Capacity Planning
 Capacity is the upper limit or ceiling on the
load that an operating unit can handle.
 The basic questions in capacity handling are:
 What kind of capacity is needed?
 How much is needed?
 When is it needed?
5-4 Capacity Planning
1. Impacts ability to meet future demands
2. Affects operating costs
3. Major determinant of initial costs
4. Involves long-term commitment
5. Affects competitiveness
6. Affects ease of management
7. Globalization adds complexity
8. Impacts long range planning
Importance of Capacity Decisions
5-5 Capacity Planning
Capacity
 Design capacity
 maximum output rate or service capacity an
operation, process, or facility is designed for
 Effective capacity
 Design capacity minus allowances such as
personal time, maintenance, and scrap
 Actual output
 rate of output actually achieved--cannot
exceed effective capacity.
5-6 Capacity Planning
Efficiency and Utilization
Actual output
Efficiency =
Effective capacity
Actual output
Utilization =
Design capacity
Both measures expressed as percentages
5-7 Capacity Planning
Actual output = 36 units/day
Efficiency = = 90%
Effective capacity 40 units/ day
Utilization = Actual output = 36 units/day
= 72%
Design capacity 50 units/day
Efficiency/Utilization Example
Design capacity = 50 trucks/day
Effective capacity = 40 trucks/day
Actual output = 36 units/day
5-8 Capacity Planning
Determinants of Effective Capacity
 Facilities
 Product and service factors
 Process factors
 Human factors
 Operational factors
 Supply chain factors
 External factors
5-9 Capacity Planning
Strategy Formulation
 Capacity strategy for long-term demand
 Demand patterns
 Growth rate and variability
 Facilities
 Cost of building and operating
 Technological changes
 Rate and direction of technology changes
 Behavior of competitors
 Availability of capital and other inputs
5-10 Capacity Planning
Key Decisions of Capacity Planning
1. Amount of capacity needed
2. Timing of changes
3. Need to maintain balance
4. Extent of flexibility of facilities
Capacity cushion – extra demand intended to offset uncertainty
5-11 Capacity Planning
Steps for Capacity Planning
1. Estimate future capacity requirements
2. Evaluate existing capacity
3. Identify alternatives
4. Conduct financial analysis
5. Assess key qualitative issues
6. Select one alternative
7. Implement alternative chosen
8. Monitor results
5-12 Capacity Planning
Make or Buy
1. Available capacity
2. Expertise
3. Quality considerations
4. Nature of demand
5. Cost
6. Risk
5-13 Capacity Planning
Developing Capacity Alternatives
1. Design flexibility into systems
2. Take stage of life cycle into account
3. Take a “big picture” approach to capacity
changes
4. Prepare to deal with capacity “chunks”
5. Attempt to smooth out capacity requirements
6. Identify the optimal operating level
5-14 Capacity Planning
Economies of Scale
 Economies of scale
 If the output rate is less than the optimal level,
increasing output rate results in decreasing
average unit costs
 Diseconomies of scale
 If the output rate is more than the optimal level,
increasing the output rate results in increasing
average unit costs
5-15 Capacity Planning
Evaluating Alternatives
Minimum
cost
Average
cost
per
unit
0 Rate of output
Production units have an optimal rate of output for minimal cost.
Figure 5.3
Minimum average cost per unit
5-16 Capacity Planning
Evaluating Alternatives
Minimum cost & optimal operating rate are
functions of size of production unit.
Average
cost
per
unit
0
Small
plant Medium
plant Large
plant
Output rate
Figure 5.4
5-17 Capacity Planning
 Need to be near customers
 Capacity and location are closely tied
 Inability to store services
 Capacity must be matched with timing of
demand
 Degree of volatility of demand
 Peak demand periods
Planning Service Capacity
5-18 Capacity Planning
Cost-Volume Relationships
Amount
($)
0
Q (volume in units)
Fixed cost (FC)
Figure 5.5a
5-19 Capacity Planning
Cost-Volume Relationships
Amount
($)
Q (volume in units)
0
Figure 5.5b
5-20 Capacity Planning
Cost-Volume Relationships
Amount
($)
Q (volume in units)
0 BEP units
Figure 5.5c
5-21 Capacity Planning
Break-Even Problem with Step Fixed Costs
Quantity
Step fixed costs and variable costs.
1 machine
2 machines
3 machines
Figure 5.6a
5-22 Capacity Planning
Break-Even Problem with Step Fixed Costs
$
TC
TC
TC
BEP2
BEP
3
Quantity
1
2
3
Multiple break-even points
Figure 5.6b
5-23 Capacity Planning
1. One product is involved
2. Everything produced can be sold
3. Variable cost per unit is the same regardless
of volume
4. Fixed costs do not change with volume
5. Revenue per unit constant with volume
6. Revenue per unit exceeds variable cost per
unit
Assumptions of Cost-Volume Analysis
5-24 Capacity Planning
Financial Analysis
 Cash Flow - the difference between cash
received from sales and other sources, and
cash outflow for labor, material, overhead,
and taxes.
 Present Value - the sum, in current value, of
all future cash flows of an investment
proposal.
5-25 Capacity Planning
Calculating Processing Requirements
Product
Annual
Demand
Standard
processing time
per unit (hr.)
Processing time
needed (hr.)
#1
#2
#3
400
300
700
5.0
8.0
2.0
2,000
2,400
1,400
5,800

