SlideShare a Scribd company logo
RESUME
AMIT KUMAR : (E-mail: k_88amit@redifmail.com)
Mob:- +91-7725952503, Passport No:- K9294406
Professional Summary:
Innovative Mechanical Site Engineer with a proven track record in design
implementation in state of the art mechanical applications and mechanical site
project management.
An Overview
 An astute professional with 6 years 6 month of experience in Power Plant Project , AFR
projects,Crusher project
 Currently associated with HAJEE AP.BAVA Co.& Const. Pvt. Ltd. as a Project Engineer at the
Site Lafarge Cement India Pvt Ltd(Nimbahera) Chittorgarh (Rajasathan).
 Proficient in Managing Project Activity , Erection and stabilization of Power Plant and its auxiliaries,
including acceptance and handing over within scheduled time .
 Proven abilities in implementing schedules and have successfully worked with the team.
 An effective communicator with excellent relationship management skills and strong analytical, challenge
oriented, problem solving & organizational abilities.
 Anchoring and planning erection activities with safety mitigation
 Installing, Erection and conducting tests to ensure operational effectiveness of plant & utilities.
 Planning & effectuating maintenance schedules for equipments.
 Leading, mentoring & monitoring the performance of team members to ensure efficiency in process
operations and meeting generation targets.
 Creating and sustaining a dynamic environment that fosters development opportunities and motivates
high performance amongst team members.
 Identifying needs for recruitment according to the generation targets.
Employment Scan
June 2013 to till date (Hajee A.P.BAVA company construction pvt ltd)
Plant Overview:
• CHITTOR CEMENT PLANT ( LAFARGE CEMENT INDIA PVT LTD)NIMBAHERA,CHITTORGARH
RAJSTHAN
Pre-screening lime stone crusher projects:
JOB: structure( conveyor,trestle) assembly,erection,fitup,bobler,apron feeder,screen,bag
filter,strenger ,pully,belt erection ,fitup
Alternate fuel resource projects:
Solid waste feeding system (CBBC & chain conveyor) in PREHEATER
Job:structure assembly erection fitup.conveyor(bucket belt ,chain) assembly erection.shute erection fitup
Packing plant: roof, side sheeting job(erection ,fittup)
• ULTRATECH CEMENT LIMITED (ADITYA BIRLA GROUP) SHAMBHUPURA , CHITTORGARH
RAJSTHAN
CAPTIVE POWER PLANT:
Boiler Capacity 81 TPH, Working Pressure 15 Kg/cm2
, Working Temp. 2650
c
Job:structure assembly erection fitup ,coil assembly erection fitup,ibr joint preparation,hytro test
attend,insulation job activity,duct assembly erection fitup,leack test attend.
Oct 2011 to May 2013 with Zillion Infra Project Pvt.Ltd
Plant Overview:-
4x270 MW power Plant (ABHIJEET POWER LIMITED) CHANDWA JHARKHAND
Job:structure,duct assembly &erection , leack test attend,ESP erection ,assembly ,fittup,leack test
attend,rapping non rapping job attend,comm ising
4X250 MW Power Plant (BRBCL/NTPC) AURANGADABAD (BIHAR)
Job: ESP erection,assembly,fittup, leack test attend,rapping non rapping job attend,commising
September 2009 to Sep 2011 with Power Mech Project Ltd.
plant Overview:-
(2x660 ) MW (Super Critical Boiler )MAHATMA GANDHI THARMAL POWER PLANT JAJHJAR:-
Boiler capacity 3300 TPH, Working pressure 273.4 Kg/cm2
And Temperature 427 0
c
Job:pressure part coil, panel erection fittup,ibr joint preparation,materialhandling,tool tackle arrangement for
job activity,labour colony control
Scholastics:
2009 :B.Tech (Elect &Telecommunication Engineering) from Chanakya Institute of Technology
Kolkata,
Under J.R.N Rajsathan Vidya Peeth University Udaipur , (Rajsthan) With First Class
Trainings Attended:-
 BSNL Telecom Dhanbad (Jharkhand) for 1 month
 IIATCA Kolkata Course on PLC & SCADA for 1 month
IT Skills
 Well versed with Windows, MS Office (Word, Excel, and PowerPoint), and Internet Applications
Personal Vitae
Date of Birth : 5th
May 1984
Nationality : Indian
Marital Status : Married
Languages Known : English, Hindi,
Permanent Address : At Village Post : Babhangama , Distt : Begusarai, Bihar
Pin code :851131
Present Address : HAPBCO SITE (LIPL NIMBAHERA,CHITTORGARH RAJSTHAN )
I hereby certify that the particulars given here in are true to the best of my knowledge and belief. If any of this
information is found to be false or incomplete I will be responsible for it.
DATE: - AMIT KUMAR

