SEMINAR
Vandana Thakur
M.Sc. Nursing 1st
year
Principles of
Assessment, formative
and Summative
Assessment, Internal and
External Assessment
Outlines
Introduction of Assessment.
Definitions of Assessment.
Purposes of Assessment.
Characteristics of Assessment.
Principles of Assessment.
Functions of Assessment.
Formative Assessment.
Summative Assessment.
Internal Assessment.
External Assessment.
Objectives
• To introduce the topic.
• To define the topic.
• To explain the purposes and characteristics
• To describe the principles of assessment.
• To illustrate the functions
• To describe the formative and summative
assessment.
• To discuss the internal and external assessment.
Assessment
The word ‘assess’ comes from the Latin
verb ‘assidere’ meaning ‘to sit with’.
Assessment is a systematic process of
gathering, interpreting, and acting
upon data related to student learning
and experience for the purpose of
developing a deep understanding of
what students know, understand, and
can do with their knowledge as a result
of their educational experience.
Definitions
Assessment in education is the process of
gathering, interpreting, recording, and using
information about pupils’ responses to an
educational task. (Harlen, Gipps, Broadfoot,
Nuttal,1992)
Evaluation means the systematic examination of
events occurring and consequent on a contemporary
programme.
Cronbach et al(1980)
Evaluation is an act or a dynamic process that
allows one to make a judgment about the
desirability or value of a measure.
Evaluation is essential and never ending process or
cycle of formulating goals, measuring the progress
towards them and determining the new goals which
emerge as a result of new warning.
Chlara M. Brown
Evaluation is a process wherein the parts, processes
or outcomes of a programme are examined to see
whether they are satisfactory with reference to the
stated objectives of the programme.
Tuckman(1975)
Purposes of evaluation
To make provision for guiding the growth
of individual pupils.
To diagnose the weakness and strength of
pupils.
To locate areas where remedial measures
are needed.
To provide basis for a modification of the
curriculum and course.
To motivate pupils towards better
attainment and growth.
To test the efficiency of teachers in
providing learning experiences and the
effectiveness of instruction and classroom
activities.
To improve instruction.
For guidance and counseling services.
For the purpose of promotions to the
student.
To provide basis for the introduction of
experiences and to meet the needs of
individuals and group of pupil.
For reporting students progress to their
parents.
For the purpose of selecting students for
employment.
For the awards of scholarship and merit
awards.
To certify that a student has achieved a
particular level of performance.
Characteristics
Evaluation is a continuous
process.
Evaluation includes
academic and non-academic
subjects
Discovering the needs of an
individual and designing
learning experiences
Evaluation is purpose
oriented.
Evaluation is a procedure
for improving the product.
Principles of Evaluation
Clearly specifying what is to be evaluated
has priority in the evaluation process.
An evaluation technique should be selected
in terms of its relevance to the
characteristics of performance to be
measured.
Comprehensive evaluation requires a
variety of evaluation techniques.
Contiiii
Proper use of evaluation techniques
requires an awareness of their
limitations.
Evaluation is a means to an end, not an
end in itself.
Evaluation technique should be selected
according to purpose served.
FUNCTIONS OF EVALUATION
Functions related to instructional process
Measurement functions.
Diagnostic function.
Guidance and Remediation.
Motivating function.
Assessment of the final output.
Classification and placement.
Diagnosis, prediction and selection.
Functions related to
total education
system
Improvement of inputs and process of
education.
Maximization of output.
Values and Attitudes about Assessment
1. Teachers value and believe in students.
2. Sharing learning goals with the
students.
3. Involving students in self-assessment.
4. Providing feedback that helps students
recognize their next steps and how to
take them.
5. Being confident that every student can
improve.
6. Providing students with examples of
what we expect from them.
Factors Inhibiting Assessment
A tendency for teachers to assess quantity and
presentation of work rather than quality of
learning.
Greater attention given to marking and
grading, much of it tending to lower self esteem
of students, rather than providing advice for
improvement.
A strong emphasis on comparing students with
each other, which demoralizes the less successful
learners.
Implications for classroom practice
Share learning goals with students.
Involve students in self-assessment.
Provide feedback that helps students recognize
their next steps and how to take them.
Be confident that every student can improve.
