Sajeev R. has over 20 years of experience as a QA/QC Electrical and Instrumentation Inspector for various oil and gas projects in Saudi Arabia. He has worked on projects for Saudi Aramco, ZADCO, Technip, and other companies. Some of his responsibilities include verifying inspection readiness, identifying discrepancies, initiating reports, ensuring quality control, reviewing plans and documentation, testing installations, and coordinating with other parties. He has comprehensive skills in electrical systems installation, inspection, and commissioning.
I am submitting to express my keen interest in the position Sr. Electrical & Instrument Engineer
I am currently worked as Sr. Instrument Field Engineer at Egypt Khalda Petroleum Company (Apache) with 10+ years of overall experience at Construction, commissioning, start-up, planning and Engineering and I Expected Monthly Salary As project budget however my last total net salary 6300$
I worked as QA/QC E&I Engineer / Inspector at the world's largest gas to liquids (GTL) Pearl plant in Qatar, The plant a joint development by Qatar Petroleum and Shell, GTL feed about 15% of worldwide gas resources.
I worked as Sr. QA/QC E&I Engineer / Inspector client (SEPOC, SAFER Exploration & Production Operations Company) representative at the largest project at Yemen Central Processing Unit (CPU) LNG plant at Marib area with total and YLNG joint.
I worked as Sr. Electrical and Instrument Engineer /Supervisor at the largest project at Egypt, with Samsung Engineering.
I am submitting to express my keen interest in the position Sr. Electrical & Instrument Engineer
I am currently worked as Sr. Instrument Field Engineer at Egypt Khalda Petroleum Company (Apache) with 10+ years of overall experience at Construction, commissioning, start-up, planning and Engineering and I Expected Monthly Salary As project budget however my last total net salary 6300$
I worked as QA/QC E&I Engineer / Inspector at the world's largest gas to liquids (GTL) Pearl plant in Qatar, The plant a joint development by Qatar Petroleum and Shell, GTL feed about 15% of worldwide gas resources.
I worked as Sr. QA/QC E&I Engineer / Inspector client (SEPOC, SAFER Exploration & Production Operations Company) representative at the largest project at Yemen Central Processing Unit (CPU) LNG plant at Marib area with total and YLNG joint.
I worked as Sr. Electrical and Instrument Engineer /Supervisor at the largest project at Egypt, with Samsung Engineering.
Creative, ambitious and knowledgeable engineering professional seeks to utilize my perfect skills and experience in the Electrical Engineering Field (Power & controllers) to meet and exceed all goals in your organization while advancing my own Career.
Responsibilities: E&I QA/QC
Responsibilities for Field Inspection as per Inspection Testing Plan (ITP’s) Related (E&I)
Jobs.QA/QC with the help of specification, drawings.
Inspection for Material Receiving related Electrical, Instrument as per Indent, Delivery
Note.
Inspection for Cable Laying (E & I) in Cable Trays, Trenches as per cross-sectional
drawings.
Inspection for Cable Trays (E&I) Installation (Perforated, Ladder, Mesh) as per drawing.
Responsible for all Red Marks/As Built drawing as per site modification.
Inspection for Lighting Installation as per circuit diagram, Panel Installation,Transformer
installation.
Inspection for Heating Tracing cables and Testing.
Having Good Knowledge of (NEC) National Electrical Code.
American Petroleum Institute (API ) Standards
IEC- international ELECTROTECHNICAL Commission Standards.
Inspection for the Installation of MCT’s.
Inspection for Lightning Protection (Lightning Arresters).
Inspection for EARTHING Cable Laying, CAD Weld - Exothermic Weld joints,
Earth Bus Bar, EARTHING Test.
Inspection for Motor Installation, Resistance/IR test & Motor torque test.
Inspection for Cable Continuity/IR, Cable termination, EARTHING test.
Prepare the NCR, CAR, TQ, ITP, and Method Statements & RFI’S.
Complete QA/QC Documentation as per Project specification.
