project…………………………
….....30%
Final
Exam……………………..……
40%
References
B.N.Dutta, “Estimating costing
in civil Engineering”
W.J. Hornung, “Estimating
Building Construction Quantity
Surveying”
MoWUD, “Standard condition
of contract for construction of
civil work” Handout
6
COTM 3211 –Specification and
Quantity Surveying
Chapter Outline
1. General introduction
2. The main players in the CI
3. Stages construction process
7
1.1. General Introduction
Construction Industry is an industry which is involved in the planning,
execution and evaluation of all types of civil works.
CI Categories:
 Transport and Communication (Road, Railway, Airway, and
Telecommunication)
 Water and Energy Works; and
 Buildings and Other Physical Infrastructures
CI is among the leading industry in producing employment and
contribute to the overall national development (Current situation of
Ethiopia)
CI specially in developing countries like ETHIOPIA consumes much of
the national budget. (Almost 60%)
Ethiopian Construction Recent Trends
Roads Projects ( 43 Billion Birr in 5 yrs)
 Many road projects under the federal & regional state Road authorities
 Road to connect Addis to Adama
Hydropower and Wind energy Projects
 The Grand Ethiopian Renaissance Dam Project
 GilgelGibe I, II, and III, Tekeze, Tana Beles, Fincha-Neshe, etc.
 Wind energy (around Mekele& Adama)
Buildings projects
 Housing projects at federal & regional state level ( 400,000 houses ( 16 B Birr)
 The construction of universities and Many health centers
Water Supply and Irrigation projects ( 10.63 B Birr)
 Kessem, Tendaho, Omorate, Gidabu, FinchaSFEP, Ribi-Megech, etc.
Railway
 Addis Ababa city rail ways ( supposed to begin service shortly)
In the Private Sector
 Residential and commercial Buildings
The Client
The Consultant
The Contractor
Insurance Companies
Banks
Suppliers
Permitting Agencies
Public
10
The main players in the construction
industry are:
Assignment No.1
To be submitted individually in hard copy not more than three
pages
Study and write the role of the main participant in construction
industry
Submission date: One week as of today:
F) Nov, 17, 2014.
E) Nov, 14, 2014.
A) Nov, 14, 2014.
CE- 5121 –Contract, Specification and
Quantity Survey
11
Resources for the Construction Industry
Human Resources / Labour or Workmen
Financial Resources / Fund
Information Resources
Physical Resources such as Materials (55-70%), Equipment and Other
Assets
Services and Management.
12
1.1.1. Stages in Construction
Inception and feasibility
Planning and Design
Tendering Stages
Bid Evaluation
Award of Contract
Construction Stage
Commissioning and Acceptance
◦ Provisional Acceptance
◦ Final Acceptance
13
Inception and Feasibility
At this stage, the owner will hire consultant to formally design and
develop the concept into a practicable project.
Planning and Design Stage
At this stage, the consultant plans and designs the project based on the
owner’s requirement and the possible constraints.
Tendering stage
At this stage contractors are invited to offer their best technical and
financial offers as per the conditions and specifications depicted in the
contract document.
14
cont’d
Bid Evaluation /Evaluation of Tenders
The bids are evaluated based on:
Compliance with the contractual terms and conditions
Correction of bid prices
Detailed analysis
Award of Contract
After the negotiations have been successful, the contract will be
awarded to the successful contractor. The formal steps might include;
Writing a letter of acceptance
Writing the letter to proceed with the works
Performance bond: 10% a guarantee that will do the job as per agreed
15
cont’d
Construction stage
Here is where the actual execution of the works takes place as per
scheduled.
Commissioning and acceptance
Commissioning a process whereby the contractor makes sure that all
installed mechanical or electrical parts are operational. During
commissioning, therefore all such parts are run in the presence of the
client or his representative as per the conditions agreed.
Acceptance has two stages:
1. Provisional acceptance
2. Final acceptance
16
cont’d
1. Provisional acceptance:
The client accepts the completed works on provision basis for a one
year period.
During this period, all payments except retention are paid.
The other option is to release the retention money and require for a
bank or insurance security.
2. Final acceptance:
At this stage the owner completely accepts the works executed and
the retention money is released to the contractor.
But, if the client found out some construction default during this
period, he can oblige the contractor to work out that default or the
client himself works it out from the retention money.
17
cont’d

More Related Content

Similar to Chapter one new.pptx

Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
Sysy Jnthn
 
Thomas Koziarski Consulting brief presentation 2016
Thomas Koziarski Consulting brief presentation 2016Thomas Koziarski Consulting brief presentation 2016
Thomas Koziarski Consulting brief presentation 2016
Thomas Frank.
 
Chapter 2- Contract Management
Chapter 2- Contract ManagementChapter 2- Contract Management
Chapter 2- Contract Management
Delhi Technological University
 
Transmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesTransmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission Lines
MANTHAN CHAUHAN
 
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Kipcon Inc.
 
