SlideShare a Scribd company logo
Burj Al Arab
Cofferdam & Rigging
Firas Al Shalabi & Sunny Mahajan
CE 505
Project Presentation
1
Background
 Dubai, UAE
 1994 – 1999
 The first 7 stars hotel in the world
 The start of Dubai’s new vision of attracting new investments in
areas outside the oil industry.
 If you want to book a night there it will cost you around $2000
(according to Expedia tonight is $2039)
 1.2 million SF
 321 meters height from the sea.
2
The construction
 Two main phases:
 The manmade Island (our focus)
 The building
3
Building the island
 Temporary tube piles driven into sea bed
 Temporary sheet piles and tie rods
driven into sea bed to support
boundary rocks
Tubular pile
Sheet pile wall
4
Building the island
 Permanent boundary rock bunds (rock armor) deposited on both sides of the sheet
piles
 Hydraulic fill layers deposited between
bunds to displace sea water and form
the island
 No solid ground under the building just weak sand
(up to 180 meters deep with no solid ground). So it
was decided to go with friction piles.
Rock armor
Sand fill
5
Building the island
 Permanent SHED units placed around the island to dissipate the action of waves and
protect it.
 2M (6.5 ft) diameter 43 M (141 ft)
deep piles were driven through the
island and sea bed
SHED units
Main building piles 6
Building the island
 Excavations began in the island to remove the hydraulic fill
 A coffer dam was being built while
excavating
 2M (6.5 ft) thick concrete plug slab laid on the base of
the island to prevent the base from popping out
because of the sea pressure
 Reinforced concrete retaining wall built
 The construction of the basement
started
Concrete slab
7
Completed Island
 Completed in three years
8
Diagonal truss rigging
 Huge tubular triangular truss geometry
 The Diagonal vary from 76m to 90m in length and weigh 160 to 180 ton.
 The Diagonal connects with a 300mm diameter pin connection to the core-wall
and the Rear-leg structure.
 There are six diagonals erected at different levels on both side of the building
 transported as a single fabricated piece from the fabrication shop 15 km away
by special self propelled long trailers.
9
Diagonal truss rigging
 Dealing with the expansion about (2 inches)caused by the desert heat
 Strand jacks supported by Cat heads were connected to the building to
execute the lifting of the Diagonals and Horizontals.
10
Summary
 Many forces can destroy your temporary structures. You have to count them all.
 The safety of the crew is essential for cofferdams construction.
 Rigging elements can’t always be easy and can be more complicated than what we learned
 Putting things in the air is a different story.
 Have to come up with practical innovative on site solutions for uncertain problems
11
Thank you
References:
• Nathan. D., (2006) “Burj Al-Arab, UAE Structural Steel Construction For A Mega Project.”
master builder, 3rd quarter 77-80
http://www.mbam.org.my/mbam/images/MBJ3Q06(pdf)/@BurjAlArb.pdf
• Burj Al Arab, mega structures show. http://www.youtube.com/watch?v=RGzSNZudEHw
• Stonecypher. L., (2009). Building the tallest hotel: Burj Al Arab, Dubai.
http://www.brighthub.com/education/homework-tips/articles/57599.aspx#imgn_3
• Pourabedin. E., (2009). Burj Al Arab construction.
http://www.slideshare.net/shahrozalam210/burj-alarab1203786822334454
• Wright. T., (2000).Creating the Burj Al Arab Dubai
http://wkkarchitects.com/#/burj-al-arab/
12

More Related Content

What's hot

Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
Daniela Villa
 
Dubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copyDubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copyChyi Ong
 
My presentation on Dubhai ICON burj al arab
My presentation on Dubhai ICON  burj al arabMy presentation on Dubhai ICON  burj al arab
My presentation on Dubhai ICON burj al arab
Venu M
 
Burj al arab by oubaid majeed
Burj al arab by oubaid majeed Burj al arab by oubaid majeed
Burj al arab by oubaid majeed
junaid bashir
 
Burj al arab hotel case study
Burj al arab hotel case study Burj al arab hotel case study
Burj al arab hotel case study
Anas Khan
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
SaloniHosmani
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
shobhita4
 
Burj al-arab
Burj al-arabBurj al-arab
Burj al-arab
Souvik Mondal
 
Burj Al Arab, Tower Of The Arabs
Burj Al Arab, Tower Of The ArabsBurj Al Arab, Tower Of The Arabs
Burj Al Arab, Tower Of The Arabs
Laura Domínguez
 
Aldar Headquarters Dubai
Aldar Headquarters DubaiAldar Headquarters Dubai
Aldar Headquarters Dubai
Neha Rampuria
 