TYPES
Assessment
Formative Assessment
• formative evaluation is used
to monitor learning progress
during instruction and to
provide continuous feedback
to both pupil and teacher
regarding learning success
and failures.
• Taken at varying intervals
throughout a course to
provide information and
feedback that will help
improve.
Definitions
It is conducted to monitor the instructional
process to determine whether learning is taking
place as planned.
R.L. Ebel and D.A. Frishac 1986
It is concerned with judgment made during the
design and development of a program which are
directed towards modifying, forming, or otherwise
improving the program before it is completed.
A.J. Nitke 1983
Formative evaluation occurs over a period of time
and monitors student’s progress.
Characteristics of Formative
Assessment
Provides the students with on his progress or
gain.
Must be continuous starts with comment of
program until the time be complete it.
Informs students about extent of learning needs
to reach the education adjective.
Enables learning activities to be adjusted in
accordance with progress made or lack of it.
Useful in guiding the students and
prompting him to ask for help.
It is carried out frequently whenever
the student/teacher feels it as
necessary.
Provides teacher with qualitative and
quantitative data for modification of his
teaching.
Activities of formative
assessment
•Day to day
observation
Experiment or practical
Activity
Project
Assignment
Self Study
Questions and Answers
Home wok Exercises
Simulations
Conferencing
STRATEGIES USED IN FORMATIVE
ASSESSMENT
Criteria and goal setting
Observations
Questioning strategies
Self and peer assessment
Student record keeping
Key Elements of Formative Assessment
1. The identification by teachers & learners of
learning goals, intentions or outcomes and criteria
for achieving these.
2. Rich conversations between teachers & students
that continually build and go deeper.
3. The provision of effective, timely feedback to
enable students to advance their learning.
4. The active involvement of students in their own
learning.
5. Teachers responding to identified learning needs
and strengths by modifying their teaching
approaches.
Black & William, 1998
Summative Assessment
• Its designed to determine the extent to
which the instructional objectives have
been achieved and is used primarily for
assigning course grades or certifying
pupil mastery of the intended learning
outcomes.
• Generally taken by students at the end
of a unit or semester to demonstrate
the "sum" of what they have or have
not learned.
• "Good summative assessments--must
be demonstrably reliable, valid, and
free of bias“.
Definitions
Summative evaluation describes judgment about
the merits of an already completed program.
Term summative refers to assigning a grade for
student’s achievement at the end of a term, course
or instructional program.
To conduct at the end of instructional segment to
determine if learning is suffer complete to warrant
moving the learner to the next segment of
instruction.
Characteristics of summative
evaluation
Certifying evaluation is designed to develop
competent personal from practicing.
To place students in order of merit.
Justifies the discussion as to whether they should
more up to the next class or be awarded a degree
or diploma.
Carried out less frequently at the end of a period
of instruction.
Types of Summative Assessment
Attendance
Performance
Written product
Unseen examination
Seen examination
Open Book Examination
Multiple choice tests
Essay or report
Test
Standardized test
Types of Summative
Assessment
Oral product
Dissertation
Presentation
Portfolio
Difference between
formative and summative
assessment
Formative
•‘… often means no more
than that the assessment is
carried out frequently and is
planned at the same time as
teaching.’ (Black and Wiliam,
1999)
•‘… provides feedback which
leads to students recognizing
the (learning) gap and
closing it (Harlen, 1998)
•‘ … includes both feedback
and self-monitoring.’
(Sadler, 1989)
•‘… is used essentially to feed
back into the teaching and
learning process.’ (Tunstall
and Gipps, 1996)
Summative
•‘…assessment (that) has
increasingly been used to sum
up learning…’(Black and
Wiliam, 1999)
•‘… looks at past achievements
… adds procedures or tests to
existing work
• … is separated from teaching
… is carried out at intervals
when achievement has to be
summarized and reported.’
(Harlen, 1998)
Definition:
• Internal assessment refers to the process
evaluating students or staffs by the people who
govern it.
• No external authority or office is liable to
interfere with the test given to the members of
the institution. The only governing body is the
head of the institution.
Need for internal assessment
To give credit in final assessment.
To reduce tension associated with final
examination.
To provide link for feedback in teaching.
To evaluate sphere of activity this cannot be
alone through public exam.
To provide opportunity to the teacher to evaluate
his/her students.
To induce students for continue learning.
