SlideShare a Scribd company logo
1 of 10
Oracle E-Business Project II
Production & Supply Chain Planning
Kick of Meeting
Why ERP II
Scope of Works
Investment Summary
Project Deliverables
Project Milestone Payments
Project Plan & Schedule
Project Team Structure
Objective of ERP II
• Considering the capacity constraints of each manufacturing facility based on the Master
Production Schedule (MPS) & Material Requirement for Production (MRP) the lead time of
the suppliers along with the purchasing constraints agreed upon with the suppliers.
• Tracking all manufacturing process starting from the recipe definition (routings & formulas)
through all the manufacturing execution cycle.
• Manage all maintenance & calibration activities (preventive & reactive) which effects the
manufacturing planning along with the spare parts planning.
• Dispensing, Labeling and Enhanced Process Instructions activities are made manually
and the batch record can not be tracked on the system. Also the quantities returned from
the dispensing area to inventories is shortfall in validating those quantities.
• Standard Overheads are allocated (calculated periodically) and there is a variance
between standard and actual therefore there is no accurate way of calculating profitability.
In order to complete manage product costing the manufacturing modules must be
implemented to cater for cost rollups of the finished products.
Scope of Work
• Process Manufacturing
Oracle process manufacturing applications, a part of supply chain management, automates the entire product
life cycle for recipe-based manufacturing, from basic new product development, recipe management, and
production to cost, quality, and regulatory management. It allows you to optimize production capacity from
raw materials through final product.
• Manufacturing Execution System
The application also provides manufacturing execution system (MES) capabilities through its task-oriented
production operator interface, electronic batch record keeping and embedded quality management system
functionality. Oracle process manufacturing applications let you formulate products to individual customer
specifications, manage stability studies, account for ingredient potency variations, trace batches according to
lot number, optimize capacity, and drive continuous process improvement. MES delivers real-time shop floor
visibility to multiple layers of management.
• Advanced Supply Chain Planning
Oracle Advanced Supply Chain Planning provides database centric holistic planning and optimization that
rapidly and significantly improves supply chain performance by analyzing all aspects of a supply chain and
developing optimal plans across the virtual supply chain
• Warehouse Management
Oracle Warehouse Management (WMS) enables you to maximize their utilization of labor, space and
equipment investments by coordinating and optimizing resource usage and material flows across a global
supply chain on a single platform.
• Enterprise Asset Management
Oracle Enterprise Asset Management (eAM) is part of the Oracle e-Business suite with direct integration with
Oracle Manufacturing, Oracle Purchasing, Oracle Property Management, Oracle Quality, Oracle Inventory,
Oracle Human Resources, Oracle Financials, Oracle Fixed Assets and Oracle Projects. This enables you to
strategically monitor resource and cost planning throughout the enterprise.
Investment Summary
• Licenses Cost $87,337.50
• Process Manufacturing
• Advanced Supply Chain Management
• Warehouse Management
• Manufacturing Execution System
• Enterprise Asset Management
• Yearly Contract Support (Software Insurance) $19,214.26
• Accommodation & Ticket Expenses $15,000.00
• Hardware $ 10,000.00
• Implementation & Consultancy Service Fees $180,000.00
Total Investment $311,552.26
Deliverables Definition
Deliverable ID Deliverable Name Deliverable Purposes
WM.020 Project Work-Plan • Develop a baseline Work-plan to educate the client and determine
project resource requirements.
• A high-level network of interdependent tasks representing all
project work, with staff work assignments and schedules consistent
with the Project Management Plan.
RM.020 Team Formation Document • The client understands the obligation to provide resources to
support the project Work-plan.
Meeting Kick of Meeting • Ensure mutual understanding of the scope, objectives, and
approach, establish the roles and responsibilities of each of the
parties on the project, and to gain acceptance of the scope,
objectives and approach.
DCT Data Gathering Template • Used to guide DAD on how to collect the business data as per the
application attributes.
BF.045 High Level Solution Document
BR.030 Business Requirements
Mapping
• A set of formal statements of the detailed business requirements for
each business process, the source of these requirements
• Process flow diagrams of the events and business processes that the
applications and the associated functions of the business area will
support.
• Detailed business requirements written in business language and
associated with business processes; analysis and comparison of the
current system for a business requirement to the proposed system;
details for the type and nature of the solution in a descriptive
format.
Deliverables Definition.. Continuo
Deliverable ID Deliverable Name Deliverable Purposes
BR.100 Application Setup Document • Develop a baseline Work-plan to educate the client and determine
project resource requirements.
• A high-level network of interdependent tasks representing all
project work, with staff work assignments and schedules consistent
with the Project Management Plan.
BR.110 Security Profile Document • The use of this document is to control security between users
working with Oracle Applications.
• Roles are defined to represent the Responsibilities of users.
• Each Role represents a group of tasks that the user is permitted to
do, hence each Role is related to a number of forms that the user
can access.
