Study of Dynamic Analysis for Immersed Tube Tunnel
Mr. Jaydeep R. Shinde1,
Prof. Yogesh R. Suryawanshi2
1
JSPM’S ICOER ME (Structure),
2
JSPM’S ICOER Professor (Civil Dept.)
I. INTRODUCTION
“1. Introduction “
With the recent rapid development of global economy and engineering technology, tunnel construction has
become increasingly important in regional economic and social development. An immersed tube is underwater
tunnel composed of segments, constructed elsewhere and floated to the tunnel site to be sunk into place and
linked together. They are commonly used for road and rail crossing of rivers, estuaries and sea channels/harbors.
Immersed tubes are often used in conjunction with other forms of tunnel at their end, such as a cut and cover or
bored tunnel, which is usually necessary to continue the tunnel forms near the water‟s edge to the entrance
(portal) at the land surface. The immersed tunnel has been proposed in Dharamtar creek to link two place i.e.
Karanja and Rewas, situated on the opposite on the bank of creek which will provide an alternative access
between Mumbai and Alibaug.As shown in the below figure 1 red line represents the alignment of the immersed
tunnel whereas the blue line represent the alignment of the Mumbai-Uran link proposed by the Government
company.
Figure.1. Site selection
ABSTRACT
The main aim of the project is to connect the two coats of the Dharamtar creek i.e. Rewas in
Alibaug and Karanja in Uran by an immersed tunnel. The construction of proposed immersed
tunnel will reduce the travel time from Mumbai to Alibaug from 3 hours to 1 hour. But this
reduction in time includes the consideration of the sea-link from Sewri to Nhava Seva
(Uran).Which was proposed by government and is already under construction. Thus
construction of this immersed tunnel will ease the transportation of the city. In this study, a
preliminary analysis of IZMIR immersed tube is carried out for validating purpose. The static
analysis of the tunnel was made in finite element program. The vertical displacement of the
tube unit under static loads was calculated. Afterwards, the seismic analysis was made to
investigate stresses developed due to both racking and axial deformation of the tunnel during
an earthquake. It was found that, maximum stress due to axial deformation is longer than
compressive strength of the concrete. The high stresses in the tube occur, because of the tube
stiffness.
Keywords: Immersed Tunnel, racking deformation, tube stiffness, SAP, etc.
Study of dynamic analysis for immersed tube tunnel
www.ijceronline.com Open Access Journal Page 68
Government of India has proposed a bridge from Sewri to Uran through the Butcher Island. This will provide a
direct entry to Mumbai into Uran. If one has to the travel to Alibaug, they should travel all the way from Uran to
Panvel and then get linked to the NH-4 and then enter into Alibaug which would require an entire journey of
102 Km from Uran to Alibaug, But if this Immersed tunnel project comes into existence the Uran and Alibaug
would be linked by a very short route of about 10-15 Km. This would provide a cheap and fast excess into
Alibaug from Mumbai. This would give rise to industrialization and also improve the transport facility.
II. “SITE SURVEY”
A. Preliminary data
After the area has been selection for the immersed tunnel the main task arises is to check whether the site
selected is appropriate and economical for the tunnel manufacturing, its construction and utilization. The below
figure 2 shows the sea bed profile between Karanja (left) and Rewas (right). Based on this profile diagram the
depth of the sea at various positions were located and the favorable alignment was considered for the placement
of the tunnel blocks, The alignment of the tunnel is an shown in the figure 2 with the blue line. The maximum
depth of the sea in this alignment is just 7.4 m. and thus, this region is very much favorable for the tunnel with
respect to the depth criteria.
Figure 2 Contour plan
B. Tunnel description
The proposed immersed tunnel is composed of two lane highways. The length is 2.4 Km including the immersed
tunnel selection of 1.9 Km in the middle. The tunnel has about 19 tunnel units. The shape of each tunnel element
has 24 m width, 9 m height and the length is 100 m. The technical properties and typical cross section of the
immersed tunnel unit were illustrated in the figure 3 shown in below.
Figure 3. Cross section details of proposed tunnel element
Study of dynamic analysis for immersed tube tunnel
www.ijceronline.com Open Access Journal Page 69
1. Length: 2.2 Km
2. Number of element: 19
3. Section of Box size : (120*24*9) m
4. Number of emargency and ventilation shafts: 1
C. Validating Study
Analytical work is based on details study of IZMIR bay immersed tunnel.[1]. This tunnel was measured 40 m in
width and 7.6 m in length. The tunnel was characteristic by rectangular cross section had 32  Road traffic.
The tube was measure 40 m in width and 7.6 Km in length. The Height of tube was 10 m.
Figure 3 Site Location of IZMIR tube tunnel.
A. Current Allowable Bearing Capacity
Ultimate bearing capacity is the maximum bearing capacity of the soil without its any failure and its settlement.
It is calculated by two different criteria. One is shear failure criteria and other is tolerable settlement criteria.
The smaller value from above this is adopted as a net allowable bearing capacity of soil. From shear failure
criteria, the Allowable bearing capacity is calculated as
)1......(....................................................................................................
FS
ult
a
q
q 
Where
ultq is the final caring capacity of the sea bed sub-soil. It is calculated from following equation
 ww
RDNRBNultq .)100(5304882.0
2'''2
 …. (2)
For determining net vertical stress increase „Pnet‟ due to construction of tunnel and its subsequent operation,
including the possibility that tunnel may be temporarily full of water, but should not float when the water is
emptied. Thus, P
i
net is calculated from equation [3].
P buoyancyP trafficP layerprotectiveP seawaterP soilP
i
net
 ……………………….………………. [3]
B. Static analysis for settlement calculations
Using the finite element method (FEM) and the SAP 2000, the vertical displacement of tunnel segment is
calculated as follows.
Figure 4. 3D modelling of tube
Study of dynamic analysis for immersed tube tunnel
www.ijceronline.com Open Access Journal Page 70
By using the subsoil data, the coefficient of (vertical) Subgrade reaction (Ks) was calculated from following
equation.
]4....[....................................................................................................
1
fss
s
IIEB
k


