ABRIDGEMENT
Dynamic professional with more than 11 Years of experience in E&I installations, testing, commissioning and
Inspections services particularly in oil and gas sector in Middle East.
Equipped with abilities in Electrical and Instrumentation Inspections, Installations, Testing and Commissioning of
high tech HV/LV motors, cables, MCC and switchgear, HV & LV transformers, UPS & Batteries, Power distribution
panels, DCS & Marshalling panels and field Instruments.
EDUCATION & CREDENTIALS
 Diploma in Electrical & Electronics Engineering from Directorate of Technical Education Board, Tamil Nadu-
2002-2005
 Bachelor of Technology in Electrical Engineering from JRN Rajasthan Vidyapeeth University - 2011-2015
(Distance Mode)
PROFESSIONAL EXPERIENCE
1. Company : INVENSYS acquired by SCHNEIDER ELECTRIC
Client : RASGAS
Position : QC Engineer (E&I)
Project : RasGas Train 1 &2 onshore & offshore DCS & TMR Upgrade Project
Duration : January 2016 to July 2016
RESPONSIBILITY
• Monitored the installation and pre-commissioning process of the contractor by carrying regular inspections.
DCS & TMR UPGRADE FOR ONSHORE AND OFFSHORE PROJECT (RASGAS - QATAR)
• Implementation of QA/QC activities in accordance with approved PQP, ITP, Procedures, method statements
and other contract documents.
• Responsible for complete Quality Assurance and Control of the project, coordinate and attend client
meetings and demonstrate the project quality statistics and reports.
• Preparing, tracking and updating the monthly and overall project Key Performance Indicator (KPI).
• Closely monitoring project schedule and progress, alert project management for potential delays and quality
issues to avoid rework and cost of poor quality.
• Involved in Quality walk-through with the end-user/customer & monitoring /recording the punch points to
identify quality related issues & implement best practices etc.
• Review sub-contractor documents and inspect sub-contractor installation and testing activities.
• Conduct material receiving inspection, cabinet installation inspection, cable laying inspection and fiber optic
cable installation inspection as per ITP.
• Carry out inspections related to electrical & Instrumentation at offshore MCR platform and remote wellheads
in accordance with the offshore specifications.
• Witness and certify electrical, control cable tests and OTDR tests for FO cables.
• Compilation and preparation of dossier for hand over.
2. Company : BUREAU VERITAS - IRAQ
Client : LUKOIL
Position : E&I Inspector (TPI)
Project : West Qurna Phase-2 Project, Basra
Duration : September 2013 to December 2015
RESPONSIBILITY
• Monitored the installation and pre-commissioning process of the contractor by carrying regular inspections.
Reviewed the various construction drawings and specifications for the project
• Administered all the inspections on the hold points such as Hi-pot tests, Transformer tests, etc.,
• Conduct DCS and Marshalling panels receiving, site installation and energization inspections
• Ensured that all materials are inspected for conformance to required criteria prior to dispatching to site.
Raised NCR against non-conforming products.
• Responsibly worked at all times to the required procedures and processes to meet the company target of zero
LTIs. This includes actively participating in identifying and intervening when any HSE hazards are observed.
• Actively participated and promoted quality improvements to ensure zero quality defects.
• Continuously monitor quality of work and do Inspections on installation, calibration and testing of electrical
and instrumentation activities.
3. Company : TECNIMONT
Client : GASCO (Abu Dhabi Gas Industries LTD)
Position : Electrical QC Inspector
Project : HABSAN-5 Integrated Gas Development Process Plant
Duration : November 2011 to May 2013
RESPONSIBILITY
• Responsible for the over-all implementation of Quality control related electrical works accordance with
project specifications and Engineering standards.
• Perform routine inspection as per RFI, ITP, QCP, Project specifications & approved drawings.
• Preparation of Electrical & instrumentation quality control documents, Prepare Quality control procedure
(QCP), Inspection Test Plan (ITP) and Inspection Test Report (ITR) for electrical and instrumentation works.
• Performing material inspection and ensuring as per approved MAR and project specification.
• Preparation of calibration, installation acceptance, testing and commissioning reports.
• Raising NCR violated against specification. Suggested for correct action follow up closely and closing the
NCR.
• Verify the test equipment and devices used in the project meets the required specifications as per project
requirements, standard, testing accordance with the procedures.
• Responsible for ensuring that all relevant activities are in compliance with the company’s quality
management system.
• Responsible for ensuring that all calibrated equipment used within calibration dates
4. Company : AL-TURKI ENTERPRISES L.L.C
Client : Petroleum Development of Oman (PDO)
Position : Electrical QC Inspector
