Supervisory Role | Technical Operations – Electrical | Metal/Oil & Gas/Refinery Sector
PROFESSIONAL SUMMARY
 A dedicated professional with over 10 years of experience in maintenance operation, technical services,
project coordination and people management.
 A Diploma in Electrical Engineering; currently associated with Union Copper Rod Factory LLC, Abu
Dhabi, UAE as Electrical Technician.
 A systematic, organised & hardworking individual with an attitude to excel & backed with practical
experience.
 Hands on experience in maintenance & troubleshooting operations, erection & commissioning and repairing.
 Experience in achieving goals of operational satisfaction, cost control and attaining profitability.
 Exposure to managing processes & procedures and compliance & quality.
 Effective communicator with skills in troubleshooting, team building and planning & managing resources.
 Exposure to managing operations of equipments, reducing downtime and enhancing operational
effectiveness.
 Attributes: Honesty, hardworking, positive attitude and perseverance.
 Adept in:
Planning Erection & commissioning Troubleshooting & maintenance
Process management Project management Team management
CAREER PATH
Maaden Aluminium Company, Ras Al-Khair, KSA Jan 2014 to till date
Electrical technician
 Prepare and maintain all electrical documents like SWI, LTV etc.
 Prepare isolation procedures and level 2 isolations.
 Doing all PM and CM of all electrical equipment’s like motors, VSD, MCC etc.
 Doing maintenance and level 2 HV isolation of ESP (electrostatic precipitator).
 Working with commissioning and start up team for refinery project activity.
 Commissioning and erection of alumina refinery Whiteside like precipitation and calcination.
 Doing all activity of commissioning activity like punch list rising, punch list clearing, walk downs etc.
 Prepare work permits, JSA, TAKE5.
 Troubleshooting of all electrical equipment like LV-MV VSD (AB PF 755, 753, 7000), MCC and LV-MV
MOTOR etc.
 Working with instruments like proximity sensors, limit switches, pressure switches, pressure
transmitters, flow transmitters, MAG type flow meters.
 PM and weekly inspection of transformers (34.4kv/4.16kv and 34.4 kv/480kv), EDG.
 Prepare equipment QVD.
 Commissioning and erection of 300 meter belt conveyor from calcination to smelter tanks.
 Manage contract manpower and work planning.
 Having knowledge of white side all equipment like Disc filter, Pan filter, Calcination, Belt conveyor, 3
drive thickener etc.
 Doing troubleshooting and maintenance of material handling Elevator.
Aditya Birla Grasim Industries Ltd. Apr 2013 – Dec 2013
Technical Assistance
 Commissioning and erection of plant electrical panels, cables try work, cable laying work.
 Commissioning and testing of HT-LT panels ABB and Siemens make.
 Checking of bus bar tightness of HT-LT panels.
 Erection and commissioning of ALLEN BREDLY power flex 753 make VFD Drives panels also parameter
uploading.
 Arrange men power and supervision of them.
 Working with 33kv/440 v 2.5 MVA transformers.
SAGARKUMAR A BHARUCHI
Address: P.O. BOX: 11342, Al-Jubail industrial city 31961, Ras al-khair industrial city, KSA
Telephone: +966 569293182, +966-598754487(India) | E-mail: sagar_bharuchi@yahoo.co.in
Union Copper Rod Factory LLC, Abu Dhabi, UAE Jan 2010 -mar2013
Electrical Technician
 Handling of all kinds of electrical instruments and equipments.
 Working with all kinds of AB Drives, PLC, and Weighing Scale up to 6000 kg, AB Panel View 700, 1000,
1500, GE FANUC, IFIX SCADA Software and CO2 Analyzer.
 Handling and doing maintenance of ATLAS COMPCO make screw type Air Compressor. Like maintenance of
electrical panel, clean air filters; check all thermostat, pressure sensors, motor checking and check cooling
fan motors.
 Doing maintenance of racy pocketing compressor type air dryer.
Videocon Narmada Glass Ltd, Gujarat, India Jul 2009 - Jan 2010
Junior Technical Assistant - Electrical & Instrument
 Troubleshooting, preventive & breakdown maintenance of Process Plant instruments.
 Handling of all kinds of PLC 5/25 & 5/40, SLC 5/05 and ControlLogix Systems.
 Working with Allen Bradley, Magnetek, Telemecanique make of AC & DC Drives, HMI Panel, MCC Panel,
PDB Panel, ABB & KUKA Robots, etc.
 Operations and maintenance of Ameritherm & Pillar make of Radio frequency Generators.
Welspun Gujarat Sthal Rohren Ltd, Gujarat, India Feb 2003 - Jul 2009
Electrician
 Preventive & breakdown maintenance of HT/LT Switchgears, Transformers, Relays, Motor Starters, Lighting
and EOT Cranes.