Inspection for calibration of PI, PDIT, PT, TT, TE, FT, LT.
Functional Test of Ultrasonic Transmitters, LSL, LSH, LSHH, AT.
Inspection for Field Instrument Installation (PT,FT, LT, Control Valves as per Hook up drawing)
Inspection for Impulse Line Leak test.
Inspection for JB’S Installation, Panels, Cabinets Installation.
Preparing the complete Loop Folders like(DI,DO,AI,AO,RTD for Loop Checking Pre-
Commissioning with the attachments of Instrument loop package index, Functional loop test CR,
Material Receiving Calibration CR, Instrument Installation CR Instrument index, instrument Loop
Diagram & P& ID’S.
Responsible for clear the Punch Points.
Prepare the Final Dossier as per client HOS and Hand over to Mechanical Completion
Department (MC)
Final Walk Down of Hand over System (HOS) with Client.
Dear Respected Sir,
I am forwarding my CV for a Solar Power Plant Installation / Service in Gujarat State or Any Part of India ( Ready to Travel).
Experienced in Solar power plant Field Work (Total Experience: 4.5 years, 3.5 years in Solar Power Plant Project Engineer ( Electrical) ) . I have great skills in solar Power Plant:commissioning and O&M activities, special 100 KW & more solar Power Plant. I want to work on MW solar power Plant project. Please go through my resume attached with this mail.
I have done graduation in B. E. in Electronics & Communication, I have rich skill in Solar Power Plant Electrical PROJECTS and Electrical Grid Power Commissioning, Inspection with Government Chief Electrical Inspector with CAD Drawings, Electrical Safety Rules, and International Standards ( IS) Rules for Project Approval and Project Commissioning.
Currently, on going Solar Rooftop installation of 220 KW on industrial Tin Roof Structure at two locations in Ahmadabad, Gujarat state.
I have good skills in communication and computer network knowledge.
Current CTC: 2.7
Expected CTC: According to your company standards.
Ready to travel to distant sites for inspection & service. Good communication in English. Willing to relocate and travel international ( Passport Ready)
Interested to work sincerely for the growth of the organization and accept Challenges.
Thanking you
With regards,
Mr. Graceson Jacob
Sector 3D,
GANDHINAGAR,
Gujarat
India.
Mob:09824104095 / 09408707445
I am very much interested in applying for the post of Electrical Engineer
Currently I am working for Hamad & Mohamad Al-Futtaim Doha, Qatar as a Electrical engineer since January 2016. My current position responsibilities are LV and ELV services.
I am interested to join in your organization to sharpen my skills and to next level of experience. My strengths include being able to work well with team, to converse with anyone, and to enter easily into new situations with a creative and resourceful attitude. I am very detail oriented, sincere and punctual.
I am confident and assure you that I shall discharge my responsibilities and contribute substantially to the growth of the organization and reputation. I feel that i would be able to make a significant contribution to your organization.
I have attached my resume, which outlines my credentials and experience in detail.
Thanking you,
Warm Regards,
(Abdul Rahiman)
Address for communication:
Abdul Rahiman
Phone: +974 70420084, +974 31208802
abdulrahiman0106@gmail.com
abdulrahiman_eee@yahoo.com
Total Work Exp: 8+ year
Gulf Exp: : 5+year
Current Employer: Hamad & Mohamad Al-Futtaim
Passport No: G4739146
Exp Date : 18/08/2017
Skype Id : abdulrahiman0106
Notice Period: Immediate
Contact No: +97470420084, +974 31208802
Creative, ambitious and knowledgeable engineering professional seeks to utilize my perfect skills and experience in the Electrical Engineering Field (Power & controllers) to meet and exceed all goals in your organization while advancing my own Career.
Responsibilities: E&I QA/QC
Responsibilities for Field Inspection as per Inspection Testing Plan (ITP’s) Related (E&I)
Jobs.QA/QC with the help of specification, drawings.
Inspection for Material Receiving related Electrical, Instrument as per Indent, Delivery
Note.