Namaste tower final ppt
Namaste tower final pptNamaste tower final ppt
Namaste tower final ppt
satya prakash meena
 
Burj khalifa-mode of construction
Burj khalifa-mode of constructionBurj khalifa-mode of construction
Burj khalifa-mode of construction
Joji Mathew
 
Construction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiConstruction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiAr. Md Shahroz Alam
 
TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY
Rifquthsb1
 
Cayan tower
Cayan towerCayan tower
Cayan tower
Rajat Nainwal
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
Shubham Jain
 
Resort design
Resort designResort design
Resort design
Self-employed
 
Burj Khalifa
Burj KhalifaBurj Khalifa
Burj Khalifa
Rajat Nainwal
 

What's hot (20)

Burj-al-arab
Burj-al-arabBurj-al-arab
Burj-al-arab
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
Dubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copyDubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copy
 
My presentation on Dubhai ICON burj al arab
My presentation on Dubhai ICON  burj al arabMy presentation on Dubhai ICON  burj al arab
My presentation on Dubhai ICON burj al arab
 
Burj al arab by oubaid majeed
Burj al arab by oubaid majeed Burj al arab by oubaid majeed
Burj al arab by oubaid majeed
 
Burj al arab hotel case study
Burj al arab hotel case study Burj al arab hotel case study
Burj al arab hotel case study
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Burj al arab-uae
Burj al arab-uaeBurj al arab-uae
Burj al arab-uae
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Burj al-arab
Burj al-arabBurj al-arab
Burj al-arab
 
Burj Al Arab, Tower Of The Arabs
Burj Al Arab, Tower Of The ArabsBurj Al Arab, Tower Of The Arabs
Burj Al Arab, Tower Of The Arabs
 
Aldar Headquarters Dubai
Aldar Headquarters DubaiAldar Headquarters Dubai
Aldar Headquarters Dubai
 
Namaste tower final ppt
Namaste tower final pptNamaste tower final ppt
Namaste tower final ppt
 
Burj khalifa-mode of construction
Burj khalifa-mode of constructionBurj khalifa-mode of construction
Burj khalifa-mode of construction
 
Construction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiConstruction of Burj Al Arab, Dubai
Construction of Burj Al Arab, Dubai
 
TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY
 
Cayan tower
Cayan towerCayan tower
Cayan tower
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Resort design
Resort designResort design
Resort design
 
Burj Khalifa
Burj KhalifaBurj Khalifa
Burj Khalifa
 

Viewers also liked

innovative details in architecture
innovative details in architectureinnovative details in architecture
innovative details in architecture
Sankalp Chandel
 
Burj al arab
Burj al arabBurj al arab
Burj al arab
Gabriela Garcia
 
Cofferdam
CofferdamCofferdam
Cofferdam
ubaidpvkd
 
Cofferdam
CofferdamCofferdam
Cofferdam
Shashank Namdeo
 
Type of caissons
Type of caissonsType of caissons
Type of caissons
AB MAKASANA
 
Burj al arab presentation
Burj al arab presentationBurj al arab presentation
Burj al arab presentationKat0412
 
Burjalarab 091001090618-phpapp01-1
Burjalarab 091001090618-phpapp01-1Burjalarab 091001090618-phpapp01-1
Burjalarab 091001090618-phpapp01-1jayashree
 
Cofferdam
CofferdamCofferdam
Cofferdam
Muhammad Bilal
 
NEW BLENDED CEMENTS
NEW BLENDED CEMENTSNEW BLENDED CEMENTS
NEW BLENDED CEMENTS
Dr J.D. Bapat
 
Coffer dams types
Coffer dams  typesCoffer dams  types
Coffer dams types
Amynaah Amye
 
Burj Al Arab - Dubai
Burj Al Arab - DubaiBurj Al Arab - Dubai
Burj Al Arab - Dubai
John *
 
Burj al arab technology homework
Burj al arab technology homeworkBurj al arab technology homework
Burj al arab technology homework
nataliarodriguez611
 
Cofferdam 02
Cofferdam 02Cofferdam 02
Cofferdam 02juwes
 
Burj-Al-Arab
Burj-Al-ArabBurj-Al-Arab
Burj-Al-Arab
harry3114
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
Ghulam Mustafa Vira
 
Burj ul arab
Burj ul arabBurj ul arab
Burj ul arab
Khurram Burjees
 
Burj Al Arab Conceptos De Fuerza Original
Burj Al Arab Conceptos De Fuerza OriginalBurj Al Arab Conceptos De Fuerza Original
Burj Al Arab Conceptos De Fuerza OriginalMunicipalidad de Pirque
 