TE.020 Testing Scenario Document • The module testing strategy determines the project‘s approach to
testing. The strategy looks at the characteristics of the system to
be built, the project time line and budget, and plans the breadth
and depth of the testing effort. The effect of the testing strategy will
influence tasks related to test planning, test types, and test
executions.
TE.130 Testing Acceptance Document • On completion of acceptance DAD will be asked to sign an
acceptance Certificate as a record of the successful completion of
the project to its defined scope.
Project Milestone Payments
Subject Deliverables Amount US$
Down Payment (15%) Upon Agreement Signature & Mobilization 27,000
Milestone (1) – (25%)
CRP’s & Documents
Upon deliver and approve the following documents:
- WM.020 Project Work-Plan
- RM.020 Team formulation Document
- Meeting – Kick of Meeting.
- DTC – Data Collection Template.
- BF.045 High Level Solution document.
- BR.080 Future Process Model
- BR.030 Business Requirement Mapping.
- Conduct all required CRP’s
45,000
Milestone (2) – (30%)
Training
Upon complete and approve Core Team training:
- Setup & Advanced Features Training
- Functional Training (Business Flows)
54, 000
Milestone (3) – (20%)
Testing
Upon deliver and approve the following activities:
-Define Testing Criteria.
- TE.020 Testing Scenario Document
- Develop Test script (Business Process & Reports).
- Conduct Testing.
-Customer Testing Acceptance.
- BR.100 Application Setup Document
- BR.110 Security Profile Document
36,000
Milestone (4) – (10%)
Production
After one Month from Go-Live Date. 18,000
Total Implementation Fees 180,000
Project Plan & Schedule
Phase One (4 Months) :
1. OPM (Oracle Process Manufacturing):
OPM System Administration
OPM Product Development
Formula Management
Quality Management
OPM Process Execution
Production Management
OPM Cost Management
2. Manufacturing Execution System (MES) OPM
3. Advanced Supply Chain Planning
Phase Two (3 Months)
1. Enterprise Asset Management
2. Warehouse Management System
Month 1
• CRP & Documentation
Month2
• Training
Month 3
• Testing
Month 4
• Migration & Go Live
Month 4
• CRP & Documentation
Month 5
• Training &Testing
Month 6
• Migration & Go Live
Project Team Structure
Team Team Member Area Responsibility
Steering
Committee
Abdul Rahman
Al-Ghoul
Supply Chain Sponsor • Conduct regular project progress reviews every 2 weeks/1 month.
• Ensure that the business is performed with the best use of the Product.
• Where necessary, make the appropriate decisions to avoid delays.
• Ensuring other members of the management share commitment to the project.
Provide the resources required to make the project a success.
• Making decisions that can change project organization, project scope, or
allocation of project funding.
• Removing obstacles to meeting critical success factors which may impact the
successful outcome of the project.
• Approve overall system functionality and ensure that the business needs are
met.
Isamil Khalifeh Technical Sponsor
Hany Bushnaq Financial Sponsor
Project
Manager
Ziad Yousef Project Owner
• Elect, document, co-ordinate, communicate all planning and resource
requirements and ensure that project deadlines are met.
• Be accountable for each component of the project life cycle to be performed
within the planned timescales and resource availability.
• Monitor and report project team progress to the Steering Committee.
• Assuming overall responsibility for the successful conclusion of the project.
• Measuring project success against budget, original scope, business objectives.
Developing and maintaining project plans.
• Assigning tasks to project personnel & Monitoring staff and project progress.
• Assuming responsibility for planning resource requirements and coordinating the
daily tasks of all project team members in conjunction with contract resources
Business
Owner
Abdul Rahman
Al-Ghoul
Supply chain,
Manufacturing &
Maintenance Areas
• Responsible for the day-to-day management of the contractual commitments to
the project.
• Work as MIS Key users for the total implementation of the project and work in
close coordination other key users for the specified modules
• Participate in the Business Requirements Definition stage.
• Identify the Reporting Requirements
• Map the business data.
• Approve the deliverables.
• Setting up the Oracle Applications Production environment.
• Coordinating and performing the Application Testing.
• Delivering the end-user training.
• Completing tasks and deliverables assigned by the project manager.
Anas Alshishani Analytical Research
Haitham Sartawi Product Development
Mohammad Reyahee Quality Control
Ahmad Al-Fayoumi System Validation
Jihad Mubarak Cost Management
Project Team Structure.. Continue
Team Team Member Area Responsibility
Core
Team
(Key
User)
Shehadeh Salem Warehouses Management • Be authorized to make binding decisions for DAD with regard to
the implementation
• Provide all information concerning DAD operations and activities
which may be required.
• DAD Key-user will be an ultimate user of the system. Their primary
responsibility is to understand the life cycle of the project, and
where their involvement lines.
• They must ensure that they have an open, inquiring mind and look
for practical solutions when functionality is discussed with the
subject matter experts.
• Participate in the Business Requirements Definition stage.
• Key-users will be requested to take certain decisions that might
affect the whole business process
• Identify the Reporting Requirements
• Map the business data.
• Approve the deliverables
• Key-user must undertake to attend and contribute in the training
offered by the project
• Key-user will be responsible to transfer the application skills to the
end-user
• Reporting DAD business procedures.
Supply Chain Planning
Mohammed Subhi. Production #1
Production #2
Farid Abu Ajamiah Maintenance & Spar Parts
Murad Al-Samneh Analytical Research
Ahmad Esa Al Zghool Quality Control & Stability #1
Hadeel Ibrahim Product Development
Cost Management