Inspection for Cable Laying (E & I) in Cable Trays, Trenches as per cross-sectional
drawings.
Inspection for Cable Trays (E&I) Installation (Perforated, Ladder, Mesh) as per drawing.
Responsible for all Red Marks/As Built drawing as per site modification.
Inspection for Lighting Installation as per circuit diagram, Panel Installation,Transformer
installation.
Inspection for Heating Tracing cables and Testing.
Having Good Knowledge of (NEC) National Electrical Code.
American Petroleum Institute (API ) Standards
IEC- international ELECTROTECHNICAL Commission Standards.
Inspection for the Installation of MCT’s.
Inspection for Lightning Protection (Lightning Arresters).
Inspection for EARTHING Cable Laying, CAD Weld - Exothermic Weld joints,
Earth Bus Bar, EARTHING Test.
Inspection for Motor Installation, Resistance/IR test & Motor torque test.
Inspection for Cable Continuity/IR, Cable termination, EARTHING test.
Prepare the NCR, CAR, TQ, ITP, and Method Statements & RFI’S.
Complete QA/QC Documentation as per Project specification.
Inspection for calibration of PI, PDIT, PT, TT, TE, FT, LT.
Functional Test of Ultrasonic Transmitters, LSL, LSH, LSHH, AT.
Inspection for Field Instrument Installation (PT,FT, LT, Control Valves as per Hook up drawing)
Inspection for Impulse Line Leak test.
Inspection for JB’S Installation, Panels, Cabinets Installation.
Preparing the complete Loop Folders like(DI,DO,AI,AO,RTD for Loop Checking Pre-
Commissioning with the attachments of Instrument loop package index, Functional loop test CR,
Material Receiving Calibration CR, Instrument Installation CR Instrument index, instrument Loop
Diagram & P& ID’S.
Responsible for clear the Punch Points.
Prepare the Final Dossier as per client HOS and Hand over to Mechanical Completion
Department (MC)
Final Walk Down of Hand over System (HOS) with Client.
Dear Respected Sir,
I am forwarding my CV for a Solar Power Plant Installation / Service in Gujarat State or Any Part of India ( Ready to Travel).
Experienced in Solar power plant Field Work (Total Experience: 4.5 years, 3.5 years in Solar Power Plant Project Engineer ( Electrical) ) . I have great skills in solar Power Plant:commissioning and O&M activities, special 100 KW & more solar Power Plant. I want to work on MW solar power Plant project. Please go through my resume attached with this mail.
I have done graduation in B. E. in Electronics & Communication, I have rich skill in Solar Power Plant Electrical PROJECTS and Electrical Grid Power Commissioning, Inspection with Government Chief Electrical Inspector with CAD Drawings, Electrical Safety Rules, and International Standards ( IS) Rules for Project Approval and Project Commissioning.
Currently, on going Solar Rooftop installation of 220 KW on industrial Tin Roof Structure at two locations in Ahmadabad, Gujarat state.
I have good skills in communication and computer network knowledge.
Current CTC: 2.7
Expected CTC: According to your company standards.
Ready to travel to distant sites for inspection & service. Good communication in English. Willing to relocate and travel international ( Passport Ready)
Interested to work sincerely for the growth of the organization and accept Challenges.
Thanking you
With regards,
Mr. Graceson Jacob
Sector 3D,
GANDHINAGAR,
Gujarat
India.
Mob:09824104095 / 09408707445
I am very much interested in applying for the post of Electrical Engineer
Currently I am working for Hamad & Mohamad Al-Futtaim Doha, Qatar as a Electrical engineer since January 2016. My current position responsibilities are LV and ELV services.
I am interested to join in your organization to sharpen my skills and to next level of experience. My strengths include being able to work well with team, to converse with anyone, and to enter easily into new situations with a creative and resourceful attitude. I am very detail oriented, sincere and punctual.
I am confident and assure you that I shall discharge my responsibilities and contribute substantially to the growth of the organization and reputation. I feel that i would be able to make a significant contribution to your organization.