 Working with AC / DC Drives of Siemens, Indramat and Eurotherm make.
 Working with PLC’S Siemens (S7), GE Fanuc, and Cegelac Alspa make, Photo sensors, Defuse sensors, PX
Switches, Different types of valves, Laser system for horizontal adjustment, height sensors for vertical
control, Pressure and flow switches, Welding M/C, Transformers, and other field equipments, CNC & HNC
machines, VCB, ACB and Relays.
 Working and doing maintenance of ATLAS COMPCO and DEMAG make air compressors.
KEY PERFORMANCE AREAS
Project Coordination
 Coordinating projects for erection & commissioning and maintenance with accountability for strategic
utilization & deployment of resources to achieve organizational objectives.
 Controlling project activities entailing requirement gathering & final execution.
 Managing the material/spare part management from requisition to procurement & ensure availability to
match project schedule.
 Keeping track of work progress in terms of cost, resource deployment, quality compliance and time over
runs.
 Conducting trials & tests, identifying changes & making final modifications in components.
Maintenance, Servicing & Repair
 Handling critical Issues and service team, managing problems and informing management on repetitive
failures for appropriate re-course.
 Looking after workshop activities, batching plant and stone crushers.
 Managing service and maintenance of DG-Sets Sub Station, transformers, starters, compressors, cranes,
pumps etc.
Operations & Process Management
 Maintaining the documents, reviewing & carrying out inspection tests for determining the effectiveness of
the equipments.
 Ensuring cost reduction by implementing new techniques and working on productivity improvement
 Performing root cause analysis on complaints & accordingly taking counter measures.
 Monitoring the performance results taking necessary actions if any variations in the results.
People Management
 Managing a team of 2 operators/workers.
 Interfacing with people, managing healthy environment & inculcating teamwork.
 Planning effective manpower deployment & working schedules of the workforce.
 Guiding team on safety & technical aspects to enhance team’s skills and productivity.
EDUCATION
Qualification Institute/University Year %
Diploma – Electrical Engineering NIE, Surat, India 2008 67.60
ITI ITI, Gandhinagar, India 2003 71.14
PERSONAL DETAILS
 Date of Birth: 31st
May 1986.
 Nationality: Indian.
 Marital status: Single.
 Languages Known: English, Hindi and Gujarati.
 Passport No: F 9147949 Valid till Jul 2016.

SAGAR RESUME

  • 1.
    Supervisory Role |Technical Operations – Electrical | Metal/Oil & Gas/Refinery Sector PROFESSIONAL SUMMARY  A dedicated professional with over 10 years of experience in maintenance operation, technical services, project coordination and people management.  A Diploma in Electrical Engineering; currently associated with Union Copper Rod Factory LLC, Abu Dhabi, UAE as Electrical Technician.  A systematic, organised & hardworking individual with an attitude to excel & backed with practical experience.  Hands on experience in maintenance & troubleshooting operations, erection & commissioning and repairing.  Experience in achieving goals of operational satisfaction, cost control and attaining profitability.  Exposure to managing processes & procedures and compliance & quality.  Effective communicator with skills in troubleshooting, team building and planning & managing resources.  Exposure to managing operations of equipments, reducing downtime and enhancing operational effectiveness.  Attributes: Honesty, hardworking, positive attitude and perseverance.  Adept in: Planning Erection & commissioning Troubleshooting & maintenance Process management Project management Team management CAREER PATH Maaden Aluminium Company, Ras Al-Khair, KSA Jan 2014 to till date Electrical technician  Prepare and maintain all electrical documents like SWI, LTV etc.  Prepare isolation procedures and level 2 isolations.  Doing all PM and CM of all electrical equipment’s like motors, VSD, MCC etc.  Doing maintenance and level 2 HV isolation of ESP (electrostatic precipitator).  Working with commissioning and start up team for refinery project activity.  Commissioning and erection of alumina refinery Whiteside like precipitation and calcination.  Doing all activity of commissioning activity like punch list rising, punch list clearing, walk downs etc.  Prepare work permits, JSA, TAKE5.  Troubleshooting of all electrical equipment like LV-MV VSD (AB PF 755, 753, 7000), MCC and LV-MV MOTOR etc.  Working with instruments like proximity sensors, limit switches, pressure switches, pressure transmitters, flow transmitters, MAG type flow meters.  PM and weekly inspection of transformers (34.4kv/4.16kv and 34.4 kv/480kv), EDG.  Prepare equipment QVD.  Commissioning and erection of 300 meter belt conveyor from calcination to smelter tanks.  Manage contract manpower and work planning.  Having knowledge of white side all equipment like Disc filter, Pan filter, Calcination, Belt conveyor, 3 drive thickener etc.  Doing troubleshooting and maintenance of material handling Elevator. Aditya Birla Grasim Industries Ltd. Apr 2013 – Dec 2013 Technical Assistance  Commissioning and erection of plant electrical panels, cables try work, cable laying work.  Commissioning and testing of HT-LT panels ABB and Siemens make.  Checking of bus bar tightness of HT-LT panels.  Erection and commissioning of ALLEN BREDLY power flex 753 make VFD Drives panels also parameter uploading.  Arrange men power and supervision of them.  Working with 33kv/440 v 2.5 MVA transformers. SAGARKUMAR A BHARUCHI Address: P.O. BOX: 11342, Al-Jubail industrial city 31961, Ras al-khair industrial city, KSA Telephone: +966 569293182, +966-598754487(India) | E-mail: sagar_bharuchi@yahoo.co.in
  • 2.
