SlideShare a Scribd company logo
MONTENOT SOPHIE
Contact No.: 0033624271789 ~ E-Mail: smontenot77@gmail.com
~ Senior Level Assignments ~
~ Cavity Cell Management ~ Project Management ~
PROFILE SUMMARY
 Result-oriented professional with over 12 years of experience in Project Management, Cavity Cell Management, Cost
Control, Works Interface Management, Contract Management, Liaison & Coordination and Team Management
 Presently associated with Vinci Group, Nationwide as Quality and Geotechnical Manager
 Skilled in defining geophysical and additional (surveys) prospections using standard and non-standard measures
 Track record of establishing and managing oversight of the global cavity risk management process (300km of new High
Speed Line)
 Swift in completing projects with competent cross-functional skills and making sure on time deliverables within pre-
set cost parameters
 An enterprising leader with skills in leading personnel towards accomplishment of common goals
SKILL SET
Cavity Cell Management
Stakeholder Management
Budgeting
Design Engineering
Project Management
Contract Management
Documentation
Team Management
WORK EXPERIENCE
Since May'04 with Vinci Group, France, Nationwide
Presently designated as Quality & Geotechnical Manager
Growth Path:
May’04 to Jan’07 Laboratory Manager
Nov’06 to Nov’09 Quality & Geotechnical Manager
May’09 to Feb’11 Quality, Geotechnical and Cavity Manager
Feb’11 to Jun’15 Geotechnical manager - Cavity Cell Management
Jun’16 to till date Quality & Geotechnical Manager
During Vinci Construction and Earthworks:
As Geotechnical Manager
Title: West Bypass of Strasbourg (25 km) - Build Construction and Design Project (Starting phase)
 Developing project baselines while monitoring and controlling projects with respect to cost, resources deployment, time
over-runs and quality compliance to ensure its satisfactory execution
 Managingrelationship with project stakeholders, keeping stakehol ders informed of progress and issues in order to manage
expectations on all project requirements and deliverables
As Manager - Cavity Cell Management
 Title: Cavity Cell Management, under the Technical Direction of infrastructure staff, for the LGV SEA Tours-Bordeaux Line
(New High Speed Line - 340km); Cavity risks along approximately 150km of the route
 Supervising 5 Junior Geotechnical Engineers
 Establishment of the overall prospection process, oversight of the cavity problem
 Definition of the treatments to implement in order to resolve the cavity problem
 Works interface management (meetings)
 Contract drafting and oversight
 Sub-contractor oversight
 Control and analyses on the documents provided by the sub-contractors
 Management of a team of junior geotechnical engineers
 Drafting summary files for the natural hazard section of the SEA line safety file
As Quality, Geotechnical and Cavity Manager
Title: H1 section of the High-Speed Rhine-Rhone Line; Refurbishment of the Besançon – Devecey Railway Line; Major karstic risks
 Contributed towards:
o External checks (the earth-moving work was sub-contracted)
o Oversight of the geophysical services to define the cavity risk zones
o Implementation of the general and specific operational procedures
o Site adaptation
o Geotechnical consulting for the BVM 31 section – LGV line near the Besançon Viotte station
 Collaborated between the geotechnical study department and the site
 Instituted definition of the level classes (according to the French Railway Network Authority Guideline)
During GTM Earthworks
As Quality and Geotechnical Manager
Title: A1/A2 section of the High-Speed Rhine-Rhone line; 7 km, 3 trestles, 1 viaduct, 2,000,000 m3 of displaced material;
Bank Construction in Flood-prone and Compressible Zones – Wet and Fine-grain Cut Materials
 Internal and external checks (earth-moving)
 Liaised between the geotechnical study department and the site
 Implemented operational procedures
 Managed oversight of the:
o Pre-loading bank material packing (installation and instrument oversight)
o Bank construction (sorting the cut materials and transforming them into filler – treatment)
 Monitored specific earth-moving operational procedures – specific construction measures
Title: OPA2 Section of the High-Speed Rhine-Rhone Line; Pre-loadingthe technical blocks in flood-proneand compressible zones
 Monitored internal checks (earth-moving)
 Implemented operational procedures
 Managed oversight of the packing for 9 pre-loaded banks (installation and instrument oversight)
As Laboratory Manager
Title: SCAO Company (Western Motorway Construction Company) on the A85 K3 Angers/Tours construction site; Langeais North
Bypass: 18 km, 2 viaducts, 1,300,000 m3 of fine material cleared, compressible zone
 Instituted internal, external and outside checks (earthworks and civil engineering)
 Administered Maturity metre monitoring for the concrete in the bed of the viaducts
 Managed application and checks for the SCAO quality system
 Supervising a laboratory team (around 10 persons)
Accomplishments:
 Took several measures such as prospection and analysis of 100% of the project and recommended earthwork building
solutions,concrete injection on all cavity found, to ensure that projects were in line with requirements specified by clients
 Undertook initiatives such as every week meeting with the production management to ensure having and giving all
information about cavity problems, all system and reporting document is create to follow the prospection, analysis and
solution during the project for each work to ensure that cavity cell management was in place
 Overcome management and technical challenges during the completion of last project by taking adapted measures as
challenging staff, adapted management to take the best in each member of staff, found technical solution to respect the
schedule and budget (3 months to find and realise a build solution on 800m of new line, by concrete injection on 15m deep
by 2.5 m scare)
 Created important documentation such as a new software for earthwork laboratory, as return of experience report on
different subject as geophysical interest in cavity prospection, in earthwork design on behalf of the company
APPRETENCESHIP
Organisation: GEOTEC, Dijon
Period: June’02 to April’04
Role: Apprentice Geotechnical Engineer
ACADEMIC DETAILS
2004 DESS/ Masters in Applied Geology as a work-study programme with the GEOTEC Company, Besançon
2001 DEA-level Soil and Sub-Soil Protection, Planning and Exploitation, with optional credits in
Geotechnics, Nancy from LAEGO.
2000 Erasmus Masters in Geology with Extra Credits in Rock Mechanics and Geological Engineering from
Oxford Brookes University
PERSONAL DETAILS
Date of Birth: 10th Nov’77
Address: 4 Rue De l’hôtel Dieu 39100 Dole
Languages Known: English, French
Location Preference: India

