INTRODUCTION TO THE ARCHITECTURAL
   CONSERVATION PROJECT FOR THE
  FACADES OF THE ROYAL PALACE OF
           STOCKHOLM

  Heymowski A.a, Günther L.b, Myrin M.c, Andersson E.a, Hägnefelt U.d, Valanis A.d
   a HOS Arkitekter AB, (andreas.heymowski, elias.andersson)@hosark.se, Sweden
                         b National Property Board of Sweden

                                  c Tyréns AB, Sweden

                               d Norconsult AB, Sweden
The Royal Palace of Stockholm
               Style: Baroque
               Built: 17th century
               Architect: Nicodemus Tessin

               42,000 m2 total area
               1430 rooms (closets, basements etc)
               972 windows
               28 free standing statues
               717 balustrade pieces
               28,000 m2 total facade area
The facades of the Royal Palace




                                        Façade Materials
 9500 m2    stone facade        Sandstone (Gotland & Roslag)
11,000 m2   plaster             Plaster
 7,500 m2   windows and doors   Tin, Copper, Iron
28,000 m2   total facade area   Wood, Glass
Examples of stone decay
The project step by step
2005   Detachment of a piece of decorative    2010       Project Directive
       sandstone from the façade                         formal declaration of commence
                                                         of action and official terms for the
                                                         project entitled:

                                                     Long-term maintenance of facades
                                                     Software engineering; investigation,
2006   Maintenance program                                guidelines, pre-planning
       i.e. determination of the actions
       required for the preservation of the   2011       Pilot Project
       entire palace                                     investigation of practical aspects
2009   Preliminary Study                                 and guidelines and specifications
       investigation into the condition of               for the implementation of the full
       the facades and suggested coarse of               façade work
       action by means of a dedicated
       project
Past projects for the restoration of
           the facades
1697 – Start of construction
1760 – Tessin’s Death
1830 – Completion of construction




                          Extensive stone                     Stone work and
                        restoration, stone                    conservation of
                         replacement and        Work on the all of the façade
 Partial replacement of
                        use of oil solutions   façade plaster    windows
   the sculpted stone
Connection to the ICOMOS guidelines
Challenges:

• plethora of parameters and aspects
• non-linearity in the decision-making process
• extensive testing, evaluation and continuous update of processes in
  order to establish a concrete plan for remedial measures
The applied approach :

Maintenance program:     Establishment of clear targets and definition of
                         values and objectives of the program,
Preliminary Study:       Completion of the required investigation and
                         research, to determine standards, requirements
                         and processes
Pilot Project:           Implementation, evaluation and potential update
                         of the proposed methods for remedy and control.
Values and Objectives of the program
Authenticity of material
    Identification and preservation of the original stone façade to the
    greatest extent possible

Shape integrity
    it cannot be allowed to let the artistic and architecturally significant
    elements wither to the point that the shape is lost

cases of conflict
    the form's authenticity and fidelity to Tessin's ideas is more significant

Decisions
    should be made on a case to case basis in order to preserve the
    authentic material to the greatest possible extent
The Preliminary Study
“the most mature and concrete part of the project so far”
“qualitative assessment of the structure”

CONTENT
   - Research carried our regarding:
             the construction of the palace
             past trauma and previous maintenance programs
             structural modifications
             changes of use
   -Inventory activities
             detection, classification and evaluation of visible damages
               (structural damages and irregularities) and decay of
               materials
The Pilot Project
Duration: February 2010 – end of 2011
“quantitative assessment of the structure”

CONTENT

       the investigation of the structural behavior of the Palace
       actual assessment of structural damage
       Investigation of material decay
       decision regarding appropriate remedial measures
       geometric documentation of the palace
Goals of the Pilot Project
 Selection of appropriate substitute materials
 Criteria for the choice between the conservation or replacement of
  pieces
 Non-invasive methods of intervention (modern or traditional)
 Standards and requirements of the geometric documentation process
  (accuracies, equipment, deliverables)
 Methods for the assessment of the structural behavior of the structure
 Requirements for monitoring applications
 Frequency and nature of documentation processes
 3D recording, modeling and printing methods
 Quality measures and reports
Project Team

The National Property Board of Sweden (owner of the palace and
                manager of the            project)

Prof. Andreas Heymowski (the palace architect)

HOS Arkitekter AB (historical and architectural investigation, production
                of drawings.)

