SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
BACHELOR OF QUANTITY SURVEYING (HONOURS)
MARCH 2016 INTAKE
BUILDING SERVICES 1 [BLD 60403]
ASSIGNMENT
BUILDING INTEGRATION OF SOLAR ENERGY
GROUP MEMBERS:
NAME STUDENT ID
PANG KAI YUN 0319802
SAM WEI YIN 0320364
TRACE GEW YEE 0320269
YEO KAI WEN 0319844
AUDREY TING 0320247
CHOW KAH YIEN 0320300
LIM ZI SHAN 0320372
CHONG HUI XIN 0319363
LECTURER: MS.LIM TZE SHWAN
SUBMISSIONDATE : 28 JUNE 2016
1
CONTENT
No. Content Page No.
1. Introduction 2
2. Solar Energy 3
3. Installation 17
4. Application 25
5. Maintenance 33
6. Advantages and Disadvantages 37
7. Case study: Mont-Cenis Academy 39
8. Possible Problems of the System 48
9. Recommendations forFuture Improvement 50
10. Learning Outcome 51
11. References 52
12. Bibliography 54
2
INTRODUCTION
Solar energy is a type of renewable source of energy that is sustainable, clean, no
emission, reliable and inexhaustible, unlike the fossil fuels which are finite. Solar energy is a
non-polluting source of energy. It does not emit any greenhouse gases effect when it
producing the electricity. Solar energy is provided by the sun which the energy is in the form
of solar radiation. It makes the possibility production of the solar energy. The solar energy
technologies today are broadly distinguished into active and passive. In active solar energy,
it can convert the energy from the sun into usable form such as hot water and electricity
system with the use of mechanical system whereas in passive solar energy, it can convert
the solar energy to heat energy without the use of mechanical system. The active solar
energy include using the photovoltaic panels generate the electricity directly from the
sunlight solar energy or solar thermal convert the sunlight into useful output such as water
heating, cooling, ventilation and so on. One of the advantages of the solar energy is that we
can use both simple and complex to capture the solar energy and use it for heating. There
are two strategies to capture the sunlight from the sun which are active and passive solar
technology. Active solar technology is used to convert the solar energy to heat and electricity
power with the use of active mechanical system. Photovoltaic and solar thermal are the
examples of active solar energy. Passive solar technology is used to convert the solar
energy to heat energy without the use of active mechanical system. Passive solar
technology it includes those ventilation, improve air circulation, orienting spaces and others.
Mainly practice on using windows, trees, building placement or other techniques to capture
and deflect the sun for uses.
In this report, our topic is building integration with solar energy. We had selected one
case study which is Mont-Cenis Academy. This building is integrated with photovoltaic
technology. Photovoltaic is a device which takes light from the sun and turns into electricity.
The purpose of installing photovoltaic panel is due to lighting densities of solar modules used
between 53 and 93 %. Also, it supplies the necessary shade for the hall. The windows of the
buildings intensify the supply of daylight to the building.
3
SOLAR ENERGY
History
Solar energy is the oldest energy source. It was adored by many ancient civilizations
as a powerful god. The first known was applied for drying the preserved food. There was a
Swiss scientist, Horace- Benedict de Saussure had created the first solar collector in 1767.
The solar collector is an insulated box which covered three layers of glass to absorb the heat
energy. It had become known as the first solar oven where the oven reaches the
temperature of 110 degree celsius.
In the year of 1839, A French physicist Alexandre Edmond Becquerel had discovered
the photovoltaic effect by using two electrodes which placed in the electrolyte and it figured
out that the electricity increased after exposed to the light.
The solar heating has been used for a very long time ago, it started from ancient
Greek. They used solar energy to heat their homes since 4th century BC. In 19th century,
the people began to use solar water heaters which consists of a painted with black colour of
metal tank that installed on the roof top. However, this system had to wait for a long time to
heat the water as the sun went down, the water would cool down. In the year of 1909,
William J. Bailey had developed a new system which was quite similar to the solar systems
used today. The tank and the solar collector separated to two different units. One installed
on the roof and another installed inside the house which can be keep the hot water longer
than previous system.
4
PHOTOVOLTAIC
Photovoltaic is one of the most promising renewable energy technologies.
Photovoltaic panels is use to convert the sunlight from the sun to electricity that replace the
use of the electricity supplied by the utility grid without concern for the energy supply for the
environment harm. Photovoltaic panels mostly installed on the rooftops because the space
of the exposure is directly to the sun. Besides that, there are other possible installations for
the photovoltaic panels such as ground mount, pole mount, carport, a top a porch or shaded
area. This system is eligible for the federal tax credits and state incentives. In building
integrated photovoltaics (BIPV) involves combining solar photovoltaics with the building
construction. It can save the cost of materials and electricity and reduce pollution also it
added to the architectural appearance to the building of itself. The value of BIPV system is
the building design and energy conservation. During construction, the builders can reduce
the cost of photovoltaics system also the design issues for separating mounted system. Most
of the construction of the buildings is built during a retrofit. The designers of this system will
considered the arrangement and the possibilities of the solar technology compare to the
space of the construction uses.
Typesof Photovoltaic System
Photovoltaic systems are generally classified based on the end-use application of the
technology. There are three main types of photovoltaic system existing today for solar power
generation at home, which are grid-tie, off-grid and hybrid systems. Each system have their
advantages and disadvantages. Which type of systems is more suitable for your household
is depends on what goals you have for the solar energy to do for your home.
Grid-Tie System
Grid-Tie System is a solar system that is connected to the utility power grid. In this
way, the power supply drawn from the utility grid will be reduced by the amount of power
generated by the PV system. However, when there is little or no output from the PV system
due to cloudy weather or at night, the electricity drawn from the utility grid will be
correspondingly increased. This system only works when the grid is up. If the grid power
goes out, the grid-tie inverter needs to be shut down immediately.
5
An example of how a grid-tie system works
Advantages:
1. Lowest initial cost, because there is no need for expensive batteries and generator
2. Save more money with net metering
3. Constantly power your house unless the national grid is down
4. More efficiently because its DC does not go into a battery that causes energy loss.
5. Low maintenance cost
Disadvantages:
1. No power when the grid is down.
2. Access to the utility power grid is required.
6
Off-Grid System
An off-grid system or stand-alone system is designed to operate independent of the
utility power grid. This system required batteries for energy storage to provide electricity
when there is little or no output from the PV system. During the day the sun shines, it will not
only supplies power to your home, but will charge the batteries as well. When it is rainy days
or the sun isn’t shining, you use the power stored in the batteries.
An example of how an off-grid system works
Advantages
1. Self-sufficiency on a clean, renewable energy source
2. Ideal for remote areas where national grids cannot reach
3. No power bills
Disadvantages
1. Higher initial cost because batteries and generator are expensive
2. Required maintenance for batteries and generator
3. No grid backup
7
Hybrid System
Hybrid system is a combination of grid-tied and off-grid systems. These systems can
either be described as off-grid solar with utility backup power or grid-tied solar with extra
battery storage. This system functions like a grid tied system when the grid is up, but it also
charges a set of batteries. If the grid goes down, the inverter disconnects from the grid, but
it continues to supply power to the house from the batteries and inverter, basically behaving
like an off-grid system when the grid is down.
An example of how a hybrid system works
Advantages:
1. Provides backup power when the utility grid goes down
2. Less expensive than off-grid solar systems
3. Provides some of the advantages of both systems.
Disadvantages:
1. Still has a battery system that is expensive to buy and maintain.
8
Solar Panel
A solar panel is a collection of solar cells. Solar cells are small devices which can
convert sunlight into electricity. One cell will only provide a very small amount of power.
Several cells connected together and fixed in a frame to form a module (solar panel), which
can produce a larger, useful amount of power. The final product that you see on rooftops are
a series of connected panels called an array.
Types of solar panels
The main difference in solar panels is the purity or the arrangement of the silicon.
The more perfect the arrangement of molecules of silicon, the better the solar panel at
converting sunlight into electricity. There are five main types of solar cells and the best type
for you will vary depending upon the need of your project. Of Course, the more efficient the
panels are the more expensive, but this should not be your main reason for choosing one
type over another.
Monocrystalline Photovoltaic Solar Panel
Monocrystalline is the highest quality of solar cell. These cells are cut from a single,
continuous solid cylinder of crystal. The cylinder is then sliced into thin wafers to create solar
cells. These cells are the most efficient when convert the sun's energy to electricity.
Therefore, they are the most expensive solar panels currently available, but they require less
space than other cells because they can produce more energy.
9
Solar panel and solar cell of Monocrystalline
Polycrystalline Photovoltaic Solar Panel
Polycrystalline solar panel is now the most popular choice in residential installs. They
are made up of multiple silicon cells that are melted together and then recrystallized. This
process is simpler and less wasteful than with monocrystalline panels. These cells are
slightly less efficient, but also cheaper than monocrystalline cells.
Solar panel and solar cell of Polycrystalline
Amorphous Silicon Photovoltaic Solar Panel
Amorphous silicon solar panel is the least expensive and least efficient solar panels.
These panels can be manufactured by placing a thin film of amorphous (non crystalline)
silicon onto a wide choice of surfaces. These panels can be thin and flexible, which is why
they are normally known as “Thin Film” solar panels.
10
Solar panel and solar cell of Amorphous silicon
Hybrid Silicon Photovoltaic Solar Panel
Hybrid silicon solar panel is the combination of both monocrystalline solar cells and
amorphous solar cells to generate maximum efficiency. These panels have higher efficiency
ratings than other solar panel and it is a lot more expensive than mono or poly-crystalline
panels. They are better suited to countries that have sunnier climes.
Solar panel of Hybrid Silicon
11
Building Integrated Photovoltaics (BIPV)
Rather than an individual type of solar cell technology, building integrated
photovoltaics are solar photovoltaics that are integrated into the building in the form of solar
shingles, solar tiles, slates and others. This type of system can be integrated into roofs,
facades, walls and even windows. However, BIPV is way too expensive to install at regular
houses.
Solar shingles
12
SOLAR THERMAL
Solar thermal , also known as solar heating system is used convert the sunlight from
the sun to heat energy to provide the heat to the homes, it can also used in solar thermal
collector to cook the food and provide hot water. This system can be found on top of the
buildings. The panels on the roof of the buildings are the collectors of sunlight, then the
panels heating up the liquid in the tubes which is located on the panel and then it
transported into a container or tank which is ready to use. The installation and the
appearance are much similar to photovoltaic panels. The solar convertor does not act as the
same functions as photovoltaic that convert the sunlight to electricity, but it transfer the
energy to water. In Mediterranean countries, there are around 30% of homes that installed
with solar water heater, it highlights the basic household of the hot water needs. Building
integrated solar thermal system (BIST) is the application of the solar equipment of buildings
that perform the function and collect the solar energy. It is complicated by the complexity for
both solar energy and function of the buildings. There are several methods to collect the
solar energy by using glazed, unglazed, active and others. Different methods systems
capture solar thermal energy. Solar thermal energy is majority used in space heating, drying,
hot water heating and other processes. There are some solar energy systems that are
created by adding the elements to structure and shell of the buildings to give an aesthetic
view.
Typesof Solar Thermal
There are two types of solar thermal system which are active solar heating system
and passive solar heating system. Active solar water heating systems have circulating
pumps and control whereas passive solar water heating system don’t have circulating
pumps and control.
Active solar water heating system
In active solar water heating system, there are two types of active solar water heating
system which are direct circulation system and indirect circulation system. In direct
circulation system, it circulates the household water through the collector which is solar
panel by using the pumps. The system works very well in different climates like summer and
winter seasons.
13
An example of how active solar water heating system works
Passive solar water heating system
In passive solar water heating system, the pumps circulate the heat- transfer fluid
through the collector. It heats the water and flow it into homes. This passive solar water
heating system quite happens in winter seasons.
An example of how passive solar water heating system works
14
Solar ThermalCollector
Solar thermal collector is the heart of a solar thermal system. It absorbs solar
radiation, converts it into heat, and transfers useful heat to the solar system. The main
component of solar thermal collector is the absorber plate. A coated metal plate will absorbs
the sun’s radiation and causes its temperature to rise above the atmosphere. The plate then
releases the energy through radiation and convection to its surroundings. Thus, heat is
transferred to the heat-transfer fluid which in turn feeds the hot water system.