More Related Content

What's hot

Randall McKnight Resume 1-15-16
Randall McKnight Resume 1-15-16Randall McKnight Resume 1-15-16
Randall McKnight Resume 1-15-16
Randall McKnight CWI NACE 2
 
Michael J. Arnold's Resume (NACE CIP Level 2 Coating Inspector)
Michael J. Arnold's Resume (NACE CIP Level 2 Coating Inspector)Michael J. Arnold's Resume (NACE CIP Level 2 Coating Inspector)
Michael J. Arnold's Resume (NACE CIP Level 2 Coating Inspector)
Michael Arnold
 
shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsons
Shane Reynolds
 
Vivencio pachoro cv 2016
Vivencio pachoro cv 2016Vivencio pachoro cv 2016
Vivencio pachoro cv 2016
Vivencio Pachoro
 
Tabnak Drilling Management
Tabnak Drilling ManagementTabnak Drilling Management
Tabnak Drilling Management
Mojrian Web
 
CV (2)
CV (2)CV (2)
CV (2)
Abdul Waheed
 
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
James Herrmann
 
cv
cvcv
Jeo Consultancy Engineering Mining
Jeo Consultancy Engineering MiningJeo Consultancy Engineering Mining
Jeo Consultancy Engineering Mining
Murat Cetintas
 
Brophy resume,8-2016
Brophy resume,8-2016Brophy resume,8-2016
Brophy resume,8-2016
brian brophy
 
Ghermoul med-resume operation ws
Ghermoul med-resume operation wsGhermoul med-resume operation ws
Ghermoul med-resume operation ws
Mohamed ghermoul
 
TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016
Travis Both
 
Philip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhilip Karow_FinalResumeJL
Philip Karow_FinalResumeJL
Phil Karow
 
