SlideShare a Scribd company logo
1 of 33
Download to read offline
An introduction to PRINCE2 ®
                                                          Copyright © 2011 Attra Partners Limited. All rights
                                                          reserved. Reproduction in whole or in part in any
                                                          form or medium without express written permission
                                                          of Attra Partners Ltd is prohibited.

                                                          www.attrapartners.com




                                                                                                  (version 2.0)
PRINCE2® is a Registered Trademark of the Office of Government Commerce in the
United Kingdom and other countries.




Project Management training for the real world!
The PRINCE2® Certification Levels
    There are two levels of certifications for PRINCE2:
    PRINCE2 Foundation (usually taken after 3 training days)
         Course
             Focus on principles, processes , themes and how to apply them
             Focus on learning PRINCE2
         Exam
             1 hour
             75 multiple choice questions
             50% pass rate


    PRINCE2 Practitioner (usually taken after an additional 2 training days)
         Course
             Focus on processes & how to run a project from A to Z
             Focus on practicing and tailoring PRINCE2
             More techniques, add-ons, etc.                                  Practitioner Recertification
         Exam                                                                • Required after max of 5 years
             2.5 hours                                                       • 1 hour exam can be taken
             Case Study of approx 10 pages                                     after 3 years-5 years
             108 multiple choice questions, covering
             9 out of 10 syllabus areas
             55% pass rate                                                   Note
                                                                              • PRINCE2 Certification is not
                                                                                valid after 5 years
Project Management
training for the real world!                                                                       2
The PRINCE2 Elements
    PRINCE2 consists of the following 4 elements:

    Principles (7)
            These are the ”core values” on which PRINCE2 is built.
    Themes (7)
            Themes are guides that help us in various processes during a
             PRINCE2 project life-cycle. Themes do not map to processes on a 1
             to 1 mapping. Some Themes are heavily used in certain processes,
             while others may be needed more lightly throughout many processes.
    Processes (7)
            Processes help guiude us through the PRINCE2 life-cycle in a
             specific order, with multiple activities within any one process.
    Tailroing
            Tailoring is fundamental to the successful application of PRINCE2 –
             we should not apply textbook theory to projects, but should think
             carefully about tailoring the method to the specific envirnoment and
             project type we are dealing with.

                                                            © Crown Copyright 2009. Reproduc
Project Management
training for the real world!                                                                   3
What PRINCE2 does NOT provide:

      1. Specialist aspects      
      2. Detailed techniques     
      3. Leadership capability   
      4. Motivational skills     
      5. Interpersonal skills    




                                     © Crown Copyright 2009. Reproduc
Project Management
training for the real world!                                            4
The structure of PRINCE2
   7 Principles, 7 Themes, 7 Processes
                                                                                    The 4 integrated
                         PROJECT ENVIRONMENT                                          elements of
                                                                                       PRINCE2:
                          7.Progress        1.Business Case
                                                             2.Organization
            6.Change             PRINCE2 Processes                                   1. Principles
                                    1 2 3 4 5 6 7
                                                                3.Quality
                                                                                      2. Themes
                              5.Risks             4. Plans
                                        PRINCE2                                      3. Processes
                                        Themes
                                                                                     4. Tailoring of
                                                                                         PRINCE2
          4. Manage by stages                                7. Tailor to project
                                 PRINCE2 Principles             environment
         3. Defined roles &
          responsibilities                              6. Focus on products
               2. Learn from experience             5. Manage by exception

                         1. Continued business justification




Project Management
training for the real world!                                                                 5
The 7 Principles (or ”core values”)
                                            PRINCE2 was recently
      1. Continued business justification   refreshed with the help of
                                            200+ organizations and
                                            individual contributions.
      2. Learn from experience
                                            At a high level, projects can be
                                            PRINCE2 compliant if they apply
      3. Defined roles & responsibilities   these principles

                                            We can refer to these principles
      4. Manage by stages                   to understand why PRINCE2 is
                                            built the way it is

      5. Manage by exception

      6. Focus on products

      7. Tailor to project environment




                                             © Crown Copyright 2009. Reproduc
Project Management
training for the real world!                                                    6
The 7 Themes (or guides)
                               These guides will help us
      1. Organization          undertake many activities
                               recommended by the PRINCE2
                               method.
      2. Business Case
                               For example, we will use Quality
                               concepts and best practice
      3. Quality               when documenting our main
                               deliverable (called the Project
                               Product Description in PRINCE2
      4. Plans                 terms). This is done in the
                               Start-up (SU) Process.

      5. Progress              We also then use Quality
                               concepts and best practice
                               when we are planning the
      6. Risk                  overall quality strategy in the
                               Initiating a Project (IP)
                               Process.
      7. Change
                               Etc..




                                © Crown Copyright 2009. Reproduc
Project Management
training for the real world!                                       7
The 7 Processes
                                          Processes lead us in an orderly
      1. Starting up a Project (SU)       way through the project
                                          management life cycle from
                                          Start-up to ultimate Closure.
      2. Directing a Project (DP)

      3. Initiating a Project (IP)

      4. Stage Boudaries (SB)

      5. Controlling a Stage (CS)

      6. Managing Product Delivery (MP)

      7. Closing a Project (CP)




                                           © Crown Copyright 2009. Reproduc
Project Management
training for the real world!                                                  8
Relating Themes to Processes (an example)
        Themes provide us with “detailed guidance” on important elements of PRINCE2 that
         we need to apply as we navigate through a PRINCE2 project life-cycle (processes)
        For example: An important activity with the Start-up process is to “Design and Appoint
         the Project Management Team”. To do this effectively, we really need to read and
         understand the “Organization Theme”. We will also need the Organization Theme
         when we perform other activities throughout the project life-cycle.


                   Appoint the Executive and
                                                                        Organization
                     the Project Manager                               Theme is used
                                                                         heavily in
                            Capture            Design and appoint          these
                        previous lessons           the project
                                               management team           activities
         Prepare the outline                     Select the project
           Business Case                       approach & assemble
                                                  the Project Brief

                                                                               Request to
                                                      Plan the                  initiate a
                                                  initiation stage               project
       Starting up a Project (SU)

Project Management
training for the real world!                                                             9
PRINCE2® Processes

       The diagram on the following slide shows the typical process flow.
        Note the following:
             A project mandate triggers the project
             We then use the SU process to ensure we have a viable project . This is
              not considered part of the project, but known as “Pre-Project” work.
             IP is considered the first stage. We create most of the project
              documentation in IP and assemble them in a master document called the
              PID (Project Initiation document).
             We start to control the day-to-day running of the project in CS (Project
              Manager’s responsibility) which in turn drives MP where the Team
              Manager will control actual work to create our product.
             Near the end of every stage (except the last stage) we will hit a Stage
              Boundary (SB) where we will prepare for the next stage. In the last
              stage we hit CP to start winding down.