Project : Amal & Amin Stem Project.
Duration : March 2011 to September 2011
RESPONSIBILITY
• Monitor daily inspection activities and verifies compliance to PDO Standards (DEP), National Electrical
Codes, IEC.
• Handled the Inspections of installation, testing & commissioning of Power Transformers, Beam pump well
motors, MV/LV Switchgears, Motor Control Centers, Distribution boards, etc.
• Supervising quality control functions of a project or its parts, including quality control inspection schedules
and the collection of quality records. Assessing implementation of the quality plan on site.
• Inspection of 11kV, 33kV Overhead Transmission lines installation and erection (Erection of HT & LT poles,
Stringing & Cable Installation).
• Involved in the punch-listing of the completed construction activities (Punch-List –A&B) & ensure closing of
the punch items by the construction team before Mechanical Completion.
5. Company : GAMA Qatar Co, W.L.L, Qatar.
Client : Chiyoda Technip Joint Venture (CTJV)
Position : E&I QC Inspector
Project : Qatargas ConocoPhillips Shell Onshore LNG Project (QG 3&4)
Duration : Sept 2007 to Nov 2010
RESPONSIBILITY
• Responsible for the over-all implementation of Quality control related electrical works accordance with
project specifications and Engineering standards.
• Perform routine inspection as per RFI, ITP, QCP, Project specifications & approved drawings.
• Preparation of Electrical & instrumentation quality control documents, Prepare Quality control procedure
(QCP), Inspection Test Plan (ITP) and Inspection Test Report (ITR) for electrical and instrumentation works.
• Performing material inspection and ensuring as per approved MAR and project specification.
• Preparation of calibration, installation acceptance, testing and commissioning reports.
• Review of all electrical & instrumentation drawings related to scope of project work.
• Suggested for correct action follow up closely and closing the NCR.
• Verify the test equipment and devices used in the project meets the required specifications as per project
requirements, standard, testing accordance with the procedures.
6. Company : Valuthur Gas Turbine Power plant (96MW), Tamilnadu, India.
Position : Maintenance Technician.
Duration : September 2005 to July 2007.
Scope of Works:
 Maintenance of MV/LV panel boards & field controls.
 Testing of the transformers, earthing system, relays, panel boards and circuit breakers.
 Calibration of metering units and relays.
 Fire fighting and safety maintenance.
 Daily Generation Report (Fuel, Water and Energy) Preparation Work.
 Trouble shooting of Transformer, Switch gears and Circuit Breakers.
CAREER HIGHLIGHTS
Handled the Inspections on installation, testing & pre-commissioning of following item
 132/33KV, 33/11KV, 11/3.3KV, 11/0.415KV power transformers, switchgears and Bus duct.
• HV/LV Motors.
• HV/LV power, control and communication cables installation, Hi-Pot testing.
• Cathodic protection system underground pipe lines and Metal Tanks. Installation of Permanent Anodes,
Temporary Mg Anodes, Galvanic Anodes, Test station, AJB, NJB, MJB and Positive Negative cable laying,
and Termination, Installation and termination of Transformer rectifier.
• Small power distribution, lighting system, battery bank & UPS.
• Plant earthing & lightning protection system.
• Platform Cranes, Motor Operated Valves, etc.
• Inspection of various types of cable trays and conduit system.
• Electrical heat tracing for process area.
• Fiber optic cable testing using OTDR & splicing.
• Conduct material receiving inspection, Cabinet installation, Junction boxes, Instrument local panels, cable
laying inspection and fiber optic cable installation inspection as per ITP.
• Instruments like flow transmitters, level transmitters, temperature indicators, flow control valves, solenoid
valves, pressure control valves.
• Paging system, plant alarm system (smoke detectors, heat detectors, gas detectors & manual call points)
• Impulse tubing by conducting high pressure test using nitrogen & check for leakage & holding pressure.
• Inspection of Enclosures (IP, Ex, Temp & Gas group)
• Perform inspection of cable trench before laying the cables and back-filling after laying the cables.
TRAINING PROGRAMS ATTENDED
 HUET & Sea Survival
 HSE
 RFI Familiarization
course
 Electrical Safety
 Electrical Log out &
Tag out (LOTO)
 Fire and Safety
 PMC & SIMOPS
 Gas Tester
 H2S Awareness
 Scaffolding works at
height
 Confined Space
awareness
PERSONAL PROFILE
Name : S.Abdul Hakkim
Date of Birth : 11th may 1986
Gender : Male
Nationality : Indian
Religion : Muslim
Marital status : Married
Languages Known : English, Tamil, Hindi and Malayalam
Passport Number : Z 3054954
Date of Expire : 22-01-2025
Driving License : UAE Valid Driving License holder
Residence Address : 8/35 West Street,
Therkuthravai (POST),
Ramanathapuram (DIST),
Tamil Nadu,
PIN-623504.
DECLARATION
I hereby declare that all the information’s furnished above are true to the best of my knowledge and belief.
Thanking You,
Yours Truly,
S.ABDUL HAKKIM