Types of solar thermal collector
Solar thermal collector's job is very simple. It sits in the sun than absorb and transfer
the heat. But to do this efficiently, solar thermal collectors need to absorb a high level of
solar radiation, while minimizing losses from the reflection and heat loss to the surrounding
environment. There are two main types of solar thermal collector, which are flat plate solar
collector and evacuated tube solar collector. Each type has a different role, depends on
where the project is and what the heating needs are.
Flat Plate Solar Collector
Flat plate solar collector has been used since the early 1900’s. It consists an
absorber panel welded to copper pipe where the heat transfer to the water circulates through.
This is encased in an insulated box to help retain the collected heat, and covered by a sheet
of glass or glazing, which also provides an insulating air space.
15
Cross Section of a Flat Plate Solar Collector
Evacuated Tube Solar Collector
Evacuated Tube Solar Collector is a much newer system. It is introduced to the
market in the 1970's. The evacuated tube consists of two concentric glass tubes fused at the
top and bottom. The space between the two tubes is evacuated to form a vacuum. This
vacuum serves as an insulation barrier, minimizing heat loss and increasing efficiency. The
inner glass tube is coated with an absorptive coating to absorb the solar radiation. The heat
is transferred to the water circulating inside the copper pipe. The water is heated and then
flow to the hot water storage tank.
16
Cross Section of a Evacuated Tube Solar Collector
17
INSTALLATIONS
The installation of solar panel is very important because it effect the total sunlight
received. Basically, solar panel is installed on rooftops because rooftops gets the most direct
sun exposure and you want to make sure your solar panel is maximally effective year around.
Actually, there are many ways to install solar panel on your roof depends on your individual
requirements and the type of roof you have.
BEFORE INSTALLATION
There are many benefits to installing solar panels at your home, everything from
lowering your energy bills to reducing your carbon footprint. However, choosing solar isn’t a
decision you should make lightly. There are a number of considerations to be made before
one installs these panels at their home.
1. Amount of sun exposure through the year
Same type of system will produce different result in different home due to the amount of sun
exposure it gets throughout the year. Therefore we should determine the total solar energy
received during the daytime for month, and year.
2. Shading
Shade from trees, nearby buildings, and other obstructions can block the sun, reduce your
solar panel's effectiveness. If the solar panels are all on the same string, and one of the
panels is shaded, all the panels will have the electricity production limited to the one shaded
panel. If you know shading is going to be an issue, you might wish to put panels on different
strings to ensure that you maximize the electricity produced from panels.
18
3. Climate & weather conditions
High ambient temperatures can decrease the output of solar systems, and clouds and
rainfall patterns can affect system output and maintenance requirements. High levels of air
pollution can require regular cleaning to limit efficiency losses.
4. Position of the solar panel
Solar panel produces most power when they are pointed directly at the sun. They should be
installed so that they can receive maximum sunlight. In the southern hemisphere, your
panels should ideally face to the north (towards the equator) and opposite in the northern
hemisphere.
5. Type of Solar Panels
A solar system can save you money as the technology has become affordable and price of
grid electricity keeps rising. It is important to know which solar technology to use as different
types are suitable for different conditions. Thin-film panels are better for shaded sites and in
general are a little cheaper, however they also require more space. Polycrystalline and
mono-crystalline panels are more efficient and need less space but are not suited to sites
with shade. Take some time to compare different types of solar panels and brands to
determine the perfect fit for your house.
6. Number of Solar Panels
When installing a solar panel, you have to figure out how many panels is needed to be able
to meet your electricity needs. Your household consumption of electricity and how much you
want to supplement from solar power will determine the number of solar panels you need.
The systems are modular and you can add more panels in the future.
19
7. Roof Space
How much of your electricity you want to generate using a home solar system will greatly
determine how much space you'll require. If you have a large home, you will likely require
more energy, but you may also have an adequately-sized roof. Solar panels can also be on
a solar pole mount anywhere on your property if your roof does not offer sufficient square
footage.
8. Roof Condition
While installing a solar panel in conjunction with a new roof is the best option for success,
you can also install solar panels on your existing roof as long as it meets some basic
qualifications. If your roof doesn't pass muster, you may need to repair it or install a new roof.
If you own an older property, you may need roof repairs or even an entire roof replacement
before solar panels can be installed safely. If the property has any construction flaws or
other structural issues, installing solar panels may pose a risk and end up being more
expensive to maintain or repair than you anticipated. Take the condition of your property and
your roof into consideration so you can make any major repairs before installation begins.
The expected lifespan of your current roofing system also needs to be determined. It
generally takes about 20 years for people to see a return on investment for their solar panel
systems. If your roofing system won’t survive that long, it’s best to forgo your project until
new construction can occur.
TYPESOF SOLAR PANEL INSTALLATION
Solar panel installation can divide into two main types, which are pitched roof mount
and flat roof mount. Pitched roof mounts include flush mount, angle mount and fin mount.
While flat roof mount include attached mount, ballasted mount and hybrid mount. Which
types of installation are suited for your house will based on the size, affordability, utility, and
convenience.
20
Pitched Roof Mount
Pitched roof mounting is installing solar panels on non-flat or angled roofs. This is the
most common type of solar panel installation seen in residential solar systems. This type of
roof installation is more difficult to install and maintain, due to the roof orientation and angle
are not compatible with the optimum solar array tilt angle.
Flush Mount
Flush mounts are the cheapest and most simple solar panel mounting solution
available. It is installed by placing a metal end bracket on each side of the solar panel,
elevating it several inches from the surface, so that air can flow under the unit and keep it
cool. This type of installation typically used with small solar arrays on rooftops because it
cannot support large solar panels, but it can install at the slope of any roof.
Angle Mount
Angle mount is typically done on a roof with a lower pitch where the owners do not
mind having the panels stick up and away from the roof. This type of installation also has
higher efficiency for the PV system.
21
Fin Mount
Fin mount is for homes with shallow roof pitches where the roofs slope to the east
and to the west. It is the most obtrusive of the mounting styles, but is sometimes the only
option available. These systems will be fairly efficient, but will need more roof area than the
others.
Flat Roof Mount
Flat roof mount is more common on commercial installations and is easier to install. It
offers flexibility for orienting and tilting the solar panels for ideal solar collection. The three
main flat roof mounting techniques are attached, ballasted and a hybrid option that uses both
ballast and structural attachments.
Attached Mount
This type of installation relies on penetrations in the roof surface and connections to
the framing. There are several options available for fastening the racking system to the
building.
.
22
Ballasted Mount
Ballasts mount rely solely on the weight of the array, racking system and additional
material, like concrete paver, to hold the array to the roof. This type of installation does not
require penetration and can withstand winds up to 90 mph.
Hybrid Mount
Hybrid mount is a combination of ballasted and structural attachments. This type of
installation takes advantage of both attached and ballasted features. A hybrid racking
system requires a minimum number of penetrations and some level of ballasting.
23
INSTALLATIONPROCESS
Solar panel
1. Measure and mark the size of the solar panel follow by remove and mounting
brackets are attached to the rafters.
2. The tiles are placing back after grinding of the undersides to enable a flush fit.
Replaced damage tiles with new.
3. Rails are bolted extend slightly beyond the panel to the brackets to support the
panels
4. Clips and bolt are used to attached the panels to the rails to enable the panels to be
removed quickly and easy for roof maintenance when necessary.
5. Electrical cable behind each panel is connected to the adjoining panel to form a
“string”. The cable is fed under the tile and into the roof void where it is connected to
the inverter.
6. The roof installation is completed. Notice that there must be a margin between the
edge of the panels and the edge of the roof
7. The cables are connected into two DC isolators which are connected to the inverter.
The AC output from the inverter is fed into a AC isolator from where it is taken down
to the consumer unit and generation meter.
8. It is not necessary to access the inverter after installations except for maintenance
and data from the inverter can be transmitted to a computer or other dedicated
device.
Solar thermal
1. Measure the distance between mounting bracket. The distance between should be
125-155cm. Remove appropriate roof tiles to fit roof bracket console.
2. Fasten roof bracket console to rafters with provided self-tapping screws
3. Replace the roof tile and cut tile to ensure correct fit if necessary
4. Insert the hammer-head bolt into the roof bracket and hand tighten
5. Attach lower mounting rails and follow by upper mounting rail
6. The upper and lower mounting rails must be mounted perfectly straight and parallel
to one another
24
7. Set addition mounting point as described in No. 1-4 if additional collectors are to be
fitted.
8. Push the clamping piece extension halfway into the inner groove of the mounting rail
and tighten
9. Insert the following mounting rails and attach them using the clamping piece
extension
10. Attach the mounting rail using the roof bracket or clamping piece extension
11. Hang the first collector in the lower mounting rail and adjust. The distance between
collector and the end of mounting rails is equal 45mm
12. Place the clamping piece on the mounting rail and hand tighten for now
13. Attach the second collector
14. Rotate the clamping piece by 90 degree and screw it tight using a long socket
wrench
15. With clashing mounting rails, insert and position the mounting part in the upper
mounting rail
16. Attach additional clamping piece
17. Attach the mounting part on the upper left and right end of the collector field and
screw the collectors into place.
25
APPLICATION
Nowadays architecture and solar panel can be combined to create a new form of
construction, giving them a whole new look. They are not only replacing the conventional
building envelope materials, but they also generate power. These modules, mounted on the
building over the existing structure, can increase the appeal of the building and its resale
value. In fact, many parts of the building can be easily substituted with photovoltaics.
ROOF
The most common way to install solar panel on the building is to mount the solar
panel in a frame on the roof. Basically, they are mounted above and parallel to the roof
surface and installed facing north-south orientation to maximise the amount of solar energy
received. The solar panel can also replace the roofing material or the roof itself to become
part of the roof's structure as well as providing electricity. It can be either an integrated,
single-piece solar rooftop made with laminated glass, or solar roof shingles which can be
mounted on the roof instead of regular roof shingles.
Solar panel Single-piece solar rooftop
Solar roof shingles
26
FACADES
Solar panel can replace traditional glass windows with semi-transparent thin-film or
crystalline solar panels integrated into the exterior sides of buildings. Although these
surfaces have less access to the direct sunlight than rooftop systems, they offer a larger
available area.
GENyO Building, Spanish
FEMSA (Coca-cola) headquarters, Monterrey, Mexico
27
SKYLIGHT
Skylight is also known as roof windows. It provides a multifunctional solution where it
does not only generate energy, but natural illumination is also provided to achieve solar
control by filtering effect to avoid infrared and UV irradiation into the interior. It can also
enhance thermal comfort and avoid interior aging.
Viracopos International Airport, São Paulo, Brazil
Norvatis Headquarters, East Hanover, NewJersey
28
CURTAIN WALL
Curtain wall is considered as an outer covering of a building and it is a non-structural
cladding system for the external walls of a building. It offers architects a multitude of
possibilities for the integration of solar panels into buildings in an efficient and ecological
manner.
Azurmendi restaurant, Bizkaia, Spain
Guadalhorce Valley Rural Development Group (GDR) Headquarters, Spain
29
CANOPY
Canopy is basically a roof like covering that provides shade or shelter. Solar panel
can have a higher performance when integrated into canopy because it is usually free from
overshadowing and are easy to ventilate.
Bart Station, San Francisco
Arcadia University, Pennsylvania, USA
30
AWNINGS
Awnings can keep the unwanted direct rays of the sun out of your eyes while
absorbing them to create electricity. The angle of awnings could be adjusted to best capture
and block the rays of the sun depending on the season.
BALUSTRADE
Balustrades are always the forgotten area of solar energy. With such a large amount
of them in existence we can now turn them into an attractive source of energy. Integrated
solar panel into balustrade not only enhanced the facade design whilst ensuring safety of the
occupants and energy generation. They are also perfect in allowing good visibility whilst
protecting privacy.
Großhadern Clinic, Munich, Germany
31
FUNCTION
Solar panels that integrate into the building will provide at least one additional
functionality to the building envelop besides electricity generation, such as:
1. Sun protection
The photovoltaic cells provide sun protection, delivering shading and glare control acting as
opaque elements. It can also provide the desired degree of transparency according to the
design of the building.
