SlideShare a Scribd company logo
CHANGE
     CONTROL
MANAGEMENT IN
    PROJECTS
          TRAINING
[
TRAINING




                              OBJECTIVE
               To qualify students to understand that the change needed to evolve
               or even to survive is a prerequisite of the ultimate management
               technique and is one of the greatest difficulties in the business
               field.
               The organization needs to have their processes and their work
               team prepared and it needs to be mature enough to very fast
               adapt itself to the changes and ensure the success of its projects
               and operations.




           TRAINING CONTENT
               At the end of the course the student will be able to:

               ✓✓Identify the uncertainty areas of the project
               ✓✓Structure an integrated change control process
               ✓✓Get support to implement the integrated change process
               ✓✓Understand and minimize the resistance that comes from the
                 cultural aspects of the informality

               ✓✓Integrate the changes in project scope, schedule and quality
               ✓✓Structure the change control board (CCB)

                                                 © Macrosolutions SA. All rights reserved.   2/14
[
TRAINING




                         FACT SHEET
                                                                                DESCRIPTION

                                                           Course number of hours. The number of days depends
           COURSE DURATION
                                                           on the daily number of hours dedicated in each course.
           16 Hours.

                                                           The minimum number of students suggested to ensure
           NUMBER OF PARTICIPANTS
                                                           the training economic viability.
           Minimum 20 students per class.

           TARGET AUDIENCE
           Project managers, project team members, sponsors and others stakeholders interested in the
           project management process.

           REQUIREMENTS
           Project management knowledge.

                                                           The language in which the training is ministered.
           LANGUAGE(S)
           Portuguese and English.

           LOCAL
           Provided by the contractor. Worldwide attendance.

                                                           Closed classes are hired by a particular organization
           CLOSED CLASSES
                                                           or group. In this case all the participants are selected/
           (IN COMPANY)?                                   chosen by the contracting organization.
           Yes.

                                                           Open classes offer public access in which the
           OPEN CLASSES?
                                                           registration is done by each participant, individually.
           No.

                                                           Professional Development Units are the measuring
           CERTIFICATION AND PDU
                                                           units issued by the Project Management Institute for
           All training participants will receive a        the credential holders. With these units the credential
           participation certificate with 16 PMI’s PDUs.   holders can maintain their certifications.
           (PMI R.E.P. activity number: Macro017)



                                                                            © Macrosolutions SA. All rights reserved.   3/14
[
TRAINING




STANDARDS AND
METHODOLOGIES
                                              Project management standards and methodologies discussed
                                              and addressed in the training.


               Project Management Institute (PMI)                   UK Office of Government Commerce (OGC)

    PMBOK Guide                                              PRINCE2 (Projects in Controlled Environments)

    PMI Practice Standard for Estimating                 —   MSP (Managing Successful Programmes)                      —

    PMI Practice Standard for Earned Value Management    —   M_O_R (Management of Risks)                               —

    PMI Practice Standard for Configuration                  P3M3 (Portfolio, Programme, and Project
                                                                                                                       —
    Management                                               Management Maturity Model)

    PMI Practice Standard for Risk Management            —   P3O (Portfolio, Programme and Project Offices)            —

    PMI Practice Standard for Work Breakdown Structure   —   MoP (Management of Portfolios)                            —

    PMI Practice Standard for Scheduling                 —   MoV (Management of Value)                                 —

    PMI Standard for Portfolio Management                —
                                                                                  Scrum Alliance
    PMI Standard for Program Management                  —
                                                             Scrum Methodology
    PMI Project Manager Development Competency
                                                         —
    Framework
                                                               International Project Management Association (IPMA)
    Organizational Project Management Maturity Model
                                                         —   ICB® IPMA Competence Baseline
    (OPM3®)                                                                                                            —



                                                                                 © Macrosolutions SA. All rights reserved.   4/14
[
TRAINING




                 BASIC
              PROGRAM
    [
    COURSE OPENING


    [
    INTRODUCTION TO CHANGE MANAGEMENT
    ›› Understanding the nature and necessity of change
    ›› Influence of external and internal scenario
    ›› Recognizing the uncertainties
    ›› A question of survival

                                                          © Macrosolutions SA. All rights reserved.   5/14
[
TRAINING
BASIC PROGRAM




    [
    ORGANIZATIONAL PROCESSES
    ›› Organizational processes mapping
    ›› Maturity processes diagnosis
    ›› Maturity projects diagnosis


    [
    PLANNING AND IMPLEMENTING A PROJECT CHANGE MANAGEMENT
    ›› Cultural aspects
    ›› Analysis of the organizational strategy
    ›› Gap Analysis
    ›› The role of communication
    ›› The profile of the project implementers of change management
    ›› Organizational Support
    ›› Creating the plan for change management
    ›› Setting performance indicators
    ›› Implementing the project change management


    [
    OBSTACLES
    ›› Organization culture and defects
    ›› Market and competition
    ›› Communication
    ›› Risks


    [
    KEEPING THE ORGANIZATION ON TRACK
    ›› Lessons learned
    ›› Assessment of benefits
    ›› Implement and monitor continuous improvement


    [
    COURSE CLOSE-OUT

                                                                  © Macrosolutions SA. All rights reserved.   6/14
[
TRAINING




    MY COOKING
       PROJECT                                                                 ®


       EXERCISE
           Ricardo Vargas had the opportunity to learn very interesting
           dynamics that show the project management importance
           while studying in the Strategy and Innovation program at the
           Massachusetts Institute of Technology (MIT).
           During the classes, he developed a simple dynamic based on
           the elaboration of a quick dinner for guests to demonstrate
           the importance of establishing the appropriate strategies for
           managing the project and the inherent risks to every decision
           making and also to the manager risk profile.