Project Management
training for the real world!                                                  10
PRINCE2® Process Flow
                                                 1           2         3        ...               n
                                            Initiation                                           Final
      Project              Pre-project                           Subsequent Stages
                                             Stage                                               Stage
      Mandate

                                                                                      Authorize Project
                         DP                    Give ad-hoc Direction
                                                                                          Closure
       Directing                              Authorize
                               Authorize                             Authorize a Stage
                                                 the
       (EX, SU, SS)            Initiation                            or Exception Plan
                                               Project
                                                                                  ...
                           SU
       Managing
                                                   SB         SB           SB
                                                                                  ...                  CP
        (Project
        Manager)                                    IP        CS           CS     ...                  CS

       Delivering
         (typyically
            Team                                             MP            MP     ...                MP
         Manager)


Project Management
training for the real world!                                                                      11
Docs

   Documents prepared during the Start-up Process (SU)
                                                   1 (min)           2         3        ...               n
                                                    Initiation                                           Final
      Project              Pre-project                                   Subsequent Stages
                                                     Stage                                               Stage
      Mandate

                                                                                              Authorize Project
                         DP                            Give ad-hoc Direction
                                                                                                  Closure
       Directing                                      Authorize
                               Authorize                                     Authorize a Stage
                                                         the
       (EX, SU, SS)            Initiation                                    or Exception Plan
                                                       Project
                                                                                          ...
                           SU
       Managing
                                                          SB          SB           SB
                                                                                          ...                  CP
        (Project Log
           Daily               Project
        Manager)                Brief                       IP        CS           CS     ...                  CS

       DeliveringLog
         Lessons
                                        Outline
                                       Business
                                         Case
         (typyically
            Team                                                     MP            MP     ...                MP
         Manager) Stage Plan
                (initiation)             Project
                                         Product
                                          Desc
Project Management
training for the real world!                                                                              12
Theme #1

     ORGANIZATION
     TO DEFINE AND ESTABLISH THE PROJECT’S STRUCTURE OF
     ACCOUNTABILITY AND RESPONSIBILITIES




Project Management
training for the real world!                              13
                                                           13
PRINCE2® - Organization Theme (the main project interests)
                                                                              • 4 levels of management overall
                                                                              • 3 levels within the Project Management Team


                      Executive                                                Corporate or programme management
                      (only one!)


                      Business                                                           Directing – Project Board




                                                    Project management team
                                                                                     Senior             Executive         Senior
                                                                                     User(s)                            Supplier(s))

                        The
                       project
                                                                                         Managing – Project Manager
         User                       Supplier




     Senior                           Senior
                                                                                        Delivering - Team Manager(s)
     User(s)                        Supplier(s)                                                    Team Members


     good       bad     friendly     indifferent   Stakeholders                                 nasty     supportive     interested
                                                                               © Crown Copyright 2009. Reproduced under Licence from OGC.
Project Management
training for the real world!                                                                                             14
Organization Theme: Typical Project Management team structure

                                     Corporate or programme management


    Form a User                                                                                            Form a
                                                    Project Board
        Group                                                                                              Supplier
   (if too many)                                                                                            Group
                   Senior User(s)                    Executive                 Senior Supplier(s)      (if too many)




              Business, User and                                                Change Authority
               Supplier Project
                  Assurance                       Project Manager

                                                                                 Project Support

                                                  Team Manager(s)


                                                    Team members


                           Within the project management team       Lines of authority

                           From the customer                        Project Assurance responsibility
                          From the supplier                         Lines of support/advice

                                                                                                                       (s)
Project Management
training for the real world!                                                                              15
Theme #2

     BUSINESS CASE
     TO ESTABLISH MECHANISMS TO JUDGE WHETHER THE PROJECT IS (AND REMAINS)
     DESIRABLE, VIABLE ANDACHIEVABLE AS A MEANS TO SUPPORT DECISION MAKING
     IN ITS (CONTINUED) INVESTMENT.




Project Management
training for the real world!                                             16
                                                                          16
PRINCE2® - Business Case Theme
   (business case development path)

   Notes:
    An outline Business Case is developed in SU
    The main/refined Business Case is completed in IP
    The Business Case is used to assess the continued viability of the project
    The Business Case is updated at stage boundaries (SB)
                                                             Confirm                         Confirm                       Confirm
                                                             benefits                        benefits                      benefits



      Pre-             Initiation           Subsequent delivery                                             Post-project
                                                                        Final delivery stage
     project             stage                   stage(s)


           Verify               Verify                        Verify
           outline             detailed                      updated
       Business Case        Business Case                 Business Case

            Develop                                          Maintain
         Business Case                                     Business Case

                                                                                © Crown Copyright 2009. Reproduced under Licence from OGC.
Project Management
training for the real world!                                                                                       17
Theme #3

     QUALITY
     TO DEFINE AND IMPLEMENT THE MEANS BY WHICH THE PROJECT WILL CREATE AND
     VERIFY PRODUCTS THAT ARE FIT FOR PURPOSE.




                                                                               M - 47
Project Management
training for the real world!                                             18
                                                                          18
PRINCE2® - Quality Theme

       Note the following:
             Quality is closely related to the “Focus on Products” principle and is
              reinforced within PRINCE2 by the creation of the Project Product
              Description (PPD) document in SU
             The PPD includes statements about the customer’s quality expectations
              and acceptance criteria to avoid any ambiguity
             When doing detailed planning (usually at Stage Boundaries – SB) we
              create Product Descriptions which are really sub-components of the
              Project Product or overall deliverable (see the Product Breakdown
              Structure in the next Theme “PLANS”)




Project Management
training for the real world!                                                 19
The PRINCE2 ® path to quality
                       Pre-           Initiation                   Subsequent                    Final
                      Project          Stage                         Stages                      Stage

      Directing                                                   DP
                        SU                     SB                 SB                 SB                  CP
     Managing
                                       IP                 CS                    CS                CS

     Delivering                                           MP                    MP                MP


                   Describe the     Plan the               Plan the                                    Accept
                                                                              Plan the
                  Project Product   Planning              Production                                     the
                                                                             Production
                                                                                                       Project
                                         Plan the                                                      Product
                    Choose the          Production
                     approach                                          Produce the        Produce the
                                                    Produce the
                                                      Product            Product            Product
                                                     Quality            Quality            Quality
                                                    Control the        Control the        Control the
                                                     Product            Product            Product

                                                    Approve the        Approve the        Approve the
                                                      Product            Product            Product
Project Management
training for the real world!                                                                      20
Theme #4