2. Architectural design
Solar panels that are available in a wide range of designs make it possible to use them as
architectural design elements. Moreover, the innovative solar panels add to the image of the
building and contribute to the impressive atmosphere within.
3. Thermal Control
When the solar panel is exposed to radiation, particularly the case with direct radiation to the
solar panel, the temperature of a solar panel can increase significantly. The heat from the
solar panel then radiates into the environment can be harnessed to provide heating or can
be utilized to enhance passive ventilation systems.
4. Thermal insulation
The multilayer glass structures of the solar panel can be used to provide thermal insulation
depends on their thickness. Furthermore, most of the solar panels can also be integrated
into insulation double or triple glazing structures or used as alternative front cladding for
curtain or roof insulation elements.
32
5. Weather protection
The glass structure of solar panel naturally provides weather protection. With the correct
choice of cover glazing layers or films in combination with the building integration mounting
system, solar panel can provide rain-proofing, wind-proofing, wind load resistance and
ageing resistance as well as offering residual structural integrity to the building.
6. Sound insulation
Solar panel can reflect or attenuate sound depending on their construction. For this reason,
they can also be used as sound protection elements. Integrated solar panels at facades or
roof already possess sound insulating properties because of their multi-layer structure. The
solar panel design also can be adapted to meet specific local requirements regarding sound
insulation. The sound reduction index can be adjusted by increasing the thickness of the
glazing and by using asynchronous cover layers and specific intermediate layers.
33
MAINTENANCE
PHOTOVOLTAIC
Photovoltaic consists of solar array, solar charge controller, battery, inverter and
lighting protection. Each of these components requires maintenance. Minimal maintenance
is required for solar PV. There is some general knowledge of PV management. First, make
sure there are no trees or thing that could block the panel from sunlight. Next, ensure the
panel is installed 15° from horizontal. This could let the rainfall to clean some dust that stick
at the surface of the array. There was a schedule to manage solar PV. The panel should
check and record the electric output once a month. Besides, visually inspect should be done
once a year. Finally, clean the array once a year to remove the soiling accumulated on the
side of the array.
Solar Panel
Solar array is the essential component for any solar usage system that converts
sunlight to direct-current. It is one of the components that need to be maintained the most.
Solar can be clean using water once a month and once a year. It can clean up the dust that
cannot be washed off by rainfall such as bird drop. It could ensure no soiling form at the
edges of each array. Soiling could cause the formation of plant on the panel. This could
affect the PV system. Next, a visually inspect of the array once a year to ensure no physical
damage on each array.
Battery
A battery was a component use to store electric charge convert from solar energy.
There are two types of battery commonly used at solar system which is sealed gel battery
and deep cycle flooded-lead acid battery. Maintenance of battery cans longer the life of
battery. Safety precaution should be considered when checking the battery to prevent
hazards. For an example, a safety goggles and protective gloves should be worn when
doing maintenance work of the battery. The battery should be clean to ensure the surface of
the battery is clean to provide a good visual. Some useless clothes could be used to clean
the battery. Next, check the electrolyte level of the battery should be done once a month.
Volume of acid inside battery should be checked during this process. If the volume of the
34
acid was less than the requirement, it should add back. The voltage of the battery should be
checked frequently to ensure the battery is always at the good stage.
Battery
Invertor
Inverter was the component convert direct- current to alternating-current for our daily
used. Maintenance of this inverter includes minimize the accumulation of dust on the outer
surface by using a dry cloth to clean it. Besides, checking whether the inverter can function
in a good condition or not. If the functionality of this inverter was low a replacement should
be done. We should also check the connection of wire. If the connection of the wire in the
inverter was loose already we should retighten it. Next, we should check the temperature of
the inverter. If the temperature was at abnormal stage, a replacement of this inverter should
be done.
Inverter
35
SOLAR THERMAL
Solar collector
Solar collector was panel to collect sunlight which installs on the rooftop. Since this
collector was located at outer space that no covering so it was easier to trap dirt. Solar
collector was a panel to collect the heat energy from sunlight. Therefore, when installing this
panel ensure there are no blocking object near this panel. Maintenance of solar thermal was
low and every solar thermal has warranty 5 to 10 years. Maintenance of solar collector had
to be done frequently to ensure its function. Maintenance of this solar collector including
keeping it clean, the glazing was not cracked or yellow. Cracking of the solar collector might
affect the solar thermal system. Besides, visually check the collector during the day normally
mid-morning, noon, and mid-afternoon once a year. Shading can affect the presentation of
the thermal system. Growth of the plant on it will also affect the functionality of solar thermal
system. When doing maintenance work, these entire things had to be checked. Next, make
sure the fasteners connecting the collector to roof are in good condition. We have to ensure
the structure of the supporting of the solar collector was in good condition to prevent it from
collapse.
Piping,duct and insulator.
We have to if there were any leaking or damage to the pipe.
Wire
Next, we also need to check the connection of the wire. If the connection of the wire
had loosened, retighten it.
PressureValve
We also need to check the pressure valve to ensure the opening of the opening can
function properly.
36
Pumper
We also need to ensure the pumper is in good condition. If the pumper does not
function well, there might cause no hot water supply.
Heat transferfluids
Moreover, checking the heat transfer fluids also included in the checklist of
maintenance. We have to make sure the antifreeze solution was replaced frequently.
Mineralcontent
We also need to check the mineral content of the water supply. If the mineral content
of water is too high we have to add a descaling or mild acid solution to the water every few
years.
Storage tank
Finally, we need to check the storage tank. Ensure the tank had no crack, leak, rust
or corrosion. These are the checklist for solar thermal.
37
ADVANTAGES AND DISADVANTAGES
ADVANTAGES
1. Renewable and Environment friendly
Solar energy is a renewable energy that is generated from natural processes and are
continuously replenished. This type of energy cannot be exhausted and is constantly
renewed. It can be used to heat and cool our building without any impact on the global
warming.
2. Cost Savings
Putting solar panels on our roof is likely to save our money by reduce dependence on the
size of the solar system and our electricity or heat usage. The technology of solar panel is
continuing advances, which are increasing the efficiency and lowering the cost of production.
Therefore, making it even more cost effective.
3. Easy to install
The creation of solar energy requires little maintenance. Once the solar panels have been
installed and are working at maximum efficiency there is only a small amount of
maintenance required each year to ensure they are in working order. It can be installed on
almost any size or shape of the roof without the stringent installation requirements of a
traditional solar energy system.
4. Low Maintenance
Nowadays, the solar energy systems do not require a lot of maintenance or either repair
work. It can be used a long period of time as the rain will wash off any accumulated dust or
particles. Most of the solar panels are mounted on the roof so they don’t involve any moving
parts which makes it impossible to really damage them. It can last for about 25 years.
5. Silent
This solar panel produces silent energy by converting the sunlight into usable electricity. So
there is no sound pollution effect to the surrounding area which made it more pleasant to
people who live around you.
38
DISADVANTAGES
1. Availability of Sunlight
Solar energy cannot be produced during night time, it is only capable of producing power
during the daytime where there is sunlight.
2. Site suitability
A good location can generate more solar energy from the sun. If the house is under shade or
covered by trees and landscapes which are surrounded by huge buildings, it may not
suitable to install solar panels.
3. Initial Cost
The starting cost of purchasing and installing solar panels is expensive. Although installing
solar panels will deliver a return on investment like reduced energy bills, however the
process takes many years to complete.
4. Installation Area
Solar panel installation may not require a huge space for home users as it can install on
rooftops. For companies or business, it requires a huge space in order to provide sufficient
electricity on a constant basis.
5. Inefficiency
Solar panels only have a 40% efficiency rate sunlight is absorbed by the solar panels. The
other 60% of the sunlight gets wasted and is not harnessed.
39
CASE STUDY : MONT-CENIS ACADEMY
INTRODUCTION
Location: Herne, North Rhine-Westphalia, Germany
Owner: EMC, Ministry of Interiors of North Rhine-Westphalia, City of Herne
Architect: Jourda, Paris; Hegger Hegger und Schleif, Kassel
Client: EMC Mont-Cenis with Gilles Perraudin and HHS
Area: 7,100 m2 usable interior building 11,700 m2; 13,000 m2 greenhouse
Schedule: Competition in 1992, construction 1997- 1999
Construction Cost: 51,130,000 € (1999 value)
40
Mont-Cenis Academy is located at the heart of the Herne region of Sodingen on the
site of the Mont Cenis pit dismantled in 1978, in the course of the Internationale
Bauausstellung Emscherpark (IBA 1989-1999) an unusual complex of buildings developed.
This project was planned as an urban neighbourhood shopping centre, the building serves
as both residential and retail space, complemented by a public marketplace in front of the
complex.
First and foremost, this academy has a 176m long, 72m wide and 15m tall gigantic
glass shell which is borne by timber framing and embraces the individual structures with their
various functions. The academy aside, there is also a library, the district hall and a civic hall.
Furthermore, with its waters and tropical-nursery-like palm trees, the weather-proof green
interior of the shell with its Mediterranean microclimate can be experienced as an outdoor
area, as it were.
As this academy has a large microclimatic glass envelope (72m x 180m x 15m) with
parted buildings inside the envelope, it have the concept of natural ventilation that was set
up and a program for the control of the motor driven windows in the facades and in the roof
was developed. In addition, a three-story perimeter development and a roof garden with a
children’s playground was built on top of a supermarket. Moreover, behind its colourful
facade are 40 flats that are suitable for the elderly and seven penthouse flats. Other than
that, heating is supplied by a cogeneration unit that uses methane gas from the former Mont
Cenis coal mine and supplies other buildings in area as well. Hence, it is part of the Mont
Cenis energy park, which links the area’s industrial heritage with the technologies of the
future.
Location of Mont Cenis Academy
41
Site Plan
Plan View
Elevation View
42
HISTORY
At the former coal mine Mont-Cenis in Sodingen, a quarter of Herne, the academy
Mont-Cenis in combination with a quarter centre was built as a part of the International
Building Exhibition Emscherpark (architects: Jourda Architects, Paris, Hegger-Hegger
Schleif, Kassel). The building was inaugurated in August 1999. Central part of the
arrangement is a glass microclimatic envelope; in which the buildings of the academy and
the quarter centre are placed. The glass hall causes a shift of the climate inside to higher
temperatures compared to the climate outside during the cold seasons. The world’s largest
building integrated photovoltaic power plant with one megawatt peak output is integrated in
the roof of the glass hall on 10.000 m². The PV panels are arranged in clouds and serve as a
sun protection during the summer.
43
ARCHITECTURAL CONCEPT
This education centre represents an architectural milestone in terms of protection of
the environment and low energy consumption. The construction of a greenhouse over
13000m² provides a setting for a natural microclimate. The centre’s different programmatic
elements are located within this glass envelope. The scheme engages in various
environmental preservation and enhancement systems which are soil decontamination,
exploitation of released mine gases, rain water collection and recycling, passive use of solar
energy, active exploitation of solar energy, and use of natural and recyclable building
materials.
In the case of facade or roof systems the photovoltaic system is added to the building
after it was built. Facade integrated photovoltaic systems could consist of various
transparent module types, like crystalline and micro-perforated amorphous transparent
modules. In such case a part of natural light is transmitted into the building through the
modules. Solar cells are available in different colours. Roof-integrated photovoltaic systems
are integrated into the roof; the roof is concealed with transparent photovoltaic modules, or
they are added to the roof later. Such systems are added to a flat roof or on a sloping roof
usually only if the building is small. It is possible to use tiles, which integrate solar cells.
PHOTOVOLTAIC SYSTEM
The photovoltaic system is integrated to the façade and roof of this building. The roof
with 10.000 m² solar panels does not only serve as a sunshade but also as a solar power
plant and at 750,000 kWh p.a. generates more than double the building’s own consumption.
Besides, the individual roof and facade elements can be variably opened to avoid
overheating. The types of solar panel used in this project are polycrystalline and
monocrystalline silicon. The size of the panel is 3.2 m2
and the weight is about 130 kg. It has
efficiency approximately from 12.8% to 16%.
Installation
PV modules and glass panes of the overhead glazing rest on aluminium profiles and
are held in place with aluminium pressure plates. The vertical PV-and-glass facade is carried
out as a structural glazing facade. The glass panes and PV modules are glued onto
44
aluminium profiles. All aluminium profiles are mounted on the load-bearing wooden
substructure and were designed especially for this project by Wicona Bausysteme GmbH,
Ulm.
