Green Building and Renovating
• Vancouver lead the world in green building
design and construction. The City is
working to reduce the amount of energy
consumed by the city's new homes 33%
by 2020.
Green Building and Renovating
12 Ways to design your house to be energy efficient
1) Efficient Lightning
2) In-Home Energy Display
3) Gas Fireplace Efficiency
4) Window Perfomance
5) Ventilator
6) Exterior Walls
7) Toilets
8) Under-slab Insulation
9) Basement Walls
10) Pre Piping
11) Domestic Hot Water Supply Efficiency
12) Car Charger
Permits and Regulations
• Building permits and regulations are enforced by the City
of Vancouver to ensure safety and livability for you, your
neighbours, and future property owners and residents.
Permit Application Process
• Step 1 - Document the building before
work
begins
• Step 2 - Document the proposed changes
• Step 3 - Arrange for a Letter of Assurance
• Step 4 - Arrange for a Letter of Credit
• Step 5 - Apply for a development permit
• Step 6 - Arrange for a final inspection
Constructions Damage Deposit
• The heritage buildings in Vancouver either
renovations or new constructions will
require a refundable damage deposit
before the building permit issued.
Inspections
• Inspections is to ensure that renovation or
construction work complies with the
relevant bylaws, and meets the City's
goals around life safety, accessibility,
green buildings.
Fees
Deposit Fees
• The deposit will be at least $1,000. For
single family homes, the fee is typically
$2,000. For other projects, the deposit may
be significantly larger.
Inspection Fee
• The inspection fee will vary, based on the
size of the project. For 2012, the fee ranges
from $166.45 to $3,221.71.
Utilities locations and Construction
• Modern City has to complex network of water,
telephone, electrical , voice communication
carrier pipes below ground.
• Due to the utility installations need to be safe,
the staff review proposed construction to ensure
they meet all the requirements, policies,
procedures and protocols.
Benefits of energy efficiency
heritage buildings in Vancouver
1) Installation of :
• Fireplace
• Chimney
2) Embodied energy
• The buildings retain their embodied
energy.
• The energy used in lifecycle of a
building which are
• Initial Energy
• Recurring Energy
• Operating Energy
• Energy to demolish and dispose of the
building
3) Low Energy-Intensive Building
• Example of materials for construct building are woods and bricks
• Reduce greenhouse gas emission
Benefits of energy efficiency of overall
heritage building
• Thermal mass
• Natural Ventilation System
• Construction of timber floor
• Installation of insulation
• Produce lesser unwanted substances
Disadvantages
• Thermal Bridging
Case Study: City Of Vancouver
• Heritage buildings mostly 20th century.
• 2150 of registered heritage buildings.
• The large amount of heritage buildings in a city
may cause huge energy consumption.
• How to solve it? “Vancouver’s 2020 Greenest
City Action Plan”.
Examples:
Type of House Rating
Older house not upgraded 0 to 50
Upgraded old house 51 to 65
Energy-efficient upgraded old house or typical new
house
66 to 74
Energy-efficient new house 75 to 79
Highly energy-efficient new house 80 to 90
An "advanced house" that uses little or no purchased
energy
91 to
100
EnerGuide Rating Chart
Heritage Buildings Performance
Upgrades
• Domestic Hot Water (DHW):
I. Solar panels installed.
• Electrical System:
I. Installed two parallel electric system
II. Modern alarm system installed.
III. Modern electronic equipment.
IV. Speaker system
Heritage Buildings Performance
Upgrades
• Heating:
I. Introduce radiant heat.
II. Introduce Ground Source Heat Pump(GSHP).
III. Installation of Heat Recovery Ventilator(HRV).
IV. Backed up heating unit in the attic.
• Insulation:
I. R5/ inch spray soy-based polyurethane installed.
Heritage Buildings Performance
Upgrades
• Seismic Upgrades:
I. Reinforced rebar and cement reinforcements
beneath chimney and main walls.