                                          © Macrosolutions SA. All rights reserved.   7/14
[
TRAINING
MY COOKING PROJECT EXERCISE




                                                                                                                                                                                                                                                                                                            The dynamics is are performed in two hours with all participants.
                                                                                                                                                                                                                                                                                                            They were divided into groups, competing for the best performance
                                                                                                                                                                                                                                                                                                            seeking to understand the risks associated with each decision.


                                                                                                         Features                                                                                                                                                                                           1- Shows the influence of the RISK PROFILE of
                                                                                                                                                                                                                                                                                                            the project decision maker.
                                                                                                                                                                                                                                                                                                            2- Promotes TEAMWORK in the decision-
                                                                                                                                                                                                                                                                                                            making
                                                                                                                                                                                                                                                                                                            3- Evaluate the effectiveness of the duration
                                                                                                                                                                                                                                                                                                            COMPRESSION mechanisms.


                                                                                                                                                                                                                                                                                                                                           [     MY COOKING PROJECT®
                                                                                                                                                                                                                                                                                                                                                 MAPA DE RISCOS



      [     MY COOKING PROJECT®
            GRÁFICO DE GANTT
                                                                                                                                                                                                                                                                                                                                                                          CENÁRIO 01

                                                                                                                                  CENÁRIO 01                                                                                                        Tempo Total:
                                                                                                                                                                                                                                                                                                                                               ALTA




    0-2   2-4   4-6   6-8   8 - 10   10 - 12   12 - 14   14 - 16   16 - 18   18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74   74 - 76 76 - 78 78 - 80 80 - 82
                                                                                                                                                                                                                                                                                                                                         PROBABILIDADE
                                                                                                                                                                                                                                                                                                                                             MÉDIA
                                                                                                                                                                                                                                                                                                                                               BAIXA




                                                                                                                                                                                                                                                                                                                                                           BAIXO              MÉDIO                                   ALTO
                                                                                                                                                                                                                                                                                                                                                                             IMPACTO
    0-2   2-4   4-6   6-8   8 - 10   10 - 12   12 - 14   14 - 16   16 - 18   18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74   74 - 76 76 - 78 78 - 80 80 - 82




    0-2   2-4   4-6   6-8   8 - 10   10 - 12   12 - 14   14 - 16   16 - 18
                                                                                                                                 CENÁRIO 02                                                                                                         Tempo Total:
                                                                             18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74   74 - 76 76 - 78 78 - 80 80 - 82
                                                                                                                                                                                                                                                                                                                                                                          CENÁRIO 02
                                                                                                                                                                                                                                                                                                                                               ALTA
                                                                                                                                                                                                                                                                                                                                         PROBABILIDADE
                                                                                                                                                                                                                                                                                                                                             MÉDIA
                                                                                                                                                                                                                                                                                                                                               BAIXA




    0-2   2-4   4-6   6-8   8 - 10   10 - 12   12 - 14   14 - 16   16 - 18   18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74   74 - 76 76 - 78 78 - 80 80 - 82


                                                                                                                                                                                                                                           © 2010 Ricardo Viana Vargas. Todos direitos reservados. Reprodução Proibida.




                                                                                                                                                                                                                                                                                                                                                           BAIXO              MÉDIO                                   ALTO
                                                                                                                                                                                                                                                                                                                                                                             IMPACTO
                                                                                                                                                                                                                                                                                                                                                                                          © 2010 Ricardo Viana Vargas. Todos direitos reservados. Reprodução Proibida.




                                                                                                                                                                                                                                                                                                                                                                       © Macrosolutions SA. All rights reserved.                                                         8/14
[
TRAINING




    PMCOASTER                                                                    ®


      DYNAMIC
                       It is a dynamics developed to simulate the real
                       projects environment.
                       Divided into teams, the participants will plan and
                       execute the construction of a functional high speed
                       roller coaster prototype for a theme park.
                        Students will define the work, evaluate the project
           feasible budget and time in order to execute it. They will do so
           concerning the time and costs constraints. Then, students will
           execute and monitor the project to demonstrate the effectiveness
           of the plan in adverse conditions.
           The approximate duration of the dynamics is 2 hours and its main
           objective is to show the interrelationship between the scope
           required, deadlines and available budget. In addition, the aspects
           related to the teamwork quality are directly addressed.

                                            © Macrosolutions SA. All rights reserved.   9/14
[
TRAINING
PMCOASTER DYNAMIC




       Features     1- Shows the direct relationship between
                    project SCOPE, TIME and COSTS.
                    2- It highlights the importance of the
                    DECISION MAKING in resource-limited
                    settings.
                    3- Enables participants to understand the
                    mechanisms directly related to the creation of
                    the project schedule.




                                           © Macrosolutions SA. All rights reserved.   10/14
[
TRAINING




                                ADDITIONAL
                                 DYNAMICS
                                    As part of our methodology, in this course the following dynamics
                                    will be used:



    [
    CASE STUDIES
    › Ricardo Vargas and the Macrosolutions’ team have selected a relevant set of case studies and
      exercises that allow the participants to associate real and fictional cases the to daily work.
    › All case studies are appropriate to the nature of the client and the training audience.


    [
    VIDEOS SELECTION
    › In order to facilitate the student learning, videos that cover various parts of movies,
      commercials, home videos, etc. are used in the classroom environment to fix concepts and
      associate technical issues with the reality of work and also to introduce new concepts.
    › They are short videos with direct focus on specific topics, tools and cases.