The interconnecting plugs and the required cabling are integrated in the aluminium
profiles that hold the PV modules and glass panes into place. They are invisible and
protected against weather conditions and ultraviolet light. This new mounting detail was
possible due to the specially developed PV plug. The plug is not thicker than the 4mm glass
pane of the PV modules and therefore fits well in the rebate. The plug helps to cut down the
installation time and costs.
How Solar Photovoltaic Work in Mont-CenisAcademy
During summer:
1. Doors open for natural ventilation
2. Hot air rises and escapes through open roof lights drawing fresh air in to lower level
of building.
3. Photovoltaic cells produce energy
4. Photovoltaic cells (solar shades)
5. Fresh air is drawn in from shaded areas outside of glass house
6. Vegetation and water features shade and evaporatively cool Glass house
7. Fresh air drawn in through underground air duct
45
During winter:
1. Wind deflected from Glass house (prevents heat loss from inner buildings)
2. Heat reclaimed from exhausted air
3. Fresh air drawn in – preheated by glass house
4. Glass house heated by sun and by heat loss from buildings
5. Glass house protects microclimate from noise
6. Fresh air drawn in through underground air duct
46
Passive Solar EnergyUse
Glass envelope
 Creates a climatic shift in summer and winter
 Keeps out the wind and rain and creates a garden-like interior with a mild micro-
climate
 No need absolute weatherproofed against wind and rain
Sophisticated ventilation and heating systems
 Reduces the energy consumption
 Ventilation of the glass envelope is controlled automatically from a central position
 Meteorological station and sensor supply climate data
 Prevents overheating in summer, the roof and façade elements can opened
variably
 Hot days, doors in lower façade can be opened
 Shadows of the trees and the cooling effect of waterfall and fountains are used
 Air is naturally cooled or heated during very hot or cold periods (consistent below-
grade temperature)
47
Daylighting concept
 Special design of the PV roof light shelves were incorporated into certain facades of
the buildings inside the glass envelope to reflect daylight deeper into their rooms
 Hologram films integrated into the roof micro-climate envelope redirect the sunlight
down into the library and the entrance hall
 In library the hologram films act as a heliostat, which intensifies the light level
 In the entrance hall they break up the light spectrum and create a rainbow effect
48
POSSIBLE PROBLEMS TO THE SYSTEM
1.Roof penetrations
If the section of solar racking is poorly connected, water will leak into the house. When the
waterproof barrier between the house and outdoor is penetrated, water penetration can
cause rotting, molding, damage to the longevity of the house and destroy the underlying
wood and structure.
2.Wind loads
When solar panels are poorly attached to the roof, these solar panels can cause major
impairment in heavy winds. Anchors can be pulled out of the building if there are improperly
mounted and will create a small entry for moisture to penetrate which will lead to mold
growth and rotting problems.
3.Snow loads
Solar panels are very light. However, these light solar panels can hold snow in extreme
circumstances. During a storm with serious storm, extreme snow can gather and add loads
to the houses. If the solar installation is poorly planned, the loading could weaken the
supporting structure of the house and cause a roof collapse.
4.Electricalhazards
The solar panels produce DC current. In the solar panels, a device called an inverter is used
to change the DC current from the solar installation into AC current to be used in the house.
The electricity must be integrated with the electrical system in the house before the
electricity leaves the inverter. Improperly integrated currents can cause electrical fire and
electrocution dangers. Even if everything appears to be in working order, hazards could also
exist.
49
5.Solar cells are not long lasting and system must be replaced
after 25 years
Solar panels are built to last and will do so for much longer than 25 years warranty might
suggest. An industry’s 25 years warranty means that the company will continue producing 80%
of their original production in 25 years. Solar panels also require maintenance and upgrades
and performance will reduce each year.
6. Retrofit and long term fault tolerance.
Solar panels are difficult to retrofit and replace faulty modules throughout their life cycle.
During the installation, if a solar panel breakdown it has to be substituted with module of
similar electrical characteristics. The solar panel is improving all the times and are
impossible to use a new solar panel in an old installation. Due to this reason, solar panel
companies have to keep an inventory of cells and modules for 25 years as a supply for old
systems.
7.Risk to firemen during a fire
During a fire, the first thing a fireman does is cut the power to enable them to spray water
and use axes to cut a hole in the roof to let the smoke out. However, when there are solar
panels on your roof, cutting the power does not eliminate the hazardous voltages present at
the string ends because the solar panel cannot easily be switched off and will continue to
operate even when damaged. Firemen preparing to cut a hole could be electrocuted.
50
RECOMMENDATIONS FOR FUTURE IMPROVEMENT
1.Reduce the costof solar panels
The most obvious obstacle to the widespread adoption of solar panels has been its cost. The
initial cost of installing and maintaining solar panels is too high. If the costs are lower than
before, soon the homeowners will be wondering why they are paying so much for electricity
bill when they could get it from the sun for a fraction of the cost and start installing solar
panels in their house. Besides, solar companies can simplify the buying and installation
process so the customers only have to set up a free installation to get started.
2.New advances in Technology
More efficient semiconductors need to be discovered to increase the efficiency of energy
conversion will reduce the size of the array and less space is required to produce the same
amount of energy. Low toxicity chemicals and materials can be used in manufacturing solar
panels. New materials such as perovskites which is cheaper and more efficient at energy
conversion can be used to manufacture solar panels. New transmission technology is
needed to bring the clean energy to the market. Clear solar panels can be designed and
incorporated into windows, making installation easier and increase the aesthetics of the
technology.
3.Shading
By shading a façade system panel provide a passive way to limit excessive solar gains.
Good opportunities of the combination of system modules into shading devices, gives both
reduced cooling loads and utilization of solar energy which are a noticeable expression of
the conservation of energy.
51
LEARNING OUTCOME
Building services are the systems which installed in the buildings to make people feel
comfortable, functional and safe. Building services are what makes a building comes alive. It
include solar energy, ventilation, drainage, telecommunication, storm water system, drainage
system, sewage disposal, cold water supply system and hot water supply system.
With this assignment, our lecturer had given us the opportunity to do a report on
building integrated with solar energy. Based on our research, we found out that there are two
system in solar energy which are active solar energy and passive solar technology. Active
solar technology employs the mechanical system by converting the sunlight to electricity. For
passive solar technology, it is a method that harness in its direct form without using any
mechanical devices system. Solar panels capture the sunlight and generate the electricity to
the buildings.
Throughout this assignment, we had managed to learn more about this particular
topic which is solar energy. Based on our research, we learnt the types of solar energy, the
application and installation of the solar energy. Each of the solar energy system such as
photovoltaics and solar thermal has its own specifications, functions and professions.
Besides that, we are able to define the advantages and disadvantages of the solar energy
system. We know that the solar energy is a reusable resource it does not create any
pollution, sound, no emission. It can help us to save money and solve the energy
predicament in the long-term plan.
Thus, we had chosen Mont Cenis Academy as the building for our case study. We
had learnt about the system that works in the building throughout this assignment. This
building had the good example for our topic regarding integrated with solar energy.
In this assignment, all of us are fully participating in this group assignment. Every
member had completely did well in their roles. We had realized that teamwork is vital when
a group assignment or task is given. Lastly, we would like to appreciate our lecturer, Ms. Lim
Tze Shwan that lead us and help us on this assignment.
52
REFERENCES
8.2. Building Integrated Solar Energy Technologies. (n.d.). Retrieved May 25, 2016, from
https://www.e-education.psu.edu/eme807/node/650
Agrawal, B., & Tiwari, G. N. (2010). Building integrated photovoltaic thermal systems: For
sustainable developments.
Building-Integrated Photovoltaics. (n.d.). Retrieved May 19, 2016, from
http://www.seia.org/policy/solar-technology/photovoltaic-solar-electric/building-integrated-
photovoltaics
Charleson, A. (2005). Structure as architecture: A source book for architects and structural
engineers. Oxford: Elsevier.
Gevorkian, P. (2008). Solar power in building design: The engineer's complete design
resource. New York: McGraw-Hill.
Grid Direct Solar. (2015). Retrieved May 27, 2016, from
http://www.intermtnwindandsolar.com/grid-direct-solar/
Grid-Tied, Off-Grid and Hybrid Solar Systems - Energy Informative. (n.d.). Retrieved May 25,
2016, from http://energyinformative.org/grid-tied-off-grid-and-hybrid-solar-systems/
Hybrid Solar. (2015). Retrieved May 27, 2016, from
http://www.intermtnwindandsolar.com/hybrid-solar/
Off-Grid Solar. (2015). Retrieved May 27, 2016, from
http://www.intermtnwindandsolar.com/off-grid-solar/
Prasad, D. K., & Snow, M. (2005). Designing with solar power: A source book for building
integrated photovoltaics (BiPV). Mulgrave, Vic.: Images.
Prasad, D., & Snow, M. (2005). Designing with solar power: A sourcebook book for building
Iintegrated photovoltaics (BiPV). Victoria (Australia): The Images Publishing Group.
Schittich, C. (2003). In Detail: Solar architecture: Strategies, visions, concepts. Basel ;
Boston ; Berlin: Birkhäuser.
53
Solar Energy. (2013). In S. Butler (Ed.), The Macquarie Dictionary. South Yarra, Australia:
Macquarie Dictionary Publishers. Retrieved from
http://search.credoreference.com/content/entry/macqdict/solar_energy/0
Solar Energy. (n.d.). Retrieved June 08, 2016, from
http://www.eesi.org/topics/solar/description
Solar Panel Fires and Electrical Hazards. (n.d.). Retrieved May 13, 2016, from
https://www.nachi.org/solar-panel-fire-electrical-hazards.htm
Solar PV Mounting Types – Alternate Power International. (n.d.). Retrieved May 23, 2016,
from http://altpowerinternational.com/solar-pv-mounting-types/
Solar water heating. (n.d.). Retrieved May 09, 2016, from
http://www.energysavingtrust.org.uk/domestic/solar-water-heating
Stand-Alone Photovoltaic Systems. (n.d.). Retrieved May 09, 2016, from
http://www.fsec.ucf.edu/en/consumer/solar_electricity/basics/types_of_pv.htm
WARNING: 3 Serious Risks That Solar Could Pose to Your Home. (n.d.). Retrieved May 23,
2016, from http://sunbridgesolar.com/warning-3-serious-risks-that-solar-can-pose-to-your-
home/
54
BIBLIOGRAPHY
Baukunst-nrw - Academy Mont-Cenis Residential Development in Herne, Architecture. (n.d.).
Retrieved May 27, 2016, from http://www.baukunst-nrw.de/en/projects/Academy-Mont-
Cenis-Residential-Development--1696.htm
BIPV - Building Integrated Photovoltaics. (n.d.). Retrieved May 14, 2016, from
http://www.pvresources.com/en/bipv/bipv.php
Description of how solar power works - Solar Thermal and Solar PV. (n.d.). Retrieved May
17, 2016, from http://www.viridiansolar.co.uk/Products_Solar_Energy_How_It_Works.htm
Gevorkian, P. (2008). Solar power in building design: The engineer's complete design
resource. New York: McGraw-Hill.
How Solar Energy Works. (n.d.). Retrieved June 07, 2016, from
http://www.ucsusa.org/clean_energy/our-energy-choices/renewable-energy/how-solar-
energy-works.html#.V0CCq_l97rc
How to install a solar panel mounting system on your roof. (n.d.). Retrieved May 10, 2016,
from http://www.solarchoice.net.au/blog/how-to-install-a-solar-panel-mounting-system-on-
your-roof/
How To Mount a Solar Panel, in 7 Steps. (2011). Retrieved May 25, 2016, from
http://home.howstuffworks.com/home-improvement/construction/green/install-solar-
panels.htm
Int Jnl of Low-Carbon Technologies. (n.d.). Retrieved June 13, 2016, from
http://ijlct.oxfordjournals.org/content/10/4/379.full
Mont-Cenis Academy. (n.d.). Retrieved May 06, 2016, from
http://www.bipv.ch/index.php/en/administration-s-en/item/590-montcenis
Rooftop Review. (n.d.). Retrieved May 26, 2016, from
http://www.quickmountpv.com/blog/10-tips-for-installing-solar-roof-mounts/
55
Solar Panel Installation Types. (2010). Retrieved May 26, 2016, from
http://greenzu.com/solar-installation
Training Academy Mont-Cenis Herne. (n.d.). Retrieved May 05, 2016, from
http://www.sbp.de/en/project/training-academy-mont-cenis-herne/

Building integration-of-solar-energy

  • 1.