where,
B – Half of the tunnel width
E s – corrected elasticity modulus
Is and If - influence factors.
F. Preliminary seismic analysis of the tunnel
The seismic behavior and of tunnels is differs from the behavior and design of structures built above ground. As
immersed tunnels are confined within surrounding soil inside the trench, they do not subject to any vibration
amplifications. There are two types of deformation that are affect immersed tunnels one is Axial and lateral
deformation and second -one is Sinking deformation source files in one of the following:
Figure 5. Compressive stress in longitudinal direction
Also, the resultant Mmax value under the static load is account as 19.06 KN-m.
Figure 6. Resultant Mmax Diagram
The structure is deform under static loading is within the permissible limit. The deformed shape in lateral
direction is calculated as 42 mm shown in bellow.
Study of dynamic analysis for immersed tube tunnel
www.ijceronline.com Open Access Journal Page 71
Figure 7. Deform shape under static load
C. Response spectrum Analysis
A response spectrum represents is graph of response versus frequency, where the response might be
displacement, velocity, acceleration, or force. The models which were used for modal analysis were again run
using single point Response spectrum method.
III. “PROPOSED TUNNEL”
The proposed tunnel is 24 m in width and 1900 m in length. This tunnel is divided into 20 m length segment
with height 10 m. The vertical solid wall has 1 m thickness, Top thick slab is 1 m and bottom slab is 2.3 m thick.
The soil pressure is calculated by Rankine‟s method which is 70 KN/m2 which absence of seepage and pore
pressure. The water pressure act on top surface as gravity load is 80 KN/m2. The proposed 3D model is as
follow. The 3D model is analyzed for response spectrum under the different loading condition. The tunnel is
divided into 3 lanes. And assume that the all lane are open to vehicle transport. As per the validating paper it is
assume that 25 vehicle are placed in each lane. Therefore total load transfer on bed is calculated as 0 .54 t/m2.
The analyzed model shows following amount of result.
Figure 8. Deformed model under soil pressure
Study of dynamic analysis for immersed tube tunnel
www.ijceronline.com Open Access Journal Page 72
Figure 9. Deformed shape mode-1
Figure 10. Deformed shape mode-2
Figure 11. Deformed shape mode -3
Study of dynamic analysis for immersed tube tunnel
www.ijceronline.com Open Access Journal Page 73
The graph bellow represents the period and frequency variation against the mode value.
Graph 1. Period against frequency
Graph 2. Response spectrum moadl information
IV. “CONCLUSION”
The primary results obtained in the validating study helps to analyze the proposed Mumbai Alibaug immersed
tunnel. The IZMIR bay tube tunnel was analyzed for static result, after apply response spectrum method the
results shows within permissible limit as per slandered. This helps in preliminary analyzing proposed immersed
tube model with comparing validating results.
“REFERENCES”
[1] Morris, Martin W.(1998), „The design of the Western Immersed Tube Tunnel, Hong Kong‟, http://dx.doi.org/10.5169/seals-59042
[2] L.C.F. Ingerslev (2005),‟ Marmaray project: designing an immersed tunnel for the Bosphorus‟, Underground Space Use: Analysis
of the Past and Lessons for the
[3] Richard M. Bennett, Scott M.wood, Eric C. Drumm and N. Randy Rainwater, “Vertical Loads on concrete Box Culverts under High
Embankments”, part of Journal of bridge Engineering, Vol. 10, No. 6, November 1, 2005, @ASCE, ISSN 1084-0702/2005/6-643-
649.
[4] Anil K. Garg, Ali Abolmaali and Raul Fernandez, “Experimental investigation of shear capacity of precast reinforced concrete box
culverts”, Part of Journal of Bridge Engineering, Vol. 12, No. 4, July 1, 2007, @ 1084-0702/2007/4-511-517.
[5] S.S.Chen and I.E. Harik, “ Dynamic Effect of a moving Truck on a culvert”, part of Journal of Bridge Engineering, Vol. 17, No. 2,
March 1, 2012, @ASCE, ISSN 1084-0702/2012/2-382-388.
[6] Huang M., Liu H. Fast frequency-domain analysis method for longitudinal seismic response of super-long immersed tunnels 18th
International Conference on Soil Mechanics and Geotechnical Engineering, Paris 2013,pp1715-1718
[7] T. Kasper, C. Rotwitt & P.G. Jackson, Foundation of an immersed tunnel on marine clay improved by cement deep mixing and sand
compaction piles,17th international conference on soil mechanics and geotechnical engineering, Alexanrdria,Egypt vol 3, pp. 2415-
2418
[8] Slawomie lotysz, immersed tunnel technology: A brief history of its development, civil and environmental report No. 4, 2010 pp.
102-105
[9] Moreno Pescara, Giuseppe Maria Gaspari, Luca Repetto, Design of underground structures under seismic conditions: a long deep
tunnel and a metro tunnel. ETH Zurich – 15 Dec. 2011 Colloquium on seismic design of tunnels pp. 1-37
[10] Nisa Kartaltepe, Preliminary Design And Analysis For An Immersed Tube Tunnel .Across The İzmir Bay, İzmir Institute of
Technology, İZMİR,MS,2008,pp 21-22
[11] Rahai Alir, investigation of Earthquake effect on buried box culverts, published by Elsevier Science Ltd.1996 11 world conference
on Earthquake Engineering ISRN 0 08 0428223
[12] Nguyen Khanh Tung, WuLi*el at Application of Immersed tunnel Technology in Saigon East-West Highway project, EJGE Vol.
19[2014], Bund. Q, pp. 4207-4214