    [
    GROUP WORK
    › Several studies and exercises will be proposed by the instructor in order to present a particular
      topic or discuss a particular approach to project management.
    › Throughout the training the teamwork will be encouraged and strengthened as a mean for the
      group to learn.

                                                                      © Macrosolutions SA. All rights reserved.   11/14
[
TRAINING




EXCLUSIVE STUDENT
     ACCESS AREA
                                                          In addition to the exclusive printed material,
                                                          all participants will have access to the
                                                          courseware’s electronic version, to the files
                                                          of exercises and to the work done in the
                                                          classroom.
                                                          The access is given through the restricted
                                                          site that is available and prepared by the
                                                          Macrosolutions team considering each
                                                          course that we provide. This initiative is a
                                                          pioneer in the educational market and also
                                                          anticipates trends related to the documents’
                                                          electronic management
    Student Area’s on the website macrosolutions.com.br

                                                                       © Macrosolutions SA. All rights reserved.   12/14
[
TRAINING




            REQUIRED
           EQUIPMENT
            The equipment required for the proper realization of the course is:




           [ HIGH RESOLUTION PROJECTOR (1024X768)


           [ SOUND SYSTEM FOR VIDEO DISPLAY


           [ INTERNET ACCESS


           [ VARIABLE ILLUMINATION INSIDE THE CLASSROOM


           [ 01 TABLE FOR EACH GROUP OF FIVE STUDENTS


           [ 01 FLIP CHART FOR EACH GROUP OF FIVE STUDENTS

                                              © Macrosolutions SA. All rights reserved.   13/14
[
TRAINING




         FURTHER
     INFORMATION
           For further information about this course, please contact:


           Phone: +55 31 3024-3003
           Fax: +55 31 3024-3005
           email: info@macrosolutions.com.br

                                            © Macrosolutions SA. All rights reserved.   14/14

More Related Content

What's hot

Macrosolutions Training: Project Procurement Management
Macrosolutions Training: Project Procurement ManagementMacrosolutions Training: Project Procurement Management
Macrosolutions Training: Project Procurement Management
Macrosolutions SA
 
Macrosolutions Training: Portfolio Management
Macrosolutions Training: Portfolio ManagementMacrosolutions Training: Portfolio Management
Macrosolutions Training: Portfolio Management
Macrosolutions SA
 
Macrosolutions Training: Project Human Resource Management and Project Leader...
Macrosolutions Training: Project Human Resource Management and Project Leader...Macrosolutions Training: Project Human Resource Management and Project Leader...
Macrosolutions Training: Project Human Resource Management and Project Leader...
Macrosolutions SA
 
Macrosolutions PMDome Workshop (en)
Macrosolutions PMDome Workshop (en)Macrosolutions PMDome Workshop (en)
Macrosolutions PMDome Workshop (en)
Macrosolutions SA
 
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions SA
 
Macrosolutions Training: Negotiation Techniques for Project Managers
Macrosolutions Training: Negotiation Techniques for Project ManagersMacrosolutions Training: Negotiation Techniques for Project Managers
Macrosolutions Training: Negotiation Techniques for Project Managers
Macrosolutions SA
 
Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2
Brian Phillips
 
Macrosolutions Training: Earned Value Analysis in projects
Macrosolutions Training: Earned Value Analysis in projectsMacrosolutions Training: Earned Value Analysis in projects
Macrosolutions Training: Earned Value Analysis in projects
Macrosolutions SA
 
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…
netmind
 
Macrosolutions Training: Project Communications Management
Macrosolutions Training: Project Communications ManagementMacrosolutions Training: Project Communications Management
Macrosolutions Training: Project Communications Management
Macrosolutions SA
 
Prince2 2009 & its benefits potifob stefan ondek
Prince2 2009 & its benefits   potifob stefan ondekPrince2 2009 & its benefits   potifob stefan ondek
Prince2 2009 & its benefits potifob stefan ondekLucie Budíková
 
Intl. pm standards prince2, pmi & co. - potifob 2011
Intl. pm standards   prince2, pmi & co. - potifob 2011Intl. pm standards   prince2, pmi & co. - potifob 2011
Intl. pm standards prince2, pmi & co. - potifob 2011
POTIFOB
 
P3 M3 Services 2v0 App
P3 M3 Services 2v0 AppP3 M3 Services 2v0 App
P3 M3 Services 2v0 App
AndyMurray
 
MPI Global Training Flyer Overwiew Programmes
MPI Global Training Flyer Overwiew ProgrammesMPI Global Training Flyer Overwiew Programmes
MPI Global Training Flyer Overwiew Programmes
Joyce Dogniez
 
P3M3 - Discovery Assessment
P3M3 - Discovery AssessmentP3M3 - Discovery Assessment
P3M3 - Discovery Assessment
Profeo
 
Prince2 2009 & its benefits
Prince2 2009 & its benefitsPrince2 2009 & its benefits
Prince2 2009 & its benefits
POTIFOB1
 
P3 m3 intro long
P3 m3 intro longP3 m3 intro long
P3 m3 intro long
Kadlaa
 
P3 m3 self_assess_project
P3 m3 self_assess_projectP3 m3 self_assess_project
P3 m3 self_assess_projectReferendo Org
 
Pdc capmhandbook
Pdc capmhandbookPdc capmhandbook
Pdc capmhandbookjohnlucy
 
Pdc pmphandbook
Pdc pmphandbookPdc pmphandbook
Pdc pmphandbookjohnlucy
 

What's hot (20)

Macrosolutions Training: Project Procurement Management
Macrosolutions Training: Project Procurement ManagementMacrosolutions Training: Project Procurement Management
Macrosolutions Training: Project Procurement Management
 
Macrosolutions Training: Portfolio Management
Macrosolutions Training: Portfolio ManagementMacrosolutions Training: Portfolio Management
Macrosolutions Training: Portfolio Management
 
Macrosolutions Training: Project Human Resource Management and Project Leader...
Macrosolutions Training: Project Human Resource Management and Project Leader...Macrosolutions Training: Project Human Resource Management and Project Leader...
Macrosolutions Training: Project Human Resource Management and Project Leader...
 