More Related Content

What's hot

mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineerMubashir ahmee
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
Electrical Maintenance Technician
Electrical Maintenance TechnicianElectrical Maintenance Technician
Electrical Maintenance TechnicianMohammad Azim uddin
 
Electrical Engineer-Abid1
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1abidullah ullah
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 
ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016RUKNUDDIN ALI
 
Karthikeyan. ex insp cv
Karthikeyan.  ex insp cvKarthikeyan.  ex insp cv
Karthikeyan. ex insp cv
Karthi keyan
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineerKRISHNAMOORTHY A
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
Khalid Eltahir
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
Abdul Rahiman
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
Abdullah Almutairi
 
MEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANMEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANSUDARSANAN NANU
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP SupervisorArun Arun
 
CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC Firoz Mohammad
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanicalShaik Ghouse
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
Subhash +966535838322
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisor
andi dipayadnya
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
Subhash +966535838322
 

What's hot (20)

mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
B.tech electrical engineer cv
B.tech electrical engineer cvB.tech electrical engineer cv
B.tech electrical engineer cv
 
Electrical Maintenance Technician
Electrical Maintenance TechnicianElectrical Maintenance Technician
Electrical Maintenance Technician
 
Electrical Engineer-Abid1
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016
 
Karthikeyan. ex insp cv
Karthikeyan.  ex insp cvKarthikeyan.  ex insp cv
Karthikeyan. ex insp cv
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
MEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANMEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANAN
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP Supervisor
 
ugandhar CompEx resume
ugandhar CompEx resumeugandhar CompEx resume
ugandhar CompEx resume
 
CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisor
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
 

Similar to Electrical Inspector CV

CV of Tahir Mahmood
CV of Tahir MahmoodCV of Tahir Mahmood
CV of Tahir Mahmood
Tahir Mahmood
 
Commission resume
Commission resumeCommission resume
Commission resume
Manos Thangaraja
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CVRyan Quilala
 