More Related Content

What's hot

Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine mohammadsalikali
 
Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...
Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...
Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...Rajesh Prasad
 
OPTIMUM DESIGN FOR HIGHWAY EMBANKMENT WITH STONE COLUMN
OPTIMUM DESIGN FOR HIGHWAY EMBANKMENT WITH STONE COLUMNOPTIMUM DESIGN FOR HIGHWAY EMBANKMENT WITH STONE COLUMN
OPTIMUM DESIGN FOR HIGHWAY EMBANKMENT WITH STONE COLUMNIAEME Publication
 
Back analysis of high tunnel convergences in clayey marls
Back analysis of high tunnel convergences in clayey marlsBack analysis of high tunnel convergences in clayey marls
Back analysis of high tunnel convergences in clayey marlsSYSTRA
 
Assessing the interaction between the excavation of a large cavern and existi...
Assessing the interaction between the excavation of a large cavern and existi...Assessing the interaction between the excavation of a large cavern and existi...
Assessing the interaction between the excavation of a large cavern and existi...SYSTRA
 
Lyapichev, Landau. Modern structural & technological solutions for new dams (...
Lyapichev, Landau. Modern structural & technological solutions for new dams (...Lyapichev, Landau. Modern structural & technological solutions for new dams (...
Lyapichev, Landau. Modern structural & technological solutions for new dams (...Yury Lyapichev
 
19021 d2004 well foundation design ppt
19021 d2004 well foundation design ppt19021 d2004 well foundation design ppt
19021 d2004 well foundation design pptBala Balaji
 
7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERINGVATSAL PATEL
 
Separating underground metro lines under operation in Baku
Separating underground metro lines under operation in BakuSeparating underground metro lines under operation in Baku
Separating underground metro lines under operation in BakuSYSTRA
 
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-AghaBasics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-AghaHossam Shafiq II
 
Lyapichev. Analysis, design & behavior of CFRDs
Lyapichev. Analysis, design & behavior of CFRDsLyapichev. Analysis, design & behavior of CFRDs
Lyapichev. Analysis, design & behavior of CFRDsYury Lyapichev
 
Designing and construction of piles under various field conditions
Designing and construction of piles under various field conditions Designing and construction of piles under various field conditions
Designing and construction of piles under various field conditions Dr. Naveen BP
 
Mechanical Response Analysis of Asphalt Pavement Structure
Mechanical Response Analysis of Asphalt Pavement StructureMechanical Response Analysis of Asphalt Pavement Structure
Mechanical Response Analysis of Asphalt Pavement StructureIJERA Editor
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)inventionjournals
 
Importance of geological considerations while choosing tunnel sites and align...
Importance of geological considerations while choosing tunnel sites and align...Importance of geological considerations while choosing tunnel sites and align...
Importance of geological considerations while choosing tunnel sites and align...Buddharatna godboley
 
MET411FinalReport
MET411FinalReportMET411FinalReport
MET411FinalReportRudy Bores
 

What's hot (20)

Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine
 
Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...
Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...
Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...
 
OPTIMUM DESIGN FOR HIGHWAY EMBANKMENT WITH STONE COLUMN
OPTIMUM DESIGN FOR HIGHWAY EMBANKMENT WITH STONE COLUMNOPTIMUM DESIGN FOR HIGHWAY EMBANKMENT WITH STONE COLUMN
OPTIMUM DESIGN FOR HIGHWAY EMBANKMENT WITH STONE COLUMN
 
Back analysis of high tunnel convergences in clayey marls
Back analysis of high tunnel convergences in clayey marlsBack analysis of high tunnel convergences in clayey marls
Back analysis of high tunnel convergences in clayey marls
 
Assessing the interaction between the excavation of a large cavern and existi...
Assessing the interaction between the excavation of a large cavern and existi...Assessing the interaction between the excavation of a large cavern and existi...
Assessing the interaction between the excavation of a large cavern and existi...
 
Lyapichev, Landau. Modern structural & technological solutions for new dams (...
Lyapichev, Landau. Modern structural & technological solutions for new dams (...Lyapichev, Landau. Modern structural & technological solutions for new dams (...
Lyapichev, Landau. Modern structural & technological solutions for new dams (...
 