More Related Content

What's hot

cv of Shohid
cv of Shohidcv of Shohid
cv of Shohid
Shohidul Islam
 
Resume R
Resume RResume R
Resume R
RISHIKESH YADAV
 
Resume Vinoth
Resume VinothResume Vinoth
Resume Vinoth
VINOTH KUMAR
 
Sarvesh_CV (2)
Sarvesh_CV (2)Sarvesh_CV (2)
Sarvesh_CV (2)
Sarvesh Deshmukh
 
ResumeFeb2015
ResumeFeb2015ResumeFeb2015
ResumeFeb2015
pervez ahmed memon
 
Arvinder Singh CV
Arvinder Singh CVArvinder Singh CV
Arvinder Singh CV
Arvinder Singh
 
Sumeet Kumar Resume
Sumeet Kumar ResumeSumeet Kumar Resume
Sumeet Kumar Resume
Sumeet Kumar
 
Kanika Chadha
Kanika ChadhaKanika Chadha
Kanika Chadha
Kanika Bhatia
 
Updated Resume
Updated ResumeUpdated Resume
Updated Resume
KISTAMSETTY SITARAMAIAH
 
BINOD UPDATED RESUME (2)
BINOD UPDATED RESUME (2)BINOD UPDATED RESUME (2)
BINOD UPDATED RESUME (2)
Binod Yadav
 
Iqbal cv...final
Iqbal cv...finalIqbal cv...final
Iqbal cv...final
Iqbal Hossain
 
harish kumar soni - Copy (2)
harish kumar soni - Copy (2)harish kumar soni - Copy (2)
harish kumar soni - Copy (2)
harish kumar soni
 
Ali update CV-18-05-2016
Ali update CV-18-05-2016Ali update CV-18-05-2016
Ali update CV-18-05-2016
NAZAKATH ALI
 
Engr,imran cv.cement.
Engr,imran cv.cement.Engr,imran cv.cement.
Engr,imran cv.cement.
M Imran Ali Khan Imran
 
hariom gupta cv for maintenance and project
hariom gupta cv for maintenance and projecthariom gupta cv for maintenance and project
hariom gupta cv for maintenance and project
hariom gupta
 
Resume
ResumeResume
Resume
Sourav Sen
 
Paul Battersby CV 2016
Paul Battersby CV 2016Paul Battersby CV 2016
Paul Battersby CV 2016
Paul Battersby
 
CustomerCopy final
CustomerCopy finalCustomerCopy final
CustomerCopy final
Dwarka Prasad Kawde
 
Raghvendra Resume-8+
Raghvendra Resume-8+Raghvendra Resume-8+
Raghvendra Resume-8+
Raghvendra Singh
 

What's hot (19)

cv of Shohid
cv of Shohidcv of Shohid
cv of Shohid
 
Resume R
Resume RResume R
Resume R
 
Resume Vinoth
Resume VinothResume Vinoth
Resume Vinoth
 
Sarvesh_CV (2)
Sarvesh_CV (2)Sarvesh_CV (2)
Sarvesh_CV (2)
 
ResumeFeb2015
ResumeFeb2015ResumeFeb2015
ResumeFeb2015
 
Arvinder Singh CV
Arvinder Singh CVArvinder Singh CV
Arvinder Singh CV
 
Sumeet Kumar Resume
Sumeet Kumar ResumeSumeet Kumar Resume
Sumeet Kumar Resume
 
Kanika Chadha
Kanika ChadhaKanika Chadha
Kanika Chadha
 
Updated Resume
Updated ResumeUpdated Resume
Updated Resume
 
BINOD UPDATED RESUME (2)
BINOD UPDATED RESUME (2)BINOD UPDATED RESUME (2)
BINOD UPDATED RESUME (2)
 
Iqbal cv...final
Iqbal cv...finalIqbal cv...final
Iqbal cv...final
 
harish kumar soni - Copy (2)
harish kumar soni - Copy (2)harish kumar soni - Copy (2)
harish kumar soni - Copy (2)
 
Ali update CV-18-05-2016
Ali update CV-18-05-2016Ali update CV-18-05-2016
Ali update CV-18-05-2016
 
Engr,imran cv.cement.
Engr,imran cv.cement.Engr,imran cv.cement.
Engr,imran cv.cement.
 
hariom gupta cv for maintenance and project
hariom gupta cv for maintenance and projecthariom gupta cv for maintenance and project
hariom gupta cv for maintenance and project
 