Land surveyor
Land surveyorLand surveyor
Land surveyor
Maniyan Suresh
 
Greg Quinn - Resume 20150214
Greg Quinn - Resume 20150214Greg Quinn - Resume 20150214
Greg Quinn - Resume 20150214
Gregory Quinn
 
K Horner_RESUME_20161103
K Horner_RESUME_20161103K Horner_RESUME_20161103
K Horner_RESUME_20161103
Kenneth Horner
 
CV - AGK LinkedIn
CV - AGK LinkedInCV - AGK LinkedIn
CV - AGK LinkedIn
Anteneh Getachew Getachew
 
Dnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CVDnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CV
NANDLAL PRASAD
 
Resume- Nauss, Paul M.
Resume- Nauss, Paul M.Resume- Nauss, Paul M.
Resume- Nauss, Paul M.
Paul Nauss
 
Well site geologists
Well site geologistsWell site geologists
Well site geologists
Sigve Hamilton Aspelund
 

What's hot (20)

Randall McKnight Resume 1-15-16
Randall McKnight Resume 1-15-16Randall McKnight Resume 1-15-16
Randall McKnight Resume 1-15-16
 
Michael J. Arnold's Resume (NACE CIP Level 2 Coating Inspector)
Michael J. Arnold's Resume (NACE CIP Level 2 Coating Inspector)Michael J. Arnold's Resume (NACE CIP Level 2 Coating Inspector)
Michael J. Arnold's Resume (NACE CIP Level 2 Coating Inspector)
 
shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsons
 
Vivencio pachoro cv 2016
Vivencio pachoro cv 2016Vivencio pachoro cv 2016
Vivencio pachoro cv 2016
 
Tabnak Drilling Management
Tabnak Drilling ManagementTabnak Drilling Management
Tabnak Drilling Management
 
CV (2)
CV (2)CV (2)
CV (2)
 
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
 
cv
cvcv
cv
 
Jeo Consultancy Engineering Mining
Jeo Consultancy Engineering MiningJeo Consultancy Engineering Mining
Jeo Consultancy Engineering Mining
 
Brophy resume,8-2016
Brophy resume,8-2016Brophy resume,8-2016
Brophy resume,8-2016
 
Ghermoul med-resume operation ws
Ghermoul med-resume operation wsGhermoul med-resume operation ws
Ghermoul med-resume operation ws
 
TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016
 
Philip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhilip Karow_FinalResumeJL
Philip Karow_FinalResumeJL
 
Land surveyor
Land surveyorLand surveyor
Land surveyor
 
Greg Quinn - Resume 20150214
Greg Quinn - Resume 20150214Greg Quinn - Resume 20150214
Greg Quinn - Resume 20150214
 
K Horner_RESUME_20161103
K Horner_RESUME_20161103K Horner_RESUME_20161103
K Horner_RESUME_20161103
 
CV - AGK LinkedIn
CV - AGK LinkedInCV - AGK LinkedIn
CV - AGK LinkedIn
 
Dnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CVDnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CV
 
Resume- Nauss, Paul M.
Resume- Nauss, Paul M.Resume- Nauss, Paul M.
Resume- Nauss, Paul M.
 
Well site geologists
Well site geologistsWell site geologists
Well site geologists
 

Similar to CV pro SMOn-ENG

Antonio MartinezArano B. Ch. E, MBA, PMP, Resume
Antonio MartinezArano B. Ch. E, MBA, PMP, ResumeAntonio MartinezArano B. Ch. E, MBA, PMP, Resume
Antonio MartinezArano B. Ch. E, MBA, PMP, Resume
Antonio Martin Martinez Arano
 
Peter McGough CV 2010
Peter McGough CV 2010Peter McGough CV 2010
Peter McGough CV 2010
pmcgough
 
Cv for Bui Nguyen Pho - Envir Engineer (19.12.2016)
Cv for Bui Nguyen Pho - Envir Engineer (19.12.2016)Cv for Bui Nguyen Pho - Envir Engineer (19.12.2016)
Cv for Bui Nguyen Pho - Envir Engineer (19.12.2016)
Pho Bui Nguyen
 