Quality Management Plan
Quality Management PlanQuality Management Plan
Quality Management Plan
AnuragBhat7
 
CURRICULUM VITAE World Bank Format V3
CURRICULUM VITAE World Bank Format V3CURRICULUM VITAE World Bank Format V3
CURRICULUM VITAE World Bank Format V3
Johannes Wartensteiner
 
Mechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed OmerMechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed Omer
Omer Mohammed
 
QSS
QSSQSS
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
Jy Chong
 
Qs(ici&itd) (1)
Qs(ici&itd) (1)Qs(ici&itd) (1)
Qs(ici&itd) (1)
Js Cheok
 
Cl report final
Cl report finalCl report final
Cl report final
Arthur Wilson
 
Ijciet 10 01_088
Ijciet 10 01_088Ijciet 10 01_088
Ijciet 10 01_088
IAEME Publication
 
Construction Safety Training_Session 01_Overview of the Construction Industry
Construction Safety Training_Session 01_Overview of the Construction IndustryConstruction Safety Training_Session 01_Overview of the Construction Industry
Construction Safety Training_Session 01_Overview of the Construction Industry
Muizz Anibire
 
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTSFINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
Lenson Mhango
 
GRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATION
GRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATIONGRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATION
GRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATION
IRAGI MIHIGO Didier
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
Dean Sanchez
 
contract_management.ppt
contract_management.pptcontract_management.ppt
contract_management.ppt
ssuser32da691
 
CV waqar Azeem QS
CV waqar Azeem QSCV waqar Azeem QS
CV waqar Azeem QS
WAQAR AZEEM
 
Curriculam_Vijay supervisor-2-2-2-3 (1)
Curriculam_Vijay supervisor-2-2-2-3 (1)Curriculam_Vijay supervisor-2-2-2-3 (1)
Curriculam_Vijay supervisor-2-2-2-3 (1)
Vijaya Kumar
 

Similar to Chapter one new.pptx (20)

Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
 
Thomas Koziarski Consulting brief presentation 2016
Thomas Koziarski Consulting brief presentation 2016Thomas Koziarski Consulting brief presentation 2016
Thomas Koziarski Consulting brief presentation 2016
 
Chapter 2- Contract Management
Chapter 2- Contract ManagementChapter 2- Contract Management
Chapter 2- Contract Management
 
Transmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesTransmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission Lines
 
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
 
Quality Management Plan
Quality Management PlanQuality Management Plan
Quality Management Plan
 
CURRICULUM VITAE World Bank Format V3
CURRICULUM VITAE World Bank Format V3CURRICULUM VITAE World Bank Format V3
CURRICULUM VITAE World Bank Format V3
 
Mechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed OmerMechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed Omer
 
QSS
QSSQSS
QSS
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
 
Qs(ici&itd) (1)
Qs(ici&itd) (1)Qs(ici&itd) (1)
Qs(ici&itd) (1)
 
Cl report final
Cl report finalCl report final
Cl report final
 
Ijciet 10 01_088
Ijciet 10 01_088Ijciet 10 01_088
Ijciet 10 01_088
 
Construction Safety Training_Session 01_Overview of the Construction Industry
Construction Safety Training_Session 01_Overview of the Construction IndustryConstruction Safety Training_Session 01_Overview of the Construction Industry
Construction Safety Training_Session 01_Overview of the Construction Industry
 
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTSFINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
 
GRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATION
GRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATIONGRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATION
GRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATION
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
contract_management.ppt
contract_management.pptcontract_management.ppt
contract_management.ppt
 
CV waqar Azeem QS
CV waqar Azeem QSCV waqar Azeem QS
CV waqar Azeem QS
 
Curriculam_Vijay supervisor-2-2-2-3 (1)
Curriculam_Vijay supervisor-2-2-2-3 (1)Curriculam_Vijay supervisor-2-2-2-3 (1)
Curriculam_Vijay supervisor-2-2-2-3 (1)
 

Recently uploaded

ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
Madan Karki
 
gray level transformation unit 3(image processing))
gray level transformation unit 3(image processing))gray level transformation unit 3(image processing))
gray level transformation unit 3(image processing))
shivani5543
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
NazakatAliKhoso2
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENTNATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
Addu25809
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
LAXMAREDDY22
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 

Recently uploaded (20)

ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
 
gray level transformation unit 3(image processing))
gray level transformation unit 3(image processing))gray level transformation unit 3(image processing))
gray level transformation unit 3(image processing))
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENTNATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 