Resume
ResumeResume
Resume
 
Paul Battersby CV 2016
Paul Battersby CV 2016Paul Battersby CV 2016
Paul Battersby CV 2016
 
CustomerCopy final
CustomerCopy finalCustomerCopy final
CustomerCopy final
 
Raghvendra Resume-8+
Raghvendra Resume-8+Raghvendra Resume-8+
Raghvendra Resume-8+
 

Similar to Amit resume

Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
Aman Sharma
 
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
Aman Sharma
 
Resume_kalika
Resume_kalikaResume_kalika
Resume_kalika
Deepak Home
 
Ashutosh CV
Ashutosh CVAshutosh CV
Ashutosh CV
ashutosh nandan
 
Avtar_singh CV 2016
Avtar_singh  CV 2016Avtar_singh  CV 2016
Avtar_singh CV 2016
Avtar Singh
 
sudhir rusume
sudhir rusumesudhir rusume
Resume
ResumeResume
AKM
AKMAKM
ARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_UpdtdARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_Updtd
Aritra Ghosh
 
Nizami cv
Nizami cvNizami cv
Resume(1)
Resume(1)Resume(1)
Resume(1)
Chitrakant Sahu
 
Turbine and Auxillaries
Turbine and AuxillariesTurbine and Auxillaries
Turbine and Auxillaries
VIVEK PATHAK
 
Resume_Kailash Kumar Jain
Resume_Kailash Kumar JainResume_Kailash Kumar Jain
Resume_Kailash Kumar Jain
Kailash Jain
 
PM_SSN_Steel.
PM_SSN_Steel.PM_SSN_Steel.
PM_SSN_Steel.
Satpal Singh Nagi
 
Surajit cv.doc
Surajit cv.docSurajit cv.doc
Surajit cv.doc
surajit das
 
CV Solar
CV SolarCV Solar
CV Solar
swaraj singh
 
Resume_Ravindra
Resume_RavindraResume_Ravindra
Resume_Ravindra
Ravindra Singh
 
Resume ravindra
Resume ravindraResume ravindra
Resume ravindra
Ravindra Singh
 
090424 C S306554(2)
090424 C S306554(2)090424 C S306554(2)
090424 C S306554(2)
any thermal power plant
 
Avneesh 5_
Avneesh  5_Avneesh  5_
Avneesh 5_
avneesh sharma
 

Similar to Amit resume (20)

Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 
Resume_kalika
Resume_kalikaResume_kalika
Resume_kalika
 
Ashutosh CV
Ashutosh CVAshutosh CV
Ashutosh CV
 
Avtar_singh CV 2016
Avtar_singh  CV 2016Avtar_singh  CV 2016
Avtar_singh CV 2016
 
sudhir rusume
sudhir rusumesudhir rusume
sudhir rusume
 
Resume
ResumeResume
Resume
 
AKM
AKMAKM
AKM
 
ARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_UpdtdARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_Updtd
 
Nizami cv
Nizami cvNizami cv
Nizami cv
 
Resume(1)
Resume(1)Resume(1)
Resume(1)
 
Turbine and Auxillaries
Turbine and AuxillariesTurbine and Auxillaries
Turbine and Auxillaries
 
Resume_Kailash Kumar Jain
Resume_Kailash Kumar JainResume_Kailash Kumar Jain
Resume_Kailash Kumar Jain
 
PM_SSN_Steel.
PM_SSN_Steel.PM_SSN_Steel.
PM_SSN_Steel.
 
Surajit cv.doc
Surajit cv.docSurajit cv.doc
Surajit cv.doc
 
CV Solar
CV SolarCV Solar
CV Solar
 
Resume_Ravindra
Resume_RavindraResume_Ravindra
Resume_Ravindra
 
Resume ravindra
Resume ravindraResume ravindra
Resume ravindra
 
090424 C S306554(2)
090424 C S306554(2)090424 C S306554(2)
090424 C S306554(2)
 
Avneesh 5_
Avneesh  5_Avneesh  5_
Avneesh 5_
 

Recently uploaded

CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
PKavitha10
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
PreethaV16
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
aryanpankaj78
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
AjmalKhan50578
 
Engineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdfEngineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdf
edwin408357
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
upoux
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
ijaia
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
Gas agency management system project report.pdf
Gas agency management system project report.pdfGas agency management system project report.pdf
Gas agency management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
 
Engineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdfEngineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdf
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
Gas agency management system project report.pdf
Gas agency management system project report.pdfGas agency management system project report.pdf
Gas agency management system project report.pdf
 