Basic principles of internal
assessment
Should be continuous and made by subject
teacher, it does not replace exam.
It uses suitable evaluation tools and techniques.
Fix proportion of marks according to hours of
instructions and importance of subject to
nursing.
Used as a feedback to improve teaching.
Students should know their internal assessment
marks before their final exams.
Give opportunity to students to improve their
internal assessment grade by additional tests,
assignments etc.
Results must be studied statistically.
Improve a number of components.
Procedure for internal
assessment
Internal assessment should be
comprehensive evaluating all the aspects
of student’s growth. Eg- academic
achievement, personality traits etc.
Internal assessment should be kept
separately.
Through internal assessment teachers
can change attitude of students favorable
towards day to day program.
Internal assessment should be objective,
unbiased and based on all the records of
unit test, practical tests, home work, class
work, observational scales and
inventories, participation in group
project etc.
Components of internal assessment
• Subject wise
assessment.
• Assessment of
co curricular
activities.
• Assessment of
personality
traits.
Validity of internal assessment
The tool of internal assessment is very powerful
if objectively and free from bias.
It becomes invalid if the teacher is biased has
prejudice against a particular pupil.
Advantages
No undue weight age is given to annual or external
exams.
Students will be engaged in study throughout the
year.
They will be more regular, alert and science in
students.
Eleventh hour preparation in exams will be
reduced to minimum.
Internal assessment helps to reduce anxiety and
prevent nervous breakdown in students.
Disadvantages
A teacher may misuse it.
It can cause a great harm in the hands of an
inexperienced, insincere teacher.
It will lose its validity if favourism, personal
prejudice and subjectivity.
 
EXTERNAL ASSESSMENT
Definition
An evaluation carried out by evaluators
external to the entity evaluated.
An evaluation which is performed by
persons outside the organization
responsible for the intervention itself.
 
Importance/objectives of
external assessment
Degree/certificate
A standard.
To make distinguish.
Comparison of abilities.
To evaluate the progress.
Selection for higher education.
To get employment.
Popularity/standard of educational
institution.
Selection of intelligent students.
Competition.
Evaluation of teacher’s performance.
Evaluation of objectives and curriculum.
Creation of good habits in students.
Satisfaction and happiness of parents.
Classification of results
50 % pass in each of the theory and practical
separately.
50-59 % second division.
60-74% first division.
75 % and above is distinction.
For declaring the rank aggregate of 2 years
marks to be considered.
Regulations for
examination
Process of external
assessment
Selection of paper setters and reviewers.
Setting and moderation of question papers.
Printing and packing of question papers
confidential nature of printing work.
Selection of examination centers.
Appointments of superintendants and
invigilators and staff for the fair conduct of
examination at centres.
Supply of stationary to centres.
Distributing of question papers to examinees under
the supervision of the centre’s superintendents.
Posting of police personnel at the centres.
Packing of scripts and sending them to board’s
office or examining body office.
Deployment of special squads for checking unfair
means.
Assignment of fake of fictitious or secret roll
numbers to answer books at the board’s office.
Examination scheme
Minimum marks shall be 50 % in each of the
theory and practical papers separately.
A candidate must have minimum of 80%
attendance in theory and practical in each subject
for appearing for examination.
A candidate has to pass in theory and practical
exam separately in each of the paper.
Contiiii
If a candidate fails in either theory or practical
paper he/she has to reappear for both the
papers.
All practical examination must be held in the
respective clinical areas.
One internal and external examiner should
jointly conduct practical examination for each
student.
Advantages
A person will be able to know his/her performance
and knowledge.
For most people exam may encourage them to work
and learn.
It can create competition which pushes the
competitioners to do their best.
It helps in developing one’s own personality and
confidence.
If a person passes the exam and got good result, it
helps to get a scholarship which will bring to have a
good job.
Demerits
• Use of unfair means in examination hall.
• Just pass the exam to get degree.
• Partial curriculum is covered.
• In complete evaluation of personality.
• Unreliable results.
• Use of helping books and guess papers.
Contiii
• Chance/luck.
• Corruption
• Exams without specific objectives.
• Negative effect/impact on the students.
• No attention over research.
• It is time consuming.
• Pet questions are respected.
• Standards vary from board to board and
universities in the same year.
Contiiiii
• Marking is not up to the standard.