    SCHOOL OF ARCHITECTURE,BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) MARCH 2016 INTAKE BUILDING SERVICES 1 [BLD 60403] ASSIGNMENT BUILDING INTEGRATION OF SOLAR ENERGY GROUP MEMBERS: NAME STUDENT ID PANG KAI YUN 0319802 SAM WEI YIN 0320364 TRACE GEW YEE 0320269 YEO KAI WEN 0319844 AUDREY TING 0320247 CHOW KAH YIEN 0320300 LIM ZI SHAN 0320372 CHONG HUI XIN 0319363 LECTURER: MS.LIM TZE SHWAN SUBMISSIONDATE : 28 JUNE 2016
  • 2.
    1 CONTENT No. Content PageNo. 1. Introduction 2 2. Solar Energy 3 3. Installation 17 4. Application 25 5. Maintenance 33 6. Advantages and Disadvantages 37 7. Case study: Mont-Cenis Academy 39 8. Possible Problems of the System 48 9. Recommendations forFuture Improvement 50 10. Learning Outcome 51 11. References 52 12. Bibliography 54
  • 3.
    2 INTRODUCTION Solar energy isa type of renewable source of energy that is sustainable, clean, no emission, reliable and inexhaustible, unlike the fossil fuels which are finite. Solar energy is a non-polluting source of energy. It does not emit any greenhouse gases effect when it producing the electricity. Solar energy is provided by the sun which the energy is in the form of solar radiation. It makes the possibility production of the solar energy. The solar energy technologies today are broadly distinguished into active and passive. In active solar energy, it can convert the energy from the sun into usable form such as hot water and electricity system with the use of mechanical system whereas in passive solar energy, it can convert the solar energy to heat energy without the use of mechanical system. The active solar energy include using the photovoltaic panels generate the electricity directly from the sunlight solar energy or solar thermal convert the sunlight into useful output such as water heating, cooling, ventilation and so on. One of the advantages of the solar energy is that we can use both simple and complex to capture the solar energy and use it for heating. There are two strategies to capture the sunlight from the sun which are active and passive solar technology. Active solar technology is used to convert the solar energy to heat and electricity power with the use of active mechanical system. Photovoltaic and solar thermal are the examples of active solar energy. Passive solar technology is used to convert the solar energy to heat energy without the use of active mechanical system. Passive solar technology it includes those ventilation, improve air circulation, orienting spaces and others. Mainly practice on using windows, trees, building placement or other techniques to capture and deflect the sun for uses. In this report, our topic is building integration with solar energy. We had selected one case study which is Mont-Cenis Academy. This building is integrated with photovoltaic technology. Photovoltaic is a device which takes light from the sun and turns into electricity. The purpose of installing photovoltaic panel is due to lighting densities of solar modules used between 53 and 93 %. Also, it supplies the necessary shade for the hall. The windows of the buildings intensify the supply of daylight to the building.
  • 4.
    3 SOLAR ENERGY History Solar energyis the oldest energy source. It was adored by many ancient civilizations as a powerful god. The first known was applied for drying the preserved food. There was a Swiss scientist, Horace- Benedict de Saussure had created the first solar collector in 1767. The solar collector is an insulated box which covered three layers of glass to absorb the heat energy. It had become known as the first solar oven where the oven reaches the temperature of 110 degree celsius. In the year of 1839, A French physicist Alexandre Edmond Becquerel had discovered the photovoltaic effect by using two electrodes which placed in the electrolyte and it figured out that the electricity increased after exposed to the light. The solar heating has been used for a very long time ago, it started from ancient Greek. They used solar energy to heat their homes since 4th century BC. In 19th century, the people began to use solar water heaters which consists of a painted with black colour of metal tank that installed on the roof top. However, this system had to wait for a long time to heat the water as the sun went down, the water would cool down. In the year of 1909, William J. Bailey had developed a new system which was quite similar to the solar systems used today. The tank and the solar collector separated to two different units. One installed on the roof and another installed inside the house which can be keep the hot water longer than previous system.
  • 5.
    4 PHOTOVOLTAIC Photovoltaic is oneof the most promising renewable energy technologies. Photovoltaic panels is use to convert the sunlight from the sun to electricity that replace the use of the electricity supplied by the utility grid without concern for the energy supply for the environment harm. Photovoltaic panels mostly installed on the rooftops because the space of the exposure is directly to the sun. Besides that, there are other possible installations for the photovoltaic panels such as ground mount, pole mount, carport, a top a porch or shaded area. This system is eligible for the federal tax credits and state incentives. In building integrated photovoltaics (BIPV) involves combining solar photovoltaics with the building construction. It can save the cost of materials and electricity and reduce pollution also it added to the architectural appearance to the building of itself. The value of BIPV system is the building design and energy conservation. During construction, the builders can reduce the cost of photovoltaics system also the design issues for separating mounted system. Most of the construction of the buildings is built during a retrofit. The designers of this system will considered the arrangement and the possibilities of the solar technology compare to the space of the construction uses. Typesof Photovoltaic System Photovoltaic systems are generally classified based on the end-use application of the technology. There are three main types of photovoltaic system existing today for solar power generation at home, which are grid-tie, off-grid and hybrid systems. Each system have their advantages and disadvantages. Which type of systems is more suitable for your household is depends on what goals you have for the solar energy to do for your home. Grid-Tie System Grid-Tie System is a solar system that is connected to the utility power grid. In this way, the power supply drawn from the utility grid will be reduced by the amount of power generated by the PV system. However, when there is little or no output from the PV system due to cloudy weather or at night, the electricity drawn from the utility grid will be correspondingly increased. This system only works when the grid is up. If the grid power goes out, the grid-tie inverter needs to be shut down immediately.
  • 6.
    5 An example ofhow a grid-tie system works Advantages: 1. Lowest initial cost, because there is no need for expensive batteries and generator 2. Save more money with net metering 3. Constantly power your house unless the national grid is down 4. More efficiently because its DC does not go into a battery that causes energy loss. 5. Low maintenance cost Disadvantages: 1. No power when the grid is down. 2. Access to the utility power grid is required.
  • 7.
    6 Off-Grid System An off-gridsystem or stand-alone system is designed to operate independent of the utility power grid. This system required batteries for energy storage to provide electricity when there is little or no output from the PV system. During the day the sun shines, it will not only supplies power to your home, but will charge the batteries as well. When it is rainy days or the sun isn’t shining, you use the power stored in the batteries. An example of how an off-grid system works Advantages 1. Self-sufficiency on a clean, renewable energy source 2. Ideal for remote areas where national grids cannot reach 3. No power bills Disadvantages 1. Higher initial cost because batteries and generator are expensive 2. Required maintenance for batteries and generator 3. No grid backup
  • 8.
    7 Hybrid System Hybrid systemis a combination of grid-tied and off-grid systems. These systems can either be described as off-grid solar with utility backup power or grid-tied solar with extra battery storage. This system functions like a grid tied system when the grid is up, but it also charges a set of batteries. If the grid goes down, the inverter disconnects from the grid, but it continues to supply power to the house from the batteries and inverter, basically behaving like an off-grid system when the grid is down. An example of how a hybrid system works Advantages: 1. Provides backup power when the utility grid goes down 2. Less expensive than off-grid solar systems 3. Provides some of the advantages of both systems. Disadvantages: 1. Still has a battery system that is expensive to buy and maintain.
  • 9.
    8 Solar Panel A solarpanel is a collection of solar cells. Solar cells are small devices which can convert sunlight into electricity. One cell will only provide a very small amount of power. Several cells connected together and fixed in a frame to form a module (solar panel), which can produce a larger, useful amount of power. The final product that you see on rooftops are a series of connected panels called an array. Types of solar panels The main difference in solar panels is the purity or the arrangement of the silicon. The more perfect the arrangement of molecules of silicon, the better the solar panel at converting sunlight into electricity. There are five main types of solar cells and the best type for you will vary depending upon the need of your project. Of Course, the more efficient the panels are the more expensive, but this should not be your main reason for choosing one type over another. Monocrystalline Photovoltaic Solar Panel Monocrystalline is the highest quality of solar cell. These cells are cut from a single, continuous solid cylinder of crystal. The cylinder is then sliced into thin wafers to create solar cells. These cells are the most efficient when convert the sun's energy to electricity. Therefore, they are the most expensive solar panels currently available, but they require less space than other cells because they can produce more energy.
  • 10.
    9 Solar panel andsolar cell of Monocrystalline Polycrystalline Photovoltaic Solar Panel Polycrystalline solar panel is now the most popular choice in residential installs. They are made up of multiple silicon cells that are melted together and then recrystallized. This process is simpler and less wasteful than with monocrystalline panels. These cells are slightly less efficient, but also cheaper than monocrystalline cells. Solar panel and solar cell of Polycrystalline Amorphous Silicon Photovoltaic Solar Panel Amorphous silicon solar panel is the least expensive and least efficient solar panels. These panels can be manufactured by placing a thin film of amorphous (non crystalline) silicon onto a wide choice of surfaces. These panels can be thin and flexible, which is why they are normally known as “Thin Film” solar panels.
  • 11.
    10 Solar panel andsolar cell of Amorphous silicon Hybrid Silicon Photovoltaic Solar Panel Hybrid silicon solar panel is the combination of both monocrystalline solar cells and amorphous solar cells to generate maximum efficiency. These panels have higher efficiency ratings than other solar panel and it is a lot more expensive than mono or poly-crystalline panels. They are better suited to countries that have sunnier climes. Solar panel of Hybrid Silicon
  • 12.
    11 Building Integrated Photovoltaics(BIPV) Rather than an individual type of solar cell technology, building integrated photovoltaics are solar photovoltaics that are integrated into the building in the form of solar shingles, solar tiles, slates and others. This type of system can be integrated into roofs, facades, walls and even windows. However, BIPV is way too expensive to install at regular houses. Solar shingles
  • 13.
    12 SOLAR THERMAL Solar thermal, also known as solar heating system is used convert the sunlight from the sun to heat energy to provide the heat to the homes, it can also used in solar thermal collector to cook the food and provide hot water. This system can be found on top of the buildings. The panels on the roof of the buildings are the collectors of sunlight, then the panels heating up the liquid in the tubes which is located on the panel and then it transported into a container or tank which is ready to use. The installation and the appearance are much similar to photovoltaic panels. The solar convertor does not act as the same functions as photovoltaic that convert the sunlight to electricity, but it transfer the energy to water. In Mediterranean countries, there are around 30% of homes that installed with solar water heater, it highlights the basic household of the hot water needs. Building integrated solar thermal system (BIST) is the application of the solar equipment of buildings that perform the function and collect the solar energy. It is complicated by the complexity for both solar energy and function of the buildings. There are several methods to collect the solar energy by using glazed, unglazed, active and others. Different methods systems capture solar thermal energy. Solar thermal energy is majority used in space heating, drying, hot water heating and other processes. There are some solar energy systems that are created by adding the elements to structure and shell of the buildings to give an aesthetic view. Typesof Solar Thermal There are two types of solar thermal system which are active solar heating system and passive solar heating system. Active solar water heating systems have circulating pumps and control whereas passive solar water heating system don’t have circulating pumps and control. Active solar water heating system In active solar water heating system, there are two types of active solar water heating system which are direct circulation system and indirect circulation system. In direct circulation system, it circulates the household water through the collector which is solar panel by using the pumps. The system works very well in different climates like summer and winter seasons.
  • 14.
    13 An example ofhow active solar water heating system works Passive solar water heating system In passive solar water heating system, the pumps circulate the heat- transfer fluid through the collector. It heats the water and flow it into homes. This passive solar water heating system quite happens in winter seasons. An example of how passive solar water heating system works
  • 15.