More Related Content

Similar to ERP II Overview.ppt

Jason Kitchenham Mhighlights
Jason Kitchenham MhighlightsJason Kitchenham Mhighlights
Jason Kitchenham Mhighlights
Jason Kitchenham
 
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
ssuser835d1a
 
BuildingdigitalServiceswithServiceBuildingBlocks (2)
BuildingdigitalServiceswithServiceBuildingBlocks (2)BuildingdigitalServiceswithServiceBuildingBlocks (2)
BuildingdigitalServiceswithServiceBuildingBlocks (2)
Helmut Steigele
 
CV_Alana Miles-2015-
CV_Alana Miles-2015-CV_Alana Miles-2015-
CV_Alana Miles-2015-
Alana Miles
 
Resume of Mohamed Sajid Maqba_2016
Resume of Mohamed Sajid Maqba_2016Resume of Mohamed Sajid Maqba_2016
Resume of Mohamed Sajid Maqba_2016
Mohamed Sajid Maqba
 

Similar to ERP II Overview.ppt (20)

CRM Implementations and Upgrades
CRM Implementations and UpgradesCRM Implementations and Upgrades
CRM Implementations and Upgrades
 
CPI_MOM_KBR_20110909_v1
CPI_MOM_KBR_20110909_v1CPI_MOM_KBR_20110909_v1
CPI_MOM_KBR_20110909_v1
 
Jason Kitchenham Mhighlights
Jason Kitchenham MhighlightsJason Kitchenham Mhighlights
Jason Kitchenham Mhighlights
 
American Electric Power Ercot kickoff
American Electric Power Ercot kickoffAmerican Electric Power Ercot kickoff
American Electric Power Ercot kickoff
 
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project Management
 
Case study value of it strategy in hi tech industry
Case study value of it strategy in hi tech industryCase study value of it strategy in hi tech industry
Case study value of it strategy in hi tech industry
 