Tyréns (stone restoration , design and a structural engineering)

Norconsult AB (acquisition of laser scanner data and production of
                orthophotos)
Outlook of the entire project
Geometric documentation of the facades

  -Terrestrial laser scanning
  -Image acquisition
  -Pointcloud drawings
  -Orthophotos
  -Line-drawings
Data Acquisition
Pointclouds and line-drawings
Pointclouds and line-drawings
Pointclouds and line-drawings
Photogrammetric processing
Orthophotos




Orthophoto scale 1:20   pixel size: 2.5mm
Orthophotos and point clouds
Completion of line drawings
Completion of line drawings
Comparison to old drawings




                            Old drawings

                            New drawings




                     differences up to 35 cm
Orthophoto drawings
Restoration plans
Conclusions & Future work
Currenlty

Overview of the processes of research, documentation and decision making
for a large architectural heritage conservation project in conjunction to the
ICOMOS “Recommendations for the analysis, conservation and structural
restoration of architectural heritage”

An example of the steps a team may follow from research to implementation


Future work

Completion of the pilot project
Development of a concrete plan for the entire project
Information management
Thank you for your attention

More Related Content

What's hot

Wada Architecture
Wada ArchitectureWada Architecture
Wada Architecture
Hrishi Desai
 
Amdavad ni Gufa / Hussain-Doshi Gufa
Amdavad ni Gufa / Hussain-Doshi GufaAmdavad ni Gufa / Hussain-Doshi Gufa
Amdavad ni Gufa / Hussain-Doshi Gufa
Ubaid Khan
 
VERNACULAR ARCHITECTURE
VERNACULAR ARCHITECTUREVERNACULAR ARCHITECTURE
case study of chandigarh college of architecture
case study of chandigarh college of architecturecase study of chandigarh college of architecture
case study of chandigarh college of architecture
Abhishek Tiwari
 
Bharat Bhavan, Bhopal by charless correa
Bharat Bhavan, Bhopal by charless correaBharat Bhavan, Bhopal by charless correa
Bharat Bhavan, Bhopal by charless correa
Ar. M. Senthil [ senthilmani ]
 
Beijing National Stadium
Beijing National StadiumBeijing National Stadium
Beijing National Stadium
luisaam
 
Swimming Pool Construction - Completed Projects
Swimming Pool Construction - Completed Projects Swimming Pool Construction - Completed Projects
Swimming Pool Construction - Completed Projects
Ajay Jain
 
Climate analysis pune
Climate analysis puneClimate analysis pune
Climate analysis pune
ABHISHEKMOHALKAR
 
School Of Architecture And Planning vijayawada , Case study sheets and Liter...
School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...
School Of Architecture And Planning vijayawada , Case study sheets and Liter...
UdayGotetiStudios
 
Long span structures
Long span structures  Long span structures
Long span structures
Aroh Thombre
 
Vernacular architecture
Vernacular architectureVernacular architecture
Vernacular architecture
Aishwarya Sharma
 
Climate responsive architecture (1)
Climate responsive architecture (1)Climate responsive architecture (1)
Climate responsive architecture (1)
Sonakshi Bhattacharjee
 
Vernacular architecture introduction
Vernacular architecture introductionVernacular architecture introduction
Vernacular architecture introduction
Bala Hari Krishnan S
 
GERSONSVEJ YOUTH CENTRE CASE STUDY
GERSONSVEJ YOUTH CENTRE CASE STUDYGERSONSVEJ YOUTH CENTRE CASE STUDY
GERSONSVEJ YOUTH CENTRE CASE STUDY
AJAYS100
 
Charles correa
Charles correaCharles correa
Charles correa
vikashsaini78
 
ARCHITECTURAL STANDARDS
ARCHITECTURAL STANDARDSARCHITECTURAL STANDARDS
ARCHITECTURAL STANDARDS
stuti31
 
Museum Case Studies
Museum Case StudiesMuseum Case Studies
Museum Case Studies
Ar. M. Senthil [ senthilmani ]
 
warm and humid climate
warm and humid climatewarm and humid climate
warm and humid climate
DhvaniR2
 