I have attached my resume, which outlines my credentials and experience in detail.
Thanking you,
Warm Regards,
(Abdul Rahiman)
Address for communication:
Abdul Rahiman
Phone: +974 70420084, +974 31208802
abdulrahiman0106@gmail.com
abdulrahiman_eee@yahoo.com
Total Work Exp: 8+ year
Gulf Exp: : 5+year
Current Employer: Hamad & Mohamad Al-Futtaim
Passport No: G4739146
Exp Date : 18/08/2017
Skype Id : abdulrahiman0106
Notice Period: Immediate
Contact No: +97470420084, +974 31208802
Experience in the field of Testing and Commissioning & QA/QC of power system products, look forward for an opportunity to display my skills in the field of Testing, commissioning Operation & Maintenance and Execution of projects related to power systems
I am working as a Electrical Commissioning Engineer / CompEx Inspector/QAQC Engineer for the 14 years Experience and happy to mention some of my achievements in this role
1. RESUME
SAJEEV R. Email: sajeevrajagopal@yahoo.com MOB:
+971564993973
QA/QC E & I AND CP INSPECTOR
(ARAMCO &ZADCO
APPROVED)
PERSONNEL PROFILE:-
NAME : SAJEEV R.
NATIONALITY: INDIAN
EDUCATIONAL QUALIFICATION:-
Diploma in Electrical and Electronics Engineering
COMPUTER KNOWLEDGE:-
MS Office
PROFESSIONAL QUALIFICATION:
Familiar with Saudi Aramco Quality Management Information system ( QMIS ) &
Technip Site Management and Control ( SMC ) Release 4.0
Completed the Quality Management System (QMS ) Lead Auditor Training Course
– IRCA REFERENCE A17072, Certificate Number 104835
BASIC H2S (9014) OPITO APPROVED.
Saudi Aramco permit receiver Certificate
SUMMARY OF EXPERIENCE:-
Having ample experience in the field of Electrical and instrumentation
Engineering, engaged in inspection, supervision testing and commissioning of
various electrical equipment, instrumentation and cathodic protection. Quality
Sajeev R. – QA/QC E & I Inspector
Page 1 of 8
2. Control and Supervision for the installation of electrical equipments such as;
lighting, conduit layout, cable tray, cable pulling and termination of medium, low
voltage cable. Testing and commissioning of medium and low voltage cables
including motors. Installation of Cathodic Protection; galvanic anodes and deep
anode beds, Installation of Positive and Negative cables from rectifiers to
structures. Holiday Testing of Positive Anode Cables. Hook-Up and Installation of
Process related instruments such as; impulse tubing, transmitters, controllers,
PI, PDIT, PCV, etc. Calibration and loop checking of instrument’s from field to
DCS/PLC. Installation, Pre-commissioning and testing of 230KV, 34.5KV &
13.8KV Substations, MV/LV Switchgear,MV/LV MCC’S, MV/LV Transformers,
230KV, 34.5KV Cables , Boiler system, Cooling tower, MOV’S, Control panels
and Lightning protection system.
SKILLS AND STRENGTH:-
Installation of SCADA System, Base Station Radio, Omni-Directional
Antenna and RF Feeder, GPS Antenna and GPS Time Server and Pre-
commissioning testing. Well Hook-up’s, PDHMS & MPFM Installation and
SCADA Integration.
> Electrical heat tracing system
Installation and Commissioning of Power and other Electrical,
Instrumentation and CP Equipments.
Electrical, Instrumentation and CP Installation and Standards.
Installation of various Electrical Machinery and Control Installation.
Cable Design (Cable Jointing, Glanding and Termination, Laying works,
Cable Tray works).
Conduit Pipe Installation.
Ability to Coordinate the Project Activity.
Installation,Pre-commissioning and testing of 230KV,34.5KV & 13.8KV
Substations,MV/LV Switchgear,MV/LV MCC’S & Transformers.