Cofferdam
CofferdamCofferdam
Cofferdam
sauravsaxena3
 

Viewers also liked (20)

Burj al-arab
Burj al-arabBurj al-arab
Burj al-arab
 
innovative details in architecture
innovative details in architectureinnovative details in architecture
innovative details in architecture
 
Burj al arab
Burj al arabBurj al arab
Burj al arab
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
Type of caissons
Type of caissonsType of caissons
Type of caissons
 
Burj al arab presentation
Burj al arab presentationBurj al arab presentation
Burj al arab presentation
 
Burjalarab 091001090618-phpapp01-1
Burjalarab 091001090618-phpapp01-1Burjalarab 091001090618-phpapp01-1
Burjalarab 091001090618-phpapp01-1
 
Caisson types
Caisson typesCaisson types
Caisson types
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
NEW BLENDED CEMENTS
NEW BLENDED CEMENTSNEW BLENDED CEMENTS
NEW BLENDED CEMENTS
 
Coffer dams types
Coffer dams  typesCoffer dams  types
Coffer dams types
 
Burj Al Arab - Dubai
Burj Al Arab - DubaiBurj Al Arab - Dubai
Burj Al Arab - Dubai
 
Burj al arab technology homework
Burj al arab technology homeworkBurj al arab technology homework
Burj al arab technology homework
 
Cofferdam 02
Cofferdam 02Cofferdam 02
Cofferdam 02
 
Burj-Al-Arab
Burj-Al-ArabBurj-Al-Arab
Burj-Al-Arab
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
Burj ul arab
Burj ul arabBurj ul arab
Burj ul arab
 
Burj Al Arab Conceptos De Fuerza Original
Burj Al Arab Conceptos De Fuerza OriginalBurj Al Arab Conceptos De Fuerza Original
Burj Al Arab Conceptos De Fuerza Original
 
Cofferdam
CofferdamCofferdam
Cofferdam
 

Similar to Burj al arab (Cofferdam&Rigging)

BURJ AL ARAB Presentation on Structural System
BURJ AL ARAB Presentation on Structural SystemBURJ AL ARAB Presentation on Structural System
BURJ AL ARAB Presentation on Structural System
ABDURRAB ANSARI
 
Introduction of Burj Al Arab, Dubai
Introduction of Burj Al Arab, DubaiIntroduction of Burj Al Arab, Dubai
Introduction of Burj Al Arab, DubaiAr. Md Shahroz Alam
 
115903034-Burj-Al-Arab.pptx
115903034-Burj-Al-Arab.pptx115903034-Burj-Al-Arab.pptx
115903034-Burj-Al-Arab.pptx
GhaziMoe
 
20150421031337318
2015042103133731820150421031337318
20150421031337318
James Prs
 
ANSHU PPT NARDEY SIR.pptx
ANSHU PPT NARDEY SIR.pptxANSHU PPT NARDEY SIR.pptx
ANSHU PPT NARDEY SIR.pptx
AnshuBarmase
 
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
Tonyamis
 
MODERN BUILDING (BURJ AL-ARAB)
MODERN BUILDING (BURJ AL-ARAB) MODERN BUILDING (BURJ AL-ARAB)
MODERN BUILDING (BURJ AL-ARAB)
sathish sak
 
Palm island
Palm islandPalm island
GE Presentation 6th October 2010
GE Presentation 6th October 2010GE Presentation 6th October 2010
GE Presentation 6th October 2010
Tonyamis
 
Monolithic dome ppt
Monolithic dome pptMonolithic dome ppt
Monolithic dome ppt
Padmashree Sridhar
 
Structure and Details of Burj Al Arab, Dubai
Structure and Details of Burj Al Arab, DubaiStructure and Details of Burj Al Arab, Dubai
Structure and Details of Burj Al Arab, DubaiAr. Md Shahroz Alam
 
Project Management - Marina bay Sands
Project Management - Marina bay SandsProject Management - Marina bay Sands
Project Management - Marina bay Sands
Bimenpreet Kaur
 
Al dar hq
Al dar hqAl dar hq
Al dar hq
Nikhil Jaiswal
 
CAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABICAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABI
Self employed
 
burj khalifa
burj khalifaburj khalifa
burj khalifa
sauravavantador
 
Busan geoje fixed link
Busan   geoje fixed linkBusan   geoje fixed link
Busan geoje fixed link
Vicky Matwan
 