Architecture Professional practice
Architecture Professional  practice Architecture Professional  practice
Architecture Professional practice
Ar. Mukunda K.S
 
Heydar Aliyev Cultural Centre
Heydar Aliyev Cultural CentreHeydar Aliyev Cultural Centre
Heydar Aliyev Cultural Centre
Tanisha Agarwal
 

What's hot (20)

Wada Architecture
Wada ArchitectureWada Architecture
Wada Architecture
 
Amdavad ni Gufa / Hussain-Doshi Gufa
Amdavad ni Gufa / Hussain-Doshi GufaAmdavad ni Gufa / Hussain-Doshi Gufa
Amdavad ni Gufa / Hussain-Doshi Gufa
 
VERNACULAR ARCHITECTURE
VERNACULAR ARCHITECTUREVERNACULAR ARCHITECTURE
VERNACULAR ARCHITECTURE
 
case study of chandigarh college of architecture
case study of chandigarh college of architecturecase study of chandigarh college of architecture
case study of chandigarh college of architecture
 
Bharat Bhavan, Bhopal by charless correa
Bharat Bhavan, Bhopal by charless correaBharat Bhavan, Bhopal by charless correa
Bharat Bhavan, Bhopal by charless correa
 
Beijing National Stadium
Beijing National StadiumBeijing National Stadium
Beijing National Stadium
 
Swimming Pool Construction - Completed Projects
Swimming Pool Construction - Completed Projects Swimming Pool Construction - Completed Projects
Swimming Pool Construction - Completed Projects
 
Climate analysis pune
Climate analysis puneClimate analysis pune
Climate analysis pune
 
School Of Architecture And Planning vijayawada , Case study sheets and Liter...
School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...
School Of Architecture And Planning vijayawada , Case study sheets and Liter...
 
Long span structures
Long span structures  Long span structures
Long span structures
 
Vernacular architecture
Vernacular architectureVernacular architecture
Vernacular architecture
 
Climate responsive architecture (1)
Climate responsive architecture (1)Climate responsive architecture (1)
Climate responsive architecture (1)
 
Vernacular architecture introduction
Vernacular architecture introductionVernacular architecture introduction
Vernacular architecture introduction
 
GERSONSVEJ YOUTH CENTRE CASE STUDY
GERSONSVEJ YOUTH CENTRE CASE STUDYGERSONSVEJ YOUTH CENTRE CASE STUDY
GERSONSVEJ YOUTH CENTRE CASE STUDY
 
Charles correa
Charles correaCharles correa
Charles correa
 
ARCHITECTURAL STANDARDS
ARCHITECTURAL STANDARDSARCHITECTURAL STANDARDS
ARCHITECTURAL STANDARDS
 
Museum Case Studies
Museum Case StudiesMuseum Case Studies
Museum Case Studies
 
warm and humid climate
warm and humid climatewarm and humid climate
warm and humid climate
 
Architecture Professional practice
Architecture Professional  practice Architecture Professional  practice
Architecture Professional practice
 
Heydar Aliyev Cultural Centre
Heydar Aliyev Cultural CentreHeydar Aliyev Cultural Centre
Heydar Aliyev Cultural Centre
 

Viewers also liked

Architectural Conservation- Hampi World Heritage Site
Architectural Conservation- Hampi World Heritage SiteArchitectural Conservation- Hampi World Heritage Site
Architectural Conservation- Hampi World Heritage Site
Rajat Rana
 
Automatic Target Identification
Automatic Target IdentificationAutomatic Target Identification
Automatic Target Identification
Artemis Valanis
 
High resolution textured models for engineering applications
High resolution textured models for engineering applicationsHigh resolution textured models for engineering applications
High resolution textured models for engineering applications
Artemis Valanis
 
Case-Study_Silvia_Rossi_20-5-2015
Case-Study_Silvia_Rossi_20-5-2015Case-Study_Silvia_Rossi_20-5-2015
Case-Study_Silvia_Rossi_20-5-2015
Silvia Rossi
 
Architectural Conservation_Ac b lec 01
Architectural Conservation_Ac b lec 01Architectural Conservation_Ac b lec 01
Architectural Conservation_Ac b lec 01
Joarder Hafiz Ullah
 