     PLANS
     TO FACILITATE COMMUNICATION AND CONTROL BY DEFINING THE MEANS OF
     DELIVERING THE PRODUCTS (THE WHERE AND HOW, BY WHOM, AND ESTIMATING
     THE WHEN AND HOW MUCH)




                                                                                 M - 61
Project Management
training for the real world!                                               21
                                                                            21
PRINCE2 ® - Plans Theme (Planning levels)
   Notes:
    PRINCE2 emphasises that we need different levels of plan to cater for the needs of the
       different management levels.
    A strong focus on “product based planning” is part of the PRINCE2 philosophy


         Corporate or programme plan


                               Project Plan
                                                IP
                                                                              SB
        (Initiation)             (Delivery)
                                                                                     Exception Plans
        Stage Plan              Stage Plans
                       SU                       SB
                                                                                       as necessary

                                Team Plans
                                              MP
                                                                © Crown Copyright 2009. Reproduced under Licence from OGC.
Project Management
training for the real world!                                                                       22
Product Breakdown Structure (PBS)
        PRINCE2 recommends the use of a PBS as a planning pre-requisite

                                                 New Flight Booking System
                                                     (fully Operational)



           Management                                      Software                    Hardware
                                 Training
            products                                       System


                PID                                      Installed Flight
                               User Manuals                                            High Screen
                                                            Booking
                                                                                         Monitors
                                                             System
       •Initiation stage End   Administrator                                            High Spec
       Stage Report              Manuals                                                  Server
       •Stage plan [2]
                                                               Booking Front-
                                On-line Help                        End
       •End Stage Report [2]
                                                                Application
       •Stage plan [3]
                               Trained Front-
                               line Desk Staff                 Booking Back-
       •End Stage Report [3]                                   End Database
       •Stage plan [4]
                                  On-Line
                                 Help Docs
       •End Project Report

                                                                            External       Management    Product
                                                        Gouping
                                                                            product          product
Project Management
training for the real world!                                                                            23
Flight Booking System Example – Product Flow Diagram (PFD)

       PRINCE2 recommends the use of a PFD after a PBS has been created

                                                          High Spec
                                                            Server



                                              Booking Back-              High Screen        Stage 2
                                              End Database                 Monitors         Product
                                                                                          Descriptions
            On-Line
           Help Docs
                                                                      Booking Front-End
                               On-line Help
                                                                         Application
                                                                                            Stage 3
                                                 User Manuals                               Product
                                                                                          Descriptions


                                    Trained Front-                    Installed Flight
                                    line Desk Staff                      Booking
                                                                          System            Stage 4
                                                                                            Product
                                                      Administrator                       Descriptions
                                                        Manuals


                                               New Flight Booking System
                                                   (fully Operational)
Project Management
training for the real world!                                                                      24
Theme #5

     PROGRESS
     TO ESTABLISH MECHANISMS TO MONITOR ANDCOMPARE ACTUAL ACHIEVEMENTS
     AGAINST THOSE PLANNED; PROVIDE A FORECAST FOR THE PROJECT OBJECTIVES
     AND THE PROJECT;S CONTINUED VIABILITY; AND CONTROL AND UNACCEPTABLE
     DEVIATIONS




                                                                              M - 101
Project Management
training for the real world!                                            25
                                                                         25
PRINCE2 ® - Progress Theme
    PRINCE2 recommends six areas of a project that need to be managed,
    controlled & tracked to ensure the project remains on track. These are
    depicted below:


                                             Costs



                               Benefits                 Timescale

                                           Aspects of
                                            Project
                                          Performance
                               Scope                     Quality



                                              Risk




Project Management
training for the real world!                                           26
What we wish to control & where we document it
              Tolerance areas                                Project        Stage        Work       Product
                                                                                         Package
   Time       +/- amounts of time on target                                               Work
                                                             Project Plan   Stage Plan                  NA
              completion dates                                                           Package

   Cost       +/- amounts of planned budget                                               Work
                                                             Project Plan   Stage Plan                  NA
                                                                                         Package

   Scope      Permitted variation of the scope of a
              project solution, e.g. MoSCoW prioritization                                Work
                                                             Project Plan   Stage Plan                  NA
              of requirements (Must have, Should have,                                   Package
              Could have, Won’t have’).

   Risk       Limit on the aggregated value of threats
              (e.g. expected monetary value to remain less      Risk
                                                                                          Work
              than 10% of the plan’s budget); and            Management     Stage Plan                  NA
                                                                                         Package
              Limit on any individual threat (e.g. any        Strategy
              threat to operational service)

   Quality    Defining quality targets in terms of ranges,     Project
                                                                                                     Product
              e.g. a product that weighs 300g +/- 10g          Product         NA          NA
                                                                                                    Description
                                                              Description

   Benefits   Defining target benefits in terms of ranges,
              e.g. to achieve minimum cost savings of          Business
                                                                               NA          NA           NA
              5% per branch, with an average of 7%              Case
              across all branches




Project Management
training for the real world!                                                                       27
Theme #6

     RISK
     TO IDENTIFY, ASSESS AND CONTROL UNCERTAINTY AN, AS A RESULT, IMPROVE THE ABILITY OF
     THE PROJECT TO SUCCEED.




                                                                                             M - 77
Project Management
training for the real world!                                                           28
                                                                                        28
PRINCE2 ® - Risk Theme (Definitions)
    Risk: An uncertain event or set of events that, should it occur, will have
          an effect on the achievements of objectives.


    PRINCE2 defines two types of risks (“bad” and “good”):

         Risk “Threat”: ..can have a negative impact on objectives

         Risk “Opportunity”: ..can have a favourable impact on objectives




Project Management
training for the real world!                                              29
PRINCE2 ® Risk responses


              Threat responses                  Opportunity responses


                   Avoid                               Exploit

                    Reduce
          (probability and/or impact)
                                                                                           Risk Budget
                   Fallback
             (reduces impact only)                    Enhance                           Sum of money
                                                                                          set aside to
                    Transfer                                                             fund specific
      (reduces impact only, and often only                                              management
             the financial impact)                                                       responses to
                                                                                          threats and
                                                                                        opportunities
                                        Share


                   Accept                               Reject


                                                                        © Crown Copyright 2009. Reproduced under Licence from OGC.
Project Management
training for the real world!                                                                               30
Theme #7

     CHANGE
     TO IDENTIFY, ASSESS AND CONTROL ANY POTENTIAL ANDAPPROVED CHANGES TO
     THE BASELINE.




                                                                             M - 91
Project Management
training for the real world!                                           31
                                                                        31
PRINCE2 ® - Change Theme
    The PRINCE2 philosophy is not to prevent change (because this is unrealistic in
    the real world), but to control it and put in place proper controls so we do not end
    up with a run-away project.