Macrosolutions PMDome Workshop (en)
Macrosolutions PMDome Workshop (en)Macrosolutions PMDome Workshop (en)
Macrosolutions PMDome Workshop (en)
 
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
 
Macrosolutions Training: Negotiation Techniques for Project Managers
Macrosolutions Training: Negotiation Techniques for Project ManagersMacrosolutions Training: Negotiation Techniques for Project Managers
Macrosolutions Training: Negotiation Techniques for Project Managers
 
Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2
 
Macrosolutions Training: Earned Value Analysis in projects
Macrosolutions Training: Earned Value Analysis in projectsMacrosolutions Training: Earned Value Analysis in projects
Macrosolutions Training: Earned Value Analysis in projects
 
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…
 
Macrosolutions Training: Project Communications Management
Macrosolutions Training: Project Communications ManagementMacrosolutions Training: Project Communications Management
Macrosolutions Training: Project Communications Management
 
Prince2 2009 & its benefits potifob stefan ondek
Prince2 2009 & its benefits   potifob stefan ondekPrince2 2009 & its benefits   potifob stefan ondek
Prince2 2009 & its benefits potifob stefan ondek
 
Intl. pm standards prince2, pmi & co. - potifob 2011
Intl. pm standards   prince2, pmi & co. - potifob 2011Intl. pm standards   prince2, pmi & co. - potifob 2011
Intl. pm standards prince2, pmi & co. - potifob 2011
 
P3 M3 Services 2v0 App
P3 M3 Services 2v0 AppP3 M3 Services 2v0 App
P3 M3 Services 2v0 App
 
MPI Global Training Flyer Overwiew Programmes
MPI Global Training Flyer Overwiew ProgrammesMPI Global Training Flyer Overwiew Programmes
MPI Global Training Flyer Overwiew Programmes
 
P3M3 - Discovery Assessment
P3M3 - Discovery AssessmentP3M3 - Discovery Assessment
P3M3 - Discovery Assessment
 
Prince2 2009 & its benefits
Prince2 2009 & its benefitsPrince2 2009 & its benefits
Prince2 2009 & its benefits
 
P3 m3 intro long
P3 m3 intro longP3 m3 intro long
P3 m3 intro long
 
P3 m3 self_assess_project
P3 m3 self_assess_projectP3 m3 self_assess_project
P3 m3 self_assess_project
 
Pdc capmhandbook
Pdc capmhandbookPdc capmhandbook
Pdc capmhandbook
 
Pdc pmphandbook
Pdc pmphandbookPdc pmphandbook
Pdc pmphandbook
 

Viewers also liked

Project management, get your projects in control
Project management, get your projects in controlProject management, get your projects in control
Project management, get your projects in control
Alexander Prins
 
Management control of projects
Management control of projectsManagement control of projects
Management control of projectsSai Mahesh
 
Alklar Project control and metrics
Alklar Project control and metricsAlklar Project control and metrics
Alklar Project control and metrics
Alexander Prins
 
Management Control of Projects
Management Control of ProjectsManagement Control of Projects
Management Control of ProjectsE P John
 
Project Management Control
Project Management ControlProject Management Control
Project Management Control
ahmad bassiouny
 
Management control systems jsb 606 part1
Management control systems jsb 606 part1Management control systems jsb 606 part1
Management control systems jsb 606 part1
Debasis Das
 
Ten Rules for Strategic Innovators - Vijay Govindarajan
Ten Rules for Strategic Innovators - Vijay GovindarajanTen Rules for Strategic Innovators - Vijay Govindarajan
Ten Rules for Strategic Innovators - Vijay Govindarajan
Innovation Excellence
 
Project control. Management
Project control. ManagementProject control. Management
Project control. Management
Marius Miron
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS
Akash Prasanna
 
Project control
Project controlProject control
Project control
monisha pattnaik
 
Management control system
Management control systemManagement control system
Management control system
Online
 
Management control system
Management control systemManagement control system
Management control system
Ankur Thakur
 

Viewers also liked (14)

Project management, get your projects in control
Project management, get your projects in controlProject management, get your projects in control
Project management, get your projects in control
 
Management control of projects
Management control of projectsManagement control of projects
Management control of projects
 
Alklar Project control and metrics
Alklar Project control and metricsAlklar Project control and metrics
Alklar Project control and metrics
 
Management Control of Projects
Management Control of ProjectsManagement Control of Projects
Management Control of Projects
 
Project management
Project managementProject management
Project management
 
Project Management Control
Project Management ControlProject Management Control
Project Management Control
 
Management control systems jsb 606 part1
Management control systems jsb 606 part1Management control systems jsb 606 part1
Management control systems jsb 606 part1
 
Ten Rules for Strategic Innovators - Vijay Govindarajan
Ten Rules for Strategic Innovators - Vijay GovindarajanTen Rules for Strategic Innovators - Vijay Govindarajan
Ten Rules for Strategic Innovators - Vijay Govindarajan
 
Project control. Management
Project control. ManagementProject control. Management
Project control. Management
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS
 
Project control
Project controlProject control
Project control
 
Project Control Process
Project Control ProcessProject Control Process
Project Control Process
 