Sajeev R. – QA/QC E & I Inspector
Page 2 of 8
3. Installation, Pre-commissioning & Testing of Lightning protection system.
Installation, Inspection & Testing of Grounding system.
Installation, Pre-commissioning & Testing Inspection of MV/LV Motors.
WORKING EXPERIENCE:-
Company : ABB SpA-Process Automation Division
Project : ZAKUM DEVELOPMENT COMPANY ZIRKU FACILITIES
EPC FOR POWER UPGRADE AT ZIRKU PROJECT NO.8374
Position : QC ELECTRICAL INSPECTOR (ZADCO APPROVED)
Duration : 01 APRIL 2015 to till date
Company : Zamil Offshore Services Company, KSA
Project : Offshore Hook-up, Upgrade Modification & Comm. Support
Contract No: 6600027423 / J.O. 10-03026-0037
Position : E&I INSPECTOR (ARAMCO APPROVED)
Duration : 26 Feb 2013 to 04 March 2015
Company : Technip Italy S.P.A
Project : Saudi Aramco Total Refining & Petrochemical Company (SATORP)
Contract No: 3000235433
Position : Electrical Inspector (SATORP Approved)
Duration : 29 Oct. 2011 to 19 Dec. 2012
Company : Mohd.Al Mojil Group Company
Project : Mnifa Co-Generation and Main Substations
B.I.No : 10-00450-0003
Position : QA/QC E&I Inspector (Aramco Approved)
Duration : 18th
Apr.2011 to 20th
Oct. 2011
Company : Contracting & Trading Company (CAT)
Project : MGS Expansion, SRG-2 P/L, PCV & Meter Station Upgrade
B.I. No. : BI-10-00433-0002
Position : QA/QC E & I Inspector (Aramco Approved)
Duration : 12th
Jan. 2010 to 17th
Apr.2011
Sajeev R. – QA/QC E & I Inspector
Page 3 of 8
4. Company : Al Latifa Cont. Company
Project : Saudi Aramco Corporate Data Center (CDC) Project
Dhahran (BI-10-0273)
Position : QA/QC Electrical Inspector (Aramco Approved)
Duration : 7th
Oct. 2009 to 7th
Jan. 2010
Company : Arabian Bemco
Project : Utility Upgrade Project at Juaymah Gas Plant
Saudi Aramco (BI-10-03454)
Position : QA/QC Electrical Inspector (Aramco Approved)
Duration : 9th
Apr. 2008 to 2nd
Aug. 2009
Job Responsibilities:-
Verification of inspection readiness before issuing RFI.
Keeping the Files/Inspection Records always updated.
Highlighting all discrepancies/anomaly detected during monitoring
inspection and informing the same to QC Manager.
Initiate Surveillance and Non Conformance Report (NCR) as required in
consultation with QC Manager.
Follow of corrective and preventive action for NCRs/Surveillance issued
and verification of effectiveness of the same.
Taking immediate remedial to clear inspection log book comments.
Submitting daily report to QC Manager at the end of each day of work.
Sole responsible for all Quality Control Activities for the allotted area of
discipline.
Verification of materials supplied with that of materials approval.
Verification of proper functioning and utilization of measuring
instruments.
Familiarization with overall construction scope of work.
Sajeev R. – QA/QC E & I Inspector
Page 4 of 8
5. Verification of correctness of Equipment/Materials identifications provided,
color coding scheme of cables in accordance with internal practice.
Identification/Numbering of cables and its cores in accordance with IFC
drawings.
Monitoring, verification of calibration and identification of measuring
instruments.
Final cable termination inspection of the primary and secondary cables.
Prepare Inspection Test Plan (ITP) for Electrical Discipline.
Inspect the work under as per specifications and standards.
Assuring correct quality materials as per specification.
Testing and commissioning of electrical installations and equipments.
Inspection charge for Electrical works at Port Facilities
Inspection of installation Grounding System, Cathodic Protection System,
Small Power and Lighting Installation, Fabrication of Instrument and
Electrical Equipment Support, Substation Equipments, Low and Medium
Voltage Motors.