Top Business Benefits of Application Lifecycle Management (ALM)
Top Business Benefits of Application Lifecycle Management (ALM)Top Business Benefits of Application Lifecycle Management (ALM)
Top Business Benefits of Application Lifecycle Management (ALM)
 
Arunkumar Resume
Arunkumar ResumeArunkumar Resume
Arunkumar Resume
 
Using Benchmarking to Quantify the Benefits of Software Process Improvement
Using Benchmarking to Quantify the Benefits of Software Process ImprovementUsing Benchmarking to Quantify the Benefits of Software Process Improvement
Using Benchmarking to Quantify the Benefits of Software Process Improvement
 
PAC Fast Track Implementation Program
PAC Fast Track Implementation ProgramPAC Fast Track Implementation Program
PAC Fast Track Implementation Program
 
Practical Enterprise Architecture in Medium-size Corporation using TOGAF
Practical Enterprise Architecture in Medium-size Corporation using TOGAFPractical Enterprise Architecture in Medium-size Corporation using TOGAF
Practical Enterprise Architecture in Medium-size Corporation using TOGAF
 
BuildingdigitalServiceswithServiceBuildingBlocks (2)
BuildingdigitalServiceswithServiceBuildingBlocks (2)BuildingdigitalServiceswithServiceBuildingBlocks (2)
BuildingdigitalServiceswithServiceBuildingBlocks (2)
 
What i es do iie iab v2
What i es do iie iab v2What i es do iie iab v2
What i es do iie iab v2
 
CV_Alana Miles-2015-
CV_Alana Miles-2015-CV_Alana Miles-2015-
CV_Alana Miles-2015-
 
Resume of Mohamed Sajid Maqba_2016
Resume of Mohamed Sajid Maqba_2016Resume of Mohamed Sajid Maqba_2016
Resume of Mohamed Sajid Maqba_2016
 
Shriraam Madanagopal Internship Report
Shriraam Madanagopal Internship ReportShriraam Madanagopal Internship Report
Shriraam Madanagopal Internship Report
 
CV D. Maimbolwa
CV D. MaimbolwaCV D. Maimbolwa
CV D. Maimbolwa
 
7 Project planning for software engineering.pptx
7 Project planning for software engineering.pptx7 Project planning for software engineering.pptx
7 Project planning for software engineering.pptx
 
Profile Sumana_Sen
Profile Sumana_SenProfile Sumana_Sen
Profile Sumana_Sen
 

Recently uploaded

Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 

Recently uploaded (20)

Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by Anitaraj
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptx
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 