II. Engineered beams and hangers.
III. Hurricane ties between the floors.
IV. Iron ties to the chimneys.
V. Interior sheer walls added.
Type of House Upgraded House Original House
Total Embodied:
Material: 567.975 388.874
Transportation: 29.445 23.841
Total: 597.420 412.715
Operating Energy:
Annual Operating
Energy:
79.4 199.4
Total Operating Energy:
(75 years)
5955 14955
Total Lifetime
Energy:
(75 years)
6552.4 15367.72
Energy Usage Comparison: Upgraded and Original
House
Possible Problems and Precautions
 Construction
 Check the materials status
 Performance done by workers under control
Decay , quality , outlook and design affected
 Breathing performance
 Exchange air with outdoor environment
 Modern materials will affects the breathing performance
as well as trap moisture
Increasing of decay and damp problems
 Financial cost and payback
 Hire professions to control the quality of works
 Cost more due to heritage buildings
Much more expensive than a normal building
 Repaint and repairing
 Common paint-staking
 Extra cost of paint to take care the properties of
building
Affect the bonding strength of paint
Possible Problems and Precautions (cont’d)
Recommendation for
future improvement
Things to do before renovating the
building:
1. Identify the parts of the building we need
to upgrade
2. Request an energy improvement plan
that establishes priorities and
alternatives, including life cycle from
energy auditor.
Method to improve energy efficient
1. Install components that provide natural
ventilation and light
• Example: windows, interior courtyards, skylights and roof ventilators
• Reduce the use of mechanical ventilation
• Minimize the cost of electricity
• Maintain the thermal comfort, example: heat can be dispersed from
the building through these openings.
Method to improve energy efficient
2. Build thick masonry wall
• Have substantial mass and high thermal inertia
• Enable heat to be reduced in the building during hot weather and
traps heat during cold weather.
• Suitable to all climate weather
• In summer, heat absorbed at the outer surface of the wall takes a
period of time to transfer to the interior part of wall.
• In winter, heat is trapped within the building by dampening the
overall peaks of heat gain and loss.
Method to improve energy efficient
3. Install wide overhang roof (hot climate) or
sloping roof (cold climate)
• Wide overhang roof creates porches that can minimize the heat
absorbed from the sun
• Apply light coloured roofs to greatly reduce heat absorbed
• Sloping roof has no overhang prevails which allows the shedding of
snow
• Increase the beneficial solar heat gain through windows
Method to improve energy efficient
4. Floor plans
• In cold climates, the design of the building should be low ceiling
• Allows the heat to be shared more frequently inside the building
• Small windows with interior shutters should be installed to reduce
drafts and heat loss from the building
• In hot climate, wide central halls with high ceilings, breezeways and
large porches should be designed
• To maximize the air circulation.
Method to improve energy efficient
5. Repairing and weather-stripping windows
and doors
• Use draft-proof interlocking zinc, bronze or stainless steel weather-
stripping
• Add or tighten exterior or interior storm windows and doors with
gasket
• Allow for weep holes along the bottom rail to drain or vent
condensed water vapour
• Determine and seal locations of air infiltration
Method to improve energy efficient
6. Reduce energy demands for heating and
cooling
This can be done by 2 steps:
1. Upgrade to mechanical systems and major appliances (make sure
that we do not make alterations or adding new materials)
2. Corrective work or treatments, such as weatherization, that require
other alterations to the building may be considered.