Management control system
Management control systemManagement control system
Management control system
 
Management control system
Management control systemManagement control system
Management control system
 

Similar to Macrosolutions Training: Change Control Management in projects

Macrosolutions Training: PMO – Project Management Office
Macrosolutions Training: PMO – Project Management OfficeMacrosolutions Training: PMO – Project Management Office
Macrosolutions Training: PMO – Project Management Office
Macrosolutions SA
 
Macrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for ExecutivesMacrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for Executives
Macrosolutions SA
 
Training Catalog 0710
Training Catalog 0710Training Catalog 0710
Training Catalog 0710
olivierlazar
 
Macrosolutions Consulting Service: Coaching and Mentoring in Project Management
Macrosolutions Consulting Service: Coaching and Mentoring in Project ManagementMacrosolutions Consulting Service: Coaching and Mentoring in Project Management
Macrosolutions Consulting Service: Coaching and Mentoring in Project Management
Macrosolutions SA
 
Macrosolutions Consulting Service: Resources and Investment Optimization thro...
Macrosolutions Consulting Service: Resources and Investment Optimization thro...Macrosolutions Consulting Service: Resources and Investment Optimization thro...
Macrosolutions Consulting Service: Resources and Investment Optimization thro...
Macrosolutions SA
 
Macrosolutions Consulting Service: Development of Project Management Career Plan
Macrosolutions Consulting Service: Development of Project Management Career PlanMacrosolutions Consulting Service: Development of Project Management Career Plan
Macrosolutions Consulting Service: Development of Project Management Career Plan
Macrosolutions SA
 
Macrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and DiagnosisMacrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions SA
 
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
Macrosolutions SA
 
Project Management Credentials
Project Management CredentialsProject Management Credentials
Project Management Credentials
David Khaw, MBA, MPM, PMP, CPT, NS-NLP, CTC
 
Macrosolutions Consulting Service: Projects accelerated planning through the ...
Macrosolutions Consulting Service: Projects accelerated planning through the ...Macrosolutions Consulting Service: Projects accelerated planning through the ...
Macrosolutions Consulting Service: Projects accelerated planning through the ...
Macrosolutions SA
 
Macrosolutions Consulting Service: Structuring the Risks Management Processes
Macrosolutions Consulting Service: Structuring the Risks Management ProcessesMacrosolutions Consulting Service: Structuring the Risks Management Processes
Macrosolutions Consulting Service: Structuring the Risks Management Processes
Macrosolutions SA
 
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...
Macrosolutions SA
 
Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...
Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...
Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...
Macrosolutions SA
 
Pmp project management professional
Pmp   project management professionalPmp   project management professional
Pmp project management professional
Zabeel Institute
 
ilovepdf_ المحاضرة رقم 186 دكتور / اشرف حمدان بمشاركة الاستاذة /سارة سالم عنو...
ilovepdf_ المحاضرة رقم 186 دكتور / اشرف حمدان بمشاركة الاستاذة /سارة سالم عنو...ilovepdf_ المحاضرة رقم 186 دكتور / اشرف حمدان بمشاركة الاستاذة /سارة سالم عنو...
ilovepdf_ المحاضرة رقم 186 دكتور / اشرف حمدان بمشاركة الاستاذة /سارة سالم عنو...
Egyptian Engineers Association
 
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
Stefan Ondek, PMP, CSPM
 
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
Macrosolutions SA
 
Project Management, Pmi Perspective
Project Management, Pmi PerspectiveProject Management, Pmi Perspective
Project Management, Pmi Perspective
Urooj Muhammad khan, PMP, ITIL, CSM
 
Macrosolutions Consulting Service: Portfolio and Investment Management
Macrosolutions Consulting Service: Portfolio and Investment ManagementMacrosolutions Consulting Service: Portfolio and Investment Management
Macrosolutions Consulting Service: Portfolio and Investment Management
Macrosolutions SA
 
Certification brochure uk_v2
Certification brochure uk_v2Certification brochure uk_v2
Certification brochure uk_v2starpmoadmin
 

Similar to Macrosolutions Training: Change Control Management in projects (20)

Macrosolutions Training: PMO – Project Management Office
Macrosolutions Training: PMO – Project Management OfficeMacrosolutions Training: PMO – Project Management Office
Macrosolutions Training: PMO – Project Management Office
 
Macrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for ExecutivesMacrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for Executives
 
Training Catalog 0710
Training Catalog 0710Training Catalog 0710
Training Catalog 0710
 
Macrosolutions Consulting Service: Coaching and Mentoring in Project Management
Macrosolutions Consulting Service: Coaching and Mentoring in Project ManagementMacrosolutions Consulting Service: Coaching and Mentoring in Project Management
Macrosolutions Consulting Service: Coaching and Mentoring in Project Management
 
Macrosolutions Consulting Service: Resources and Investment Optimization thro...
Macrosolutions Consulting Service: Resources and Investment Optimization thro...Macrosolutions Consulting Service: Resources and Investment Optimization thro...
Macrosolutions Consulting Service: Resources and Investment Optimization thro...
 
Macrosolutions Consulting Service: Development of Project Management Career Plan
Macrosolutions Consulting Service: Development of Project Management Career PlanMacrosolutions Consulting Service: Development of Project Management Career Plan
Macrosolutions Consulting Service: Development of Project Management Career Plan
 
Macrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and DiagnosisMacrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
 
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
 
Project Management Credentials
Project Management CredentialsProject Management Credentials
Project Management Credentials
 
Macrosolutions Consulting Service: Projects accelerated planning through the ...
Macrosolutions Consulting Service: Projects accelerated planning through the ...Macrosolutions Consulting Service: Projects accelerated planning through the ...
Macrosolutions Consulting Service: Projects accelerated planning through the ...
 