Conservation of Heritage Buildings
Conservation of Heritage BuildingsConservation of Heritage Buildings
Architectural conservation
Architectural conservationArchitectural conservation
Architectural conservation
Aditi Koshley
 

Viewers also liked (7)

Architectural Conservation- Hampi World Heritage Site
Architectural Conservation- Hampi World Heritage SiteArchitectural Conservation- Hampi World Heritage Site
Architectural Conservation- Hampi World Heritage Site
 
Automatic Target Identification
Automatic Target IdentificationAutomatic Target Identification
Automatic Target Identification
 
High resolution textured models for engineering applications
High resolution textured models for engineering applicationsHigh resolution textured models for engineering applications
High resolution textured models for engineering applications
 
Case-Study_Silvia_Rossi_20-5-2015
Case-Study_Silvia_Rossi_20-5-2015Case-Study_Silvia_Rossi_20-5-2015
Case-Study_Silvia_Rossi_20-5-2015
 
Architectural Conservation_Ac b lec 01
Architectural Conservation_Ac b lec 01Architectural Conservation_Ac b lec 01
Architectural Conservation_Ac b lec 01
 
Conservation of Heritage Buildings
Conservation of Heritage BuildingsConservation of Heritage Buildings
Conservation of Heritage Buildings
 
Architectural conservation
Architectural conservationArchitectural conservation
Architectural conservation
 

Similar to Built heritage documentation

report.pptx
report.pptxreport.pptx
report.pptx
NanaMagdy2
 
Construction industry
Construction industryConstruction industry
Construction industry
Visionary_
 
D1 (B1) Jan Lindgård - Management and extension of service life of infrastruc...
D1 (B1) Jan Lindgård - Management and extension of service life of infrastruc...D1 (B1) Jan Lindgård - Management and extension of service life of infrastruc...
D1 (B1) Jan Lindgård - Management and extension of service life of infrastruc...
Svenska Betongföreningen
 
Restoration of monuments
Restoration of monumentsRestoration of monuments
Restoration of monuments
piyush2588
 
LHP PROJECT.pdf
LHP PROJECT.pdfLHP PROJECT.pdf
LHP PROJECT.pdf
Prince Ahirwar
 
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
Sustainable Performance Institute
 
Low cost houisng and alternate building materials
Low cost houisng and alternate building materialsLow cost houisng and alternate building materials
Low cost houisng and alternate building materials
Naresh Yadav
 
CV Endercan ÖZEN
CV  Endercan ÖZENCV  Endercan ÖZEN
CV Endercan ÖZEN
Endercan
 
D2 (A5) Øyvind Bjontegaard - Concrete R&D activities involvement; Norwegian P...
D2 (A5) Øyvind Bjontegaard - Concrete R&D activities involvement; Norwegian P...D2 (A5) Øyvind Bjontegaard - Concrete R&D activities involvement; Norwegian P...
D2 (A5) Øyvind Bjontegaard - Concrete R&D activities involvement; Norwegian P...
Svenska Betongföreningen
 
Marina barrage (09/10s2)
Marina barrage (09/10s2)Marina barrage (09/10s2)
Marina barrage (09/10s2)
gn022010sem1
 
M.Salah cv1
M.Salah cv1M.Salah cv1
M.Salah cv1
mohamed salah
 
CV pro SMOn-ENG
CV pro SMOn-ENGCV pro SMOn-ENG
CV pro SMOn-ENG
Sophie Montenot
 
Electrical maintanance
Electrical maintananceElectrical maintanance
Electrical maintanance
Madhan Gopal
 
Refurbishment
RefurbishmentRefurbishment
Refurbishment
taufiqahmad_87
 
fib 2006
fib 2006fib 2006
fib 2006
Maria Bostenaru
 
LECT 2a.ppt
LECT 2a.pptLECT 2a.ppt
LECT 2a.ppt
ssusera5efb0
 
Cost estimation of a Building
Cost  estimation of a BuildingCost  estimation of a Building
Cost estimation of a Building
ARAVINDBORRA1
 
BUILDING CONSTRUCTION AND PLANNING
BUILDING CONSTRUCTION AND PLANNINGBUILDING CONSTRUCTION AND PLANNING
BUILDING CONSTRUCTION AND PLANNING
satishchapagain1
 