    On a day-to-day basis, the Project Manager is responsible for managing change
    within the Controlling a Stage (CS) process. One of the key activities in the CS
    process is “Capture & examine Issues and Risks” which forms the entry point for
    managing change. Change is considered as a type of issue in PRINCE2 terms
    (see next slide).

                                                    Escalate                Report
                                                issues and risks          highlights
               Controlling a Stage




                                     Take corrective         Review stage
                                         action                 status
                                                                                    Capture and
                                                                                   examine issues
                                                                                      and risks
                                                                                          Receive
                                       Authorize              Review Work
                                                                                        completed
                                     Work Packages           Package status
                                                                                       Work Packages


Project Management
training for the real world!                                                                           32
PRINCE2 ® Issue Types
   Issue types         Definition                  Project Manager               Project Board
   Request for change A proposal for a change      • Capture                     • Approve
                      to a baseline (including     • Impact analysis (examine)   • Reject
                      baselined Product
                      Descriptions).               • Propose action              • Defer decision
                                                   • Present to the person or    • Request more
                                                    group who has the              information
                                                    competence to accept or      • Ask for Exception Plan
                                                    refuse the request for
                                                    change

   Off-specification   Errors or omissions         • Capture                     • Grant a concession
                       A product is, or will not   • Impact analysis             • Instruct that the off-
                       be, delivered as                                            specification be resolved
                       described in the
                                                   • Propose action
                       Product Description.        • Project Manager tries to    • Defer decision
                                                     handle inside stage         • Request more
                                                     tolerances                    information
                                                   • If impossible: Exception    • Ask for Exception Plan
                                                     Report

   Problem/concern     Any other issues            • The Project Manager         • Provide guidance
                                                     resolves within             • Ask for Exception Plan
                                                     tolerances
                                                   • If impossible: Exception
                                                     Report


Project Management
training for the real world!                                                                        33

More Related Content

What's hot

Integrating SCRUM with classical Project Management
Integrating SCRUM with classical Project ManagementIntegrating SCRUM with classical Project Management
Integrating SCRUM with classical Project ManagementJens Hoffmann
 
Analysis of Critical Success Factors Relevance along SAP Implementation Phases
Analysis of Critical Success Factors Relevance along SAP Implementation PhasesAnalysis of Critical Success Factors Relevance along SAP Implementation Phases
Analysis of Critical Success Factors Relevance along SAP Implementation PhasesJose Esteves
 
High Performance Project Management - A Holistic Approach
High Performance Project Management - A Holistic ApproachHigh Performance Project Management - A Holistic Approach
High Performance Project Management - A Holistic ApproachIT Weekend
 
5 s-a-program-to-improve-project-ppt-compatibility-mode
5 s-a-program-to-improve-project-ppt-compatibility-mode5 s-a-program-to-improve-project-ppt-compatibility-mode
5 s-a-program-to-improve-project-ppt-compatibility-modeBathuka Chuka
 
Macrosolutions Training: Project Quality Management
Macrosolutions Training: Project Quality ManagementMacrosolutions Training: Project Quality Management
Macrosolutions Training: Project Quality ManagementMacrosolutions SA
 
Macrosolutions Training: Project Management: Establishing Competitive Advantages
Macrosolutions Training: Project Management: Establishing Competitive AdvantagesMacrosolutions Training: Project Management: Establishing Competitive Advantages
Macrosolutions Training: Project Management: Establishing Competitive AdvantagesMacrosolutions SA
 
Macrosolutions Training: Program Management
Macrosolutions Training: Program ManagementMacrosolutions Training: Program Management
Macrosolutions Training: Program ManagementMacrosolutions SA
 
Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2Brian Phillips
 
110605=holy grail cmmi_scrum
110605=holy grail cmmi_scrum110605=holy grail cmmi_scrum
110605=holy grail cmmi_scrumIsabel Ferreira
 
Macrosolutions Training: Change Control Management in projects
Macrosolutions Training: Change Control Management in projectsMacrosolutions Training: Change Control Management in projects
Macrosolutions Training: Change Control Management in projectsMacrosolutions SA
 
Aras PLM Software Implementation Methodology
Aras PLM Software Implementation MethodologyAras PLM Software Implementation Methodology
Aras PLM Software Implementation MethodologyAras
 
Macrosolutions Training: Managing Complex Projects and Projects in Crisis
Macrosolutions Training: Managing Complex Projects and Projects in CrisisMacrosolutions Training: Managing Complex Projects and Projects in Crisis
Macrosolutions Training: Managing Complex Projects and Projects in CrisisMacrosolutions SA
 
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...Macrosolutions SA
 
Capstone Senior Design Projects Comprehensive
Capstone Senior Design Projects ComprehensiveCapstone Senior Design Projects Comprehensive
Capstone Senior Design Projects ComprehensiveJean Koster
 
Critical Success Factors in a Furniture Development Process
Critical Success Factors in a Furniture Development ProcessCritical Success Factors in a Furniture Development Process
Critical Success Factors in a Furniture Development ProcessAntti Pitkänen
 

What's hot (20)

Integrating SCRUM with classical Project Management
Integrating SCRUM with classical Project ManagementIntegrating SCRUM with classical Project Management
Integrating SCRUM with classical Project Management
 
Analysis of Critical Success Factors Relevance along SAP Implementation Phases
Analysis of Critical Success Factors Relevance along SAP Implementation PhasesAnalysis of Critical Success Factors Relevance along SAP Implementation Phases
Analysis of Critical Success Factors Relevance along SAP Implementation Phases
 
About scrum
About scrumAbout scrum
About scrum
 
High Performance Project Management - A Holistic Approach
High Performance Project Management - A Holistic ApproachHigh Performance Project Management - A Holistic Approach
High Performance Project Management - A Holistic Approach
 
5 s-a-program-to-improve-project-ppt-compatibility-mode
5 s-a-program-to-improve-project-ppt-compatibility-mode5 s-a-program-to-improve-project-ppt-compatibility-mode
5 s-a-program-to-improve-project-ppt-compatibility-mode
 
Macrosolutions Training: Project Quality Management
Macrosolutions Training: Project Quality ManagementMacrosolutions Training: Project Quality Management
Macrosolutions Training: Project Quality Management
 
Macrosolutions Training: Project Management: Establishing Competitive Advantages
Macrosolutions Training: Project Management: Establishing Competitive AdvantagesMacrosolutions Training: Project Management: Establishing Competitive Advantages
Macrosolutions Training: Project Management: Establishing Competitive Advantages
 
Macrosolutions Training: Program Management
Macrosolutions Training: Program ManagementMacrosolutions Training: Program Management
Macrosolutions Training: Program Management
 
Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2
 
110605=holy grail cmmi_scrum
110605=holy grail cmmi_scrum110605=holy grail cmmi_scrum
110605=holy grail cmmi_scrum
 