More Related Content

What's hot

S&OP Process
S&OP ProcessS&OP Process
S&OP Process
Anand Subramaniam
 
CAPACITY PLANNING
CAPACITY PLANNINGCAPACITY PLANNING
CAPACITY PLANNING
Shilpi Panchal
 
Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and services
gerlyn bonus
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
Pam Cudal
 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource Planning
Biswajit Ghosh
 
Operations Management Presentation
Operations Management PresentationOperations Management Presentation
Operations Management PresentationPatrick Rubix
 
Best of the Best S&OP Conference
Best of the Best S&OP ConferenceBest of the Best S&OP Conference
Best of the Best S&OP Conference
Steelwedge
 
Aggregate planning and mps om
Aggregate planning and mps omAggregate planning and mps om
Aggregate planning and mps om
fatuma ahmed
 
Scheduling
SchedulingScheduling
Schedulingjaya_22
 
Operation and value chain management
Operation and value chain managementOperation and value chain management
Operation and value chain management
Aashray For Everyone
 
Master Production Scheduling (MPS)
Master Production Scheduling (MPS) Master Production Scheduling (MPS)
Master Production Scheduling (MPS)
Pankil Shah
 
Aggregate Planning
Aggregate PlanningAggregate Planning
Aggregate Planning
Raju Rajendran
 
Supply chain management
Supply chain managementSupply chain management
Supply chain managementAniket Verma
 
Operations and Supply Chain Management
Operations and Supply Chain Management Operations and Supply Chain Management
Operations and Supply Chain Management
Sarang Dani
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planningAtif Ghayas
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
Atul Saralach
 
Chapter 5 design_of_goods_and_services
Chapter 5 design_of_goods_and_servicesChapter 5 design_of_goods_and_services
Chapter 5 design_of_goods_and_services
Nên Trần Ngọc
 

What's hot (20)

S&OP Process
S&OP ProcessS&OP Process
S&OP Process
 
CAPACITY PLANNING
CAPACITY PLANNINGCAPACITY PLANNING
CAPACITY PLANNING
 
Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and services
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource Planning
 
Operations Management Presentation
Operations Management PresentationOperations Management Presentation
Operations Management Presentation
 
Best of the Best S&OP Conference
Best of the Best S&OP ConferenceBest of the Best S&OP Conference
Best of the Best S&OP Conference
 
Aggregate planning and mps om
Aggregate planning and mps omAggregate planning and mps om
Aggregate planning and mps om
 
Chapter 9 layout strategies
Chapter 9 layout strategiesChapter 9 layout strategies
Chapter 9 layout strategies
 
Scheduling
SchedulingScheduling
Scheduling
 
Operation and value chain management
Operation and value chain managementOperation and value chain management
Operation and value chain management
 