19021 d2004 well foundation design ppt
19021 d2004 well foundation design ppt19021 d2004 well foundation design ppt
19021 d2004 well foundation design ppt
 
7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING
 
Separating underground metro lines under operation in Baku
Separating underground metro lines under operation in BakuSeparating underground metro lines under operation in Baku
Separating underground metro lines under operation in Baku
 
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-AghaBasics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
 
Lyapichev. Analysis, design & behavior of CFRDs
Lyapichev. Analysis, design & behavior of CFRDsLyapichev. Analysis, design & behavior of CFRDs
Lyapichev. Analysis, design & behavior of CFRDs
 
Project
ProjectProject
Project
 
Designing and construction of piles under various field conditions
Designing and construction of piles under various field conditions Designing and construction of piles under various field conditions
Designing and construction of piles under various field conditions
 
Mechanical Response Analysis of Asphalt Pavement Structure
Mechanical Response Analysis of Asphalt Pavement StructureMechanical Response Analysis of Asphalt Pavement Structure
Mechanical Response Analysis of Asphalt Pavement Structure
 
D044032430
D044032430D044032430
D044032430
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)
 
report
reportreport
report
 
Importance of geological considerations while choosing tunnel sites and align...
Importance of geological considerations while choosing tunnel sites and align...Importance of geological considerations while choosing tunnel sites and align...
Importance of geological considerations while choosing tunnel sites and align...
 
Aashto design
Aashto designAashto design
Aashto design
 
MET411FinalReport
MET411FinalReportMET411FinalReport
MET411FinalReport
 

Viewers also liked

QSAR Studies of the Inhibitory Activity of a Series of Substituted Indole and...
QSAR Studies of the Inhibitory Activity of a Series of Substituted Indole and...QSAR Studies of the Inhibitory Activity of a Series of Substituted Indole and...
QSAR Studies of the Inhibitory Activity of a Series of Substituted Indole and...inventionjournals
 
ใบงานท 6
ใบงานท   6ใบงานท   6
ใบงานท 62793233922
 
Bolsas de alimentos a niños desnutridos, Guatemala
Bolsas de alimentos a niños desnutridos, GuatemalaBolsas de alimentos a niños desnutridos, Guatemala
Bolsas de alimentos a niños desnutridos, GuatemalaAlvaro Galvis
 
Michael John Neave CV
Michael John Neave CVMichael John Neave CV
Michael John Neave CVMj Neave
 
Cuadro Explicativo de Tributario
Cuadro Explicativo de TributarioCuadro Explicativo de Tributario
Cuadro Explicativo de TributarioAle Perez
 
Μίλτος Σαχτούρης
Μίλτος ΣαχτούρηςΜίλτος Σαχτούρης
Μίλτος Σαχτούρηςmpaschoudi89
 
CreacióN Literaria No Sexista
CreacióN Literaria No SexistaCreacióN Literaria No Sexista
CreacióN Literaria No Sexistafomen2
 
Mazuma affilite marketing program in Hongkong
Mazuma affilite marketing program in HongkongMazuma affilite marketing program in Hongkong
Mazuma affilite marketing program in Hongkongmazumaaffiliates
 
TEXT EXTRACTION FROM RASTER MAPS USING COLOR SPACE QUANTIZATION
TEXT EXTRACTION FROM RASTER MAPS USING COLOR SPACE QUANTIZATIONTEXT EXTRACTION FROM RASTER MAPS USING COLOR SPACE QUANTIZATION
TEXT EXTRACTION FROM RASTER MAPS USING COLOR SPACE QUANTIZATIONcsandit
 
agen sofa, agen sofa anak, agen sofa angin,
agen sofa, agen sofa anak, agen sofa angin, agen sofa, agen sofa anak, agen sofa angin,
agen sofa, agen sofa anak, agen sofa angin, KursiSofaRotanSintetis
 
Presentacion Fundamentos S L I N I A
Presentacion  Fundamentos  S L  I N I APresentacion  Fundamentos  S L  I N I A
Presentacion Fundamentos S L I N I AJose Rojas
 
Terra #176862-v3-l’oreal beauty-advisors_microsoft_share_point
Terra #176862-v3-l’oreal beauty-advisors_microsoft_share_pointTerra #176862-v3-l’oreal beauty-advisors_microsoft_share_point
Terra #176862-v3-l’oreal beauty-advisors_microsoft_share_pointAleksandra Strelkova
 

Viewers also liked (16)

QSAR Studies of the Inhibitory Activity of a Series of Substituted Indole and...
QSAR Studies of the Inhibitory Activity of a Series of Substituted Indole and...QSAR Studies of the Inhibitory Activity of a Series of Substituted Indole and...
QSAR Studies of the Inhibitory Activity of a Series of Substituted Indole and...
 