Simple design
Simple designSimple design
Simple design
 
Macrosolutions Training: Change Control Management in projects
Macrosolutions Training: Change Control Management in projectsMacrosolutions Training: Change Control Management in projects
Macrosolutions Training: Change Control Management in projects
 
Aras PLM Software Implementation Methodology
Aras PLM Software Implementation MethodologyAras PLM Software Implementation Methodology
Aras PLM Software Implementation Methodology
 
Macrosolutions Training: Managing Complex Projects and Projects in Crisis
Macrosolutions Training: Managing Complex Projects and Projects in CrisisMacrosolutions Training: Managing Complex Projects and Projects in Crisis
Macrosolutions Training: Managing Complex Projects and Projects in Crisis
 
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
 
Capstone Senior Design Projects Comprehensive
Capstone Senior Design Projects ComprehensiveCapstone Senior Design Projects Comprehensive
Capstone Senior Design Projects Comprehensive
 
Critical Success Factors in a Furniture Development Process
Critical Success Factors in a Furniture Development ProcessCritical Success Factors in a Furniture Development Process
Critical Success Factors in a Furniture Development Process
 
Stage 3
Stage 3Stage 3
Stage 3
 
Certified Scrum Training Boris Gloger
Certified Scrum Training Boris GlogerCertified Scrum Training Boris Gloger
Certified Scrum Training Boris Gloger
 
Agile intro module 4
Agile intro   module 4Agile intro   module 4
Agile intro module 4
 

Viewers also liked

Viewers also liked (15)

Zahran's 10 minute introduction to PRINCE2
Zahran's 10 minute introduction to PRINCE2Zahran's 10 minute introduction to PRINCE2
Zahran's 10 minute introduction to PRINCE2
 
The prince2-training-manual-sample
The prince2-training-manual-sampleThe prince2-training-manual-sample
The prince2-training-manual-sample
 
An Introduction to PRINCE2 (book)
An Introduction to PRINCE2 (book)An Introduction to PRINCE2 (book)
An Introduction to PRINCE2 (book)
 
1 2. project management
1 2. project management1 2. project management
1 2. project management
 
Pankaj ppt version 3.0
Pankaj  ppt version 3.0Pankaj  ppt version 3.0
Pankaj ppt version 3.0
 
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...
 
Prince2 2009-process-model
Prince2 2009-process-modelPrince2 2009-process-model
Prince2 2009-process-model
 
Starter kit del docente hi tech - v02
Starter kit del docente hi tech - v02Starter kit del docente hi tech - v02
Starter kit del docente hi tech - v02
 
Cost Engineering for Projects
Cost Engineering for ProjectsCost Engineering for Projects
Cost Engineering for Projects
 
Prince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison DemystifiedPrince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison Demystified
 
AXELOS - PRINCE2® Foundation
AXELOS - PRINCE2® FoundationAXELOS - PRINCE2® Foundation
AXELOS - PRINCE2® Foundation
 
I° Livello - Corso Sommelier AIS - Appunti
I° Livello - Corso Sommelier AIS - AppuntiI° Livello - Corso Sommelier AIS - Appunti
I° Livello - Corso Sommelier AIS - Appunti
 
Functional point analysis
Functional point analysisFunctional point analysis
Functional point analysis
 
Learn the SECRETS to passing your PRINCE2 Practitioner exam with flying colou...
Learn the SECRETS to passing your PRINCE2 Practitioner exam with flying colou...Learn the SECRETS to passing your PRINCE2 Practitioner exam with flying colou...
Learn the SECRETS to passing your PRINCE2 Practitioner exam with flying colou...
 
Prince2 Methodology
Prince2 MethodologyPrince2 Methodology
Prince2 Methodology
 

Similar to Attra Partners Prince2 Intro

International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...Stefan Ondek, PMP, CSPM
 
Prince2 resources e-book 1
Prince2 resources e-book 1Prince2 resources e-book 1
Prince2 resources e-book 1Knowledge Train
 
PRINCE 2 foundation & practitioner certification training
PRINCE 2   foundation & practitioner certification trainingPRINCE 2   foundation & practitioner certification training
PRINCE 2 foundation & practitioner certification trainingCeltem Learning
 
Prince2 quick guide
Prince2 quick guidePrince2 quick guide
Prince2 quick guideMaven
 
prince2_practitioner_resource_book _v3.5.pdf
prince2_practitioner_resource_book _v3.5.pdfprince2_practitioner_resource_book _v3.5.pdf
prince2_practitioner_resource_book _v3.5.pdfEduardoMena35
 
PRINCE2 - Presentation
PRINCE2 - PresentationPRINCE2 - Presentation
PRINCE2 - PresentationMatt Trigg
 
Prince2 foundation-certification
Prince2 foundation-certificationPrince2 foundation-certification
Prince2 foundation-certificationKnowledgehut
 
Prince2 Agile Frukostmöte
Prince2 Agile FrukostmötePrince2 Agile Frukostmöte
Prince2 Agile FrukostmöteLars Lundgren
 
PRINCE2-ATO-Toolkit-Presentation-Tailoring the Framework
PRINCE2-ATO-Toolkit-Presentation-Tailoring the FrameworkPRINCE2-ATO-Toolkit-Presentation-Tailoring the Framework
PRINCE2-ATO-Toolkit-Presentation-Tailoring the FrameworkDarren Radford
 
Demystifying Prince2 : Why does it matter?
Demystifying Prince2 : Why does it matter?Demystifying Prince2 : Why does it matter?
Demystifying Prince2 : Why does it matter?Edureka!
 
Project management intro from prince2 foundation
Project management intro from prince2  foundationProject management intro from prince2  foundation
Project management intro from prince2 foundationbhprabhu
 
The ultimate fast-track guide to PRINCE2 for PMP credential holders
The ultimate fast-track guide to PRINCE2 for PMP credential holdersThe ultimate fast-track guide to PRINCE2 for PMP credential holders
The ultimate fast-track guide to PRINCE2 for PMP credential holdersAlison Wood
 
The ultimate fast-track guide to PRINCE2 for PMP credential holders
The ultimate fast-track guide to PRINCE2 for PMP credential holdersThe ultimate fast-track guide to PRINCE2 for PMP credential holders
The ultimate fast-track guide to PRINCE2 for PMP credential holdersKnowledge Train
 
Prince2 certification-india(foundation+practitioner)
Prince2 certification-india(foundation+practitioner)Prince2 certification-india(foundation+practitioner)
Prince2 certification-india(foundation+practitioner)Knowledgehut
 
PRINCE2 Project Management Quick Guide
PRINCE2 Project Management Quick GuidePRINCE2 Project Management Quick Guide
PRINCE2 Project Management Quick GuideMaven
 

