REMINDER
Check in on the
COLLABORATE mobile app
Beyond Customization
Prepared by:
Cari Stieglitz, PMP
Program Director, Faithful+Gould
Diana Kennedy
Primavera Architect, Faithful+Gould
Increasing User Adoption with
Unifier’s Functionality
Session ID#:
Introductions
■ Cari Stieglitz
■ Diana Kennedy
Beyond Customization
■ We are asked to adapt and change with technology at
an exponential rate.
Beyond Customization
“According to the experts, the next century looks like an airplane runway
that never ends, with the technology careening faster and faster toward
an unknown terrain. -Nora Isaacs”
Because the IT industry thrives on rapidly changing
technologies. Those who work in IT should embrace change
rather than fight it.
Beyond Customization
■ How do you balance the power of the software with the threat
of “over-customization”?
Technology Change
■ Primavera Unifier - Enterprise Project Portfolio Management
▪ Highly configurable to “build the tool around the process – not
the process around the tool”
▪ Purpose-built business processes and integrated automation
through workflow, alerts and document management
▪ Provide clients with an ongoing, customized solution which
melds their evolving line of business with best practice.
Technology Change
■ Process Change
▪ If Unifier is configured on top of bad processes, don’t blame
Unifier. Use Unifier to perform process analytics and to make
incremental improvements.
▪ •Unifier is not a silver bullet, but it is a tool to be used on the
evolving path to improvement.
“Automating Bad Process Doesn't Make it
Effective!” Simon Moffatt on Oct 28, 2009
Technology Change
Business Process Unifier Workflow
Technology Change
Over - Customization
Technology Change
■ Over – Customizing Leads to:
▪ Future restrictions
▪ Confusing processes
▪ “Muda” or wasted time, waiting, and over-processing
Technology Change
Avoid over-customizing by reviewing processes
through a “Lean” lens.
Technology Change
■ Translate existing processes into a custom BP with lean form
design.
Technology Change
How do I do this?
Technology Change
Technology Change
■ Remember KISS • Form Numbering
• Workflows vs. Multiple BP’s
• Choose the right BP type
• Remove excess fields
• Think about clear formatting
• Support LEAN processes
• Remove excess workflow steps
Technology Change
Please complete the session
evaluation
We appreciate your feedback and insight
You may complete the session evaluation either
on paper or online via the mobile app

Beyond customization increasing user adoption with unifiers functionality - Oracle Primavera P6 Collaborate 14

  • 1.
    REMINDER Check in onthe COLLABORATE mobile app Beyond Customization Prepared by: Cari Stieglitz, PMP Program Director, Faithful+Gould Diana Kennedy Primavera Architect, Faithful+Gould Increasing User Adoption with Unifier’s Functionality Session ID#:
  • 2.
  • 3.
    Beyond Customization ■ Weare asked to adapt and change with technology at an exponential rate.
  • 4.
    Beyond Customization “According tothe experts, the next century looks like an airplane runway that never ends, with the technology careening faster and faster toward an unknown terrain. -Nora Isaacs” Because the IT industry thrives on rapidly changing technologies. Those who work in IT should embrace change rather than fight it.
  • 5.
    Beyond Customization ■ Howdo you balance the power of the software with the threat of “over-customization”?
  • 6.
    Technology Change ■ PrimaveraUnifier - Enterprise Project Portfolio Management ▪ Highly configurable to “build the tool around the process – not the process around the tool” ▪ Purpose-built business processes and integrated automation through workflow, alerts and document management ▪ Provide clients with an ongoing, customized solution which melds their evolving line of business with best practice.
  • 7.
    Technology Change ■ ProcessChange ▪ If Unifier is configured on top of bad processes, don’t blame Unifier. Use Unifier to perform process analytics and to make incremental improvements. ▪ •Unifier is not a silver bullet, but it is a tool to be used on the evolving path to improvement. “Automating Bad Process Doesn't Make it Effective!” Simon Moffatt on Oct 28, 2009
  • 8.
  • 9.
  • 10.
    Technology Change ■ Over– Customizing Leads to: ▪ Future restrictions ▪ Confusing processes ▪ “Muda” or wasted time, waiting, and over-processing
  • 11.
    Technology Change Avoid over-customizingby reviewing processes through a “Lean” lens.
  • 12.
    Technology Change ■ Translateexisting processes into a custom BP with lean form design.
  • 13.
  • 14.
  • 15.
    Technology Change ■ RememberKISS • Form Numbering • Workflows vs. Multiple BP’s • Choose the right BP type • Remove excess fields • Think about clear formatting • Support LEAN processes • Remove excess workflow steps
  • 16.
  • 17.
    Please complete thesession evaluation We appreciate your feedback and insight You may complete the session evaluation either on paper or online via the mobile app