    14 Solar ThermalCollector Solar thermalcollector is the heart of a solar thermal system. It absorbs solar radiation, converts it into heat, and transfers useful heat to the solar system. The main component of solar thermal collector is the absorber plate. A coated metal plate will absorbs the sun’s radiation and causes its temperature to rise above the atmosphere. The plate then releases the energy through radiation and convection to its surroundings. Thus, heat is transferred to the heat-transfer fluid which in turn feeds the hot water system. Types of solar thermal collector Solar thermal collector's job is very simple. It sits in the sun than absorb and transfer the heat. But to do this efficiently, solar thermal collectors need to absorb a high level of solar radiation, while minimizing losses from the reflection and heat loss to the surrounding environment. There are two main types of solar thermal collector, which are flat plate solar collector and evacuated tube solar collector. Each type has a different role, depends on where the project is and what the heating needs are. Flat Plate Solar Collector Flat plate solar collector has been used since the early 1900’s. It consists an absorber panel welded to copper pipe where the heat transfer to the water circulates through. This is encased in an insulated box to help retain the collected heat, and covered by a sheet of glass or glazing, which also provides an insulating air space.
  • 16.
    15 Cross Section ofa Flat Plate Solar Collector Evacuated Tube Solar Collector Evacuated Tube Solar Collector is a much newer system. It is introduced to the market in the 1970's. The evacuated tube consists of two concentric glass tubes fused at the top and bottom. The space between the two tubes is evacuated to form a vacuum. This vacuum serves as an insulation barrier, minimizing heat loss and increasing efficiency. The inner glass tube is coated with an absorptive coating to absorb the solar radiation. The heat is transferred to the water circulating inside the copper pipe. The water is heated and then flow to the hot water storage tank.
  • 17.
    16 Cross Section ofa Evacuated Tube Solar Collector
  • 18.
    17 INSTALLATIONS The installation ofsolar panel is very important because it effect the total sunlight received. Basically, solar panel is installed on rooftops because rooftops gets the most direct sun exposure and you want to make sure your solar panel is maximally effective year around. Actually, there are many ways to install solar panel on your roof depends on your individual requirements and the type of roof you have. BEFORE INSTALLATION There are many benefits to installing solar panels at your home, everything from lowering your energy bills to reducing your carbon footprint. However, choosing solar isn’t a decision you should make lightly. There are a number of considerations to be made before one installs these panels at their home. 1. Amount of sun exposure through the year Same type of system will produce different result in different home due to the amount of sun exposure it gets throughout the year. Therefore we should determine the total solar energy received during the daytime for month, and year. 2. Shading Shade from trees, nearby buildings, and other obstructions can block the sun, reduce your solar panel's effectiveness. If the solar panels are all on the same string, and one of the panels is shaded, all the panels will have the electricity production limited to the one shaded panel. If you know shading is going to be an issue, you might wish to put panels on different strings to ensure that you maximize the electricity produced from panels.
  • 19.
    18 3. Climate &weather conditions High ambient temperatures can decrease the output of solar systems, and clouds and rainfall patterns can affect system output and maintenance requirements. High levels of air pollution can require regular cleaning to limit efficiency losses. 4. Position of the solar panel Solar panel produces most power when they are pointed directly at the sun. They should be installed so that they can receive maximum sunlight. In the southern hemisphere, your panels should ideally face to the north (towards the equator) and opposite in the northern hemisphere. 5. Type of Solar Panels A solar system can save you money as the technology has become affordable and price of grid electricity keeps rising. It is important to know which solar technology to use as different types are suitable for different conditions. Thin-film panels are better for shaded sites and in general are a little cheaper, however they also require more space. Polycrystalline and mono-crystalline panels are more efficient and need less space but are not suited to sites with shade. Take some time to compare different types of solar panels and brands to determine the perfect fit for your house. 6. Number of Solar Panels When installing a solar panel, you have to figure out how many panels is needed to be able to meet your electricity needs. Your household consumption of electricity and how much you want to supplement from solar power will determine the number of solar panels you need. The systems are modular and you can add more panels in the future.
  • 20.
    19 7. Roof Space Howmuch of your electricity you want to generate using a home solar system will greatly determine how much space you'll require. If you have a large home, you will likely require more energy, but you may also have an adequately-sized roof. Solar panels can also be on a solar pole mount anywhere on your property if your roof does not offer sufficient square footage. 8. Roof Condition While installing a solar panel in conjunction with a new roof is the best option for success, you can also install solar panels on your existing roof as long as it meets some basic qualifications. If your roof doesn't pass muster, you may need to repair it or install a new roof. If you own an older property, you may need roof repairs or even an entire roof replacement before solar panels can be installed safely. If the property has any construction flaws or other structural issues, installing solar panels may pose a risk and end up being more expensive to maintain or repair than you anticipated. Take the condition of your property and your roof into consideration so you can make any major repairs before installation begins. The expected lifespan of your current roofing system also needs to be determined. It generally takes about 20 years for people to see a return on investment for their solar panel systems. If your roofing system won’t survive that long, it’s best to forgo your project until new construction can occur. TYPESOF SOLAR PANEL INSTALLATION Solar panel installation can divide into two main types, which are pitched roof mount and flat roof mount. Pitched roof mounts include flush mount, angle mount and fin mount. While flat roof mount include attached mount, ballasted mount and hybrid mount. Which types of installation are suited for your house will based on the size, affordability, utility, and convenience.
  • 21.
    20 Pitched Roof Mount Pitchedroof mounting is installing solar panels on non-flat or angled roofs. This is the most common type of solar panel installation seen in residential solar systems. This type of roof installation is more difficult to install and maintain, due to the roof orientation and angle are not compatible with the optimum solar array tilt angle. Flush Mount Flush mounts are the cheapest and most simple solar panel mounting solution available. It is installed by placing a metal end bracket on each side of the solar panel, elevating it several inches from the surface, so that air can flow under the unit and keep it cool. This type of installation typically used with small solar arrays on rooftops because it cannot support large solar panels, but it can install at the slope of any roof. Angle Mount Angle mount is typically done on a roof with a lower pitch where the owners do not mind having the panels stick up and away from the roof. This type of installation also has higher efficiency for the PV system.
  • 22.
    21 Fin Mount Fin mountis for homes with shallow roof pitches where the roofs slope to the east and to the west. It is the most obtrusive of the mounting styles, but is sometimes the only option available. These systems will be fairly efficient, but will need more roof area than the others. Flat Roof Mount Flat roof mount is more common on commercial installations and is easier to install. It offers flexibility for orienting and tilting the solar panels for ideal solar collection. The three main flat roof mounting techniques are attached, ballasted and a hybrid option that uses both ballast and structural attachments. Attached Mount This type of installation relies on penetrations in the roof surface and connections to the framing. There are several options available for fastening the racking system to the building. .
  • 23.
    22 Ballasted Mount Ballasts mountrely solely on the weight of the array, racking system and additional material, like concrete paver, to hold the array to the roof. This type of installation does not require penetration and can withstand winds up to 90 mph. Hybrid Mount Hybrid mount is a combination of ballasted and structural attachments. This type of installation takes advantage of both attached and ballasted features. A hybrid racking system requires a minimum number of penetrations and some level of ballasting.
  • 24.
    23 INSTALLATIONPROCESS Solar panel 1. Measureand mark the size of the solar panel follow by remove and mounting brackets are attached to the rafters. 2. The tiles are placing back after grinding of the undersides to enable a flush fit. Replaced damage tiles with new. 3. Rails are bolted extend slightly beyond the panel to the brackets to support the panels 4. Clips and bolt are used to attached the panels to the rails to enable the panels to be removed quickly and easy for roof maintenance when necessary. 5. Electrical cable behind each panel is connected to the adjoining panel to form a “string”. The cable is fed under the tile and into the roof void where it is connected to the inverter. 6. The roof installation is completed. Notice that there must be a margin between the edge of the panels and the edge of the roof 7. The cables are connected into two DC isolators which are connected to the inverter. The AC output from the inverter is fed into a AC isolator from where it is taken down to the consumer unit and generation meter. 8. It is not necessary to access the inverter after installations except for maintenance and data from the inverter can be transmitted to a computer or other dedicated device. Solar thermal 1. Measure the distance between mounting bracket. The distance between should be 125-155cm. Remove appropriate roof tiles to fit roof bracket console. 2. Fasten roof bracket console to rafters with provided self-tapping screws 3. Replace the roof tile and cut tile to ensure correct fit if necessary 4. Insert the hammer-head bolt into the roof bracket and hand tighten 5. Attach lower mounting rails and follow by upper mounting rail 6. The upper and lower mounting rails must be mounted perfectly straight and parallel to one another
  • 25.
    24 7. Set additionmounting point as described in No. 1-4 if additional collectors are to be fitted. 8. Push the clamping piece extension halfway into the inner groove of the mounting rail and tighten 9. Insert the following mounting rails and attach them using the clamping piece extension 10. Attach the mounting rail using the roof bracket or clamping piece extension 11. Hang the first collector in the lower mounting rail and adjust. The distance between collector and the end of mounting rails is equal 45mm 12. Place the clamping piece on the mounting rail and hand tighten for now 13. Attach the second collector 14. Rotate the clamping piece by 90 degree and screw it tight using a long socket wrench 15. With clashing mounting rails, insert and position the mounting part in the upper mounting rail 16. Attach additional clamping piece 17. Attach the mounting part on the upper left and right end of the collector field and screw the collectors into place.
  • 26.
    25 APPLICATION Nowadays architecture andsolar panel can be combined to create a new form of construction, giving them a whole new look. They are not only replacing the conventional building envelope materials, but they also generate power. These modules, mounted on the building over the existing structure, can increase the appeal of the building and its resale value. In fact, many parts of the building can be easily substituted with photovoltaics. ROOF The most common way to install solar panel on the building is to mount the solar panel in a frame on the roof. Basically, they are mounted above and parallel to the roof surface and installed facing north-south orientation to maximise the amount of solar energy received. The solar panel can also replace the roofing material or the roof itself to become part of the roof's structure as well as providing electricity. It can be either an integrated, single-piece solar rooftop made with laminated glass, or solar roof shingles which can be mounted on the roof instead of regular roof shingles. Solar panel Single-piece solar rooftop Solar roof shingles
  • 27.
    26 FACADES Solar panel canreplace traditional glass windows with semi-transparent thin-film or crystalline solar panels integrated into the exterior sides of buildings. Although these surfaces have less access to the direct sunlight than rooftop systems, they offer a larger available area. GENyO Building, Spanish FEMSA (Coca-cola) headquarters, Monterrey, Mexico
  • 28.
    27 SKYLIGHT Skylight is alsoknown as roof windows. It provides a multifunctional solution where it does not only generate energy, but natural illumination is also provided to achieve solar control by filtering effect to avoid infrared and UV irradiation into the interior. It can also enhance thermal comfort and avoid interior aging. Viracopos International Airport, São Paulo, Brazil Norvatis Headquarters, East Hanover, NewJersey
  • 29.
    28 CURTAIN WALL Curtain wallis considered as an outer covering of a building and it is a non-structural cladding system for the external walls of a building. It offers architects a multitude of possibilities for the integration of solar panels into buildings in an efficient and ecological manner. Azurmendi restaurant, Bizkaia, Spain Guadalhorce Valley Rural Development Group (GDR) Headquarters, Spain
  • 30.
    29 CANOPY Canopy is basicallya roof like covering that provides shade or shelter. Solar panel can have a higher performance when integrated into canopy because it is usually free from overshadowing and are easy to ventilate. Bart Station, San Francisco Arcadia University, Pennsylvania, USA
  • 31.
    30 AWNINGS Awnings can keepthe unwanted direct rays of the sun out of your eyes while absorbing them to create electricity. The angle of awnings could be adjusted to best capture and block the rays of the sun depending on the season. BALUSTRADE Balustrades are always the forgotten area of solar energy. With such a large amount of them in existence we can now turn them into an attractive source of energy. Integrated solar panel into balustrade not only enhanced the facade design whilst ensuring safety of the occupants and energy generation. They are also perfect in allowing good visibility whilst protecting privacy. Großhadern Clinic, Munich, Germany
  • 32.