~~~Thank You~~~

More Related Content

What's hot

Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
ISCN_Secretariat
 
Pile Chapter 11 Technical Ym
Pile Chapter 11   Technical   YmPile Chapter 11   Technical   Ym
Pile Chapter 11 Technical Ym
Galala University
 

What's hot (20)

TE Studio - Intep Portfolio
TE Studio - Intep PortfolioTE Studio - Intep Portfolio
TE Studio - Intep Portfolio
 
Building enclosure design presentation 1
Building enclosure design presentation 1Building enclosure design presentation 1
Building enclosure design presentation 1
 
2013 University of Minnesota Passive House Lecture
2013 University of Minnesota Passive House Lecture2013 University of Minnesota Passive House Lecture
2013 University of Minnesota Passive House Lecture
 
Energy cork tea 29 oct15
Energy cork tea 29 oct15Energy cork tea 29 oct15
Energy cork tea 29 oct15
 
Karpiak Mulhall Passive House
Karpiak Mulhall Passive HouseKarpiak Mulhall Passive House
Karpiak Mulhall Passive House
 
24th Street Passive House Projects
24th Street Passive House Projects24th Street Passive House Projects
24th Street Passive House Projects
 
MinnePHit House Case Study
MinnePHit House Case StudyMinnePHit House Case Study
MinnePHit House Case Study
 
Passivhaus Designing for heating load 25th Passivhaus Conference
Passivhaus Designing for heating load 25th Passivhaus ConferencePassivhaus Designing for heating load 25th Passivhaus Conference
Passivhaus Designing for heating load 25th Passivhaus Conference
 
Passive House in a Cold Climate @ BBBB 2015 WI Conference
Passive House in a Cold Climate @ BBBB 2015 WI ConferencePassive House in a Cold Climate @ BBBB 2015 WI Conference
Passive House in a Cold Climate @ BBBB 2015 WI Conference
 
Building an even better Passivhaus School
Building an even better Passivhaus SchoolBuilding an even better Passivhaus School
Building an even better Passivhaus School
 
Aesthetics in a High-Performing Building How Beauty Blends with Energy Savings
Aesthetics in a High-Performing Building How Beauty Blends with Energy SavingsAesthetics in a High-Performing Building How Beauty Blends with Energy Savings
Aesthetics in a High-Performing Building How Beauty Blends with Energy Savings
 
Passivhaus Archive Hereford
Passivhaus Archive HerefordPassivhaus Archive Hereford
Passivhaus Archive Hereford
 
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
 
THERMAL BRIDGING
THERMAL BRIDGINGTHERMAL BRIDGING
THERMAL BRIDGING
 
Efficient and Affordable: Applying the Passive House Standard to Low-income, ...
Efficient and Affordable: Applying the Passive House Standard to Low-income, ...Efficient and Affordable: Applying the Passive House Standard to Low-income, ...
Efficient and Affordable: Applying the Passive House Standard to Low-income, ...
 
PASSIVE HOUSE POSTER
PASSIVE HOUSE POSTERPASSIVE HOUSE POSTER
PASSIVE HOUSE POSTER
 
Energy Fit Homes
Energy Fit Homes Energy Fit Homes
Energy Fit Homes
 
Is Passivhaus a step too far? South Pacific Passive House Conference Auckland...
Is Passivhaus a step too far? South Pacific Passive House Conference Auckland...Is Passivhaus a step too far? South Pacific Passive House Conference Auckland...
Is Passivhaus a step too far? South Pacific Passive House Conference Auckland...
 
C25 wg1 dimitrios_bikas
C25 wg1 dimitrios_bikasC25 wg1 dimitrios_bikas
C25 wg1 dimitrios_bikas
 
Pile Chapter 11 Technical Ym
Pile Chapter 11   Technical   YmPile Chapter 11   Technical   Ym
Pile Chapter 11 Technical Ym
 

Viewers also liked

Cultural heritage & its importance
Cultural heritage & its importanceCultural heritage & its importance
Cultural heritage & its importance
Tousif Raja
 

Viewers also liked (14)

Elaich module 3 topic 3.8.b - From salt decay in lab to exercise salt decay p...
Elaich module 3 topic 3.8.b - From salt decay in lab to exercise salt decay p...Elaich module 3 topic 3.8.b - From salt decay in lab to exercise salt decay p...
Elaich module 3 topic 3.8.b - From salt decay in lab to exercise salt decay p...
 
Elaich module 4 topic 4.6 - Criteria and methodology for cleaning - pilot app...
Elaich module 4 topic 4.6 - Criteria and methodology for cleaning - pilot app...Elaich module 4 topic 4.6 - Criteria and methodology for cleaning - pilot app...
Elaich module 4 topic 4.6 - Criteria and methodology for cleaning - pilot app...