Res15-Brad Young_151221
Res15-Brad Young_151221Res15-Brad Young_151221
Res15-Brad Young_151221
Brad Young
 
CV_JAKKARIN PAETPITAK_(ENG)_141015
CV_JAKKARIN PAETPITAK_(ENG)_141015CV_JAKKARIN PAETPITAK_(ENG)_141015
CV_JAKKARIN PAETPITAK_(ENG)_141015
Jakkarin Paetpitak
 
CV C Pieroni Sept 2016 (3)
CV C Pieroni  Sept 2016 (3)CV C Pieroni  Sept 2016 (3)
CV C Pieroni Sept 2016 (3)
Costantino Pieroni
 
CV C Pieroni Sept 2016 (3)
CV C Pieroni  Sept 2016 (3)CV C Pieroni  Sept 2016 (3)
CV C Pieroni Sept 2016 (3)
Costantino Pieroni
 
Ali Khidr CV
Ali Khidr CVAli Khidr CV
Ali Khidr CV
Ali Khidr
 
Nivaldo Curcio CV Feb 2015
Nivaldo Curcio CV Feb 2015Nivaldo Curcio CV Feb 2015
Nivaldo Curcio CV Feb 2015
NIVALDO CURCIO
 
RajeevCV2016
RajeevCV2016RajeevCV2016
RajeevCV2016
Rajeevan Jehanathan
 
Ali Khidr CV
Ali Khidr CVAli Khidr CV
Ali Khidr CV
Ali Khidr
 
NM SM
NM SMNM SM
RESUME LE XUAN TUYEN
RESUME LE XUAN TUYENRESUME LE XUAN TUYEN
RESUME LE XUAN TUYEN
Lê Xuân Tuyển
 
CURRICULUM VITAE Walid Alhaddad Drilling Supervisor
CURRICULUM VITAE Walid Alhaddad Drilling SupervisorCURRICULUM VITAE Walid Alhaddad Drilling Supervisor
CURRICULUM VITAE Walid Alhaddad Drilling Supervisor
walid madani
 
Completion & integrity engineer achievements
Completion & integrity engineer achievementsCompletion & integrity engineer achievements
Completion & integrity engineer achievements
Joseph Bracic
 
Naveed Asif C.V Updated
Naveed Asif C.V UpdatedNaveed Asif C.V Updated
Naveed Asif C.V Updated
?????? ????? Naveed Asif
 
Oil & Gas Disciplines
Oil & Gas DisciplinesOil & Gas Disciplines
Oil & Gas Disciplines
Fidan Aliyeva
 
Bill resume
Bill resumeBill resume
Bill resume
Awili Bill
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
Nailesh Patel
 
Resume CV
Resume CVResume CV
Resume CV
Ali Mmmh
 

Similar to CV pro SMOn-ENG (20)

Antonio MartinezArano B. Ch. E, MBA, PMP, Resume
Antonio MartinezArano B. Ch. E, MBA, PMP, ResumeAntonio MartinezArano B. Ch. E, MBA, PMP, Resume
Antonio MartinezArano B. Ch. E, MBA, PMP, Resume
 
Peter McGough CV 2010
Peter McGough CV 2010Peter McGough CV 2010
Peter McGough CV 2010
 
Cv for Bui Nguyen Pho - Envir Engineer (19.12.2016)
Cv for Bui Nguyen Pho - Envir Engineer (19.12.2016)Cv for Bui Nguyen Pho - Envir Engineer (19.12.2016)
Cv for Bui Nguyen Pho - Envir Engineer (19.12.2016)
 
Res15-Brad Young_151221
Res15-Brad Young_151221Res15-Brad Young_151221
Res15-Brad Young_151221
 
CV_JAKKARIN PAETPITAK_(ENG)_141015
CV_JAKKARIN PAETPITAK_(ENG)_141015CV_JAKKARIN PAETPITAK_(ENG)_141015
CV_JAKKARIN PAETPITAK_(ENG)_141015
 