    31 FUNCTION Solar panels thatintegrate into the building will provide at least one additional functionality to the building envelop besides electricity generation, such as: 1. Sun protection The photovoltaic cells provide sun protection, delivering shading and glare control acting as opaque elements. It can also provide the desired degree of transparency according to the design of the building. 2. Architectural design Solar panels that are available in a wide range of designs make it possible to use them as architectural design elements. Moreover, the innovative solar panels add to the image of the building and contribute to the impressive atmosphere within. 3. Thermal Control When the solar panel is exposed to radiation, particularly the case with direct radiation to the solar panel, the temperature of a solar panel can increase significantly. The heat from the solar panel then radiates into the environment can be harnessed to provide heating or can be utilized to enhance passive ventilation systems. 4. Thermal insulation The multilayer glass structures of the solar panel can be used to provide thermal insulation depends on their thickness. Furthermore, most of the solar panels can also be integrated into insulation double or triple glazing structures or used as alternative front cladding for curtain or roof insulation elements.
  • 33.
    32 5. Weather protection Theglass structure of solar panel naturally provides weather protection. With the correct choice of cover glazing layers or films in combination with the building integration mounting system, solar panel can provide rain-proofing, wind-proofing, wind load resistance and ageing resistance as well as offering residual structural integrity to the building. 6. Sound insulation Solar panel can reflect or attenuate sound depending on their construction. For this reason, they can also be used as sound protection elements. Integrated solar panels at facades or roof already possess sound insulating properties because of their multi-layer structure. The solar panel design also can be adapted to meet specific local requirements regarding sound insulation. The sound reduction index can be adjusted by increasing the thickness of the glazing and by using asynchronous cover layers and specific intermediate layers.
  • 34.
    33 MAINTENANCE PHOTOVOLTAIC Photovoltaic consists ofsolar array, solar charge controller, battery, inverter and lighting protection. Each of these components requires maintenance. Minimal maintenance is required for solar PV. There is some general knowledge of PV management. First, make sure there are no trees or thing that could block the panel from sunlight. Next, ensure the panel is installed 15° from horizontal. This could let the rainfall to clean some dust that stick at the surface of the array. There was a schedule to manage solar PV. The panel should check and record the electric output once a month. Besides, visually inspect should be done once a year. Finally, clean the array once a year to remove the soiling accumulated on the side of the array. Solar Panel Solar array is the essential component for any solar usage system that converts sunlight to direct-current. It is one of the components that need to be maintained the most. Solar can be clean using water once a month and once a year. It can clean up the dust that cannot be washed off by rainfall such as bird drop. It could ensure no soiling form at the edges of each array. Soiling could cause the formation of plant on the panel. This could affect the PV system. Next, a visually inspect of the array once a year to ensure no physical damage on each array. Battery A battery was a component use to store electric charge convert from solar energy. There are two types of battery commonly used at solar system which is sealed gel battery and deep cycle flooded-lead acid battery. Maintenance of battery cans longer the life of battery. Safety precaution should be considered when checking the battery to prevent hazards. For an example, a safety goggles and protective gloves should be worn when doing maintenance work of the battery. The battery should be clean to ensure the surface of the battery is clean to provide a good visual. Some useless clothes could be used to clean the battery. Next, check the electrolyte level of the battery should be done once a month. Volume of acid inside battery should be checked during this process. If the volume of the
  • 35.
    34 acid was lessthan the requirement, it should add back. The voltage of the battery should be checked frequently to ensure the battery is always at the good stage. Battery Invertor Inverter was the component convert direct- current to alternating-current for our daily used. Maintenance of this inverter includes minimize the accumulation of dust on the outer surface by using a dry cloth to clean it. Besides, checking whether the inverter can function in a good condition or not. If the functionality of this inverter was low a replacement should be done. We should also check the connection of wire. If the connection of the wire in the inverter was loose already we should retighten it. Next, we should check the temperature of the inverter. If the temperature was at abnormal stage, a replacement of this inverter should be done. Inverter
  • 36.
    35 SOLAR THERMAL Solar collector Solarcollector was panel to collect sunlight which installs on the rooftop. Since this collector was located at outer space that no covering so it was easier to trap dirt. Solar collector was a panel to collect the heat energy from sunlight. Therefore, when installing this panel ensure there are no blocking object near this panel. Maintenance of solar thermal was low and every solar thermal has warranty 5 to 10 years. Maintenance of solar collector had to be done frequently to ensure its function. Maintenance of this solar collector including keeping it clean, the glazing was not cracked or yellow. Cracking of the solar collector might affect the solar thermal system. Besides, visually check the collector during the day normally mid-morning, noon, and mid-afternoon once a year. Shading can affect the presentation of the thermal system. Growth of the plant on it will also affect the functionality of solar thermal system. When doing maintenance work, these entire things had to be checked. Next, make sure the fasteners connecting the collector to roof are in good condition. We have to ensure the structure of the supporting of the solar collector was in good condition to prevent it from collapse. Piping,duct and insulator. We have to if there were any leaking or damage to the pipe. Wire Next, we also need to check the connection of the wire. If the connection of the wire had loosened, retighten it. PressureValve We also need to check the pressure valve to ensure the opening of the opening can function properly.
  • 37.
    36 Pumper We also needto ensure the pumper is in good condition. If the pumper does not function well, there might cause no hot water supply. Heat transferfluids Moreover, checking the heat transfer fluids also included in the checklist of maintenance. We have to make sure the antifreeze solution was replaced frequently. Mineralcontent We also need to check the mineral content of the water supply. If the mineral content of water is too high we have to add a descaling or mild acid solution to the water every few years. Storage tank Finally, we need to check the storage tank. Ensure the tank had no crack, leak, rust or corrosion. These are the checklist for solar thermal.
  • 38.
    37 ADVANTAGES AND DISADVANTAGES ADVANTAGES 1.Renewable and Environment friendly Solar energy is a renewable energy that is generated from natural processes and are continuously replenished. This type of energy cannot be exhausted and is constantly renewed. It can be used to heat and cool our building without any impact on the global warming. 2. Cost Savings Putting solar panels on our roof is likely to save our money by reduce dependence on the size of the solar system and our electricity or heat usage. The technology of solar panel is continuing advances, which are increasing the efficiency and lowering the cost of production. Therefore, making it even more cost effective. 3. Easy to install The creation of solar energy requires little maintenance. Once the solar panels have been installed and are working at maximum efficiency there is only a small amount of maintenance required each year to ensure they are in working order. It can be installed on almost any size or shape of the roof without the stringent installation requirements of a traditional solar energy system. 4. Low Maintenance Nowadays, the solar energy systems do not require a lot of maintenance or either repair work. It can be used a long period of time as the rain will wash off any accumulated dust or particles. Most of the solar panels are mounted on the roof so they don’t involve any moving parts which makes it impossible to really damage them. It can last for about 25 years. 5. Silent This solar panel produces silent energy by converting the sunlight into usable electricity. So there is no sound pollution effect to the surrounding area which made it more pleasant to people who live around you.
  • 39.
    38 DISADVANTAGES 1. Availability ofSunlight Solar energy cannot be produced during night time, it is only capable of producing power during the daytime where there is sunlight. 2. Site suitability A good location can generate more solar energy from the sun. If the house is under shade or covered by trees and landscapes which are surrounded by huge buildings, it may not suitable to install solar panels. 3. Initial Cost The starting cost of purchasing and installing solar panels is expensive. Although installing solar panels will deliver a return on investment like reduced energy bills, however the process takes many years to complete. 4. Installation Area Solar panel installation may not require a huge space for home users as it can install on rooftops. For companies or business, it requires a huge space in order to provide sufficient electricity on a constant basis. 5. Inefficiency Solar panels only have a 40% efficiency rate sunlight is absorbed by the solar panels. The other 60% of the sunlight gets wasted and is not harnessed.
  • 40.
    39 CASE STUDY :MONT-CENIS ACADEMY INTRODUCTION Location: Herne, North Rhine-Westphalia, Germany Owner: EMC, Ministry of Interiors of North Rhine-Westphalia, City of Herne Architect: Jourda, Paris; Hegger Hegger und Schleif, Kassel Client: EMC Mont-Cenis with Gilles Perraudin and HHS Area: 7,100 m2 usable interior building 11,700 m2; 13,000 m2 greenhouse Schedule: Competition in 1992, construction 1997- 1999 Construction Cost: 51,130,000 € (1999 value)
  • 41.
    40 Mont-Cenis Academy islocated at the heart of the Herne region of Sodingen on the site of the Mont Cenis pit dismantled in 1978, in the course of the Internationale Bauausstellung Emscherpark (IBA 1989-1999) an unusual complex of buildings developed. This project was planned as an urban neighbourhood shopping centre, the building serves as both residential and retail space, complemented by a public marketplace in front of the complex. First and foremost, this academy has a 176m long, 72m wide and 15m tall gigantic glass shell which is borne by timber framing and embraces the individual structures with their various functions. The academy aside, there is also a library, the district hall and a civic hall. Furthermore, with its waters and tropical-nursery-like palm trees, the weather-proof green interior of the shell with its Mediterranean microclimate can be experienced as an outdoor area, as it were. As this academy has a large microclimatic glass envelope (72m x 180m x 15m) with parted buildings inside the envelope, it have the concept of natural ventilation that was set up and a program for the control of the motor driven windows in the facades and in the roof was developed. In addition, a three-story perimeter development and a roof garden with a children’s playground was built on top of a supermarket. Moreover, behind its colourful facade are 40 flats that are suitable for the elderly and seven penthouse flats. Other than that, heating is supplied by a cogeneration unit that uses methane gas from the former Mont Cenis coal mine and supplies other buildings in area as well. Hence, it is part of the Mont Cenis energy park, which links the area’s industrial heritage with the technologies of the future. Location of Mont Cenis Academy
  • 42.
  • 43.
    42 HISTORY At the formercoal mine Mont-Cenis in Sodingen, a quarter of Herne, the academy Mont-Cenis in combination with a quarter centre was built as a part of the International Building Exhibition Emscherpark (architects: Jourda Architects, Paris, Hegger-Hegger Schleif, Kassel). The building was inaugurated in August 1999. Central part of the arrangement is a glass microclimatic envelope; in which the buildings of the academy and the quarter centre are placed. The glass hall causes a shift of the climate inside to higher temperatures compared to the climate outside during the cold seasons. The world’s largest building integrated photovoltaic power plant with one megawatt peak output is integrated in the roof of the glass hall on 10.000 m². The PV panels are arranged in clouds and serve as a sun protection during the summer.
  • 44.
    43 ARCHITECTURAL CONCEPT This educationcentre represents an architectural milestone in terms of protection of the environment and low energy consumption. The construction of a greenhouse over 13000m² provides a setting for a natural microclimate. The centre’s different programmatic elements are located within this glass envelope. The scheme engages in various environmental preservation and enhancement systems which are soil decontamination, exploitation of released mine gases, rain water collection and recycling, passive use of solar energy, active exploitation of solar energy, and use of natural and recyclable building materials. In the case of facade or roof systems the photovoltaic system is added to the building after it was built. Facade integrated photovoltaic systems could consist of various transparent module types, like crystalline and micro-perforated amorphous transparent modules. In such case a part of natural light is transmitted into the building through the modules. Solar cells are available in different colours. Roof-integrated photovoltaic systems are integrated into the roof; the roof is concealed with transparent photovoltaic modules, or they are added to the roof later. Such systems are added to a flat roof or on a sloping roof usually only if the building is small. It is possible to use tiles, which integrate solar cells. PHOTOVOLTAIC SYSTEM The photovoltaic system is integrated to the façade and roof of this building. The roof with 10.000 m² solar panels does not only serve as a sunshade but also as a solar power plant and at 750,000 kWh p.a. generates more than double the building’s own consumption. Besides, the individual roof and facade elements can be variably opened to avoid overheating. The types of solar panel used in this project are polycrystalline and monocrystalline silicon. The size of the panel is 3.2 m2 and the weight is about 130 kg. It has efficiency approximately from 12.8% to 16%. Installation PV modules and glass panes of the overhead glazing rest on aluminium profiles and are held in place with aluminium pressure plates. The vertical PV-and-glass facade is carried out as a structural glazing facade. The glass panes and PV modules are glued onto
  • 45.