A year with Larsen & Toubro
A year with  Larsen & ToubroA year with  Larsen & Toubro
A year with Larsen & ToubroJAIPRAKASH PATIL
 
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)
Khalid Eltahir
 
Noli updated Resume
Noli updated ResumeNoli updated Resume
Noli updated Resumenoli donez
 
1. Sharib Reza(CV)
1. Sharib Reza(CV)1. Sharib Reza(CV)
1. Sharib Reza(CV)sharib reza
 

Similar to Electrical Inspector CV (20)

Irfan - Elec Engr
Irfan - Elec EngrIrfan - Elec Engr
Irfan - Elec Engr
 
CURRICULUM VITAE doc
CURRICULUM VITAE docCURRICULUM VITAE doc
CURRICULUM VITAE doc
 
CV of Tahir Mahmood
CV of Tahir MahmoodCV of Tahir Mahmood
CV of Tahir Mahmood
 
LATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV RLATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV R
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
RESUME-Sijin
RESUME-SijinRESUME-Sijin
RESUME-Sijin
 
SHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUMESHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUME
 
Commission resume
Commission resumeCommission resume
Commission resume
 
M Imran
M ImranM Imran
M Imran
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CV
 
Elect Eng. Rizwan CV
Elect Eng. Rizwan CVElect Eng. Rizwan CV
Elect Eng. Rizwan CV
 
A year with Larsen & Toubro
A year with  Larsen & ToubroA year with  Larsen & Toubro
A year with Larsen & Toubro
 
CV
CVCV
CV
 
saif.resume dxb
saif.resume dxbsaif.resume dxb
saif.resume dxb
 
Tabrez
TabrezTabrez
Tabrez
 
Tabrez
TabrezTabrez
Tabrez
 
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)
 
Noli updated Resume
Noli updated ResumeNoli updated Resume
Noli updated Resume
 
1. Sharib Reza(CV)
1. Sharib Reza(CV)1. Sharib Reza(CV)
1. Sharib Reza(CV)
 

Recently uploaded

TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 

Recently uploaded (20)

TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 

Electrical Inspector CV

  • 1. ABDUL HAKKIM SHAHUBAR SADIQ Mobile : +91 99761 42689 (India) Email : hakkim.dee@gmail.com Position Applying For: QA/QC Inspector / Engineer (Electrical & Instrumentation) ABRIDGEMENT Dynamic professional with more than 11 Years of experience in E&I installations, testing, commissioning and Inspections services particularly in oil and gas sector in Middle East. Equipped with abilities in Electrical and Instrumentation Inspections, Installations, Testing and Commissioning of high tech HV/LV motors, cables, MCC and switchgear, HV & LV transformers, UPS & Batteries, Power distribution panels, DCS & Marshalling panels and field Instruments. EDUCATION & CREDENTIALS  Diploma in Electrical & Electronics Engineering from Directorate of Technical Education Board, Tamil Nadu- 2002-2005  Bachelor of Technology in Electrical Engineering from JRN Rajasthan Vidyapeeth University - 2011-2015 (Distance Mode) PROFESSIONAL EXPERIENCE 1. Company : INVENSYS acquired by SCHNEIDER ELECTRIC Client : RASGAS Position : QC Engineer (E&I) Project : RasGas Train 1 &2 onshore & offshore DCS & TMR Upgrade Project Duration : January 2016 to July 2016 RESPONSIBILITY • Monitored the installation and pre-commissioning process of the contractor by carrying regular inspections. DCS & TMR UPGRADE FOR ONSHORE AND OFFSHORE PROJECT (RASGAS - QATAR) • Implementation of QA/QC activities in accordance with approved PQP, ITP, Procedures, method statements and other contract documents. • Responsible for complete Quality Assurance and Control of the project, coordinate and attend client meetings and demonstrate the project quality statistics and reports. • Preparing, tracking and updating the monthly and overall project Key Performance Indicator (KPI). • Closely monitoring project schedule and progress, alert project management for potential delays and quality issues to avoid rework and cost of poor quality. • Involved in Quality walk-through with the end-user/customer & monitoring /recording the punch points to identify quality related issues & implement best practices etc. • Review sub-contractor documents and inspect sub-contractor installation and testing activities. • Conduct material receiving inspection, cabinet installation inspection, cable laying inspection and fiber optic cable installation inspection as per ITP. • Carry out inspections related to electrical & Instrumentation at offshore MCR platform and remote wellheads in accordance with the offshore specifications. • Witness and certify electrical, control cable tests and OTDR tests for FO cables. • Compilation and preparation of dossier for hand over. 2. Company : BUREAU VERITAS - IRAQ Client : LUKOIL Position : E&I Inspector (TPI) Project : West Qurna Phase-2 Project, Basra Duration : September 2013 to December 2015 RESPONSIBILITY
  • 2. • Monitored the installation and pre-commissioning process of the contractor by carrying regular inspections. Reviewed the various construction drawings and specifications for the project • Administered all the inspections on the hold points such as Hi-pot tests, Transformer tests, etc., • Conduct DCS and Marshalling panels receiving, site installation and energization inspections • Ensured that all materials are inspected for conformance to required criteria prior to dispatching to site. Raised NCR against non-conforming products. • Responsibly worked at all times to the required procedures and processes to meet the company target of zero LTIs. This includes actively participating in identifying and intervening when any HSE hazards are observed. • Actively participated and promoted quality improvements to ensure zero quality defects. • Continuously monitor quality of work and do Inspections on installation, calibration and testing of electrical and instrumentation activities. 3. Company : TECNIMONT Client : GASCO (Abu Dhabi Gas Industries LTD) Position : Electrical QC Inspector Project : HABSAN-5 Integrated Gas Development Process Plant Duration : November 2011 to May 2013 RESPONSIBILITY • Responsible for the over-all implementation of Quality control related electrical works accordance with project specifications and Engineering standards. • Perform routine inspection as per RFI, ITP, QCP, Project specifications & approved drawings. • Preparation of Electrical & instrumentation quality control documents, Prepare Quality control procedure (QCP), Inspection Test Plan (ITP) and Inspection Test Report (ITR) for electrical and instrumentation works. • Performing material inspection and ensuring as per approved MAR and project specification. • Preparation of calibration, installation acceptance, testing and commissioning reports. • Raising NCR violated against specification. Suggested for correct action follow up closely and closing the NCR. • Verify the test equipment and devices used in the project meets the required specifications as per project requirements, standard, testing accordance with the procedures. • Responsible for ensuring that all relevant activities are in compliance with the company’s quality management system. • Responsible for ensuring that all calibrated equipment used