KINGDOM TOWER JEDDAH TOWER
KINGDOM TOWER JEDDAH TOWERKINGDOM TOWER JEDDAH TOWER
KINGDOM TOWER JEDDAH TOWER
MOHAMMED JIRUWALA
 
Pm burj case
Pm burj casePm burj case
Pm burj case
Pooja Mishra
 
Seminar artificial island.pptx
Seminar  artificial island.pptxSeminar  artificial island.pptx
Seminar artificial island.pptx
VismayaChandran3
 
Description of the Patent Grant awaiting Weather Secure Agri Habitat Design b...
Description of the Patent Grant awaiting Weather Secure Agri Habitat Design b...Description of the Patent Grant awaiting Weather Secure Agri Habitat Design b...
Description of the Patent Grant awaiting Weather Secure Agri Habitat Design b...
Center for Ecological Audit,Social Inclusion and Governance
 

Similar to Burj al arab (Cofferdam&Rigging) (20)

BURJ AL ARAB Presentation on Structural System
BURJ AL ARAB Presentation on Structural SystemBURJ AL ARAB Presentation on Structural System
BURJ AL ARAB Presentation on Structural System
 
Introduction of Burj Al Arab, Dubai
Introduction of Burj Al Arab, DubaiIntroduction of Burj Al Arab, Dubai
Introduction of Burj Al Arab, Dubai
 
115903034-Burj-Al-Arab.pptx
115903034-Burj-Al-Arab.pptx115903034-Burj-Al-Arab.pptx
115903034-Burj-Al-Arab.pptx
 
20150421031337318
2015042103133731820150421031337318
20150421031337318
 
ANSHU PPT NARDEY SIR.pptx
ANSHU PPT NARDEY SIR.pptxANSHU PPT NARDEY SIR.pptx
ANSHU PPT NARDEY SIR.pptx
 
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
 
MODERN BUILDING (BURJ AL-ARAB)
MODERN BUILDING (BURJ AL-ARAB) MODERN BUILDING (BURJ AL-ARAB)
MODERN BUILDING (BURJ AL-ARAB)
 
Palm island
Palm islandPalm island
Palm island
 
GE Presentation 6th October 2010
GE Presentation 6th October 2010GE Presentation 6th October 2010
GE Presentation 6th October 2010
 
Monolithic dome ppt
Monolithic dome pptMonolithic dome ppt
Monolithic dome ppt
 
Structure and Details of Burj Al Arab, Dubai
Structure and Details of Burj Al Arab, DubaiStructure and Details of Burj Al Arab, Dubai
Structure and Details of Burj Al Arab, Dubai
 
Project Management - Marina bay Sands
Project Management - Marina bay SandsProject Management - Marina bay Sands
Project Management - Marina bay Sands
 
Al dar hq
Al dar hqAl dar hq
Al dar hq
 
CAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABICAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABI
 
burj khalifa
burj khalifaburj khalifa
burj khalifa
 
Busan geoje fixed link
Busan   geoje fixed linkBusan   geoje fixed link
Busan geoje fixed link
 
KINGDOM TOWER JEDDAH TOWER
KINGDOM TOWER JEDDAH TOWERKINGDOM TOWER JEDDAH TOWER
KINGDOM TOWER JEDDAH TOWER
 
Pm burj case
Pm burj casePm burj case
Pm burj case
 
Seminar artificial island.pptx
Seminar  artificial island.pptxSeminar  artificial island.pptx
Seminar artificial island.pptx
 
Description of the Patent Grant awaiting Weather Secure Agri Habitat Design b...
Description of the Patent Grant awaiting Weather Secure Agri Habitat Design b...Description of the Patent Grant awaiting Weather Secure Agri Habitat Design b...
Description of the Patent Grant awaiting Weather Secure Agri Habitat Design b...
 

More from Sunny Mahajan

Usage of RAP on gravel roads
Usage of RAP on gravel roadsUsage of RAP on gravel roads
Usage of RAP on gravel roads
Sunny Mahajan
 
Off site fabrication
Off site fabricationOff site fabrication
Off site fabrication
Sunny Mahajan
 
Frugal innovation-sankalp
Frugal innovation-sankalpFrugal innovation-sankalp
Frugal innovation-sankalp
Sunny Mahajan
 
Marketing101-The Geek
Marketing101-The GeekMarketing101-The Geek
Marketing101-The Geek
Sunny Mahajan
 
Project Complexity (Case study)
Project Complexity (Case study)Project Complexity (Case study)
Project Complexity (Case study)
Sunny Mahajan
 