Inspection for the installation of transformer rectifier, Positive and Negative
Cables laying and AC disconnecting switches installation.
Inspection for the installation of Deep Well Anode beds, Distributed Anode,
Sacrificial magnesium anodes and single pin, three pin test station for
pipelines.
Inspection for the installation anode/cable marker posts for pipeline.
Bonding boxes installations.
Holiday testing of positive anode cables.
Monthly reading (Pipe to Soil Potential) for cathodic protection system.
Installation and commissioning of WRMU for cathodic protection system.
Preparation of RFI, Field Inspections, Co-ordination with Client QA/QC
Inspector / Construction Team.
Sajeev R. – QA/QC E & I Inspector
Page 5 of 8
6. Co-ordination with Third Party Independent Laboratory in conducting
Tests.
Review QCP, ITP and Method of statement.
Review Pre-commissioning test packages.
Company : Shree Electrical Company, India
Position : QC Electrical Inspector
Duration : Nov. 2001 to Dec. 2007
Company : DAELIM Engineers and Constructors
Project : M/s. NTPC’s 350Mw CCPP (Naphta Based)
Position : QC Electrical Inspector
Duration : Nov. 1996 to Aug. 2001
Company : F.A.C.T., India
Position : Apprentice in Electrical Engineering
Duration : Aug. 1995 to Aug. 1996
Job Responsibilities:-
• Project quality standards specified in the Contract and that the procedures
laid down in the Quality Control procedures and inspection.
• Test Plans to achieve these standards are followed.
• Complete supervision of Panel Erection
• Fabrication, erection, commissioning of electrical equipments.
• Alignment of switchgears and testing as per specification and drawing
provided. Motors, transformers etc as for specification.
• Close Co-ordination and discussion with clients, consultant and other
department concerned.
• Quality and safety system.
• Supervisor for cable tray, cable laying, panel shifting, motor alignment,
termination of power cable control.
Sajeev R. – QA/QC E & I Inspector
Page 6 of 8
7. • Knowledge about circuit breaker, transformers, panels, relays, Insulator,
motors, generators, bus system, single line diagram of sub-station,
generation, transmission and protection etc.
• Meggering and continuity test of primary and secondary cables from
Junction Box to Instrument.
• Final Cable termination inspection of the primary and secondary cables.
• Final/Individual inspection of the Electrical and Instrumentation
equipment.
• Inspect the work under as per specifications and standards.
• Review Design and development of one line diagram, preparation of
electrical equipment specifications, identifying hazardous areas,
• Installation of Component of Sub-Station.
• Supply of line distribution for consumer’s premises low voltage.
• Prepare installation field check list and mechanical completion package for
electrical and instrumentation part
• Make as-built drawing for all changes in the execution
• Assuring correct quality materials as per specification.
• Inspection of electrical activities in the plant area such as lightning
protection, grounding system, lighting layout, power conduiting, fire & alarm
system etc.
• Inspection for material receiving, Monthly reports, electrical plan/drawings
and Safety Procedures.
• Testing and commissioning of electrical installations and equips
• Conduct megger and insulation test and prepare test record / report
• Inspection & Testing of LV Transformer.
• High voltage and Low voltage Electrical and Equipment installation.
• Site surveillance to check the construction work and give some comments
if necessary according to standard installation.
• Installation of new transformer bus ducts control gears and switch gears,
Sajeev R. – QA/QC E & I Inspector
Page 7 of 8
8. reconnection and testing of power and control cable.
• Electrical supervisor for shut down activities.
• Inspection for spares for Electrical Projects.
• Daily monitoring works and inspection to ensure conformity with plans,
design and standards.
• Inspect motor cable pulling, grounding copper bar, cable tray emergency
lighting cable installation, pole erection, string of wire and terminals well.
(SAJEEV R.)
Sajeev R. – QA/QC E & I Inspector
Page 8 of 8