Heizer 12
Heizer 12Heizer 12
Heizer 12
 
Master Production Scheduling (MPS)
Master Production Scheduling (MPS) Master Production Scheduling (MPS)
Master Production Scheduling (MPS)
 
Aggregate Planning
Aggregate PlanningAggregate Planning
Aggregate Planning
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Demand management
Demand managementDemand management
Demand management
 
Operations and Supply Chain Management
Operations and Supply Chain Management Operations and Supply Chain Management
Operations and Supply Chain Management
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Chapter 5 design_of_goods_and_services
Chapter 5 design_of_goods_and_servicesChapter 5 design_of_goods_and_services
Chapter 5 design_of_goods_and_services
 

Similar to Chapter 5 Capacity Planning.ppt

Capacity-Planning.ppt
Capacity-Planning.pptCapacity-Planning.ppt
Capacity-Planning.ppt
ChemicalsTrader
 
Operation management ppt.ppt
Operation management  ppt.pptOperation management  ppt.ppt
Operation management ppt.ppt
JyotirmayaMaharana3
 
Capacity planing
Capacity planingCapacity planing
Capacity planing
AdityaChaudhary651374
 
Chapter 05 Slides.pptx
Chapter 05                                      Slides.pptxChapter 05                                      Slides.pptx
Chapter 05 Slides.pptx
ryan gementiza
 
Chapter 05 Slides.pptx
Chapter 05                                      Slides.pptxChapter 05                                      Slides.pptx
Chapter 05 Slides.pptx
ryan gementiza
 
(capacity1).ppt
(capacity1).ppt(capacity1).ppt
(capacity1).ppt
sreeeswar
 
Capacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityCapacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of Capacity
JoanRachelCalansingi
 
Operations Management - Chapter 5.pdf
Operations Management - Chapter 5.pdfOperations Management - Chapter 5.pdf
Operations Management - Chapter 5.pdf
KhatVillados
 
CHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptxCHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptx
PeriMinstrel
 
Process selection and capacity planning
Process selection and capacity planningProcess selection and capacity planning
Process selection and capacity planningShankarjyoti Hazarika
 
Capital efficiency pull all levers
Capital efficiency pull all leversCapital efficiency pull all levers
Capital efficiency pull all levers
Bob Prieto
 
(CAPACITY PLANNIG)
(CAPACITY PLANNIG)(CAPACITY PLANNIG)
(CAPACITY PLANNIG)
Laureen Awuor
 
Strategic Capacity Planning for Products and ServicesChapter 5.docx
Strategic Capacity Planning for Products and ServicesChapter 5.docxStrategic Capacity Planning for Products and ServicesChapter 5.docx
Strategic Capacity Planning for Products and ServicesChapter 5.docx
rjoseph5
 
Strategic capacity planning for products and services chapter 5
Strategic capacity planning for products and services chapter 5Strategic capacity planning for products and services chapter 5
Strategic capacity planning for products and services chapter 5
mayank272369
 
Capacity resource planning and production scheduling
Capacity resource planning and production schedulingCapacity resource planning and production scheduling
Capacity resource planning and production schedulingdutconsult
 
Identifying opportunities for unlocking capacity at auto component manufacturer
Identifying opportunities for unlocking capacity at auto component manufacturerIdentifying opportunities for unlocking capacity at auto component manufacturer
Identifying opportunities for unlocking capacity at auto component manufacturer
Anirban Mazumdar
 
Maintenance cost to Savings
Maintenance cost to SavingsMaintenance cost to Savings
Maintenance cost to SavingsSwapnil Sharma
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity PlanningMOHD ARISH
 

Similar to Chapter 5 Capacity Planning.ppt (20)

Capacity-Planning.ppt
Capacity-Planning.pptCapacity-Planning.ppt
Capacity-Planning.ppt
 
Operation management ppt.ppt
Operation management  ppt.pptOperation management  ppt.ppt
Operation management ppt.ppt
 