Macrosolutions Consulting Service: Structuring the Risks Management Processes
Macrosolutions Consulting Service: Structuring the Risks Management ProcessesMacrosolutions Consulting Service: Structuring the Risks Management Processes
Macrosolutions Consulting Service: Structuring the Risks Management Processes
 
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...
 
Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...
Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...
Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...
 
Pmp project management professional
Pmp   project management professionalPmp   project management professional
Pmp project management professional
 
ilovepdf_ المحاضرة رقم 186 دكتور / اشرف حمدان بمشاركة الاستاذة /سارة سالم عنو...
ilovepdf_ المحاضرة رقم 186 دكتور / اشرف حمدان بمشاركة الاستاذة /سارة سالم عنو...ilovepdf_ المحاضرة رقم 186 دكتور / اشرف حمدان بمشاركة الاستاذة /سارة سالم عنو...
ilovepdf_ المحاضرة رقم 186 دكتور / اشرف حمدان بمشاركة الاستاذة /سارة سالم عنو...
 
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
 
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
 
Project Management, Pmi Perspective
Project Management, Pmi PerspectiveProject Management, Pmi Perspective
Project Management, Pmi Perspective
 
Macrosolutions Consulting Service: Portfolio and Investment Management
Macrosolutions Consulting Service: Portfolio and Investment ManagementMacrosolutions Consulting Service: Portfolio and Investment Management
Macrosolutions Consulting Service: Portfolio and Investment Management
 
Certification brochure uk_v2
Certification brochure uk_v2Certification brochure uk_v2
Certification brochure uk_v2
 

More from Macrosolutions SA

Portfólio Macrosolutions
Portfólio MacrosolutionsPortfólio Macrosolutions
Portfólio Macrosolutions
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Tempo em Projetos
Macrosolutions Treinamento: Gerenciamento de Tempo em ProjetosMacrosolutions Treinamento: Gerenciamento de Tempo em Projetos
Macrosolutions Treinamento: Gerenciamento de Tempo em Projetos
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento da Qualidade em Projetos
Macrosolutions Treinamento: Gerenciamento da Qualidade em ProjetosMacrosolutions Treinamento: Gerenciamento da Qualidade em Projetos
Macrosolutions Treinamento: Gerenciamento da Qualidade em Projetos
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...
Macrosolutions SA
 
Macrosolutions Treinamento: PMO – Project Management Office
Macrosolutions Treinamento: PMO – Project Management OfficeMacrosolutions Treinamento: PMO – Project Management Office
Macrosolutions Treinamento: PMO – Project Management Office
Macrosolutions SA
 
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de Projeto
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de ProjetoMacrosolutions Treinamento: Técnicas de Negociação para Gerentes de Projeto
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de Projeto
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Projetos para Executivos
Macrosolutions Treinamento: Gerenciamento de Projetos para ExecutivosMacrosolutions Treinamento: Gerenciamento de Projetos para Executivos
Macrosolutions Treinamento: Gerenciamento de Projetos para Executivos
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Riscos
Macrosolutions Treinamento: Gerenciamento de RiscosMacrosolutions Treinamento: Gerenciamento de Riscos
Macrosolutions Treinamento: Gerenciamento de Riscos
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Programas
Macrosolutions Treinamento: Gerenciamento de ProgramasMacrosolutions Treinamento: Gerenciamento de Programas
Macrosolutions Treinamento: Gerenciamento de Programas
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Portfólio
Macrosolutions Treinamento: Gerenciamento de PortfólioMacrosolutions Treinamento: Gerenciamento de Portfólio
Macrosolutions Treinamento: Gerenciamento de Portfólio
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetos
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetosMacrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetos
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetos
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Escopo em Projetos
Macrosolutions Treinamento: Gerenciamento de Escopo em ProjetosMacrosolutions Treinamento: Gerenciamento de Escopo em Projetos
Macrosolutions Treinamento: Gerenciamento de Escopo em Projetos
Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...
Macrosolutions SA
 

More from Macrosolutions SA (15)

Portfólio Macrosolutions
Portfólio MacrosolutionsPortfólio Macrosolutions
Portfólio Macrosolutions
 
Macrosolutions Treinamento: Gerenciamento de Tempo em Projetos
Macrosolutions Treinamento: Gerenciamento de Tempo em ProjetosMacrosolutions Treinamento: Gerenciamento de Tempo em Projetos
Macrosolutions Treinamento: Gerenciamento de Tempo em Projetos
 
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...
 
Macrosolutions Treinamento: Gerenciamento da Qualidade em Projetos
Macrosolutions Treinamento: Gerenciamento da Qualidade em ProjetosMacrosolutions Treinamento: Gerenciamento da Qualidade em Projetos
Macrosolutions Treinamento: Gerenciamento da Qualidade em Projetos
 
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...
 
Macrosolutions Treinamento: PMO – Project Management Office
Macrosolutions Treinamento: PMO – Project Management OfficeMacrosolutions Treinamento: PMO – Project Management Office
Macrosolutions Treinamento: PMO – Project Management Office
 
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de Projeto
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de ProjetoMacrosolutions Treinamento: Técnicas de Negociação para Gerentes de Projeto
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de Projeto
 
Macrosolutions Treinamento: Gerenciamento de Projetos para Executivos
Macrosolutions Treinamento: Gerenciamento de Projetos para ExecutivosMacrosolutions Treinamento: Gerenciamento de Projetos para Executivos
Macrosolutions Treinamento: Gerenciamento de Projetos para Executivos
 
Macrosolutions Treinamento: Gerenciamento de Riscos
Macrosolutions Treinamento: Gerenciamento de RiscosMacrosolutions Treinamento: Gerenciamento de Riscos
Macrosolutions Treinamento: Gerenciamento de Riscos
 
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...
 