CV C Pieroni Sept 2016 (3)
CV C Pieroni  Sept 2016 (3)CV C Pieroni  Sept 2016 (3)
CV C Pieroni Sept 2016 (3)
 
CV C Pieroni Sept 2016 (3)
CV C Pieroni  Sept 2016 (3)CV C Pieroni  Sept 2016 (3)
CV C Pieroni Sept 2016 (3)
 
Ali Khidr CV
Ali Khidr CVAli Khidr CV
Ali Khidr CV
 
Nivaldo Curcio CV Feb 2015
Nivaldo Curcio CV Feb 2015Nivaldo Curcio CV Feb 2015
Nivaldo Curcio CV Feb 2015
 
RajeevCV2016
RajeevCV2016RajeevCV2016
RajeevCV2016
 
Ali Khidr CV
Ali Khidr CVAli Khidr CV
Ali Khidr CV
 
NM SM
NM SMNM SM
NM SM
 
RESUME LE XUAN TUYEN
RESUME LE XUAN TUYENRESUME LE XUAN TUYEN
RESUME LE XUAN TUYEN
 
CURRICULUM VITAE Walid Alhaddad Drilling Supervisor
CURRICULUM VITAE Walid Alhaddad Drilling SupervisorCURRICULUM VITAE Walid Alhaddad Drilling Supervisor
CURRICULUM VITAE Walid Alhaddad Drilling Supervisor
 
Completion & integrity engineer achievements
Completion & integrity engineer achievementsCompletion & integrity engineer achievements
Completion & integrity engineer achievements
 
Naveed Asif C.V Updated
Naveed Asif C.V UpdatedNaveed Asif C.V Updated
Naveed Asif C.V Updated
 
Oil & Gas Disciplines
Oil & Gas DisciplinesOil & Gas Disciplines
Oil & Gas Disciplines
 
Bill resume
Bill resumeBill resume
Bill resume
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
Resume CV
Resume CVResume CV
Resume CV
 