Experiences from International Test and Storage Projects. Auli Niemi, Uppsala...
Experiences from International Test and Storage Projects. Auli Niemi, Uppsala...Experiences from International Test and Storage Projects. Auli Niemi, Uppsala...
Experiences from International Test and Storage Projects. Auli Niemi, Uppsala...
Geological Survey of Sweden
 
Project Management Project 1 Report
Project Management Project 1 Report Project Management Project 1 Report
Project Management Project 1 Report
Sharon Yu Jung Lim
 

Similar to Built heritage documentation (20)

report.pptx
report.pptxreport.pptx
report.pptx
 
Construction industry
Construction industryConstruction industry
Construction industry
 
D1 (B1) Jan Lindgård - Management and extension of service life of infrastruc...
D1 (B1) Jan Lindgård - Management and extension of service life of infrastruc...D1 (B1) Jan Lindgård - Management and extension of service life of infrastruc...
D1 (B1) Jan Lindgård - Management and extension of service life of infrastruc...
 
Restoration of monuments
Restoration of monumentsRestoration of monuments
Restoration of monuments
 
LHP PROJECT.pdf
LHP PROJECT.pdfLHP PROJECT.pdf
LHP PROJECT.pdf
 
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
 
Low cost houisng and alternate building materials
Low cost houisng and alternate building materialsLow cost houisng and alternate building materials
Low cost houisng and alternate building materials
 
CV Endercan ÖZEN
CV  Endercan ÖZENCV  Endercan ÖZEN
CV Endercan ÖZEN
 
D2 (A5) Øyvind Bjontegaard - Concrete R&D activities involvement; Norwegian P...
D2 (A5) Øyvind Bjontegaard - Concrete R&D activities involvement; Norwegian P...D2 (A5) Øyvind Bjontegaard - Concrete R&D activities involvement; Norwegian P...
D2 (A5) Øyvind Bjontegaard - Concrete R&D activities involvement; Norwegian P...
 
Marina barrage (09/10s2)
Marina barrage (09/10s2)Marina barrage (09/10s2)
Marina barrage (09/10s2)
 
M.Salah cv1
M.Salah cv1M.Salah cv1
M.Salah cv1
 
CV pro SMOn-ENG
CV pro SMOn-ENGCV pro SMOn-ENG
CV pro SMOn-ENG
 
Electrical maintanance
Electrical maintananceElectrical maintanance
Electrical maintanance
 
Refurbishment
RefurbishmentRefurbishment
Refurbishment
 
fib 2006
fib 2006fib 2006
fib 2006
 
LECT 2a.ppt
LECT 2a.pptLECT 2a.ppt
LECT 2a.ppt
 
Cost estimation of a Building
Cost  estimation of a BuildingCost  estimation of a Building
Cost estimation of a Building
 
BUILDING CONSTRUCTION AND PLANNING
BUILDING CONSTRUCTION AND PLANNINGBUILDING CONSTRUCTION AND PLANNING
BUILDING CONSTRUCTION AND PLANNING
 
Experiences from International Test and Storage Projects. Auli Niemi, Uppsala...
Experiences from International Test and Storage Projects. Auli Niemi, Uppsala...Experiences from International Test and Storage Projects. Auli Niemi, Uppsala...
Experiences from International Test and Storage Projects. Auli Niemi, Uppsala...
 
Project Management Project 1 Report
Project Management Project 1 Report Project Management Project 1 Report
Project Management Project 1 Report
 

More from Artemis Valanis

Project portfolio Artemis Valanis
Project portfolio Artemis ValanisProject portfolio Artemis Valanis
Project portfolio Artemis Valanis
Artemis Valanis
 
Zalongon case
Zalongon caseZalongon case
Zalongon case
Artemis Valanis
 
Fitting, portayal and mapping
Fitting, portayal and mappingFitting, portayal and mapping
Fitting, portayal and mapping
Artemis Valanis
 
Restitution Automation
Restitution AutomationRestitution Automation
Restitution Automation
Artemis Valanis
 
Markless registration for scans of free form objects
Markless registration for scans of free form objectsMarkless registration for scans of free form objects
Markless registration for scans of free form objects
Artemis Valanis
 