Amit resume

  • 1. RESUME AMIT KUMAR : (E-mail: k_88amit@redifmail.com) Mob:- +91-7725952503, Passport No:- K9294406 Professional Summary: Innovative Mechanical Site Engineer with a proven track record in design implementation in state of the art mechanical applications and mechanical site project management. An Overview  An astute professional with 6 years 6 month of experience in Power Plant Project , AFR projects,Crusher project  Currently associated with HAJEE AP.BAVA Co.& Const. Pvt. Ltd. as a Project Engineer at the Site Lafarge Cement India Pvt Ltd(Nimbahera) Chittorgarh (Rajasathan).  Proficient in Managing Project Activity , Erection and stabilization of Power Plant and its auxiliaries, including acceptance and handing over within scheduled time .  Proven abilities in implementing schedules and have successfully worked with the team.  An effective communicator with excellent relationship management skills and strong analytical, challenge oriented, problem solving & organizational abilities.  Anchoring and planning erection activities with safety mitigation  Installing, Erection and conducting tests to ensure operational effectiveness of plant & utilities.  Planning & effectuating maintenance schedules for equipments.  Leading, mentoring & monitoring the performance of team members to ensure efficiency in process operations and meeting generation targets.  Creating and sustaining a dynamic environment that fosters development opportunities and motivates high performance amongst team members.  Identifying needs for recruitment according to the generation targets. Employment Scan June 2013 to till date (Hajee A.P.BAVA company construction pvt ltd) Plant Overview: • CHITTOR CEMENT PLANT ( LAFARGE CEMENT INDIA PVT LTD)NIMBAHERA,CHITTORGARH RAJSTHAN Pre-screening lime stone crusher projects: JOB: structure( conveyor,trestle) assembly,erection,fitup,bobler,apron feeder,screen,bag filter,strenger ,pully,belt erection ,fitup Alternate fuel resource projects: Solid waste feeding system (CBBC & chain conveyor) in PREHEATER Job:structure assembly erection fitup.conveyor(bucket belt ,chain) assembly erection.shute erection fitup Packing plant: roof, side sheeting job(erection ,fittup) • ULTRATECH CEMENT LIMITED (ADITYA BIRLA GROUP) SHAMBHUPURA , CHITTORGARH RAJSTHAN
  • 2. CAPTIVE POWER PLANT: Boiler Capacity 81 TPH, Working Pressure 15 Kg/cm2 , Working Temp. 2650 c Job:structure assembly erection fitup ,coil assembly erection fitup,ibr joint preparation,hytro test attend,insulation job activity,duct assembly erection fitup,leack test attend. Oct 2011 to May 2013 with Zillion Infra Project Pvt.Ltd Plant Overview:- 4x270 MW power Plant (ABHIJEET POWER LIMITED) CHANDWA JHARKHAND Job:structure,duct assembly &erection , leack test attend,ESP erection ,assembly ,fittup,leack test attend,rapping non rapping job attend,comm ising 4X250 MW Power Plant (BRBCL/NTPC) AURANGADABAD (BIHAR) Job: ESP erection,assembly,fittup, leack test attend,rapping non rapping job attend,commising September 2009 to Sep 2011 with Power Mech Project Ltd. plant Overview:- (2x660 ) MW (Super Critical Boiler )MAHATMA GANDHI THARMAL POWER PLANT JAJHJAR:- Boiler capacity 3300 TPH, Working pressure 273.4 Kg/cm2 And Temperature 427 0 c Job:pressure part coil, panel erection fittup,ibr joint preparation,materialhandling,tool tackle arrangement for job activity,labour colony control Scholastics: 2009 :B.Tech (Elect &Telecommunication Engineering) from Chanakya Institute of Technology Kolkata, Under J.R.N Rajsathan Vidya Peeth University Udaipur , (Rajsthan) With First Class Trainings Attended:-  BSNL Telecom Dhanbad (Jharkhand) for 1 month  IIATCA Kolkata Course on PLC & SCADA for 1 month IT Skills  Well versed with Windows, MS Office (Word, Excel, and PowerPoint), and Internet Applications Personal Vitae Date of Birth : 5th May 1984 Nationality : Indian Marital Status : Married Languages Known : English, Hindi, Permanent Address : At Village Post : Babhangama , Distt : Begusarai, Bihar Pin code :851131 Present Address : HAPBCO SITE (LIPL NIMBAHERA,CHITTORGARH RAJSTHAN ) I hereby certify that the particulars given here in are true to the best of my knowledge and belief. If any of this information is found to be false or incomplete I will be responsible for it.
  • 3. DATE: - AMIT KUMAR