Capacity planing
Capacity planingCapacity planing
Capacity planing
 
Chapter 05 Slides.pptx
Chapter 05                                      Slides.pptxChapter 05                                      Slides.pptx
Chapter 05 Slides.pptx
 
Chapter 05 Slides.pptx
Chapter 05                                      Slides.pptxChapter 05                                      Slides.pptx
Chapter 05 Slides.pptx
 
Facility Laout
Facility LaoutFacility Laout
Facility Laout
 
(capacity1).ppt
(capacity1).ppt(capacity1).ppt
(capacity1).ppt
 
Capacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityCapacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of Capacity
 
Operations Management - Chapter 5.pdf
Operations Management - Chapter 5.pdfOperations Management - Chapter 5.pdf
Operations Management - Chapter 5.pdf
 
Capacity planning
Capacity planning Capacity planning
Capacity planning
 
CHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptxCHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptx
 
Process selection and capacity planning
Process selection and capacity planningProcess selection and capacity planning
Process selection and capacity planning
 
Capital efficiency pull all levers
Capital efficiency pull all leversCapital efficiency pull all levers
Capital efficiency pull all levers
 
(CAPACITY PLANNIG)
(CAPACITY PLANNIG)(CAPACITY PLANNIG)
(CAPACITY PLANNIG)
 
Strategic Capacity Planning for Products and ServicesChapter 5.docx
Strategic Capacity Planning for Products and ServicesChapter 5.docxStrategic Capacity Planning for Products and ServicesChapter 5.docx
Strategic Capacity Planning for Products and ServicesChapter 5.docx
 
Strategic capacity planning for products and services chapter 5
Strategic capacity planning for products and services chapter 5Strategic capacity planning for products and services chapter 5
Strategic capacity planning for products and services chapter 5
 
Capacity resource planning and production scheduling
Capacity resource planning and production schedulingCapacity resource planning and production scheduling
Capacity resource planning and production scheduling
 
Identifying opportunities for unlocking capacity at auto component manufacturer
Identifying opportunities for unlocking capacity at auto component manufacturerIdentifying opportunities for unlocking capacity at auto component manufacturer
Identifying opportunities for unlocking capacity at auto component manufacturer
 
Maintenance cost to Savings
Maintenance cost to SavingsMaintenance cost to Savings
Maintenance cost to Savings
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
 

Recently uploaded

RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Jos Voskuil
 
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop.com LTD
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
AUDIJEAngelo
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
Safe PaaS
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 

Recently uploaded (20)

RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
 
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 

Chapter 5 Capacity Planning.ppt

  • 1. 5-1 Capacity Planning William J. Stevenson Operations Management 8th edition
  • 2. 5-2 Capacity Planning CHAPTER 5 Capacity Planning For Products and Services McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
  • 3. 5-3 Capacity Planning Capacity Planning  Capacity is the upper limit or ceiling on the load that an operating unit can handle.  The basic questions in capacity handling are:  What kind of capacity is needed?  How much is needed?  When is it needed?
  • 4. 5-4 Capacity Planning 1. Impacts ability to meet future demands 2. Affects operating costs 3. Major determinant of initial costs 4. Involves long-term commitment 5. Affects competitiveness 6. Affects ease of management 7. Globalization adds complexity 8. Impacts long range planning Importance of Capacity Decisions
  • 5. 5-5 Capacity Planning Capacity  Design capacity  maximum output rate or service capacity an operation, process, or facility is designed for  Effective capacity  Design capacity minus allowances such as personal time, maintenance, and scrap  Actual output  rate of output actually achieved--cannot exceed effective capacity.
  • 6. 5-6 Capacity Planning Efficiency and Utilization Actual output Efficiency = Effective capacity Actual output Utilization = Design capacity Both measures expressed as percentages
  • 7. 5-7 Capacity Planning Actual output = 36 units/day Efficiency = = 90% Effective capacity 40 units/ day Utilization = Actual output = 36 units/day = 72% Design capacity 50 units/day Efficiency/Utilization Example Design capacity = 50 trucks/day Effective capacity = 40 trucks/day Actual output = 36 units/day
  • 8. 5-8 Capacity Planning Determinants of Effective Capacity  Facilities  Product and service factors  Process factors  Human factors  Operational factors  Supply chain factors  External factors
  • 9. 5-9 Capacity Planning Strategy Formulation  Capacity strategy for long-term demand  Demand patterns  Growth rate and variability  Facilities  Cost of building and operating  Technological changes  Rate and direction of technology changes  Behavior of competitors  Availability of capital and other inputs
  • 10. 5-10 Capacity Planning Key Decisions of Capacity Planning 1. Amount of capacity needed 2. Timing of changes 3. Need to maintain balance 4. Extent of flexibility of facilities Capacity cushion – extra demand intended to offset uncertainty
  • 11. 5-11 Capacity Planning Steps for Capacity Planning 1. Estimate future capacity requirements 2. Evaluate existing capacity 3. Identify alternatives 4. Conduct financial analysis 5. Assess key qualitative issues 6. Select one alternative 7. Implement alternative chosen 8. Monitor results
  • 12. 5-12 Capacity Planning Make or Buy 1. Available capacity 2. Expertise 3. Quality considerations 4. Nature of demand 5. Cost 6. Risk
  • 13. 5-13 Capacity Planning Developing Capacity Alternatives 1. Design flexibility into systems 2. Take stage of life cycle into account 3. Take a “big picture” approach to capacity changes 4. Prepare to deal with capacity “chunks” 5. Attempt to smooth out capacity requirements 6. Identify the optimal operating level
  • 14. 5-14 Capacity Planning Economies of Scale  Economies of scale  If the output rate is less than the optimal level, increasing output rate results in decreasing average unit costs  Diseconomies of scale  If the output rate is more than the optimal level, increasing the output rate results in increasing average unit costs
  • 15. 5-15 Capacity Planning Evaluating Alternatives Minimum cost Average cost per unit 0 Rate of output Production units have an optimal rate of output for minimal cost. Figure 5.3 Minimum average cost per unit
  • 16. 5-16 Capacity Planning Evaluating Alternatives Minimum cost & optimal operating rate are functions of size of production unit. Average cost per unit 0 Small plant Medium plant Large plant Output rate Figure 5.4
  • 17. 5-17 Capacity Planning  Need to be near customers  Capacity and location are closely tied  Inability to store services  Capacity must be matched with timing of demand  Degree of volatility of demand  Peak demand periods Planning Service Capacity
  • 18. 5-18 Capacity Planning Cost-Volume Relationships Amount ($) 0 Q (volume in units) Fixed cost (FC) Figure 5.5a
  • 19. 5-19 Capacity Planning Cost-Volume Relationships Amount ($) Q (volume in units) 0 Figure 5.5b
  • 20. 5-20 Capacity Planning Cost-Volume Relationships Amount ($) Q (volume in units) 0 BEP units Figure 5.5c
  • 21. 5-21 Capacity Planning Break-Even Problem with Step Fixed Costs Quantity Step fixed costs and variable costs. 1 machine 2 machines 3 machines Figure 5.6a
  • 22. 5-22 Capacity Planning Break-Even Problem with Step Fixed Costs $ TC TC TC BEP2 BEP 3 Quantity 1 2 3 Multiple break-even points Figure 5.6b
  • 23. 5-23 Capacity Planning 1. One product is involved 2. Everything produced can be sold 3. Variable cost per unit is the same regardless of volume 4. Fixed costs do not change with volume 5. Revenue per unit constant with volume 6. Revenue per unit exceeds variable cost per unit Assumptions of Cost-Volume Analysis
  • 24. 5-24 Capacity Planning Financial Analysis  Cash Flow - the difference between cash received from sales and other sources, and cash outflow for labor, material, overhead, and taxes.  Present Value - the sum, in current value, of all future cash flows of an investment proposal.
  • 25. 5-25 Capacity Planning Calculating Processing Requirements Product Annual Demand Standard processing time per unit (hr.) Processing time needed (hr.) #1 #2 #3 400 300 700 5.0 8.0 2.0 2,000 2,400 1,400 5,800