 
Elaich module 3 topic 3.6 - Diagnosis of Decay
Elaich module 3 topic 3.6 - Diagnosis of DecayElaich module 3 topic 3.6 - Diagnosis of Decay
Elaich module 3 topic 3.6 - Diagnosis of Decay
 
Elaich module 3 topic 3.5 - Preventive Conservation
Elaich module 3 topic 3.5 - Preventive ConservationElaich module 3 topic 3.5 - Preventive Conservation
Elaich module 3 topic 3.5 - Preventive Conservation
 
Elaich module 5 topic 5.1.1
Elaich module 5 topic 5.1.1Elaich module 5 topic 5.1.1
Elaich module 5 topic 5.1.1
 
Masonry Repairs
Masonry RepairsMasonry Repairs
Masonry Repairs
 
Elaich module 2 topic 2.1 - Knowing the building
Elaich module 2 topic 2.1 - Knowing the buildingElaich module 2 topic 2.1 - Knowing the building
Elaich module 2 topic 2.1 - Knowing the building
 
Elaich module 2 topic 2.5 - Historic building materials
Elaich module 2 topic 2.5 - Historic building materialsElaich module 2 topic 2.5 - Historic building materials
Elaich module 2 topic 2.5 - Historic building materials
 
Cracks in Buildings
Cracks in BuildingsCracks in Buildings
Cracks in Buildings
 
Cultural heritage & its importance
Cultural heritage & its importanceCultural heritage & its importance
Cultural heritage & its importance
 
Building Failures and its Causes- Theory of structures
Building Failures and its Causes- Theory of structuresBuilding Failures and its Causes- Theory of structures
Building Failures and its Causes- Theory of structures
 
Cracks in Buildings
Cracks in BuildingsCracks in Buildings
Cracks in Buildings
 
CASE STUDY ON CRACKS AND ITS REMEDIAL MEASURES
CASE STUDY ON CRACKS AND ITS REMEDIAL MEASURESCASE STUDY ON CRACKS AND ITS REMEDIAL MEASURES
CASE STUDY ON CRACKS AND ITS REMEDIAL MEASURES
 
Slideshare ppt
Slideshare pptSlideshare ppt
Slideshare ppt
 

Similar to Building services-i (2)

Historic Windows
Historic WindowsHistoric Windows
Historic Windows
aiahouston
 
St. James Church - Energy Audit Report
St. James Church - Energy Audit ReportSt. James Church - Energy Audit Report
St. James Church - Energy Audit Report
Michael Clarke
 

Similar to Building services-i (2) (20)

Green Building: Sustainable Architecture | Redlands, CA - McNaughton Architec...
Green Building: Sustainable Architecture | Redlands, CA - McNaughton Architec...Green Building: Sustainable Architecture | Redlands, CA - McNaughton Architec...
Green Building: Sustainable Architecture | Redlands, CA - McNaughton Architec...
 
SERVE-ING Tipperary Results & Lessons
SERVE-ING Tipperary Results & LessonsSERVE-ING Tipperary Results & Lessons
SERVE-ING Tipperary Results & Lessons
 
LEED_NC and LEED_EB
LEED_NC and LEED_EBLEED_NC and LEED_EB
LEED_NC and LEED_EB
 
Power saving
Power savingPower saving
Power saving
 
Passive-design-and-net-zero-energy-building.pptx
Passive-design-and-net-zero-energy-building.pptxPassive-design-and-net-zero-energy-building.pptx
Passive-design-and-net-zero-energy-building.pptx
 
Tipperary Energy Agency SuperHomes project
Tipperary Energy Agency SuperHomes projectTipperary Energy Agency SuperHomes project
Tipperary Energy Agency SuperHomes project
 
#Srm wed 2020
#Srm wed 2020#Srm wed 2020
#Srm wed 2020
 
Energy efficient construction and training practices - 7 Energy renovations ...
Energy efficient construction and training practices  - 7 Energy renovations ...Energy efficient construction and training practices  - 7 Energy renovations ...
Energy efficient construction and training practices - 7 Energy renovations ...