Chapter one new.pptx

  • 1. 1 Construction Technology and Management Department College of Engineering and Technology
  • 2. Course out line Course Title: Specification and Quantity surveying Course Number: COTM 3211 Credit Hours: 3 Academic year: 2016/17, Semester II Pre-requisites : Building construction II Program: III Year Regular BSc, Construction Technology and Management Instructor: Sintayehu G.
  • 3. cont’d Chapter 1. Introduction ◦ General Introduction ◦ Stages in Construction Chapter 3. Specifications ◦ Introduction ◦ Types of Specifications ◦ Specification Writing
  • 4. cont’d Chapter 4. Quantity surveying ◦ Introduction ◦ Materials Take Off Preparation and Measuring of Quantities ◦ Quantity Take Off ◦ Types of Takeoff Chapter 5. project cost estimation ◦General ◦Types of costing or estimating
  • 5. cont’d Evaluation Quiz & assignment . …………...20% Test ……………………………….…. ..10% Project………………………… ….....30% Final Exam……………………..…… 40% References B.N.Dutta, “Estimating costing in civil Engineering” W.J. Hornung, “Estimating Building Construction Quantity Surveying” MoWUD, “Standard condition of contract for construction of civil work” Handout
  • 6. 6 COTM 3211 –Specification and Quantity Surveying
  • 7. Chapter Outline 1. General introduction 2. The main players in the CI 3. Stages construction process 7
  • 8. 1.1. General Introduction Construction Industry is an industry which is involved in the planning, execution and evaluation of all types of civil works. CI Categories:  Transport and Communication (Road, Railway, Airway, and Telecommunication)  Water and Energy Works; and  Buildings and Other Physical Infrastructures CI is among the leading industry in producing employment and contribute to the overall national development (Current situation of Ethiopia) CI specially in developing countries like ETHIOPIA consumes much of the national budget. (Almost 60%)
  • 9. Ethiopian Construction Recent Trends Roads Projects ( 43 Billion Birr in 5 yrs)  Many road projects under the federal & regional state Road authorities  Road to connect Addis to Adama Hydropower and Wind energy Projects  The Grand Ethiopian Renaissance Dam Project  GilgelGibe I, II, and III, Tekeze, Tana Beles, Fincha-Neshe, etc.  Wind energy (around Mekele& Adama) Buildings projects  Housing projects at federal & regional state level ( 400,000 houses ( 16 B Birr)  The construction of universities and Many health centers Water Supply and Irrigation projects ( 10.63 B Birr)  Kessem, Tendaho, Omorate, Gidabu, FinchaSFEP, Ribi-Megech, etc. Railway  Addis Ababa city rail ways ( supposed to begin service shortly) In the Private Sector  Residential and commercial Buildings
  • 10. The Client The Consultant The Contractor Insurance Companies Banks Suppliers Permitting Agencies Public 10 The main players in the construction industry are:
  • 11. Assignment No.1 To be submitted individually in hard copy not more than three pages Study and write the role of the main participant in construction industry Submission date: One week as of today: F) Nov, 17, 2014. E) Nov, 14, 2014. A) Nov, 14, 2014. CE- 5121 –Contract, Specification and Quantity Survey 11
  • 12. Resources for the Construction Industry Human Resources / Labour or Workmen Financial Resources / Fund Information Resources Physical Resources such as Materials (55-70%), Equipment and Other Assets Services and Management. 12
  • 13. 1.1.1. Stages in Construction Inception and feasibility Planning and Design Tendering Stages Bid Evaluation Award of Contract Construction Stage Commissioning and Acceptance ◦ Provisional Acceptance ◦ Final Acceptance 13
  • 14. Inception and Feasibility At this stage, the owner will hire consultant to formally design and develop the concept into a practicable project. Planning and Design Stage At this stage, the consultant plans and designs the project based on the owner’s requirement and the possible constraints. Tendering stage At this stage contractors are invited to offer their best technical and financial offers as per the conditions and specifications depicted in the contract document. 14 cont’d
  • 15. Bid Evaluation /Evaluation of Tenders The bids are evaluated based on: Compliance with the contractual terms and conditions Correction of bid prices Detailed analysis Award of Contract After the negotiations have been successful, the contract will be awarded to the successful contractor. The formal steps might include; Writing a letter of acceptance Writing the letter to proceed with the works Performance bond: 10% a guarantee that will do the job as per agreed 15 cont’d
  • 16. Construction stage Here is where the actual execution of the works takes place as per scheduled. Commissioning and acceptance Commissioning a process whereby the contractor makes sure that all installed mechanical or electrical parts are operational. During commissioning, therefore all such parts are run in the presence of the client or his representative as per the conditions agreed. Acceptance has two stages: 1. Provisional acceptance 2. Final acceptance 16 cont’d
  • 17. 1. Provisional acceptance: The client accepts the completed works on provision basis for a one year period. During this period, all payments except retention are paid. The other option is to release the retention money and require for a bank or insurance security. 2. Final acceptance: At this stage the owner completely accepts the works executed and the retention money is released to the contractor. But, if the client found out some construction default during this period, he can oblige the contractor to work out that default or the client himself works it out from the retention money. 17 cont’d