EARLY RIVER VALLEY
  CIVILIZATIONS
       Chapter 2
CHAPTER OVERVIEW



Civilizations emerged and developed on fertile plains
in Mesopotamia, Egypt, the Indus Valley, and China
1. CITY-STATES IN
           MESOPOTAMIA



Students should be able to describe how the earliest
civilization in Asia arose in Mesopotamia, organized
into city-states, and developed into the world’s first
empire.
1. Summarize how geography affected culture in
   the Fertile Crescent

2. Describe city-states and how other cultures
   learned about them

3. Describe Sumerian religious beliefs, social
   structure, and technology

4. Explain the influence of Sumer of later
   civilizations
Bronze technology developed first in Sumeria, 3300 BCE
Sargon of Akkad unites Mesopotamia, 2350
BCE

Amorites form Babylonian Empire, ~2000 BCE

Hammurabi, ~1700 BCE

 Hammurabi’s Code, 282 written laws
2. PYRAMIDS ON THE NILE



 Students should be able to analyze Egypt’s geography,
 political structure, religion, technology, and culture.
Summarize how geography affected the
development of Egyptian culture

Explain the importance of pharaohs, pyramids,
and trade in the Old Kingdom

Describe ancient Egyptian religion, social
structure, and technology

Explain the shift from the Old Kingdom to the
New Kingdom
the crown of
   Narmer
Old Kingdom ends, 2180 BCE

Middle Kingdom until 1640 BCE

Hyksos from 1630 to 1523 BCE
3. PLANNED CITIES ON THE
          INDUS



Students should be able to describe characteristics and
accomplishments of the first Indian civilization, such
as planned cities and a written language.
The first Indian civilization built well-planned
cities on the banks of the Indus River.

  Describe the impact of geography on the Indus
  Valley culture.

  What major concepts characterize Indus Valley
  cities and culture?

  List theories about the decline of Indus Valley
  cultures.
4. RIVER DYNASTIES IN CHINA




 Students should be able to explaib how the Shang and
 Zhou dynasties affected Chinese civilization and
 culture
1. Explain the effects of geography on cultural
   development in China

2. Describe the growth & structure of the Shang
   dynasty

3. Summarize the rise and fall of the Zhou
   dynasty
2000 BCE, Xia Dynasty

1532-1027 BCE, Shang Dynasty

 Anyang
CHINESE CULTURE


Family
Religious beliefs
Ideographic writing
Shang technology and artistry
Mandate of Heaven and the dynastic
        cycle (p. 54)

1027-256 BCE, Zhou Dynasty

  Feudalism

Period of Warring States
Ch 02 Early River Valley Civilizations

Ch 02 Early River Valley Civilizations

  • 1.
    EARLY RIVER VALLEY CIVILIZATIONS Chapter 2
  • 2.
    CHAPTER OVERVIEW Civilizations emergedand developed on fertile plains in Mesopotamia, Egypt, the Indus Valley, and China
  • 3.
    1. CITY-STATES IN MESOPOTAMIA Students should be able to describe how the earliest civilization in Asia arose in Mesopotamia, organized into city-states, and developed into the world’s first empire.
  • 4.
    1. Summarize howgeography affected culture in the Fertile Crescent 2. Describe city-states and how other cultures learned about them 3. Describe Sumerian religious beliefs, social structure, and technology 4. Explain the influence of Sumer of later civilizations
  • 6.
    Bronze technology developedfirst in Sumeria, 3300 BCE
  • 7.
    Sargon of Akkadunites Mesopotamia, 2350 BCE Amorites form Babylonian Empire, ~2000 BCE Hammurabi, ~1700 BCE Hammurabi’s Code, 282 written laws
  • 9.
    2. PYRAMIDS ONTHE NILE Students should be able to analyze Egypt’s geography, political structure, religion, technology, and culture.
  • 10.
    Summarize how geographyaffected the development of Egyptian culture Explain the importance of pharaohs, pyramids, and trade in the Old Kingdom Describe ancient Egyptian religion, social structure, and technology Explain the shift from the Old Kingdom to the New Kingdom
  • 12.
  • 29.
    Old Kingdom ends,2180 BCE Middle Kingdom until 1640 BCE Hyksos from 1630 to 1523 BCE
  • 30.
    3. PLANNED CITIESON THE INDUS Students should be able to describe characteristics and accomplishments of the first Indian civilization, such as planned cities and a written language.
  • 32.
    The first Indiancivilization built well-planned cities on the banks of the Indus River. Describe the impact of geography on the Indus Valley culture. What major concepts characterize Indus Valley cities and culture? List theories about the decline of Indus Valley cultures.
  • 33.
    4. RIVER DYNASTIESIN CHINA Students should be able to explaib how the Shang and Zhou dynasties affected Chinese civilization and culture
  • 34.
    1. Explain theeffects of geography on cultural development in China 2. Describe the growth & structure of the Shang dynasty 3. Summarize the rise and fall of the Zhou dynasty
  • 36.
    2000 BCE, XiaDynasty 1532-1027 BCE, Shang Dynasty Anyang
  • 37.
    CHINESE CULTURE Family Religious beliefs Ideographicwriting Shang technology and artistry
  • 38.
    Mandate of Heavenand the dynastic cycle (p. 54) 1027-256 BCE, Zhou Dynasty Feudalism Period of Warring States

Editor's Notes

  • #12 4,100 miles long Black land (good) vs Red land (bad) isolation until 3200 BCE
  • #13 Horus with crown of Upper and Lower Egypt - after Menes, 3100 BCE
  • #14 Pharaoh = god
  • #15 Papyrus & hieroglyphics
  • #16 Papyrus & hieroglyphics
  • #17 Papyrus & hieroglyphics
  • #18 Papyrus & hieroglyphics
  • #19 Papyrus & hieroglyphics
  • #20 Rosetta Stone
  • #21 Mummification
  • #22 Mummification
  • #23 Mummification
  • #24 Mummification
  • #25 Mummification
  • #26 Mummification
  • #27 Mummification
  • #30 Monsoons Oct - May = DRY June - Sept = WET
  • #34 loess Huang He in north Chang Jiang in south
  • #36 filial piety, ancestor worship writing unifies