3 d model generation for deformation analysis using laser scanning data of a ...
3 d model generation for deformation analysis using laser scanning data of a ...3 d model generation for deformation analysis using laser scanning data of a ...
3 d model generation for deformation analysis using laser scanning data of a ...
Artemis Valanis
 
Markless registration for scans of free form objects
Markless registration for scans of free form objectsMarkless registration for scans of free form objects
Markless registration for scans of free form objects
Artemis Valanis
 
Photogrammetric texture mapping of complex objects
Photogrammetric texture mapping of complex objectsPhotogrammetric texture mapping of complex objects
Photogrammetric texture mapping of complex objects
Artemis Valanis
 
Digital scanning
Digital scanningDigital scanning
Digital scanning
Artemis Valanis
 

More from Artemis Valanis (9)

Project portfolio Artemis Valanis
Project portfolio Artemis ValanisProject portfolio Artemis Valanis
Project portfolio Artemis Valanis
 
Zalongon case
Zalongon caseZalongon case
Zalongon case
 
Fitting, portayal and mapping
Fitting, portayal and mappingFitting, portayal and mapping
Fitting, portayal and mapping
 
Restitution Automation
Restitution AutomationRestitution Automation
Restitution Automation
 
Markless registration for scans of free form objects
Markless registration for scans of free form objectsMarkless registration for scans of free form objects
Markless registration for scans of free form objects
 
3 d model generation for deformation analysis using laser scanning data of a ...
3 d model generation for deformation analysis using laser scanning data of a ...3 d model generation for deformation analysis using laser scanning data of a ...
3 d model generation for deformation analysis using laser scanning data of a ...
 
Markless registration for scans of free form objects
Markless registration for scans of free form objectsMarkless registration for scans of free form objects
Markless registration for scans of free form objects
 
Photogrammetric texture mapping of complex objects
Photogrammetric texture mapping of complex objectsPhotogrammetric texture mapping of complex objects
Photogrammetric texture mapping of complex objects
 
Digital scanning
Digital scanningDigital scanning
Digital scanning
 

Recently uploaded

National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
Quotidiano Piemontese
 
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
Neo4j
 
Mariano G Tinti - Decoding SpaceX
Mariano G Tinti - Decoding SpaceXMariano G Tinti - Decoding SpaceX
Mariano G Tinti - Decoding SpaceX
Mariano Tinti
 
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success StoryDriving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Safe Software
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc
 
GraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracyGraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracy
Tomaz Bratanic
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Paige Cruz
 
Serial Arm Control in Real Time Presentation
Serial Arm Control in Real Time PresentationSerial Arm Control in Real Time Presentation
Serial Arm Control in Real Time Presentation
tolgahangng
 
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
Neo4j
 
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAUHCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
panagenda
 
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial IntelligenceAI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
IndexBug
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
Aftab Hussain
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
名前 です男
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
shyamraj55
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
danishmna97
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
Kari Kakkonen
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
Matthew Sinclair
 
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfUnlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Malak Abu Hammad
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
SOFTTECHHUB
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
Neo4j
 

Recently uploaded (20)

National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
 
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
 
Mariano G Tinti - Decoding SpaceX
Mariano G Tinti - Decoding SpaceXMariano G Tinti - Decoding SpaceX
Mariano G Tinti - Decoding SpaceX
 
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success StoryDriving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success Story
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
 
GraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracyGraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracy
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
 
Serial Arm Control in Real Time Presentation
Serial Arm Control in Real Time PresentationSerial Arm Control in Real Time Presentation
Serial Arm Control in Real Time Presentation
 
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
 
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAUHCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
 
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial IntelligenceAI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
 
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfUnlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
 