 
Energy efficient ventilation system
Energy efficient ventilation systemEnergy efficient ventilation system
Energy efficient ventilation system
 
Building envlope
Building envlopeBuilding envlope
Building envlope
 
The National Eco House Oman
The National Eco House OmanThe National Eco House Oman
The National Eco House Oman
 
Historic Windows
Historic WindowsHistoric Windows
Historic Windows
 
Climate responsive Contemporary architecture
Climate responsive Contemporary architectureClimate responsive Contemporary architecture
Climate responsive Contemporary architecture
 
Passive design of residential complex
Passive design of residential complexPassive design of residential complex
Passive design of residential complex
 
Final Poster
Final PosterFinal Poster
Final Poster
 
IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research Presentation
 
St. James Church - Energy Audit Report
St. James Church - Energy Audit ReportSt. James Church - Energy Audit Report
St. James Church - Energy Audit Report
 
Design Strategies.pptx
Design Strategies.pptxDesign Strategies.pptx
Design Strategies.pptx
 
Raritan Inn
Raritan InnRaritan Inn
Raritan Inn
 
ZERO ENERGY BUILDING ENVELOPE COMPONENTS
ZERO ENERGY BUILDING ENVELOPE COMPONENTSZERO ENERGY BUILDING ENVELOPE COMPONENTS
ZERO ENERGY BUILDING ENVELOPE COMPONENTS
 

More from Lwj Welson (20)

De assignment
De assignmentDe assignment
De assignment
 
Pm only
Pm onlyPm only
Pm only
 
Vm presentation
Vm presentationVm presentation
Vm presentation
 
Mah Sing Group Berhad
Mah Sing Group BerhadMah Sing Group Berhad
Mah Sing Group Berhad
 
Be cost appraisal
Be cost appraisalBe cost appraisal
Be cost appraisal
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignment
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignment
 
Final pp1
Final pp1Final pp1
Final pp1
 
Bs ii-assignment
Bs ii-assignmentBs ii-assignment
Bs ii-assignment
 
Safety complete
Safety completeSafety complete
Safety complete
 
Thc construction-company-completed
Thc construction-company-completedThc construction-company-completed
Thc construction-company-completed
 
Management science presentation slides
Management science  presentation slidesManagement science  presentation slides
Management science presentation slides
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
Ct
CtCt
Ct
 
Epc oral presentation part 2
Epc oral presentation part 2Epc oral presentation part 2
Epc oral presentation part 2
 
Epc oral presentation part 1
Epc oral presentation part 1Epc oral presentation part 1
Epc oral presentation part 1
 
Psy final-write-up
Psy final-write-upPsy final-write-up
Psy final-write-up
 
Psychology social elements
Psychology social elementsPsychology social elements
Psychology social elements
 
Social behavior
Social behaviorSocial behavior
Social behavior
 

Recently uploaded

一比一原版(Lincoln毕业证)新西兰林肯大学毕业证成绩单
一比一原版(Lincoln毕业证)新西兰林肯大学毕业证成绩单一比一原版(Lincoln毕业证)新西兰林肯大学毕业证成绩单
一比一原版(Lincoln毕业证)新西兰林肯大学毕业证成绩单
tyvaq
 
一比一原版(Monash毕业证)莫纳什大学毕业证成绩单
一比一原版(Monash毕业证)莫纳什大学毕业证成绩单一比一原版(Monash毕业证)莫纳什大学毕业证成绩单
一比一原版(Monash毕业证)莫纳什大学毕业证成绩单
qogbuux
 
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
pcoow
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
qogbuux
 
Prevalence, biochemical and hematological study of diabetic patients
Prevalence, biochemical and hematological study of diabetic patientsPrevalence, biochemical and hematological study of diabetic patients
Prevalence, biochemical and hematological study of diabetic patients
Open Access Research Paper
 
一比一原版EUR毕业证鹿特丹伊拉斯姆斯大学毕业证成绩单如何办理
一比一原版EUR毕业证鹿特丹伊拉斯姆斯大学毕业证成绩单如何办理一比一原版EUR毕业证鹿特丹伊拉斯姆斯大学毕业证成绩单如何办理
一比一原版EUR毕业证鹿特丹伊拉斯姆斯大学毕业证成绩单如何办理
exehay
 
A systematic review of the implementation of Industry 4.0 in human resources
A systematic review of the implementation of Industry 4.0 in human resourcesA systematic review of the implementation of Industry 4.0 in human resources
A systematic review of the implementation of Industry 4.0 in human resources
BOHR International Journal of Operations Management Research and Practices
 
一比一原版(Massey毕业证)梅西大学毕业证成绩单
一比一原版(Massey毕业证)梅西大学毕业证成绩单一比一原版(Massey毕业证)梅西大学毕业证成绩单
一比一原版(Massey毕业证)梅西大学毕业证成绩单
tyvaq
 
Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...
Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...
Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...
Open Access Research Paper
 

Recently uploaded (20)

一比一原版(Lincoln毕业证)新西兰林肯大学毕业证成绩单
一比一原版(Lincoln毕业证)新西兰林肯大学毕业证成绩单一比一原版(Lincoln毕业证)新西兰林肯大学毕业证成绩单
一比一原版(Lincoln毕业证)新西兰林肯大学毕业证成绩单
 
一比一原版(Monash毕业证)莫纳什大学毕业证成绩单
一比一原版(Monash毕业证)莫纳什大学毕业证成绩单一比一原版(Monash毕业证)莫纳什大学毕业证成绩单
一比一原版(Monash毕业证)莫纳什大学毕业证成绩单
 
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
 
Powers and Functions of CPCB - The Water Act 1974.pdf
Powers and Functions of CPCB - The Water Act 1974.pdfPowers and Functions of CPCB - The Water Act 1974.pdf
Powers and Functions of CPCB - The Water Act 1974.pdf
 
Major-Environmental-Problems and Proven Solutions.pdf
Major-Environmental-Problems and Proven Solutions.pdfMajor-Environmental-Problems and Proven Solutions.pdf
Major-Environmental-Problems and Proven Solutions.pdf
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
 
NRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation StrategyNRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation Strategy
 
Powers of State Pollution Control Board - The Water Act 1974
Powers of State Pollution Control Board - The Water Act 1974Powers of State Pollution Control Board - The Water Act 1974
Powers of State Pollution Control Board - The Water Act 1974
 
@@how to Join @occult for money ritual..☎️+2349022657119.
@@how to Join @occult for money ritual..☎️+2349022657119.@@how to Join @occult for money ritual..☎️+2349022657119.
@@how to Join @occult for money ritual..☎️+2349022657119.
 
IPCC Vice Chair Ladislaus Change Central Asia Climate Change Conference 27 Ma...
IPCC Vice Chair Ladislaus Change Central Asia Climate Change Conference 27 Ma...IPCC Vice Chair Ladislaus Change Central Asia Climate Change Conference 27 Ma...
IPCC Vice Chair Ladislaus Change Central Asia Climate Change Conference 27 Ma...
 
CHLORITE( a phyllosilicate clay mineral)
CHLORITE( a phyllosilicate clay mineral)CHLORITE( a phyllosilicate clay mineral)
CHLORITE( a phyllosilicate clay mineral)
 
Prevalence, biochemical and hematological study of diabetic patients
Prevalence, biochemical and hematological study of diabetic patientsPrevalence, biochemical and hematological study of diabetic patients
Prevalence, biochemical and hematological study of diabetic patients
 
一比一原版EUR毕业证鹿特丹伊拉斯姆斯大学毕业证成绩单如何办理
一比一原版EUR毕业证鹿特丹伊拉斯姆斯大学毕业证成绩单如何办理一比一原版EUR毕业证鹿特丹伊拉斯姆斯大学毕业证成绩单如何办理
一比一原版EUR毕业证鹿特丹伊拉斯姆斯大学毕业证成绩单如何办理
 
Paper: Man and Environmental relationship
Paper: Man and Environmental relationshipPaper: Man and Environmental relationship
Paper: Man and Environmental relationship
 
Prevention and Control of Water Pollution
Prevention and Control of Water PollutionPrevention and Control of Water Pollution
Prevention and Control of Water Pollution
 
DRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving togetherDRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving together
 
The State Board for Water Pollution - The Water Act 1974 .pptx
The State Board for  Water Pollution - The Water Act 1974  .pptxThe State Board for  Water Pollution - The Water Act 1974  .pptx
The State Board for Water Pollution - The Water Act 1974 .pptx
 
A systematic review of the implementation of Industry 4.0 in human resources
A systematic review of the implementation of Industry 4.0 in human resourcesA systematic review of the implementation of Industry 4.0 in human resources
A systematic review of the implementation of Industry 4.0 in human resources
 
一比一原版(Massey毕业证)梅西大学毕业证成绩单
一比一原版(Massey毕业证)梅西大学毕业证成绩单一比一原版(Massey毕业证)梅西大学毕业证成绩单
一比一原版(Massey毕业证)梅西大学毕业证成绩单
 
Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...
Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...
Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...
 

Building services-i (2)

  • 1. Building Services I Name: Hong Kai Yin (0323361) Ngah Yea Zhe (0323204) Elliot Pang Tiu Seng (0319438) Welson Lum Wei Jiunn (0319514) Jackson Ting Shii Hang (0324326)
  • 3. Green Building and Renovating • Vancouver lead the world in green building design and construction. The City is working to reduce the amount of energy consumed by the city's new homes 33% by 2020.
  • 4. Green Building and Renovating 12 Ways to design your house to be energy efficient 1) Efficient Lightning 2) In-Home Energy Display 3) Gas Fireplace Efficiency 4) Window Perfomance 5) Ventilator 6) Exterior Walls 7) Toilets 8) Under-slab Insulation 9) Basement Walls 10) Pre Piping 11) Domestic Hot Water Supply Efficiency 12) Car Charger
  • 5. Permits and Regulations • Building permits and regulations are enforced by the City of Vancouver to ensure safety and livability for you, your neighbours, and future property owners and residents.
  • 6. Permit Application Process • Step 1 - Document the building before work begins • Step 2 - Document the proposed changes • Step 3 - Arrange for a Letter of Assurance • Step 4 - Arrange for a Letter of Credit • Step 5 - Apply for a development permit • Step 6 - Arrange for a final inspection
  • 7. Constructions Damage Deposit • The heritage buildings in Vancouver either renovations or new constructions will require a refundable damage deposit before the building permit issued.
  • 8. Inspections • Inspections is to ensure that renovation or construction work complies with the relevant bylaws, and meets the City's goals around life safety, accessibility, green buildings.
  • 9. Fees Deposit Fees • The deposit will be at least $1,000. For single family homes, the fee is typically $2,000. For other projects, the deposit may be significantly larger. Inspection Fee • The inspection fee will vary, based on the size of the project. For 2012, the fee ranges from $166.45 to $3,221.71.
  • 10. Utilities locations and Construction • Modern City has to complex network of water, telephone, electrical , voice communication carrier pipes below ground. • Due to the utility installations need to be safe, the staff review proposed construction to ensure they meet all the requirements, policies, procedures and protocols.
  • 11. Benefits of energy efficiency heritage buildings in Vancouver 1) Installation of : • Fireplace • Chimney
  • 12. 2) Embodied energy • The buildings retain their embodied energy. • The energy used in lifecycle of a building which are • Initial Energy • Recurring Energy • Operating Energy • Energy to demolish and dispose of the building
  • 13. 3) Low Energy-Intensive Building • Example of materials for construct building are woods and bricks • Reduce greenhouse gas emission
  • 14. Benefits of energy efficiency of overall heritage building • Thermal mass • Natural Ventilation System • Construction of timber floor • Installation of insulation • Produce lesser unwanted substances
  • 16. Case Study: City Of Vancouver • Heritage buildings mostly 20th century. • 2150 of registered heritage buildings. • The large amount of heritage buildings in a city may cause huge energy consumption. • How to solve it? “Vancouver’s 2020 Greenest City Action Plan”.
  • 17.