    Union Copper RodFactory LLC, Abu Dhabi, UAE Jan 2010 -mar2013 Electrical Technician  Handling of all kinds of electrical instruments and equipments.  Working with all kinds of AB Drives, PLC, and Weighing Scale up to 6000 kg, AB Panel View 700, 1000, 1500, GE FANUC, IFIX SCADA Software and CO2 Analyzer.  Handling and doing maintenance of ATLAS COMPCO make screw type Air Compressor. Like maintenance of electrical panel, clean air filters; check all thermostat, pressure sensors, motor checking and check cooling fan motors.  Doing maintenance of racy pocketing compressor type air dryer. Videocon Narmada Glass Ltd, Gujarat, India Jul 2009 - Jan 2010 Junior Technical Assistant - Electrical & Instrument  Troubleshooting, preventive & breakdown maintenance of Process Plant instruments.  Handling of all kinds of PLC 5/25 & 5/40, SLC 5/05 and ControlLogix Systems.  Working with Allen Bradley, Magnetek, Telemecanique make of AC & DC Drives, HMI Panel, MCC Panel, PDB Panel, ABB & KUKA Robots, etc.  Operations and maintenance of Ameritherm & Pillar make of Radio frequency Generators. Welspun Gujarat Sthal Rohren Ltd, Gujarat, India Feb 2003 - Jul 2009 Electrician  Preventive & breakdown maintenance of HT/LT Switchgears, Transformers, Relays, Motor Starters, Lighting and EOT Cranes.  Working with AC / DC Drives of Siemens, Indramat and Eurotherm make.  Working with PLC’S Siemens (S7), GE Fanuc, and Cegelac Alspa make, Photo sensors, Defuse sensors, PX Switches, Different types of valves, Laser system for horizontal adjustment, height sensors for vertical control, Pressure and flow switches, Welding M/C, Transformers, and other field equipments, CNC & HNC machines, VCB, ACB and Relays.  Working and doing maintenance of ATLAS COMPCO and DEMAG make air compressors. KEY PERFORMANCE AREAS Project Coordination  Coordinating projects for erection & commissioning and maintenance with accountability for strategic utilization & deployment of resources to achieve organizational objectives.  Controlling project activities entailing requirement gathering & final execution.  Managing the material/spare part management from requisition to procurement & ensure availability to match project schedule.  Keeping track of work progress in terms of cost, resource deployment, quality compliance and time over runs.  Conducting trials & tests, identifying changes & making final modifications in components. Maintenance, Servicing & Repair  Handling critical Issues and service team, managing problems and informing management on repetitive failures for appropriate re-course.  Looking after workshop activities, batching plant and stone crushers.  Managing service and maintenance of DG-Sets Sub Station, transformers, starters, compressors, cranes, pumps etc. Operations & Process Management  Maintaining the documents, reviewing & carrying out inspection tests for determining the effectiveness of the equipments.  Ensuring cost reduction by implementing new techniques and working on productivity improvement  Performing root cause analysis on complaints & accordingly taking counter measures.  Monitoring the performance results taking necessary actions if any variations in the results. People Management  Managing a team of 2 operators/workers.  Interfacing with people, managing healthy environment & inculcating teamwork.  Planning effective manpower deployment & working schedules of the workforce.  Guiding team on safety & technical aspects to enhance team’s skills and productivity.
  • 3.
    EDUCATION Qualification Institute/University Year% Diploma – Electrical Engineering NIE, Surat, India 2008 67.60 ITI ITI, Gandhinagar, India 2003 71.14 PERSONAL DETAILS  Date of Birth: 31st May 1986.  Nationality: Indian.  Marital status: Single.  Languages Known: English, Hindi and Gujarati.  Passport No: F 9147949 Valid till Jul 2016.