Macrosolutions Treinamento: Gerenciamento de Programas
Macrosolutions Treinamento: Gerenciamento de ProgramasMacrosolutions Treinamento: Gerenciamento de Programas
Macrosolutions Treinamento: Gerenciamento de Programas
 
Macrosolutions Treinamento: Gerenciamento de Portfólio
Macrosolutions Treinamento: Gerenciamento de PortfólioMacrosolutions Treinamento: Gerenciamento de Portfólio
Macrosolutions Treinamento: Gerenciamento de Portfólio
 
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetos
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetosMacrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetos
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetos
 
Macrosolutions Treinamento: Gerenciamento de Escopo em Projetos
Macrosolutions Treinamento: Gerenciamento de Escopo em ProjetosMacrosolutions Treinamento: Gerenciamento de Escopo em Projetos
Macrosolutions Treinamento: Gerenciamento de Escopo em Projetos
 
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...
 

Recently uploaded

20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 

Recently uploaded (20)

20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 

Macrosolutions Training: Change Control Management in projects

  • 1. CHANGE CONTROL MANAGEMENT IN PROJECTS TRAINING
  • 2. [ TRAINING OBJECTIVE To qualify students to understand that the change needed to evolve or even to survive is a prerequisite of the ultimate management technique and is one of the greatest difficulties in the business field. The organization needs to have their processes and their work team prepared and it needs to be mature enough to very fast adapt itself to the changes and ensure the success of its projects and operations. TRAINING CONTENT At the end of the course the student will be able to: ✓✓Identify the uncertainty areas of the project ✓✓Structure an integrated change control process ✓✓Get support to implement the integrated change process ✓✓Understand and minimize the resistance that comes from the cultural aspects of the informality ✓✓Integrate the changes in project scope, schedule and quality ✓✓Structure the change control board (CCB) © Macrosolutions SA. All rights reserved. 2/14
  • 3. [ TRAINING FACT SHEET DESCRIPTION Course number of hours. The number of days depends COURSE DURATION on the daily number of hours dedicated in each course. 16 Hours. The minimum number of students suggested to ensure NUMBER OF PARTICIPANTS the training economic viability. Minimum 20 students per class. TARGET AUDIENCE Project managers, project team members, sponsors and others stakeholders interested in the project management process. REQUIREMENTS Project management knowledge. The language in which the training is ministered. LANGUAGE(S) Portuguese and English. LOCAL Provided by the contractor. Worldwide attendance. Closed classes are hired by a particular organization CLOSED CLASSES or group. In this case all the participants are selected/ (IN COMPANY)? chosen by the contracting organization. Yes. Open classes offer public access in which the OPEN CLASSES? registration is done by each participant, individually. No. Professional Development Units are the measuring CERTIFICATION AND PDU units issued by the Project Management Institute for All training participants will receive a the credential holders. With these units the credential participation certificate with 16 PMI’s PDUs. holders can maintain their certifications. (PMI R.E.P. activity number: Macro017) © Macrosolutions SA. All rights reserved. 3/14
  • 4. [ TRAINING STANDARDS AND METHODOLOGIES Project management standards and methodologies discussed and addressed in the training. Project Management Institute (PMI) UK Office of Government Commerce (OGC) PMBOK Guide PRINCE2 (Projects in Controlled Environments) PMI Practice Standard for Estimating — MSP (Managing Successful Programmes) — PMI Practice Standard for Earned Value Management — M_O_R (Management of Risks) — PMI Practice Standard for Configuration P3M3 (Portfolio, Programme, and Project — Management Management Maturity Model) PMI Practice Standard for Risk Management — P3O (Portfolio, Programme and Project Offices) — PMI Practice Standard for Work Breakdown Structure — MoP (Management of Portfolios) — PMI Practice Standard for Scheduling — MoV (Management of Value) — PMI Standard for Portfolio Management — Scrum Alliance PMI Standard for Program Management — Scrum Methodology PMI Project Manager Development Competency — Framework International Project Management Association (IPMA) Organizational Project Management Maturity Model — ICB® IPMA Competence Baseline (OPM3®) — © Macrosolutions SA. All rights reserved. 4/14
  • 5. [ TRAINING BASIC PROGRAM [ COURSE OPENING [ INTRODUCTION TO CHANGE MANAGEMENT ›› Understanding the nature and necessity of change ›› Influence of external and internal scenario ›› Recognizing the uncertainties ›› A question of survival © Macrosolutions SA. All rights reserved. 5/14
  • 6. [ TRAINING BASIC PROGRAM [ ORGANIZATIONAL PROCESSES ›› Organizational processes mapping ›› Maturity processes diagnosis ›› Maturity projects diagnosis [ PLANNING AND IMPLEMENTING A PROJECT CHANGE MANAGEMENT ›› Cultural aspects ›› Analysis of the organizational strategy ›› Gap Analysis ›› The role of communication ›› The profile of the project implementers of change management ›› Organizational Support ›› Creating the plan for change management ›› Setting performance indicators ›› Implementing the project change management [ OBSTACLES ›› Organization culture and defects ›› Market and competition ›› Communication ›› Risks [ KEEPING THE ORGANIZATION ON TRACK ›› Lessons learned ›› Assessment of benefits ›› Implement and monitor continuous improvement [ COURSE CLOSE-OUT © Macrosolutions SA. All rights reserved. 6/14