  • 19. Type of House Rating Older house not upgraded 0 to 50 Upgraded old house 51 to 65 Energy-efficient upgraded old house or typical new house 66 to 74 Energy-efficient new house 75 to 79 Highly energy-efficient new house 80 to 90 An "advanced house" that uses little or no purchased energy 91 to 100 EnerGuide Rating Chart
  • 20. Heritage Buildings Performance Upgrades • Domestic Hot Water (DHW): I. Solar panels installed. • Electrical System: I. Installed two parallel electric system II. Modern alarm system installed. III. Modern electronic equipment. IV. Speaker system
  • 21. Heritage Buildings Performance Upgrades • Heating: I. Introduce radiant heat. II. Introduce Ground Source Heat Pump(GSHP). III. Installation of Heat Recovery Ventilator(HRV). IV. Backed up heating unit in the attic. • Insulation: I. R5/ inch spray soy-based polyurethane installed.
  • 22. Heritage Buildings Performance Upgrades • Seismic Upgrades: I. Reinforced rebar and cement reinforcements beneath chimney and main walls. II. Engineered beams and hangers. III. Hurricane ties between the floors. IV. Iron ties to the chimneys. V. Interior sheer walls added.
  • 23.
  • 24. Type of House Upgraded House Original House Total Embodied: Material: 567.975 388.874 Transportation: 29.445 23.841 Total: 597.420 412.715 Operating Energy: Annual Operating Energy: 79.4 199.4 Total Operating Energy: (75 years) 5955 14955 Total Lifetime Energy: (75 years) 6552.4 15367.72 Energy Usage Comparison: Upgraded and Original House
  • 25. Possible Problems and Precautions  Construction  Check the materials status  Performance done by workers under control Decay , quality , outlook and design affected  Breathing performance  Exchange air with outdoor environment  Modern materials will affects the breathing performance as well as trap moisture Increasing of decay and damp problems
  • 26.  Financial cost and payback  Hire professions to control the quality of works  Cost more due to heritage buildings Much more expensive than a normal building  Repaint and repairing  Common paint-staking  Extra cost of paint to take care the properties of building Affect the bonding strength of paint Possible Problems and Precautions (cont’d)
  • 28. Things to do before renovating the building: 1. Identify the parts of the building we need to upgrade 2. Request an energy improvement plan that establishes priorities and alternatives, including life cycle from energy auditor.
  • 29. Method to improve energy efficient 1. Install components that provide natural ventilation and light • Example: windows, interior courtyards, skylights and roof ventilators • Reduce the use of mechanical ventilation • Minimize the cost of electricity • Maintain the thermal comfort, example: heat can be dispersed from the building through these openings.
  • 30. Method to improve energy efficient 2. Build thick masonry wall • Have substantial mass and high thermal inertia • Enable heat to be reduced in the building during hot weather and traps heat during cold weather. • Suitable to all climate weather • In summer, heat absorbed at the outer surface of the wall takes a period of time to transfer to the interior part of wall. • In winter, heat is trapped within the building by dampening the overall peaks of heat gain and loss.
  • 31. Method to improve energy efficient 3. Install wide overhang roof (hot climate) or sloping roof (cold climate) • Wide overhang roof creates porches that can minimize the heat absorbed from the sun • Apply light coloured roofs to greatly reduce heat absorbed • Sloping roof has no overhang prevails which allows the shedding of snow • Increase the beneficial solar heat gain through windows
  • 32. Method to improve energy efficient 4. Floor plans • In cold climates, the design of the building should be low ceiling • Allows the heat to be shared more frequently inside the building • Small windows with interior shutters should be installed to reduce drafts and heat loss from the building • In hot climate, wide central halls with high ceilings, breezeways and large porches should be designed • To maximize the air circulation.
  • 33. Method to improve energy efficient 5. Repairing and weather-stripping windows and doors • Use draft-proof interlocking zinc, bronze or stainless steel weather- stripping • Add or tighten exterior or interior storm windows and doors with gasket • Allow for weep holes along the bottom rail to drain or vent condensed water vapour • Determine and seal locations of air infiltration
  • 34. Method to improve energy efficient 6. Reduce energy demands for heating and cooling This can be done by 2 steps: 1. Upgrade to mechanical systems and major appliances (make sure that we do not make alterations or adding new materials) 2. Corrective work or treatments, such as weatherization, that require other alterations to the building may be considered.