Dell_Kulacom
Dell_KulacomDell_Kulacom
Dell_Kulacom
 
Estrategias de mercadeo
Estrategias de mercadeoEstrategias de mercadeo
Estrategias de mercadeo
 
ใบงานท 6
ใบงานท   6ใบงานท   6
ใบงานท 6
 
Bolsas de alimentos a niños desnutridos, Guatemala
Bolsas de alimentos a niños desnutridos, GuatemalaBolsas de alimentos a niños desnutridos, Guatemala
Bolsas de alimentos a niños desnutridos, Guatemala
 
Michael John Neave CV
Michael John Neave CVMichael John Neave CV
Michael John Neave CV
 
Cuadro Explicativo de Tributario
Cuadro Explicativo de TributarioCuadro Explicativo de Tributario
Cuadro Explicativo de Tributario
 
Μίλτος Σαχτούρης
Μίλτος ΣαχτούρηςΜίλτος Σαχτούρης
Μίλτος Σαχτούρης
 
Pratica de ensino
Pratica de ensinoPratica de ensino
Pratica de ensino
 
CreacióN Literaria No Sexista
CreacióN Literaria No SexistaCreacióN Literaria No Sexista
CreacióN Literaria No Sexista
 
Mazuma affilite marketing program in Hongkong
Mazuma affilite marketing program in HongkongMazuma affilite marketing program in Hongkong
Mazuma affilite marketing program in Hongkong
 
Mmm 2009
Mmm  2009Mmm  2009
Mmm 2009
 
TEXT EXTRACTION FROM RASTER MAPS USING COLOR SPACE QUANTIZATION
TEXT EXTRACTION FROM RASTER MAPS USING COLOR SPACE QUANTIZATIONTEXT EXTRACTION FROM RASTER MAPS USING COLOR SPACE QUANTIZATION
TEXT EXTRACTION FROM RASTER MAPS USING COLOR SPACE QUANTIZATION
 
agen sofa, agen sofa anak, agen sofa angin,
agen sofa, agen sofa anak, agen sofa angin, agen sofa, agen sofa anak, agen sofa angin,
agen sofa, agen sofa anak, agen sofa angin,
 
Presentacion Fundamentos S L I N I A
Presentacion  Fundamentos  S L  I N I APresentacion  Fundamentos  S L  I N I A
Presentacion Fundamentos S L I N I A
 
Terra #176862-v3-l’oreal beauty-advisors_microsoft_share_point
Terra #176862-v3-l’oreal beauty-advisors_microsoft_share_pointTerra #176862-v3-l’oreal beauty-advisors_microsoft_share_point
Terra #176862-v3-l’oreal beauty-advisors_microsoft_share_point
 

Similar to Study of Dynamic Analysis for Immersed Tube Tunnel

Numerical analysis of influence of deep excavation on nearby existing tunnel
Numerical analysis of influence of deep excavation on nearby existing tunnelNumerical analysis of influence of deep excavation on nearby existing tunnel
Numerical analysis of influence of deep excavation on nearby existing tunneleSAT Publishing House
 
Effect Of Water On Slope Stability And Investigation Of ΝΝw Drainage Techniqu...
Effect Of Water On Slope Stability And Investigation Of ΝΝw Drainage Techniqu...Effect Of Water On Slope Stability And Investigation Of ΝΝw Drainage Techniqu...
Effect Of Water On Slope Stability And Investigation Of ΝΝw Drainage Techniqu...IJMER
 
Technical seminar
Technical seminarTechnical seminar
Technical seminarUjwal Ujwal
 
Analysis of stability of rock column between cut & cover Metro Station and NA...
Analysis of stability of rock column between cut & cover Metro Station and NA...Analysis of stability of rock column between cut & cover Metro Station and NA...
Analysis of stability of rock column between cut & cover Metro Station and NA...IRJET Journal
 
RMT Group5 presentation.pptx
RMT Group5 presentation.pptxRMT Group5 presentation.pptx
RMT Group5 presentation.pptxSubratDash37
 
Iisrt z mahantaesh tr
Iisrt z mahantaesh trIisrt z mahantaesh tr
Iisrt z mahantaesh trIISRT
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Rajesh Prasad
 
Rates of Soft Ground Tunneling in Vicinity of Existing Structures
Rates of Soft Ground Tunneling in Vicinity of Existing StructuresRates of Soft Ground Tunneling in Vicinity of Existing Structures
Rates of Soft Ground Tunneling in Vicinity of Existing StructuresIJAEMSJORNAL
 
Parametric Study on Curved Bridges Subjected to Seismic Loading
Parametric Study on Curved Bridges Subjected to Seismic LoadingParametric Study on Curved Bridges Subjected to Seismic Loading
Parametric Study on Curved Bridges Subjected to Seismic LoadingIRJET Journal
 
Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...
Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...
Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...CrimsonPublishersAMMS
 
Case studies of surveys involved in Railway Tunnel constructed under sea.
Case studies of surveys involved in Railway Tunnel constructed under sea.Case studies of surveys involved in Railway Tunnel constructed under sea.
Case studies of surveys involved in Railway Tunnel constructed under sea.Prudhvi Thota
 
Analytical study of abutment and pile behaviour of iab with soil interaction
Analytical study of abutment and pile behaviour of iab with soil interactionAnalytical study of abutment and pile behaviour of iab with soil interaction
Analytical study of abutment and pile behaviour of iab with soil interactioneSAT Publishing House
 
IRJET - Research on Design of Semi-Polygonal Segment of Submerged Floating Tu...
IRJET - Research on Design of Semi-Polygonal Segment of Submerged Floating Tu...IRJET - Research on Design of Semi-Polygonal Segment of Submerged Floating Tu...
IRJET - Research on Design of Semi-Polygonal Segment of Submerged Floating Tu...IRJET Journal
 