Similar to Attra Partners Prince2 Intro (20)

International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
 
Guide to PRINCE2®
Guide to PRINCE2® Guide to PRINCE2®
Guide to PRINCE2®
 
Prince2 resources e-book 1
Prince2 resources e-book 1Prince2 resources e-book 1
Prince2 resources e-book 1
 
PRINCE2 Executive Briefing
PRINCE2 Executive BriefingPRINCE2 Executive Briefing
PRINCE2 Executive Briefing
 
PRINCE 2 foundation & practitioner certification training
PRINCE 2   foundation & practitioner certification trainingPRINCE 2   foundation & practitioner certification training
PRINCE 2 foundation & practitioner certification training
 
Prince2 quick guide
Prince2 quick guidePrince2 quick guide
Prince2 quick guide
 
prince2_practitioner_resource_book _v3.5.pdf
prince2_practitioner_resource_book _v3.5.pdfprince2_practitioner_resource_book _v3.5.pdf
prince2_practitioner_resource_book _v3.5.pdf
 
PRINCE2 - Presentation
PRINCE2 - PresentationPRINCE2 - Presentation
PRINCE2 - Presentation
 
Prince2 Practitioner
Prince2 PractitionerPrince2 Practitioner
Prince2 Practitioner
 
Prince2 foundation-certification
Prince2 foundation-certificationPrince2 foundation-certification
Prince2 foundation-certification
 
Prince2 Agile Frukostmöte
Prince2 Agile FrukostmötePrince2 Agile Frukostmöte
Prince2 Agile Frukostmöte
 
PRINCE2-ATO-Toolkit-Presentation-Tailoring the Framework
PRINCE2-ATO-Toolkit-Presentation-Tailoring the FrameworkPRINCE2-ATO-Toolkit-Presentation-Tailoring the Framework
PRINCE2-ATO-Toolkit-Presentation-Tailoring the Framework
 
Prince2@ Foundation Certification Course
Prince2@ Foundation Certification CoursePrince2@ Foundation Certification Course
Prince2@ Foundation Certification Course
 
Demystifying Prince2 : Why does it matter?
Demystifying Prince2 : Why does it matter?Demystifying Prince2 : Why does it matter?
Demystifying Prince2 : Why does it matter?
 
Project management intro from prince2 foundation
Project management intro from prince2  foundationProject management intro from prince2  foundation
Project management intro from prince2 foundation
 
Bfi compro
Bfi comproBfi compro
Bfi compro
 
The ultimate fast-track guide to PRINCE2 for PMP credential holders
The ultimate fast-track guide to PRINCE2 for PMP credential holdersThe ultimate fast-track guide to PRINCE2 for PMP credential holders
The ultimate fast-track guide to PRINCE2 for PMP credential holders
 
The ultimate fast-track guide to PRINCE2 for PMP credential holders
The ultimate fast-track guide to PRINCE2 for PMP credential holdersThe ultimate fast-track guide to PRINCE2 for PMP credential holders
The ultimate fast-track guide to PRINCE2 for PMP credential holders
 
Prince2 certification-india(foundation+practitioner)
Prince2 certification-india(foundation+practitioner)Prince2 certification-india(foundation+practitioner)
Prince2 certification-india(foundation+practitioner)
 
PRINCE2 Project Management Quick Guide
PRINCE2 Project Management Quick GuidePRINCE2 Project Management Quick Guide
PRINCE2 Project Management Quick Guide
 