Optimal RAP content for Minnesota Roads
Optimal RAP content for Minnesota RoadsOptimal RAP content for Minnesota Roads
Optimal RAP content for Minnesota Roads
Sunny Mahajan
 
BIM case study
BIM case studyBIM case study
BIM case study
Sunny Mahajan
 

More from Sunny Mahajan (7)

Usage of RAP on gravel roads
Usage of RAP on gravel roadsUsage of RAP on gravel roads
Usage of RAP on gravel roads
 
Off site fabrication
Off site fabricationOff site fabrication
Off site fabrication
 
Frugal innovation-sankalp
Frugal innovation-sankalpFrugal innovation-sankalp
Frugal innovation-sankalp
 
Marketing101-The Geek
Marketing101-The GeekMarketing101-The Geek
Marketing101-The Geek
 
Project Complexity (Case study)
Project Complexity (Case study)Project Complexity (Case study)
Project Complexity (Case study)
 
Optimal RAP content for Minnesota Roads
Optimal RAP content for Minnesota RoadsOptimal RAP content for Minnesota Roads
Optimal RAP content for Minnesota Roads
 
BIM case study
BIM case studyBIM case study
BIM case study
 

Recently uploaded

一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 

Recently uploaded (20)

一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 

Burj al arab (Cofferdam&Rigging)

  • 1. Burj Al Arab Cofferdam & Rigging Firas Al Shalabi & Sunny Mahajan CE 505 Project Presentation 1
  • 2. Background  Dubai, UAE  1994 – 1999  The first 7 stars hotel in the world  The start of Dubai’s new vision of attracting new investments in areas outside the oil industry.  If you want to book a night there it will cost you around $2000 (according to Expedia tonight is $2039)  1.2 million SF  321 meters height from the sea. 2
  • 3. The construction  Two main phases:  The manmade Island (our focus)  The building 3
  • 4. Building the island  Temporary tube piles driven into sea bed  Temporary sheet piles and tie rods driven into sea bed to support boundary rocks Tubular pile Sheet pile wall 4
  • 5. Building the island  Permanent boundary rock bunds (rock armor) deposited on both sides of the sheet piles  Hydraulic fill layers deposited between bunds to displace sea water and form the island  No solid ground under the building just weak sand (up to 180 meters deep with no solid ground). So it was decided to go with friction piles. Rock armor Sand fill 5
  • 6. Building the island  Permanent SHED units placed around the island to dissipate the action of waves and protect it.  2M (6.5 ft) diameter 43 M (141 ft) deep piles were driven through the island and sea bed SHED units Main building piles 6
  • 7. Building the island  Excavations began in the island to remove the hydraulic fill  A coffer dam was being built while excavating  2M (6.5 ft) thick concrete plug slab laid on the base of the island to prevent the base from popping out because of the sea pressure  Reinforced concrete retaining wall built  The construction of the basement started Concrete slab 7
  • 9. Diagonal truss rigging  Huge tubular triangular truss geometry  The Diagonal vary from 76m to 90m in length and weigh 160 to 180 ton.  The Diagonal connects with a 300mm diameter pin connection to the core-wall and the Rear-leg structure.  There are six diagonals erected at different levels on both side of the building  transported as a single fabricated piece from the fabrication shop 15 km away by special self propelled long trailers. 9
  • 10. Diagonal truss rigging  Dealing with the expansion about (2 inches)caused by the desert heat  Strand jacks supported by Cat heads were connected to the building to execute the lifting of the Diagonals and Horizontals. 10
  • 11. Summary  Many forces can destroy your temporary structures. You have to count them all.  The safety of the crew is essential for cofferdams construction.  Rigging elements can’t always be easy and can be more complicated than what we learned  Putting things in the air is a different story.  Have to come up with practical innovative on site solutions for uncertain problems 11
  • 12. Thank you References: • Nathan. D., (2006) “Burj Al-Arab, UAE Structural Steel Construction For A Mega Project.” master builder, 3rd quarter 77-80 http://www.mbam.org.my/mbam/images/MBJ3Q06(pdf)/@BurjAlArb.pdf • Burj Al Arab, mega structures show. http://www.youtube.com/watch?v=RGzSNZudEHw • Stonecypher. L., (2009). Building the tallest hotel: Burj Al Arab, Dubai. http://www.brighthub.com/education/homework-tips/articles/57599.aspx#imgn_3 • Pourabedin. E., (2009). Burj Al Arab construction. http://www.slideshare.net/shahrozalam210/burj-alarab1203786822334454 • Wright. T., (2000).Creating the Burj Al Arab Dubai http://wkkarchitects.com/#/burj-al-arab/ 12