SIBE2013-Paper-A 3-Dimensional Numerical Study Of Flow Patterns Around Three ...
SIBE2013-Paper-A 3-Dimensional Numerical Study Of Flow Patterns Around Three ...SIBE2013-Paper-A 3-Dimensional Numerical Study Of Flow Patterns Around Three ...
SIBE2013-Paper-A 3-Dimensional Numerical Study Of Flow Patterns Around Three ...Fitra Adinata
 
Chenab Bridge.pdf
Chenab Bridge.pdfChenab Bridge.pdf
Chenab Bridge.pdfPpt Creater
 

Similar to Study of Dynamic Analysis for Immersed Tube Tunnel (20)

Numerical analysis of influence of deep excavation on nearby existing tunnel
Numerical analysis of influence of deep excavation on nearby existing tunnelNumerical analysis of influence of deep excavation on nearby existing tunnel
Numerical analysis of influence of deep excavation on nearby existing tunnel
 
Project report
Project reportProject report
Project report
 
Effect Of Water On Slope Stability And Investigation Of ΝΝw Drainage Techniqu...
Effect Of Water On Slope Stability And Investigation Of ΝΝw Drainage Techniqu...Effect Of Water On Slope Stability And Investigation Of ΝΝw Drainage Techniqu...
Effect Of Water On Slope Stability And Investigation Of ΝΝw Drainage Techniqu...
 
Technical seminar
Technical seminarTechnical seminar
Technical seminar
 
Analysis of stability of rock column between cut & cover Metro Station and NA...
Analysis of stability of rock column between cut & cover Metro Station and NA...Analysis of stability of rock column between cut & cover Metro Station and NA...
Analysis of stability of rock column between cut & cover Metro Station and NA...
 
RMT Group5 presentation.pptx
RMT Group5 presentation.pptxRMT Group5 presentation.pptx
RMT Group5 presentation.pptx
 
training report LMRC
training report LMRCtraining report LMRC
training report LMRC
 
Iisrt z mahantaesh tr
Iisrt z mahantaesh trIisrt z mahantaesh tr
Iisrt z mahantaesh tr
 
Auckland
AucklandAuckland
Auckland
 
Eurasia tunnel1
Eurasia tunnel1Eurasia tunnel1
Eurasia tunnel1
 
Cv15 nalisis method
Cv15 nalisis methodCv15 nalisis method
Cv15 nalisis method
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...
 
Rates of Soft Ground Tunneling in Vicinity of Existing Structures
Rates of Soft Ground Tunneling in Vicinity of Existing StructuresRates of Soft Ground Tunneling in Vicinity of Existing Structures
Rates of Soft Ground Tunneling in Vicinity of Existing Structures
 
Parametric Study on Curved Bridges Subjected to Seismic Loading
Parametric Study on Curved Bridges Subjected to Seismic LoadingParametric Study on Curved Bridges Subjected to Seismic Loading
Parametric Study on Curved Bridges Subjected to Seismic Loading
 
Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...
Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...
Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...
 
Case studies of surveys involved in Railway Tunnel constructed under sea.
Case studies of surveys involved in Railway Tunnel constructed under sea.Case studies of surveys involved in Railway Tunnel constructed under sea.
Case studies of surveys involved in Railway Tunnel constructed under sea.
 
Analytical study of abutment and pile behaviour of iab with soil interaction
Analytical study of abutment and pile behaviour of iab with soil interactionAnalytical study of abutment and pile behaviour of iab with soil interaction
Analytical study of abutment and pile behaviour of iab with soil interaction
 
IRJET - Research on Design of Semi-Polygonal Segment of Submerged Floating Tu...
IRJET - Research on Design of Semi-Polygonal Segment of Submerged Floating Tu...IRJET - Research on Design of Semi-Polygonal Segment of Submerged Floating Tu...
IRJET - Research on Design of Semi-Polygonal Segment of Submerged Floating Tu...
 
SIBE2013-Paper-A 3-Dimensional Numerical Study Of Flow Patterns Around Three ...
SIBE2013-Paper-A 3-Dimensional Numerical Study Of Flow Patterns Around Three ...SIBE2013-Paper-A 3-Dimensional Numerical Study Of Flow Patterns Around Three ...
SIBE2013-Paper-A 3-Dimensional Numerical Study Of Flow Patterns Around Three ...
 
Chenab Bridge.pdf
Chenab Bridge.pdfChenab Bridge.pdf
Chenab Bridge.pdf
 

Recently uploaded

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 

Recently uploaded (20)