ERP II Overview.ppt

  • 1. Oracle E-Business Project II Production & Supply Chain Planning Kick of Meeting Why ERP II Scope of Works Investment Summary Project Deliverables Project Milestone Payments Project Plan & Schedule Project Team Structure
  • 2. Objective of ERP II • Considering the capacity constraints of each manufacturing facility based on the Master Production Schedule (MPS) & Material Requirement for Production (MRP) the lead time of the suppliers along with the purchasing constraints agreed upon with the suppliers. • Tracking all manufacturing process starting from the recipe definition (routings & formulas) through all the manufacturing execution cycle. • Manage all maintenance & calibration activities (preventive & reactive) which effects the manufacturing planning along with the spare parts planning. • Dispensing, Labeling and Enhanced Process Instructions activities are made manually and the batch record can not be tracked on the system. Also the quantities returned from the dispensing area to inventories is shortfall in validating those quantities. • Standard Overheads are allocated (calculated periodically) and there is a variance between standard and actual therefore there is no accurate way of calculating profitability. In order to complete manage product costing the manufacturing modules must be implemented to cater for cost rollups of the finished products.
  • 3. Scope of Work • Process Manufacturing Oracle process manufacturing applications, a part of supply chain management, automates the entire product life cycle for recipe-based manufacturing, from basic new product development, recipe management, and production to cost, quality, and regulatory management. It allows you to optimize production capacity from raw materials through final product. • Manufacturing Execution System The application also provides manufacturing execution system (MES) capabilities through its task-oriented production operator interface, electronic batch record keeping and embedded quality management system functionality. Oracle process manufacturing applications let you formulate products to individual customer specifications, manage stability studies, account for ingredient potency variations, trace batches according to lot number, optimize capacity, and drive continuous process improvement. MES delivers real-time shop floor visibility to multiple layers of management. • Advanced Supply Chain Planning Oracle Advanced Supply Chain Planning provides database centric holistic planning and optimization that rapidly and significantly improves supply chain performance by analyzing all aspects of a supply chain and developing optimal plans across the virtual supply chain • Warehouse Management Oracle Warehouse Management (WMS) enables you to maximize their utilization of labor, space and equipment investments by coordinating and optimizing resource usage and material flows across a global supply chain on a single platform. • Enterprise Asset Management Oracle Enterprise Asset Management (eAM) is part of the Oracle e-Business suite with direct integration with Oracle Manufacturing, Oracle Purchasing, Oracle Property Management, Oracle Quality, Oracle Inventory, Oracle Human Resources, Oracle Financials, Oracle Fixed Assets and Oracle Projects. This enables you to strategically monitor resource and cost planning throughout the enterprise.
  • 4. Investment Summary • Licenses Cost $87,337.50 • Process Manufacturing • Advanced Supply Chain Management • Warehouse Management • Manufacturing Execution System • Enterprise Asset Management • Yearly Contract Support (Software Insurance) $19,214.26 • Accommodation & Ticket Expenses $15,000.00 • Hardware $ 10,000.00 • Implementation & Consultancy Service Fees $180,000.00 Total Investment $311,552.26
  • 5. Deliverables Definition Deliverable ID Deliverable Name Deliverable Purposes WM.020 Project Work-Plan • Develop a baseline Work-plan to educate the client and determine project resource requirements. • A high-level network of interdependent tasks representing all project work, with staff work assignments and schedules consistent with the Project Management Plan. RM.020 Team Formation Document • The client understands the obligation to provide resources to support the project Work-plan. Meeting Kick of Meeting • Ensure mutual understanding of the scope, objectives, and approach, establish the roles and responsibilities of each of the parties on the project, and to gain acceptance of the scope, objectives and approach. DCT Data Gathering Template • Used to guide DAD on how to collect the business data as per the application attributes. BF.045 High Level Solution Document BR.030 Business Requirements Mapping • A set of formal statements of the detailed business requirements for each business process, the source of these requirements • Process flow diagrams of the events and business processes that the applications and the associated functions of the business area will support. • Detailed business requirements written in business language and associated with business processes; analysis and comparison of the current system for a business requirement to the proposed system; details for the type and nature of the solution in a descriptive format.
  • 6. Deliverables Definition.. Continuo Deliverable ID Deliverable Name Deliverable Purposes BR.100 Application Setup Document • Develop a baseline Work-plan to educate the client and determine project resource requirements. • A high-level network of interdependent tasks representing all project work, with staff work assignments and schedules consistent with the Project Management Plan. BR.110 Security Profile Document • The use of this document is to control security between users working with Oracle Applications. • Roles are defined to represent the Responsibilities of users. • Each Role represents a group of tasks that the user is permitted to do, hence each Role is related to a number of forms that the user can access. TE.020 Testing Scenario Document • The module testing strategy determines the project‘s approach to testing. The strategy looks at the characteristics of the system to be built, the project time line and budget, and plans the breadth and depth of the testing effort. The effect of the testing strategy will influence tasks related to test planning, test types, and test executions. TE.130 Testing Acceptance Document • On completion of acceptance DAD will be asked to sign an acceptance Certificate as a record of the successful completion of the project to its defined scope.