Attra Partners Prince2 Intro

  • 1. An introduction to PRINCE2 ® Copyright © 2011 Attra Partners Limited. All rights reserved. Reproduction in whole or in part in any form or medium without express written permission of Attra Partners Ltd is prohibited. www.attrapartners.com (version 2.0) PRINCE2® is a Registered Trademark of the Office of Government Commerce in the United Kingdom and other countries. Project Management training for the real world!
  • 2. The PRINCE2® Certification Levels  There are two levels of certifications for PRINCE2:  PRINCE2 Foundation (usually taken after 3 training days)  Course  Focus on principles, processes , themes and how to apply them  Focus on learning PRINCE2  Exam  1 hour  75 multiple choice questions  50% pass rate  PRINCE2 Practitioner (usually taken after an additional 2 training days)  Course  Focus on processes & how to run a project from A to Z  Focus on practicing and tailoring PRINCE2  More techniques, add-ons, etc. Practitioner Recertification  Exam • Required after max of 5 years  2.5 hours • 1 hour exam can be taken  Case Study of approx 10 pages after 3 years-5 years  108 multiple choice questions, covering  9 out of 10 syllabus areas  55% pass rate Note • PRINCE2 Certification is not valid after 5 years Project Management training for the real world! 2
  • 3. The PRINCE2 Elements  PRINCE2 consists of the following 4 elements:  Principles (7)  These are the ”core values” on which PRINCE2 is built.  Themes (7)  Themes are guides that help us in various processes during a PRINCE2 project life-cycle. Themes do not map to processes on a 1 to 1 mapping. Some Themes are heavily used in certain processes, while others may be needed more lightly throughout many processes.  Processes (7)  Processes help guiude us through the PRINCE2 life-cycle in a specific order, with multiple activities within any one process.  Tailroing  Tailoring is fundamental to the successful application of PRINCE2 – we should not apply textbook theory to projects, but should think carefully about tailoring the method to the specific envirnoment and project type we are dealing with. © Crown Copyright 2009. Reproduc Project Management training for the real world! 3
  • 4. What PRINCE2 does NOT provide: 1. Specialist aspects  2. Detailed techniques  3. Leadership capability  4. Motivational skills  5. Interpersonal skills  © Crown Copyright 2009. Reproduc Project Management training for the real world! 4
  • 5. The structure of PRINCE2 7 Principles, 7 Themes, 7 Processes The 4 integrated PROJECT ENVIRONMENT elements of PRINCE2: 7.Progress 1.Business Case 2.Organization 6.Change PRINCE2 Processes 1. Principles 1 2 3 4 5 6 7 3.Quality 2. Themes 5.Risks 4. Plans PRINCE2 3. Processes Themes 4. Tailoring of PRINCE2 4. Manage by stages 7. Tailor to project PRINCE2 Principles environment 3. Defined roles & responsibilities 6. Focus on products 2. Learn from experience 5. Manage by exception 1. Continued business justification Project Management training for the real world! 5
  • 6. The 7 Principles (or ”core values”) PRINCE2 was recently 1. Continued business justification refreshed with the help of 200+ organizations and individual contributions. 2. Learn from experience At a high level, projects can be PRINCE2 compliant if they apply 3. Defined roles & responsibilities these principles We can refer to these principles 4. Manage by stages to understand why PRINCE2 is built the way it is 5. Manage by exception 6. Focus on products 7. Tailor to project environment © Crown Copyright 2009. Reproduc Project Management training for the real world! 6
  • 7. The 7 Themes (or guides) These guides will help us 1. Organization undertake many activities recommended by the PRINCE2 method. 2. Business Case For example, we will use Quality concepts and best practice 3. Quality when documenting our main deliverable (called the Project Product Description in PRINCE2 4. Plans terms). This is done in the Start-up (SU) Process. 5. Progress We also then use Quality concepts and best practice when we are planning the 6. Risk overall quality strategy in the Initiating a Project (IP) Process. 7. Change Etc.. © Crown Copyright 2009. Reproduc Project Management training for the real world! 7
  • 8. The 7 Processes Processes lead us in an orderly 1. Starting up a Project (SU) way through the project management life cycle from Start-up to ultimate Closure. 2. Directing a Project (DP) 3. Initiating a Project (IP) 4. Stage Boudaries (SB) 5. Controlling a Stage (CS) 6. Managing Product Delivery (MP) 7. Closing a Project (CP) © Crown Copyright 2009. Reproduc Project Management training for the real world! 8
  • 9. Relating Themes to Processes (an example)  Themes provide us with “detailed guidance” on important elements of PRINCE2 that we need to apply as we navigate through a PRINCE2 project life-cycle (processes)  For example: An important activity with the Start-up process is to “Design and Appoint the Project Management Team”. To do this effectively, we really need to read and understand the “Organization Theme”. We will also need the Organization Theme when we perform other activities throughout the project life-cycle. Appoint the Executive and Organization the Project Manager Theme is used heavily in Capture Design and appoint these previous lessons the project management team activities Prepare the outline Select the project Business Case approach & assemble the Project Brief Request to Plan the initiate a initiation stage project Starting up a Project (SU) Project Management training for the real world! 9
  • 10. PRINCE2® Processes  The diagram on the following slide shows the typical process flow. Note the following:  A project mandate triggers the project  We then use the SU process to ensure we have a viable project . This is not considered part of the project, but known as “Pre-Project” work.  IP is considered the first stage. We create most of the project documentation in IP and assemble them in a master document called the PID (Project Initiation document).  We start to control the day-to-day running of the project in CS (Project Manager’s responsibility) which in turn drives MP where the Team Manager will control actual work to create our product.  Near the end of every stage (except the last stage) we will hit a Stage Boundary (SB) where we will prepare for the next stage. In the last stage we hit CP to start winding down. Project Management training for the real world! 10
  • 11. PRINCE2® Process Flow 1 2 3 ... n Initiation Final Project Pre-project Subsequent Stages Stage Stage Mandate Authorize Project DP Give ad-hoc Direction Closure Directing Authorize Authorize Authorize a Stage the (EX, SU, SS) Initiation or Exception Plan Project ... SU Managing SB SB SB ... CP (Project Manager) IP CS CS ... CS Delivering (typyically Team MP MP ... MP Manager) Project Management training for the real world! 11
  • 12. Docs Documents prepared during the Start-up Process (SU) 1 (min) 2 3 ... n Initiation Final Project Pre-project Subsequent Stages Stage Stage Mandate Authorize Project DP Give ad-hoc Direction Closure Directing Authorize Authorize Authorize a Stage the (EX, SU, SS) Initiation or Exception Plan Project ... SU Managing SB SB SB ... CP (Project Log Daily Project Manager) Brief IP CS CS ... CS DeliveringLog Lessons Outline Business Case (typyically Team MP MP ... MP Manager) Stage Plan (initiation) Project Product Desc Project Management training for the real world! 12
  • 13. Theme #1 ORGANIZATION TO DEFINE AND ESTABLISH THE PROJECT’S STRUCTURE OF ACCOUNTABILITY AND RESPONSIBILITIES Project Management training for the real world! 13 13
  • 14. PRINCE2® - Organization Theme (the main project interests) • 4 levels of management overall • 3 levels within the Project Management Team Executive Corporate or programme management (only one!) Business Directing – Project Board Project management team Senior Executive Senior User(s) Supplier(s)) The project Managing – Project Manager User Supplier Senior Senior Delivering - Team Manager(s) User(s) Supplier(s) Team Members good bad friendly indifferent Stakeholders nasty supportive interested © Crown Copyright 2009. Reproduced under Licence from OGC. Project Management training for the real world! 14
  • 15. Organization Theme: Typical Project Management team structure Corporate or programme management Form a User Form a Project Board Group Supplier (if too many) Group Senior User(s) Executive Senior Supplier(s) (if too many) Business, User and Change Authority Supplier Project Assurance Project Manager Project Support Team Manager(s) Team members Within the project management team Lines of authority From the customer Project Assurance responsibility From the supplier Lines of support/advice (s) Project Management training for the real world! 15
  • 16. Theme #2 BUSINESS CASE TO ESTABLISH MECHANISMS TO JUDGE WHETHER THE PROJECT IS (AND REMAINS) DESIRABLE, VIABLE ANDACHIEVABLE AS A MEANS TO SUPPORT DECISION MAKING IN ITS (CONTINUED) INVESTMENT. Project Management training for the real world! 16 16