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 

Study of Dynamic Analysis for Immersed Tube Tunnel

  • 1. ISSN (e): 2250 – 3005 || Volume, 07 || Issue, 01|| Janaury – 2017 || International Journal of Computational Engineering Research (IJCER) www.ijceronline.com Open Access Journal Page 67 Study of Dynamic Analysis for Immersed Tube Tunnel Mr. Jaydeep R. Shinde1, Prof. Yogesh R. Suryawanshi2 1 JSPM’S ICOER ME (Structure), 2 JSPM’S ICOER Professor (Civil Dept.) I. INTRODUCTION “1. Introduction “ With the recent rapid development of global economy and engineering technology, tunnel construction has become increasingly important in regional economic and social development. An immersed tube is underwater tunnel composed of segments, constructed elsewhere and floated to the tunnel site to be sunk into place and linked together. They are commonly used for road and rail crossing of rivers, estuaries and sea channels/harbors. Immersed tubes are often used in conjunction with other forms of tunnel at their end, such as a cut and cover or bored tunnel, which is usually necessary to continue the tunnel forms near the water‟s edge to the entrance (portal) at the land surface. The immersed tunnel has been proposed in Dharamtar creek to link two place i.e. Karanja and Rewas, situated on the opposite on the bank of creek which will provide an alternative access between Mumbai and Alibaug.As shown in the below figure 1 red line represents the alignment of the immersed tunnel whereas the blue line represent the alignment of the Mumbai-Uran link proposed by the Government company. Figure.1. Site selection ABSTRACT The main aim of the project is to connect the two coats of the Dharamtar creek i.e. Rewas in Alibaug and Karanja in Uran by an immersed tunnel. The construction of proposed immersed tunnel will reduce the travel time from Mumbai to Alibaug from 3 hours to 1 hour. But this reduction in time includes the consideration of the sea-link from Sewri to Nhava Seva (Uran).Which was proposed by government and is already under construction. Thus construction of this immersed tunnel will ease the transportation of the city. In this study, a preliminary analysis of IZMIR immersed tube is carried out for validating purpose. The static analysis of the tunnel was made in finite element program. The vertical displacement of the tube unit under static loads was calculated. Afterwards, the seismic analysis was made to investigate stresses developed due to both racking and axial deformation of the tunnel during an earthquake. It was found that, maximum stress due to axial deformation is longer than compressive strength of the concrete. The high stresses in the tube occur, because of the tube stiffness. Keywords: Immersed Tunnel, racking deformation, tube stiffness, SAP, etc.
  • 2. Study of dynamic analysis for immersed tube tunnel www.ijceronline.com Open Access Journal Page 68 Government of India has proposed a bridge from Sewri to Uran through the Butcher Island. This will provide a direct entry to Mumbai into Uran. If one has to the travel to Alibaug, they should travel all the way from Uran to Panvel and then get linked to the NH-4 and then enter into Alibaug which would require an entire journey of 102 Km from Uran to Alibaug, But if this Immersed tunnel project comes into existence the Uran and Alibaug would be linked by a very short route of about 10-15 Km. This would provide a cheap and fast excess into Alibaug from Mumbai. This would give rise to industrialization and also improve the transport facility. II. “SITE SURVEY” A. Preliminary data After the area has been selection for the immersed tunnel the main task arises is to check whether the site selected is appropriate and economical for the tunnel manufacturing, its construction and utilization. The below figure 2 shows the sea bed profile between Karanja (left) and Rewas (right). Based on this profile diagram the depth of the sea at various positions were located and the favorable alignment was considered for the placement of the tunnel blocks, The alignment of the tunnel is an shown in the figure 2 with the blue line. The maximum depth of the sea in this alignment is just 7.4 m. and thus, this region is very much favorable for the tunnel with respect to the depth criteria. Figure 2 Contour plan B. Tunnel description The proposed immersed tunnel is composed of two lane highways. The length is 2.4 Km including the immersed tunnel selection of 1.9 Km in the middle. The tunnel has about 19 tunnel units. The shape of each tunnel element has 24 m width, 9 m height and the length is 100 m. The technical properties and typical cross section of the immersed tunnel unit were illustrated in the figure 3 shown in below. Figure 3. Cross section details of proposed tunnel element
  • 3. Study of dynamic analysis for immersed tube tunnel www.ijceronline.com Open Access Journal Page 69 1. Length: 2.2 Km 2. Number of element: 19 3. Section of Box size : (120*24*9) m 4. Number of emargency and ventilation shafts: 1 C. Validating Study Analytical work is based on details study of IZMIR bay immersed tunnel.[1]. This tunnel was measured 40 m in width and 7.6 m in length. The tunnel was characteristic by rectangular cross section had 32  Road traffic. The tube was measure 40 m in width and 7.6 Km in length. The Height of tube was 10 m. Figure 3 Site Location of IZMIR tube tunnel. A. Current Allowable Bearing Capacity Ultimate bearing capacity is the maximum bearing capacity of the soil without its any failure and its settlement. It is calculated by two different criteria. One is shear failure criteria and other is tolerable settlement criteria. The smaller value from above this is adopted as a net allowable bearing capacity of soil. From shear failure criteria, the Allowable bearing capacity is calculated as )1......(.................................................................................................... FS ult a q q  Where ultq is the final caring capacity of the sea bed sub-soil. It is calculated from following equation  ww RDNRBNultq .)100(5304882.0 2'''2  …. (2) For determining net vertical stress increase „Pnet‟ due to construction of tunnel and its subsequent operation, including the possibility that tunnel may be temporarily full of water, but should not float when the water is emptied. Thus, P i net is calculated from equation [3]. P buoyancyP trafficP layerprotectiveP seawaterP soilP i net  ……………………….………………. [3] B. Static analysis for settlement calculations Using the finite element method (FEM) and the SAP 2000, the vertical displacement of tunnel segment is calculated as follows. Figure 4. 3D modelling of tube