  • 7. Project Milestone Payments Subject Deliverables Amount US$ Down Payment (15%) Upon Agreement Signature & Mobilization 27,000 Milestone (1) – (25%) CRP’s & Documents Upon deliver and approve the following documents: - WM.020 Project Work-Plan - RM.020 Team formulation Document - Meeting – Kick of Meeting. - DTC – Data Collection Template. - BF.045 High Level Solution document. - BR.080 Future Process Model - BR.030 Business Requirement Mapping. - Conduct all required CRP’s 45,000 Milestone (2) – (30%) Training Upon complete and approve Core Team training: - Setup & Advanced Features Training - Functional Training (Business Flows) 54, 000 Milestone (3) – (20%) Testing Upon deliver and approve the following activities: -Define Testing Criteria. - TE.020 Testing Scenario Document - Develop Test script (Business Process & Reports). - Conduct Testing. -Customer Testing Acceptance. - BR.100 Application Setup Document - BR.110 Security Profile Document 36,000 Milestone (4) – (10%) Production After one Month from Go-Live Date. 18,000 Total Implementation Fees 180,000
  • 8. Project Plan & Schedule Phase One (4 Months) : 1. OPM (Oracle Process Manufacturing): OPM System Administration OPM Product Development Formula Management Quality Management OPM Process Execution Production Management OPM Cost Management 2. Manufacturing Execution System (MES) OPM 3. Advanced Supply Chain Planning Phase Two (3 Months) 1. Enterprise Asset Management 2. Warehouse Management System Month 1 • CRP & Documentation Month2 • Training Month 3 • Testing Month 4 • Migration & Go Live Month 4 • CRP & Documentation Month 5 • Training &Testing Month 6 • Migration & Go Live
  • 9. Project Team Structure Team Team Member Area Responsibility Steering Committee Abdul Rahman Al-Ghoul Supply Chain Sponsor • Conduct regular project progress reviews every 2 weeks/1 month. • Ensure that the business is performed with the best use of the Product. • Where necessary, make the appropriate decisions to avoid delays. • Ensuring other members of the management share commitment to the project. Provide the resources required to make the project a success. • Making decisions that can change project organization, project scope, or allocation of project funding. • Removing obstacles to meeting critical success factors which may impact the successful outcome of the project. • Approve overall system functionality and ensure that the business needs are met. Isamil Khalifeh Technical Sponsor Hany Bushnaq Financial Sponsor Project Manager Ziad Yousef Project Owner • Elect, document, co-ordinate, communicate all planning and resource requirements and ensure that project deadlines are met. • Be accountable for each component of the project life cycle to be performed within the planned timescales and resource availability. • Monitor and report project team progress to the Steering Committee. • Assuming overall responsibility for the successful conclusion of the project. • Measuring project success against budget, original scope, business objectives. Developing and maintaining project plans. • Assigning tasks to project personnel & Monitoring staff and project progress. • Assuming responsibility for planning resource requirements and coordinating the daily tasks of all project team members in conjunction with contract resources Business Owner Abdul Rahman Al-Ghoul Supply chain, Manufacturing & Maintenance Areas • Responsible for the day-to-day management of the contractual commitments to the project. • Work as MIS Key users for the total implementation of the project and work in close coordination other key users for the specified modules • Participate in the Business Requirements Definition stage. • Identify the Reporting Requirements • Map the business data. • Approve the deliverables. • Setting up the Oracle Applications Production environment. • Coordinating and performing the Application Testing. • Delivering the end-user training. • Completing tasks and deliverables assigned by the project manager. Anas Alshishani Analytical Research Haitham Sartawi Product Development Mohammad Reyahee Quality Control Ahmad Al-Fayoumi System Validation Jihad Mubarak Cost Management
  • 10. Project Team Structure.. Continue Team Team Member Area Responsibility Core Team (Key User) Shehadeh Salem Warehouses Management • Be authorized to make binding decisions for DAD with regard to the implementation • Provide all information concerning DAD operations and activities which may be required. • DAD Key-user will be an ultimate user of the system. Their primary responsibility is to understand the life cycle of the project, and where their involvement lines. • They must ensure that they have an open, inquiring mind and look for practical solutions when functionality is discussed with the subject matter experts. • Participate in the Business Requirements Definition stage. • Key-users will be requested to take certain decisions that might affect the whole business process • Identify the Reporting Requirements • Map the business data. • Approve the deliverables • Key-user must undertake to attend and contribute in the training offered by the project • Key-user will be responsible to transfer the application skills to the end-user • Reporting DAD business procedures. Supply Chain Planning Mohammed Subhi. Production #1 Production #2 Farid Abu Ajamiah Maintenance & Spar Parts Murad Al-Samneh Analytical Research Ahmad Esa Al Zghool Quality Control & Stability #1 Hadeel Ibrahim Product Development Cost Management