Built heritage documentation

  • 1. INTRODUCTION TO THE ARCHITECTURAL CONSERVATION PROJECT FOR THE FACADES OF THE ROYAL PALACE OF STOCKHOLM Heymowski A.a, Günther L.b, Myrin M.c, Andersson E.a, Hägnefelt U.d, Valanis A.d a HOS Arkitekter AB, (andreas.heymowski, elias.andersson)@hosark.se, Sweden b National Property Board of Sweden c Tyréns AB, Sweden d Norconsult AB, Sweden
  • 2. The Royal Palace of Stockholm Style: Baroque Built: 17th century Architect: Nicodemus Tessin 42,000 m2 total area 1430 rooms (closets, basements etc) 972 windows 28 free standing statues 717 balustrade pieces 28,000 m2 total facade area
  • 3. The facades of the Royal Palace Façade Materials 9500 m2 stone facade Sandstone (Gotland & Roslag) 11,000 m2 plaster Plaster 7,500 m2 windows and doors Tin, Copper, Iron 28,000 m2 total facade area Wood, Glass
  • 5. The project step by step 2005 Detachment of a piece of decorative 2010 Project Directive sandstone from the façade formal declaration of commence of action and official terms for the project entitled: Long-term maintenance of facades Software engineering; investigation, 2006 Maintenance program guidelines, pre-planning i.e. determination of the actions required for the preservation of the 2011 Pilot Project entire palace investigation of practical aspects 2009 Preliminary Study and guidelines and specifications investigation into the condition of for the implementation of the full the facades and suggested coarse of façade work action by means of a dedicated project
  • 6. Past projects for the restoration of the facades 1697 – Start of construction 1760 – Tessin’s Death 1830 – Completion of construction Extensive stone Stone work and restoration, stone conservation of replacement and Work on the all of the façade Partial replacement of use of oil solutions façade plaster windows the sculpted stone
  • 7. Connection to the ICOMOS guidelines Challenges: • plethora of parameters and aspects • non-linearity in the decision-making process • extensive testing, evaluation and continuous update of processes in order to establish a concrete plan for remedial measures The applied approach : Maintenance program: Establishment of clear targets and definition of values and objectives of the program, Preliminary Study: Completion of the required investigation and research, to determine standards, requirements and processes Pilot Project: Implementation, evaluation and potential update of the proposed methods for remedy and control.
  • 8. Values and Objectives of the program Authenticity of material Identification and preservation of the original stone façade to the greatest extent possible Shape integrity it cannot be allowed to let the artistic and architecturally significant elements wither to the point that the shape is lost cases of conflict the form's authenticity and fidelity to Tessin's ideas is more significant Decisions should be made on a case to case basis in order to preserve the authentic material to the greatest possible extent
  • 9. The Preliminary Study “the most mature and concrete part of the project so far” “qualitative assessment of the structure” CONTENT - Research carried our regarding:  the construction of the palace  past trauma and previous maintenance programs  structural modifications  changes of use -Inventory activities  detection, classification and evaluation of visible damages (structural damages and irregularities) and decay of materials
  • 10. The Pilot Project Duration: February 2010 – end of 2011 “quantitative assessment of the structure” CONTENT  the investigation of the structural behavior of the Palace  actual assessment of structural damage  Investigation of material decay  decision regarding appropriate remedial measures  geometric documentation of the palace
  • 11. Goals of the Pilot Project  Selection of appropriate substitute materials  Criteria for the choice between the conservation or replacement of pieces  Non-invasive methods of intervention (modern or traditional)  Standards and requirements of the geometric documentation process (accuracies, equipment, deliverables)  Methods for the assessment of the structural behavior of the structure  Requirements for monitoring applications  Frequency and nature of documentation processes  3D recording, modeling and printing methods  Quality measures and reports
  • 12. Project Team The National Property Board of Sweden (owner of the palace and manager of the project) Prof. Andreas Heymowski (the palace architect) HOS Arkitekter AB (historical and architectural investigation, production of drawings.) Tyréns (stone restoration , design and a structural engineering) Norconsult AB (acquisition of laser scanner data and production of orthophotos)
  • 13. Outlook of the entire project
  • 14. Geometric documentation of the facades -Terrestrial laser scanning -Image acquisition -Pointcloud drawings -Orthophotos -Line-drawings
  • 22. Completion of line drawings
  • 23. Completion of line drawings
  • 24. Comparison to old drawings Old drawings New drawings differences up to 35 cm
  • 27. Conclusions & Future work Currenlty Overview of the processes of research, documentation and decision making for a large architectural heritage conservation project in conjunction to the ICOMOS “Recommendations for the analysis, conservation and structural restoration of architectural heritage” An example of the steps a team may follow from research to implementation Future work Completion of the pilot project Development of a concrete plan for the entire project Information management
  • 28. Thank you for your attention