• For same people, exams make them
stress. This is because there too much
pressure of their parents and teachers.
• During the exam a person may also have
problems with questions.
Assessment
Assessment

Assessment

  • 1.
  • 3.
    Principles of Assessment, formative andSummative Assessment, Internal and External Assessment
  • 4.
    Outlines Introduction of Assessment. Definitionsof Assessment. Purposes of Assessment. Characteristics of Assessment. Principles of Assessment. Functions of Assessment. Formative Assessment. Summative Assessment. Internal Assessment. External Assessment.
  • 5.
    Objectives • To introducethe topic. • To define the topic. • To explain the purposes and characteristics • To describe the principles of assessment. • To illustrate the functions • To describe the formative and summative assessment. • To discuss the internal and external assessment.
  • 6.
    Assessment The word ‘assess’comes from the Latin verb ‘assidere’ meaning ‘to sit with’. Assessment is a systematic process of gathering, interpreting, and acting upon data related to student learning and experience for the purpose of developing a deep understanding of what students know, understand, and can do with their knowledge as a result of their educational experience.
  • 7.
    Definitions Assessment in educationis the process of gathering, interpreting, recording, and using information about pupils’ responses to an educational task. (Harlen, Gipps, Broadfoot, Nuttal,1992) Evaluation means the systematic examination of events occurring and consequent on a contemporary programme. Cronbach et al(1980)
  • 8.
    Evaluation is anact or a dynamic process that allows one to make a judgment about the desirability or value of a measure. Evaluation is essential and never ending process or cycle of formulating goals, measuring the progress towards them and determining the new goals which emerge as a result of new warning. Chlara M. Brown Evaluation is a process wherein the parts, processes or outcomes of a programme are examined to see whether they are satisfactory with reference to the stated objectives of the programme. Tuckman(1975)
  • 9.
    Purposes of evaluation Tomake provision for guiding the growth of individual pupils. To diagnose the weakness and strength of pupils. To locate areas where remedial measures are needed. To provide basis for a modification of the curriculum and course.
  • 10.
    To motivate pupilstowards better attainment and growth. To test the efficiency of teachers in providing learning experiences and the effectiveness of instruction and classroom activities. To improve instruction. For guidance and counseling services. For the purpose of promotions to the student.
  • 11.
    To provide basisfor the introduction of experiences and to meet the needs of individuals and group of pupil. For reporting students progress to their parents. For the purpose of selecting students for employment. For the awards of scholarship and merit awards. To certify that a student has achieved a particular level of performance.
  • 12.
    Characteristics Evaluation is acontinuous process. Evaluation includes academic and non-academic subjects Discovering the needs of an individual and designing learning experiences Evaluation is purpose oriented. Evaluation is a procedure for improving the product.
  • 13.
    Principles of Evaluation Clearlyspecifying what is to be evaluated has priority in the evaluation process. An evaluation technique should be selected in terms of its relevance to the characteristics of performance to be measured. Comprehensive evaluation requires a variety of evaluation techniques.
  • 14.
    Contiiii Proper use ofevaluation techniques requires an awareness of their limitations. Evaluation is a means to an end, not an end in itself. Evaluation technique should be selected according to purpose served.
  • 15.
    FUNCTIONS OF EVALUATION Functionsrelated to instructional process Measurement functions. Diagnostic function. Guidance and Remediation. Motivating function. Assessment of the final output. Classification and placement. Diagnosis, prediction and selection.
  • 16.
    Functions related to totaleducation system Improvement of inputs and process of education. Maximization of output.
  • 17.
    Values and Attitudesabout Assessment 1. Teachers value and believe in students. 2. Sharing learning goals with the students. 3. Involving students in self-assessment. 4. Providing feedback that helps students recognize their next steps and how to take them. 5. Being confident that every student can improve. 6. Providing students with examples of what we expect from them.
  • 18.
    Factors Inhibiting Assessment Atendency for teachers to assess quantity and presentation of work rather than quality of learning. Greater attention given to marking and grading, much of it tending to lower self esteem of students, rather than providing advice for improvement. A strong emphasis on comparing students with each other, which demoralizes the less successful learners.
  • 19.
    Implications for classroompractice Share learning goals with students. Involve students in self-assessment. Provide feedback that helps students recognize their next steps and how to take them. Be confident that every student can improve.