CV pro SMOn-ENG

  • 1. MONTENOT SOPHIE Contact No.: 0033624271789 ~ E-Mail: smontenot77@gmail.com ~ Senior Level Assignments ~ ~ Cavity Cell Management ~ Project Management ~ PROFILE SUMMARY  Result-oriented professional with over 12 years of experience in Project Management, Cavity Cell Management, Cost Control, Works Interface Management, Contract Management, Liaison & Coordination and Team Management  Presently associated with Vinci Group, Nationwide as Quality and Geotechnical Manager  Skilled in defining geophysical and additional (surveys) prospections using standard and non-standard measures  Track record of establishing and managing oversight of the global cavity risk management process (300km of new High Speed Line)  Swift in completing projects with competent cross-functional skills and making sure on time deliverables within pre- set cost parameters  An enterprising leader with skills in leading personnel towards accomplishment of common goals SKILL SET Cavity Cell Management Stakeholder Management Budgeting Design Engineering Project Management Contract Management Documentation Team Management WORK EXPERIENCE Since May'04 with Vinci Group, France, Nationwide Presently designated as Quality & Geotechnical Manager Growth Path: May’04 to Jan’07 Laboratory Manager Nov’06 to Nov’09 Quality & Geotechnical Manager May’09 to Feb’11 Quality, Geotechnical and Cavity Manager Feb’11 to Jun’15 Geotechnical manager - Cavity Cell Management Jun’16 to till date Quality & Geotechnical Manager During Vinci Construction and Earthworks: As Geotechnical Manager Title: West Bypass of Strasbourg (25 km) - Build Construction and Design Project (Starting phase)  Developing project baselines while monitoring and controlling projects with respect to cost, resources deployment, time over-runs and quality compliance to ensure its satisfactory execution  Managingrelationship with project stakeholders, keeping stakehol ders informed of progress and issues in order to manage expectations on all project requirements and deliverables As Manager - Cavity Cell Management  Title: Cavity Cell Management, under the Technical Direction of infrastructure staff, for the LGV SEA Tours-Bordeaux Line (New High Speed Line - 340km); Cavity risks along approximately 150km of the route  Supervising 5 Junior Geotechnical Engineers  Establishment of the overall prospection process, oversight of the cavity problem  Definition of the treatments to implement in order to resolve the cavity problem  Works interface management (meetings)  Contract drafting and oversight  Sub-contractor oversight  Control and analyses on the documents provided by the sub-contractors  Management of a team of junior geotechnical engineers  Drafting summary files for the natural hazard section of the SEA line safety file As Quality, Geotechnical and Cavity Manager Title: H1 section of the High-Speed Rhine-Rhone Line; Refurbishment of the Besançon – Devecey Railway Line; Major karstic risks
  • 2.  Contributed towards: o External checks (the earth-moving work was sub-contracted) o Oversight of the geophysical services to define the cavity risk zones o Implementation of the general and specific operational procedures o Site adaptation o Geotechnical consulting for the BVM 31 section – LGV line near the Besançon Viotte station  Collaborated between the geotechnical study department and the site  Instituted definition of the level classes (according to the French Railway Network Authority Guideline) During GTM Earthworks As Quality and Geotechnical Manager Title: A1/A2 section of the High-Speed Rhine-Rhone line; 7 km, 3 trestles, 1 viaduct, 2,000,000 m3 of displaced material; Bank Construction in Flood-prone and Compressible Zones – Wet and Fine-grain Cut Materials  Internal and external checks (earth-moving)  Liaised between the geotechnical study department and the site  Implemented operational procedures  Managed oversight of the: o Pre-loading bank material packing (installation and instrument oversight) o Bank construction (sorting the cut materials and transforming them into filler – treatment)  Monitored specific earth-moving operational procedures – specific construction measures Title: OPA2 Section of the High-Speed Rhine-Rhone Line; Pre-loadingthe technical blocks in flood-proneand compressible zones  Monitored internal checks (earth-moving)  Implemented operational procedures  Managed oversight of the packing for 9 pre-loaded banks (installation and instrument oversight) As Laboratory Manager Title: SCAO Company (Western Motorway Construction Company) on the A85 K3 Angers/Tours construction site; Langeais North Bypass: 18 km, 2 viaducts, 1,300,000 m3 of fine material cleared, compressible zone  Instituted internal, external and outside checks (earthworks and civil engineering)  Administered Maturity metre monitoring for the concrete in the bed of the viaducts  Managed application and checks for the SCAO quality system  Supervising a laboratory team (around 10 persons) Accomplishments:  Took several measures such as prospection and analysis of 100% of the project and recommended earthwork building solutions,concrete injection on all cavity found, to ensure that projects were in line with requirements specified by clients  Undertook initiatives such as every week meeting with the production management to ensure having and giving all information about cavity problems, all system and reporting document is create to follow the prospection, analysis and solution during the project for each work to ensure that cavity cell management was in place  Overcome management and technical challenges during the completion of last project by taking adapted measures as challenging staff, adapted management to take the best in each member of staff, found technical solution to respect the schedule and budget (3 months to find and realise a build solution on 800m of new line, by concrete injection on 15m deep by 2.5 m scare)  Created important documentation such as a new software for earthwork laboratory, as return of experience report on different subject as geophysical interest in cavity prospection, in earthwork design on behalf of the company APPRETENCESHIP Organisation: GEOTEC, Dijon Period: June’02 to April’04 Role: Apprentice Geotechnical Engineer ACADEMIC DETAILS 2004 DESS/ Masters in Applied Geology as a work-study programme with the GEOTEC Company, Besançon 2001 DEA-level Soil and Sub-Soil Protection, Planning and Exploitation, with optional credits in Geotechnics, Nancy from LAEGO. 2000 Erasmus Masters in Geology with Extra Credits in Rock Mechanics and Geological Engineering from Oxford Brookes University PERSONAL DETAILS
  • 3. Date of Birth: 10th Nov’77 Address: 4 Rue De l’hôtel Dieu 39100 Dole Languages Known: English, French Location Preference: India