  • 17. PRINCE2® - Business Case Theme (business case development path) Notes:  An outline Business Case is developed in SU  The main/refined Business Case is completed in IP  The Business Case is used to assess the continued viability of the project  The Business Case is updated at stage boundaries (SB) Confirm Confirm Confirm benefits benefits benefits Pre- Initiation Subsequent delivery Post-project Final delivery stage project stage stage(s) Verify Verify Verify outline detailed updated Business Case Business Case Business Case Develop Maintain Business Case Business Case © Crown Copyright 2009. Reproduced under Licence from OGC. Project Management training for the real world! 17
  • 18. Theme #3 QUALITY TO DEFINE AND IMPLEMENT THE MEANS BY WHICH THE PROJECT WILL CREATE AND VERIFY PRODUCTS THAT ARE FIT FOR PURPOSE. M - 47 Project Management training for the real world! 18 18
  • 19. PRINCE2® - Quality Theme  Note the following:  Quality is closely related to the “Focus on Products” principle and is reinforced within PRINCE2 by the creation of the Project Product Description (PPD) document in SU  The PPD includes statements about the customer’s quality expectations and acceptance criteria to avoid any ambiguity  When doing detailed planning (usually at Stage Boundaries – SB) we create Product Descriptions which are really sub-components of the Project Product or overall deliverable (see the Product Breakdown Structure in the next Theme “PLANS”) Project Management training for the real world! 19
  • 20. The PRINCE2 ® path to quality Pre- Initiation Subsequent Final Project Stage Stages Stage Directing DP SU SB SB SB CP Managing IP CS CS CS Delivering MP MP MP Describe the Plan the Plan the Accept Plan the Project Product Planning Production the Production Project Plan the Product Choose the Production approach Produce the Produce the Produce the Product Product Product Quality Quality Quality Control the Control the Control the Product Product Product Approve the Approve the Approve the Product Product Product Project Management training for the real world! 20
  • 21. Theme #4 PLANS TO FACILITATE COMMUNICATION AND CONTROL BY DEFINING THE MEANS OF DELIVERING THE PRODUCTS (THE WHERE AND HOW, BY WHOM, AND ESTIMATING THE WHEN AND HOW MUCH) M - 61 Project Management training for the real world! 21 21
  • 22. PRINCE2 ® - Plans Theme (Planning levels) Notes:  PRINCE2 emphasises that we need different levels of plan to cater for the needs of the different management levels.  A strong focus on “product based planning” is part of the PRINCE2 philosophy Corporate or programme plan Project Plan IP SB (Initiation) (Delivery) Exception Plans Stage Plan Stage Plans SU SB as necessary Team Plans MP © Crown Copyright 2009. Reproduced under Licence from OGC. Project Management training for the real world! 22
  • 23. Product Breakdown Structure (PBS)  PRINCE2 recommends the use of a PBS as a planning pre-requisite New Flight Booking System (fully Operational) Management Software Hardware Training products System PID Installed Flight User Manuals High Screen Booking Monitors System •Initiation stage End Administrator High Spec Stage Report Manuals Server •Stage plan [2] Booking Front- On-line Help End •End Stage Report [2] Application •Stage plan [3] Trained Front- line Desk Staff Booking Back- •End Stage Report [3] End Database •Stage plan [4] On-Line Help Docs •End Project Report External Management Product Gouping product product Project Management training for the real world! 23
  • 24. Flight Booking System Example – Product Flow Diagram (PFD)  PRINCE2 recommends the use of a PFD after a PBS has been created High Spec Server Booking Back- High Screen Stage 2 End Database Monitors Product Descriptions On-Line Help Docs Booking Front-End On-line Help Application Stage 3 User Manuals Product Descriptions Trained Front- Installed Flight line Desk Staff Booking System Stage 4 Product Administrator Descriptions Manuals New Flight Booking System (fully Operational) Project Management training for the real world! 24
  • 25. Theme #5 PROGRESS TO ESTABLISH MECHANISMS TO MONITOR ANDCOMPARE ACTUAL ACHIEVEMENTS AGAINST THOSE PLANNED; PROVIDE A FORECAST FOR THE PROJECT OBJECTIVES AND THE PROJECT;S CONTINUED VIABILITY; AND CONTROL AND UNACCEPTABLE DEVIATIONS M - 101 Project Management training for the real world! 25 25
  • 26. PRINCE2 ® - Progress Theme PRINCE2 recommends six areas of a project that need to be managed, controlled & tracked to ensure the project remains on track. These are depicted below: Costs Benefits Timescale Aspects of Project Performance Scope Quality Risk Project Management training for the real world! 26
  • 27. What we wish to control & where we document it Tolerance areas Project Stage Work Product Package Time +/- amounts of time on target Work Project Plan Stage Plan NA completion dates Package Cost +/- amounts of planned budget Work Project Plan Stage Plan NA Package Scope Permitted variation of the scope of a project solution, e.g. MoSCoW prioritization Work Project Plan Stage Plan NA of requirements (Must have, Should have, Package Could have, Won’t have’). Risk Limit on the aggregated value of threats (e.g. expected monetary value to remain less Risk Work than 10% of the plan’s budget); and Management Stage Plan NA Package Limit on any individual threat (e.g. any Strategy threat to operational service) Quality Defining quality targets in terms of ranges, Project Product e.g. a product that weighs 300g +/- 10g Product NA NA Description Description Benefits Defining target benefits in terms of ranges, e.g. to achieve minimum cost savings of Business NA NA NA 5% per branch, with an average of 7% Case across all branches Project Management training for the real world! 27
  • 28. Theme #6 RISK TO IDENTIFY, ASSESS AND CONTROL UNCERTAINTY AN, AS A RESULT, IMPROVE THE ABILITY OF THE PROJECT TO SUCCEED. M - 77 Project Management training for the real world! 28 28
  • 29. PRINCE2 ® - Risk Theme (Definitions) Risk: An uncertain event or set of events that, should it occur, will have an effect on the achievements of objectives. PRINCE2 defines two types of risks (“bad” and “good”): Risk “Threat”: ..can have a negative impact on objectives Risk “Opportunity”: ..can have a favourable impact on objectives Project Management training for the real world! 29
  • 30. PRINCE2 ® Risk responses Threat responses Opportunity responses Avoid Exploit Reduce (probability and/or impact) Risk Budget Fallback (reduces impact only) Enhance Sum of money set aside to Transfer fund specific (reduces impact only, and often only management the financial impact) responses to threats and opportunities Share Accept Reject © Crown Copyright 2009. Reproduced under Licence from OGC. Project Management training for the real world! 30
  • 31. Theme #7 CHANGE TO IDENTIFY, ASSESS AND CONTROL ANY POTENTIAL ANDAPPROVED CHANGES TO THE BASELINE. M - 91 Project Management training for the real world! 31 31
  • 32. PRINCE2 ® - Change Theme The PRINCE2 philosophy is not to prevent change (because this is unrealistic in the real world), but to control it and put in place proper controls so we do not end up with a run-away project. On a day-to-day basis, the Project Manager is responsible for managing change within the Controlling a Stage (CS) process. One of the key activities in the CS process is “Capture & examine Issues and Risks” which forms the entry point for managing change. Change is considered as a type of issue in PRINCE2 terms (see next slide). Escalate Report issues and risks highlights Controlling a Stage Take corrective Review stage action status Capture and examine issues and risks Receive Authorize Review Work completed Work Packages Package status Work Packages Project Management training for the real world! 32
  • 33. PRINCE2 ® Issue Types Issue types Definition Project Manager Project Board Request for change A proposal for a change • Capture • Approve to a baseline (including • Impact analysis (examine) • Reject baselined Product Descriptions). • Propose action • Defer decision • Present to the person or • Request more group who has the information competence to accept or • Ask for Exception Plan refuse the request for change Off-specification Errors or omissions • Capture • Grant a concession A product is, or will not • Impact analysis • Instruct that the off- be, delivered as specification be resolved described in the • Propose action Product Description. • Project Manager tries to • Defer decision handle inside stage • Request more tolerances information • If impossible: Exception • Ask for Exception Plan Report Problem/concern Any other issues • The Project Manager • Provide guidance resolves within • Ask for Exception Plan tolerances • If impossible: Exception Report Project Management training for the real world! 33