  • 20.
  • 21.
    Formative Assessment • formativeevaluation is used to monitor learning progress during instruction and to provide continuous feedback to both pupil and teacher regarding learning success and failures. • Taken at varying intervals throughout a course to provide information and feedback that will help improve.
  • 22.
    Definitions It is conductedto monitor the instructional process to determine whether learning is taking place as planned. R.L. Ebel and D.A. Frishac 1986
  • 23.
    It is concernedwith judgment made during the design and development of a program which are directed towards modifying, forming, or otherwise improving the program before it is completed. A.J. Nitke 1983 Formative evaluation occurs over a period of time and monitors student’s progress.
  • 24.
    Characteristics of Formative Assessment Providesthe students with on his progress or gain. Must be continuous starts with comment of program until the time be complete it. Informs students about extent of learning needs to reach the education adjective. Enables learning activities to be adjusted in accordance with progress made or lack of it.
  • 25.
    Useful in guidingthe students and prompting him to ask for help. It is carried out frequently whenever the student/teacher feels it as necessary. Provides teacher with qualitative and quantitative data for modification of his teaching.
  • 26.
  • 27.
  • 28.
  • 29.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
    STRATEGIES USED INFORMATIVE ASSESSMENT Criteria and goal setting Observations Questioning strategies Self and peer assessment Student record keeping
  • 38.
    Key Elements ofFormative Assessment 1. The identification by teachers & learners of learning goals, intentions or outcomes and criteria for achieving these. 2. Rich conversations between teachers & students that continually build and go deeper. 3. The provision of effective, timely feedback to enable students to advance their learning. 4. The active involvement of students in their own learning. 5. Teachers responding to identified learning needs and strengths by modifying their teaching approaches. Black & William, 1998
  • 39.
    Summative Assessment • Itsdesigned to determine the extent to which the instructional objectives have been achieved and is used primarily for assigning course grades or certifying pupil mastery of the intended learning outcomes. • Generally taken by students at the end of a unit or semester to demonstrate the "sum" of what they have or have not learned. • "Good summative assessments--must be demonstrably reliable, valid, and free of bias“.
  • 40.
    Definitions Summative evaluation describesjudgment about the merits of an already completed program. Term summative refers to assigning a grade for student’s achievement at the end of a term, course or instructional program. To conduct at the end of instructional segment to determine if learning is suffer complete to warrant moving the learner to the next segment of instruction.
  • 41.
    Characteristics of summative evaluation Certifyingevaluation is designed to develop competent personal from practicing. To place students in order of merit. Justifies the discussion as to whether they should more up to the next class or be awarded a degree or diploma. Carried out less frequently at the end of a period of instruction.
  • 42.
    Types of SummativeAssessment Attendance Performance Written product Unseen examination Seen examination Open Book Examination Multiple choice tests Essay or report Test Standardized test
  • 43.
    Types of Summative Assessment Oralproduct Dissertation Presentation Portfolio
  • 44.
  • 45.
    Formative •‘… often meansno more than that the assessment is carried out frequently and is planned at the same time as teaching.’ (Black and Wiliam, 1999) •‘… provides feedback which leads to students recognizing the (learning) gap and closing it (Harlen, 1998) •‘ … includes both feedback and self-monitoring.’ (Sadler, 1989) •‘… is used essentially to feed back into the teaching and learning process.’ (Tunstall and Gipps, 1996) Summative •‘…assessment (that) has increasingly been used to sum up learning…’(Black and Wiliam, 1999) •‘… looks at past achievements … adds procedures or tests to existing work • … is separated from teaching … is carried out at intervals when achievement has to be summarized and reported.’ (Harlen, 1998)
  • 48.
    Definition: • Internal assessmentrefers to the process evaluating students or staffs by the people who govern it. • No external authority or office is liable to interfere with the test given to the members of the institution. The only governing body is the head of the institution.
  • 49.
    Need for internalassessment To give credit in final assessment. To reduce tension associated with final examination. To provide link for feedback in teaching. To evaluate sphere of activity this cannot be alone through public exam. To provide opportunity to the teacher to evaluate his/her students. To induce students for continue learning.
  • 50.