  • 7. [ TRAINING MY COOKING PROJECT ® EXERCISE Ricardo Vargas had the opportunity to learn very interesting dynamics that show the project management importance while studying in the Strategy and Innovation program at the Massachusetts Institute of Technology (MIT). During the classes, he developed a simple dynamic based on the elaboration of a quick dinner for guests to demonstrate the importance of establishing the appropriate strategies for managing the project and the inherent risks to every decision making and also to the manager risk profile. © Macrosolutions SA. All rights reserved. 7/14
  • 8. [ TRAINING MY COOKING PROJECT EXERCISE The dynamics is are performed in two hours with all participants. They were divided into groups, competing for the best performance seeking to understand the risks associated with each decision. Features 1- Shows the influence of the RISK PROFILE of the project decision maker. 2- Promotes TEAMWORK in the decision- making 3- Evaluate the effectiveness of the duration COMPRESSION mechanisms. [ MY COOKING PROJECT® MAPA DE RISCOS [ MY COOKING PROJECT® GRÁFICO DE GANTT CENÁRIO 01 CENÁRIO 01 Tempo Total: ALTA 0-2 2-4 4-6 6-8 8 - 10 10 - 12 12 - 14 14 - 16 16 - 18 18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74 74 - 76 76 - 78 78 - 80 80 - 82 PROBABILIDADE MÉDIA BAIXA BAIXO MÉDIO ALTO IMPACTO 0-2 2-4 4-6 6-8 8 - 10 10 - 12 12 - 14 14 - 16 16 - 18 18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74 74 - 76 76 - 78 78 - 80 80 - 82 0-2 2-4 4-6 6-8 8 - 10 10 - 12 12 - 14 14 - 16 16 - 18 CENÁRIO 02 Tempo Total: 18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74 74 - 76 76 - 78 78 - 80 80 - 82 CENÁRIO 02 ALTA PROBABILIDADE MÉDIA BAIXA 0-2 2-4 4-6 6-8 8 - 10 10 - 12 12 - 14 14 - 16 16 - 18 18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74 74 - 76 76 - 78 78 - 80 80 - 82 © 2010 Ricardo Viana Vargas. Todos direitos reservados. Reprodução Proibida. BAIXO MÉDIO ALTO IMPACTO © 2010 Ricardo Viana Vargas. Todos direitos reservados. Reprodução Proibida. © Macrosolutions SA. All rights reserved. 8/14
  • 9. [ TRAINING PMCOASTER ® DYNAMIC It is a dynamics developed to simulate the real projects environment. Divided into teams, the participants will plan and execute the construction of a functional high speed roller coaster prototype for a theme park. Students will define the work, evaluate the project feasible budget and time in order to execute it. They will do so concerning the time and costs constraints. Then, students will execute and monitor the project to demonstrate the effectiveness of the plan in adverse conditions. The approximate duration of the dynamics is 2 hours and its main objective is to show the interrelationship between the scope required, deadlines and available budget. In addition, the aspects related to the teamwork quality are directly addressed. © Macrosolutions SA. All rights reserved. 9/14
  • 10. [ TRAINING PMCOASTER DYNAMIC Features 1- Shows the direct relationship between project SCOPE, TIME and COSTS. 2- It highlights the importance of the DECISION MAKING in resource-limited settings. 3- Enables participants to understand the mechanisms directly related to the creation of the project schedule. © Macrosolutions SA. All rights reserved. 10/14
  • 11. [ TRAINING ADDITIONAL DYNAMICS As part of our methodology, in this course the following dynamics will be used: [ CASE STUDIES › Ricardo Vargas and the Macrosolutions’ team have selected a relevant set of case studies and exercises that allow the participants to associate real and fictional cases the to daily work. › All case studies are appropriate to the nature of the client and the training audience. [ VIDEOS SELECTION › In order to facilitate the student learning, videos that cover various parts of movies, commercials, home videos, etc. are used in the classroom environment to fix concepts and associate technical issues with the reality of work and also to introduce new concepts. › They are short videos with direct focus on specific topics, tools and cases. [ GROUP WORK › Several studies and exercises will be proposed by the instructor in order to present a particular topic or discuss a particular approach to project management. › Throughout the training the teamwork will be encouraged and strengthened as a mean for the group to learn. © Macrosolutions SA. All rights reserved. 11/14
  • 12. [ TRAINING EXCLUSIVE STUDENT ACCESS AREA In addition to the exclusive printed material, all participants will have access to the courseware’s electronic version, to the files of exercises and to the work done in the classroom. The access is given through the restricted site that is available and prepared by the Macrosolutions team considering each course that we provide. This initiative is a pioneer in the educational market and also anticipates trends related to the documents’ electronic management Student Area’s on the website macrosolutions.com.br © Macrosolutions SA. All rights reserved. 12/14
  • 13. [ TRAINING REQUIRED EQUIPMENT The equipment required for the proper realization of the course is: [ HIGH RESOLUTION PROJECTOR (1024X768) [ SOUND SYSTEM FOR VIDEO DISPLAY [ INTERNET ACCESS [ VARIABLE ILLUMINATION INSIDE THE CLASSROOM [ 01 TABLE FOR EACH GROUP OF FIVE STUDENTS [ 01 FLIP CHART FOR EACH GROUP OF FIVE STUDENTS © Macrosolutions SA. All rights reserved. 13/14
  • 14. [ TRAINING FURTHER INFORMATION For further information about this course, please contact: Phone: +55 31 3024-3003 Fax: +55 31 3024-3005 email: info@macrosolutions.com.br © Macrosolutions SA. All rights reserved. 14/14