    44 aluminium profiles. Allaluminium profiles are mounted on the load-bearing wooden substructure and were designed especially for this project by Wicona Bausysteme GmbH, Ulm. The interconnecting plugs and the required cabling are integrated in the aluminium profiles that hold the PV modules and glass panes into place. They are invisible and protected against weather conditions and ultraviolet light. This new mounting detail was possible due to the specially developed PV plug. The plug is not thicker than the 4mm glass pane of the PV modules and therefore fits well in the rebate. The plug helps to cut down the installation time and costs. How Solar Photovoltaic Work in Mont-CenisAcademy During summer: 1. Doors open for natural ventilation 2. Hot air rises and escapes through open roof lights drawing fresh air in to lower level of building. 3. Photovoltaic cells produce energy 4. Photovoltaic cells (solar shades) 5. Fresh air is drawn in from shaded areas outside of glass house 6. Vegetation and water features shade and evaporatively cool Glass house 7. Fresh air drawn in through underground air duct
  • 46.
    45 During winter: 1. Winddeflected from Glass house (prevents heat loss from inner buildings) 2. Heat reclaimed from exhausted air 3. Fresh air drawn in – preheated by glass house 4. Glass house heated by sun and by heat loss from buildings 5. Glass house protects microclimate from noise 6. Fresh air drawn in through underground air duct
  • 47.
    46 Passive Solar EnergyUse Glassenvelope  Creates a climatic shift in summer and winter  Keeps out the wind and rain and creates a garden-like interior with a mild micro- climate  No need absolute weatherproofed against wind and rain Sophisticated ventilation and heating systems  Reduces the energy consumption  Ventilation of the glass envelope is controlled automatically from a central position  Meteorological station and sensor supply climate data  Prevents overheating in summer, the roof and façade elements can opened variably  Hot days, doors in lower façade can be opened  Shadows of the trees and the cooling effect of waterfall and fountains are used  Air is naturally cooled or heated during very hot or cold periods (consistent below- grade temperature)
  • 48.
    47 Daylighting concept  Specialdesign of the PV roof light shelves were incorporated into certain facades of the buildings inside the glass envelope to reflect daylight deeper into their rooms  Hologram films integrated into the roof micro-climate envelope redirect the sunlight down into the library and the entrance hall  In library the hologram films act as a heliostat, which intensifies the light level  In the entrance hall they break up the light spectrum and create a rainbow effect
  • 49.
    48 POSSIBLE PROBLEMS TOTHE SYSTEM 1.Roof penetrations If the section of solar racking is poorly connected, water will leak into the house. When the waterproof barrier between the house and outdoor is penetrated, water penetration can cause rotting, molding, damage to the longevity of the house and destroy the underlying wood and structure. 2.Wind loads When solar panels are poorly attached to the roof, these solar panels can cause major impairment in heavy winds. Anchors can be pulled out of the building if there are improperly mounted and will create a small entry for moisture to penetrate which will lead to mold growth and rotting problems. 3.Snow loads Solar panels are very light. However, these light solar panels can hold snow in extreme circumstances. During a storm with serious storm, extreme snow can gather and add loads to the houses. If the solar installation is poorly planned, the loading could weaken the supporting structure of the house and cause a roof collapse. 4.Electricalhazards The solar panels produce DC current. In the solar panels, a device called an inverter is used to change the DC current from the solar installation into AC current to be used in the house. The electricity must be integrated with the electrical system in the house before the electricity leaves the inverter. Improperly integrated currents can cause electrical fire and electrocution dangers. Even if everything appears to be in working order, hazards could also exist.
  • 50.
    49 5.Solar cells arenot long lasting and system must be replaced after 25 years Solar panels are built to last and will do so for much longer than 25 years warranty might suggest. An industry’s 25 years warranty means that the company will continue producing 80% of their original production in 25 years. Solar panels also require maintenance and upgrades and performance will reduce each year. 6. Retrofit and long term fault tolerance. Solar panels are difficult to retrofit and replace faulty modules throughout their life cycle. During the installation, if a solar panel breakdown it has to be substituted with module of similar electrical characteristics. The solar panel is improving all the times and are impossible to use a new solar panel in an old installation. Due to this reason, solar panel companies have to keep an inventory of cells and modules for 25 years as a supply for old systems. 7.Risk to firemen during a fire During a fire, the first thing a fireman does is cut the power to enable them to spray water and use axes to cut a hole in the roof to let the smoke out. However, when there are solar panels on your roof, cutting the power does not eliminate the hazardous voltages present at the string ends because the solar panel cannot easily be switched off and will continue to operate even when damaged. Firemen preparing to cut a hole could be electrocuted.
  • 51.
    50 RECOMMENDATIONS FOR FUTUREIMPROVEMENT 1.Reduce the costof solar panels The most obvious obstacle to the widespread adoption of solar panels has been its cost. The initial cost of installing and maintaining solar panels is too high. If the costs are lower than before, soon the homeowners will be wondering why they are paying so much for electricity bill when they could get it from the sun for a fraction of the cost and start installing solar panels in their house. Besides, solar companies can simplify the buying and installation process so the customers only have to set up a free installation to get started. 2.New advances in Technology More efficient semiconductors need to be discovered to increase the efficiency of energy conversion will reduce the size of the array and less space is required to produce the same amount of energy. Low toxicity chemicals and materials can be used in manufacturing solar panels. New materials such as perovskites which is cheaper and more efficient at energy conversion can be used to manufacture solar panels. New transmission technology is needed to bring the clean energy to the market. Clear solar panels can be designed and incorporated into windows, making installation easier and increase the aesthetics of the technology. 3.Shading By shading a façade system panel provide a passive way to limit excessive solar gains. Good opportunities of the combination of system modules into shading devices, gives both reduced cooling loads and utilization of solar energy which are a noticeable expression of the conservation of energy.
  • 52.
    51 LEARNING OUTCOME Building servicesare the systems which installed in the buildings to make people feel comfortable, functional and safe. Building services are what makes a building comes alive. It include solar energy, ventilation, drainage, telecommunication, storm water system, drainage system, sewage disposal, cold water supply system and hot water supply system. With this assignment, our lecturer had given us the opportunity to do a report on building integrated with solar energy. Based on our research, we found out that there are two system in solar energy which are active solar energy and passive solar technology. Active solar technology employs the mechanical system by converting the sunlight to electricity. For passive solar technology, it is a method that harness in its direct form without using any mechanical devices system. Solar panels capture the sunlight and generate the electricity to the buildings. Throughout this assignment, we had managed to learn more about this particular topic which is solar energy. Based on our research, we learnt the types of solar energy, the application and installation of the solar energy. Each of the solar energy system such as photovoltaics and solar thermal has its own specifications, functions and professions. Besides that, we are able to define the advantages and disadvantages of the solar energy system. We know that the solar energy is a reusable resource it does not create any pollution, sound, no emission. It can help us to save money and solve the energy predicament in the long-term plan. Thus, we had chosen Mont Cenis Academy as the building for our case study. We had learnt about the system that works in the building throughout this assignment. This building had the good example for our topic regarding integrated with solar energy. In this assignment, all of us are fully participating in this group assignment. Every member had completely did well in their roles. We had realized that teamwork is vital when a group assignment or task is given. Lastly, we would like to appreciate our lecturer, Ms. Lim Tze Shwan that lead us and help us on this assignment.
  • 53.
    52 REFERENCES 8.2. Building IntegratedSolar Energy Technologies. (n.d.). Retrieved May 25, 2016, from https://www.e-education.psu.edu/eme807/node/650 Agrawal, B., & Tiwari, G. N. (2010). Building integrated photovoltaic thermal systems: For sustainable developments. Building-Integrated Photovoltaics. (n.d.). Retrieved May 19, 2016, from http://www.seia.org/policy/solar-technology/photovoltaic-solar-electric/building-integrated- photovoltaics Charleson, A. (2005). Structure as architecture: A source book for architects and structural engineers. Oxford: Elsevier. Gevorkian, P. (2008). Solar power in building design: The engineer's complete design resource. New York: McGraw-Hill. Grid Direct Solar. (2015). Retrieved May 27, 2016, from http://www.intermtnwindandsolar.com/grid-direct-solar/ Grid-Tied, Off-Grid and Hybrid Solar Systems - Energy Informative. (n.d.). Retrieved May 25, 2016, from http://energyinformative.org/grid-tied-off-grid-and-hybrid-solar-systems/ Hybrid Solar. (2015). Retrieved May 27, 2016, from http://www.intermtnwindandsolar.com/hybrid-solar/ Off-Grid Solar. (2015). Retrieved May 27, 2016, from http://www.intermtnwindandsolar.com/off-grid-solar/ Prasad, D. K., & Snow, M. (2005). Designing with solar power: A source book for building integrated photovoltaics (BiPV). Mulgrave, Vic.: Images. Prasad, D., & Snow, M. (2005). Designing with solar power: A sourcebook book for building Iintegrated photovoltaics (BiPV). Victoria (Australia): The Images Publishing Group. Schittich, C. (2003). In Detail: Solar architecture: Strategies, visions, concepts. Basel ; Boston ; Berlin: Birkhäuser.
  • 54.
    53 Solar Energy. (2013).In S. Butler (Ed.), The Macquarie Dictionary. South Yarra, Australia: Macquarie Dictionary Publishers. Retrieved from http://search.credoreference.com/content/entry/macqdict/solar_energy/0 Solar Energy. (n.d.). Retrieved June 08, 2016, from http://www.eesi.org/topics/solar/description Solar Panel Fires and Electrical Hazards. (n.d.). Retrieved May 13, 2016, from https://www.nachi.org/solar-panel-fire-electrical-hazards.htm Solar PV Mounting Types – Alternate Power International. (n.d.). Retrieved May 23, 2016, from http://altpowerinternational.com/solar-pv-mounting-types/ Solar water heating. (n.d.). Retrieved May 09, 2016, from http://www.energysavingtrust.org.uk/domestic/solar-water-heating Stand-Alone Photovoltaic Systems. (n.d.). Retrieved May 09, 2016, from http://www.fsec.ucf.edu/en/consumer/solar_electricity/basics/types_of_pv.htm WARNING: 3 Serious Risks That Solar Could Pose to Your Home. (n.d.). Retrieved May 23, 2016, from http://sunbridgesolar.com/warning-3-serious-risks-that-solar-can-pose-to-your- home/
  • 55.
    54 BIBLIOGRAPHY Baukunst-nrw - AcademyMont-Cenis Residential Development in Herne, Architecture. (n.d.). Retrieved May 27, 2016, from http://www.baukunst-nrw.de/en/projects/Academy-Mont- Cenis-Residential-Development--1696.htm BIPV - Building Integrated Photovoltaics. (n.d.). Retrieved May 14, 2016, from http://www.pvresources.com/en/bipv/bipv.php Description of how solar power works - Solar Thermal and Solar PV. (n.d.). Retrieved May 17, 2016, from http://www.viridiansolar.co.uk/Products_Solar_Energy_How_It_Works.htm Gevorkian, P. (2008). Solar power in building design: The engineer's complete design resource. New York: McGraw-Hill. How Solar Energy Works. (n.d.). Retrieved June 07, 2016, from http://www.ucsusa.org/clean_energy/our-energy-choices/renewable-energy/how-solar- energy-works.html#.V0CCq_l97rc How to install a solar panel mounting system on your roof. (n.d.). Retrieved May 10, 2016, from http://www.solarchoice.net.au/blog/how-to-install-a-solar-panel-mounting-system-on- your-roof/ How To Mount a Solar Panel, in 7 Steps. (2011). Retrieved May 25, 2016, from http://home.howstuffworks.com/home-improvement/construction/green/install-solar- panels.htm Int Jnl of Low-Carbon Technologies. (n.d.). Retrieved June 13, 2016, from http://ijlct.oxfordjournals.org/content/10/4/379.full Mont-Cenis Academy. (n.d.). Retrieved May 06, 2016, from http://www.bipv.ch/index.php/en/administration-s-en/item/590-montcenis Rooftop Review. (n.d.). Retrieved May 26, 2016, from http://www.quickmountpv.com/blog/10-tips-for-installing-solar-roof-mounts/
  • 56.
    55 Solar Panel InstallationTypes. (2010). Retrieved May 26, 2016, from http://greenzu.com/solar-installation Training Academy Mont-Cenis Herne. (n.d.). Retrieved May 05, 2016, from http://www.sbp.de/en/project/training-academy-mont-cenis-herne/