    Basic principles ofinternal assessment Should be continuous and made by subject teacher, it does not replace exam. It uses suitable evaluation tools and techniques. Fix proportion of marks according to hours of instructions and importance of subject to nursing. Used as a feedback to improve teaching.
  • 51.
    Students should knowtheir internal assessment marks before their final exams. Give opportunity to students to improve their internal assessment grade by additional tests, assignments etc. Results must be studied statistically. Improve a number of components.
  • 52.
    Procedure for internal assessment Internalassessment should be comprehensive evaluating all the aspects of student’s growth. Eg- academic achievement, personality traits etc. Internal assessment should be kept separately.
  • 53.
    Through internal assessmentteachers can change attitude of students favorable towards day to day program. Internal assessment should be objective, unbiased and based on all the records of unit test, practical tests, home work, class work, observational scales and inventories, participation in group project etc.
  • 54.
    Components of internalassessment • Subject wise assessment. • Assessment of co curricular activities. • Assessment of personality traits.
  • 55.
    Validity of internalassessment The tool of internal assessment is very powerful if objectively and free from bias. It becomes invalid if the teacher is biased has prejudice against a particular pupil.
  • 56.
    Advantages No undue weightage is given to annual or external exams. Students will be engaged in study throughout the year. They will be more regular, alert and science in students. Eleventh hour preparation in exams will be reduced to minimum. Internal assessment helps to reduce anxiety and prevent nervous breakdown in students.
  • 57.
    Disadvantages A teacher maymisuse it. It can cause a great harm in the hands of an inexperienced, insincere teacher. It will lose its validity if favourism, personal prejudice and subjectivity.
  • 58.
  • 59.
    Definition An evaluation carriedout by evaluators external to the entity evaluated. An evaluation which is performed by persons outside the organization responsible for the intervention itself.
  • 60.
      Importance/objectives of external assessment Degree/certificate Astandard. To make distinguish. Comparison of abilities. To evaluate the progress. Selection for higher education. To get employment.
  • 61.
    Popularity/standard of educational institution. Selectionof intelligent students. Competition. Evaluation of teacher’s performance. Evaluation of objectives and curriculum. Creation of good habits in students. Satisfaction and happiness of parents.
  • 62.
    Classification of results 50% pass in each of the theory and practical separately. 50-59 % second division. 60-74% first division. 75 % and above is distinction. For declaring the rank aggregate of 2 years marks to be considered.
  • 63.
  • 64.
    Process of external assessment Selectionof paper setters and reviewers. Setting and moderation of question papers. Printing and packing of question papers confidential nature of printing work. Selection of examination centers. Appointments of superintendants and invigilators and staff for the fair conduct of examination at centres.
  • 65.
    Supply of stationaryto centres. Distributing of question papers to examinees under the supervision of the centre’s superintendents. Posting of police personnel at the centres. Packing of scripts and sending them to board’s office or examining body office. Deployment of special squads for checking unfair means. Assignment of fake of fictitious or secret roll numbers to answer books at the board’s office.
  • 66.
    Examination scheme Minimum marksshall be 50 % in each of the theory and practical papers separately. A candidate must have minimum of 80% attendance in theory and practical in each subject for appearing for examination. A candidate has to pass in theory and practical exam separately in each of the paper.
  • 67.
    Contiiii If a candidatefails in either theory or practical paper he/she has to reappear for both the papers. All practical examination must be held in the respective clinical areas. One internal and external examiner should jointly conduct practical examination for each student.
  • 68.
    Advantages A person willbe able to know his/her performance and knowledge. For most people exam may encourage them to work and learn. It can create competition which pushes the competitioners to do their best. It helps in developing one’s own personality and confidence. If a person passes the exam and got good result, it helps to get a scholarship which will bring to have a good job.
  • 69.
    Demerits • Use ofunfair means in examination hall. • Just pass the exam to get degree. • Partial curriculum is covered. • In complete evaluation of personality. • Unreliable results. • Use of helping books and guess papers.
  • 70.
    Contiii • Chance/luck. • Corruption •Exams without specific objectives. • Negative effect/impact on the students. • No attention over research. • It is time consuming. • Pet questions are respected. • Standards vary from board to board and universities in the same year.
  • 71.
    Contiiiii • Marking isnot up to the standard. • For same people, exams make them stress. This is because there too much pressure of their parents and teachers. • During the exam a person may also have problems with questions.