  • 4. Study of dynamic analysis for immersed tube tunnel www.ijceronline.com Open Access Journal Page 70 By using the subsoil data, the coefficient of (vertical) Subgrade reaction (Ks) was calculated from following equation. ]4....[.................................................................................................... 1 fss s IIEB k   where, B – Half of the tunnel width E s – corrected elasticity modulus Is and If - influence factors. F. Preliminary seismic analysis of the tunnel The seismic behavior and of tunnels is differs from the behavior and design of structures built above ground. As immersed tunnels are confined within surrounding soil inside the trench, they do not subject to any vibration amplifications. There are two types of deformation that are affect immersed tunnels one is Axial and lateral deformation and second -one is Sinking deformation source files in one of the following: Figure 5. Compressive stress in longitudinal direction Also, the resultant Mmax value under the static load is account as 19.06 KN-m. Figure 6. Resultant Mmax Diagram The structure is deform under static loading is within the permissible limit. The deformed shape in lateral direction is calculated as 42 mm shown in bellow.
  • 5. Study of dynamic analysis for immersed tube tunnel www.ijceronline.com Open Access Journal Page 71 Figure 7. Deform shape under static load C. Response spectrum Analysis A response spectrum represents is graph of response versus frequency, where the response might be displacement, velocity, acceleration, or force. The models which were used for modal analysis were again run using single point Response spectrum method. III. “PROPOSED TUNNEL” The proposed tunnel is 24 m in width and 1900 m in length. This tunnel is divided into 20 m length segment with height 10 m. The vertical solid wall has 1 m thickness, Top thick slab is 1 m and bottom slab is 2.3 m thick. The soil pressure is calculated by Rankine‟s method which is 70 KN/m2 which absence of seepage and pore pressure. The water pressure act on top surface as gravity load is 80 KN/m2. The proposed 3D model is as follow. The 3D model is analyzed for response spectrum under the different loading condition. The tunnel is divided into 3 lanes. And assume that the all lane are open to vehicle transport. As per the validating paper it is assume that 25 vehicle are placed in each lane. Therefore total load transfer on bed is calculated as 0 .54 t/m2. The analyzed model shows following amount of result. Figure 8. Deformed model under soil pressure
  • 6. Study of dynamic analysis for immersed tube tunnel www.ijceronline.com Open Access Journal Page 72 Figure 9. Deformed shape mode-1 Figure 10. Deformed shape mode-2 Figure 11. Deformed shape mode -3
  • 7. Study of dynamic analysis for immersed tube tunnel www.ijceronline.com Open Access Journal Page 73 The graph bellow represents the period and frequency variation against the mode value. Graph 1. Period against frequency Graph 2. Response spectrum moadl information IV. “CONCLUSION” The primary results obtained in the validating study helps to analyze the proposed Mumbai Alibaug immersed tunnel. The IZMIR bay tube tunnel was analyzed for static result, after apply response spectrum method the results shows within permissible limit as per slandered. This helps in preliminary analyzing proposed immersed tube model with comparing validating results. “REFERENCES” [1] Morris, Martin W.(1998), „The design of the Western Immersed Tube Tunnel, Hong Kong‟, http://dx.doi.org/10.5169/seals-59042 [2] L.C.F. Ingerslev (2005),‟ Marmaray project: designing an immersed tunnel for the Bosphorus‟, Underground Space Use: Analysis of the Past and Lessons for the [3] Richard M. Bennett, Scott M.wood, Eric C. Drumm and N. Randy Rainwater, “Vertical Loads on concrete Box Culverts under High Embankments”, part of Journal of bridge Engineering, Vol. 10, No. 6, November 1, 2005, @ASCE, ISSN 1084-0702/2005/6-643- 649. [4] Anil K. Garg, Ali Abolmaali and Raul Fernandez, “Experimental investigation of shear capacity of precast reinforced concrete box culverts”, Part of Journal of Bridge Engineering, Vol. 12, No. 4, July 1, 2007, @ 1084-0702/2007/4-511-517. [5] S.S.Chen and I.E. Harik, “ Dynamic Effect of a moving Truck on a culvert”, part of Journal of Bridge Engineering, Vol. 17, No. 2, March 1, 2012, @ASCE, ISSN 1084-0702/2012/2-382-388. [6] Huang M., Liu H. Fast frequency-domain analysis method for longitudinal seismic response of super-long immersed tunnels 18th International Conference on Soil Mechanics and Geotechnical Engineering, Paris 2013,pp1715-1718 [7] T. Kasper, C. Rotwitt & P.G. Jackson, Foundation of an immersed tunnel on marine clay improved by cement deep mixing and sand compaction piles,17th international conference on soil mechanics and geotechnical engineering, Alexanrdria,Egypt vol 3, pp. 2415- 2418 [8] Slawomie lotysz, immersed tunnel technology: A brief history of its development, civil and environmental report No. 4, 2010 pp. 102-105 [9] Moreno Pescara, Giuseppe Maria Gaspari, Luca Repetto, Design of underground structures under seismic conditions: a long deep tunnel and a metro tunnel. ETH Zurich – 15 Dec. 2011 Colloquium on seismic design of tunnels pp. 1-37 [10] Nisa Kartaltepe, Preliminary Design And Analysis For An Immersed Tube Tunnel .Across The İzmir Bay, İzmir Institute of Technology, İZMİR,MS,2008,pp 21-22 [11] Rahai Alir, investigation of Earthquake effect on buried box culverts, published by Elsevier Science Ltd.1996 11 world conference on Earthquake Engineering ISRN 0 08 0428223 [12] Nguyen Khanh Tung, WuLi*el at Application of Immersed tunnel Technology in Saigon East-West Highway project, EJGE Vol. 19[2014], Bund. Q, pp. 4207-4214