within calibration dates 4. Company : AL-TURKI ENTERPRISES L.L.C Client : Petroleum Development of Oman (PDO) Position : Electrical QC Inspector Project : Amal & Amin Stem Project. Duration : March 2011 to September 2011 RESPONSIBILITY • Monitor daily inspection activities and verifies compliance to PDO Standards (DEP), National Electrical Codes, IEC. • Handled the Inspections of installation, testing & commissioning of Power Transformers, Beam pump well motors, MV/LV Switchgears, Motor Control Centers, Distribution boards, etc. • Supervising quality control functions of a project or its parts, including quality control inspection schedules and the collection of quality records. Assessing implementation of the quality plan on site. • Inspection of 11kV, 33kV Overhead Transmission lines installation and erection (Erection of HT & LT poles, Stringing & Cable Installation). • Involved in the punch-listing of the completed construction activities (Punch-List –A&B) & ensure closing of the punch items by the construction team before Mechanical Completion. 5. Company : GAMA Qatar Co, W.L.L, Qatar. Client : Chiyoda Technip Joint Venture (CTJV) Position : E&I QC Inspector Project : Qatargas ConocoPhillips Shell Onshore LNG Project (QG 3&4) Duration : Sept 2007 to Nov 2010
  • 3. RESPONSIBILITY • Responsible for the over-all implementation of Quality control related electrical works accordance with project specifications and Engineering standards. • Perform routine inspection as per RFI, ITP, QCP, Project specifications & approved drawings. • Preparation of Electrical & instrumentation quality control documents, Prepare Quality control procedure (QCP), Inspection Test Plan (ITP) and Inspection Test Report (ITR) for electrical and instrumentation works. • Performing material inspection and ensuring as per approved MAR and project specification. • Preparation of calibration, installation acceptance, testing and commissioning reports. • Review of all electrical & instrumentation drawings related to scope of project work. • Suggested for correct action follow up closely and closing the NCR. • Verify the test equipment and devices used in the project meets the required specifications as per project requirements, standard, testing accordance with the procedures. 6. Company : Valuthur Gas Turbine Power plant (96MW), Tamilnadu, India. Position : Maintenance Technician. Duration : September 2005 to July 2007. Scope of Works:  Maintenance of MV/LV panel boards & field controls.  Testing of the transformers, earthing system, relays, panel boards and circuit breakers.  Calibration of metering units and relays.  Fire fighting and safety maintenance.  Daily Generation Report (Fuel, Water and Energy) Preparation Work.  Trouble shooting of Transformer, Switch gears and Circuit Breakers. CAREER HIGHLIGHTS Handled the Inspections on installation, testing & pre-commissioning of following item  132/33KV, 33/11KV, 11/3.3KV, 11/0.415KV power transformers, switchgears and Bus duct. • HV/LV Motors. • HV/LV power, control and communication cables installation, Hi-Pot testing. • Cathodic protection system underground pipe lines and Metal Tanks. Installation of Permanent Anodes, Temporary Mg Anodes, Galvanic Anodes, Test station, AJB, NJB, MJB and Positive Negative cable laying, and Termination, Installation and termination of Transformer rectifier. • Small power distribution, lighting system, battery bank & UPS. • Plant earthing & lightning protection system. • Platform Cranes, Motor Operated Valves, etc. • Inspection of various types of cable trays and conduit system. • Electrical heat tracing for process area. • Fiber optic cable testing using OTDR & splicing. • Conduct material receiving inspection, Cabinet installation, Junction boxes, Instrument local panels, cable laying inspection and fiber optic cable installation inspection as per ITP. • Instruments like flow transmitters, level transmitters, temperature indicators, flow control valves, solenoid valves, pressure control valves. • Paging system, plant alarm system (smoke detectors, heat detectors, gas detectors & manual call points) • Impulse tubing by conducting high pressure test using nitrogen & check for leakage & holding pressure. • Inspection of Enclosures (IP, Ex, Temp & Gas group) • Perform inspection of cable trench before laying the cables and back-filling after laying the cables. TRAINING PROGRAMS ATTENDED  HUET & Sea Survival  HSE  RFI Familiarization course  Electrical Safety  Electrical Log out & Tag out (LOTO)  Fire and Safety  PMC & SIMOPS  Gas Tester  H2S Awareness  Scaffolding works at height  Confined Space awareness PERSONAL PROFILE
  • 4. Name : S.Abdul Hakkim Date of Birth : 11th may 1986 Gender : Male Nationality : Indian Religion : Muslim Marital status : Married Languages Known : English, Tamil, Hindi and Malayalam Passport Number : Z 3054954 Date of Expire : 22-01-2025 Driving License : UAE Valid Driving License holder Residence Address : 8/35 West Street, Therkuthravai (POST), Ramanathapuram (DIST), Tamil Nadu, PIN-623504. DECLARATION I hereby declare that all the information’s furnished above are true to the best of my knowledge and belief. Thanking You, Yours Truly, S.ABDUL HAKKIM