1. K. SITARAMAIAH
Mobile: +267 71334127, +267 75243121 (Botswana) ~ Email: sairam1520@yahoo.co.in
+91 994 994 2339(Personal number in Botswana), +91 7702944882(Residence number in
India)
Middle level positions in , Operations Management, Testing & Commissioning with leading
organizations
PROFESSIONAL SYNOPSIS
o A result oriented professional with 20 years of experience in Operations and commissioning of
thermal power plants(CFBC/AFBC/Travelling grate ).
o Currently associated with M/s Steag Energy services (BOTSWANA) Pty Ltd, Thermal Power
Plant (4X150MW) situated at Palapye in Botswana.
o Working as Shift in-charge In the cadre of Deputy General Manager.
o A keen planner with competencies across:
- Operations - Cost Reductions - Commissioning
o Adept at supervision, co-ordination and managing the day-to-day and round the clock operations of
all specialized equipment and utilities.
o Proficiencies in managing operations of Equipment and Utilities in Manufacturing Facilities with
proven abilities in reducing downtime and enhancing operational efficiencies.
o Resourceful at implementing techniques for maximum utilization of manpower/machinery.
o An effective communicator with excellent relationship, management skills and strong analytical,
problem solving and organizational abilities.
AREAS OF EXPERTISE
Operation & Maintenance
⇒ Preparing SOPs, Manuals & Work Instructions for production operations for the unit and maintaining
reports for facilitating decision making by management.
⇒ Implementing proactive / predictive / preventive / shut down maintenance schedules for machinery
so as to increase machine up-time / equipment reliability.
⇒ Identifying areas of obstruction/breakdowns and taking steps to rectify the equipments through
application of trouble shooting techniques.
⇒ Executing cost saving and energy saving techniques/ measures and modifications to achieve
substantial reduction in O&M expenditures and work within the budget.
Erection & Commissioning
⇒ Executing commissioning of Equipment, followed by trial runs.
⇒ Identifying project bottlenecks and undertaking corrective measures.
⇒ Ensuring effective site management and discipline to ensure safe & timely execution of the projects.
⇒ Commissioning of equipment, followed by plant trial runs meeting targeted performance/ quality &
quantity parameters and thereafter handing over of the plant.
Process Enhancement
⇒ Analyzing various processes/applications and recommending modifications & equipment calibrations
to enhance operational efficiency.
⇒ Devising systems and process changes for qualitative improvements in productivity and for reducing
the rate of rejection.
Quality Assurance
⇒ Implementing standards and ensuring adherence to quality standards.
⇒ Mentoring & directing routine / non routine quality issues by interacting with concerned departments
such as Purchase, Production etc of projects till completion.
Man Management
⇒ Leading, mentoring & monitoring the performance of the team to ensure efficiency in process
operations & meeting of individual & group targets.
2. ⇒ Ensuring that teams adhere to all the quality tool & procedures.
⇒ Resolving interpersonal issues & working towards a harmonious work environment.
ORGANIZATIONAL EXPERIENCE
Since Oct 2014 to till to date: Working with M/s Steag Energy services (BOTSWANA)Pty Ltd,
Botswana as Shift in-charge in the cadre of Deputy General Manger. Here I am responsible
for the operation of 4X150 MW CFBC boilers supplied by WUXI China and TG sets are
supplied by Dongfang.
Since July 2011 to October 2014: Worked with M/s Simhapuri Energy Limited, Nellore,
Andhra Pradesh as Shift in-charge in the cadre of Chief Manager (Operations). Here I am
responsible for operations and commissioning of 4X150 MW CFBC boilers supplied by WUXI
China with 487TPH capacity each, 137ksc pressure and 5350
C Temperature and TG sets are
supplied by Harbin China with Super high pressure intermediate reheat, single shaft line,
double casing and double exhaust condensing steam turbine.
Since May 2009 to July 2011: Worked with M/s Jindal South West Energy Limited, Barmer,
Rajasthan as a Shift Charge Engineer in the cadre of Deputy Manager (Operations). Here I am
responsible for operations of 8X135 MW CFBC boilers supplied by DEC China with 440TPH
capacity each, 137ksc pressure and 5350
C Temperature and TG sets are supplied by DEC
China with Super high pressure intermediate reheat, single shaft line, double casing and
double exhaust condensing steam turbine.
Since March 2008 to May 2009: Worked with M/s Triveni Engineering and Industries Limited,
Khtauli, UttarPradesh as a Shift Charge Engineer in the cadre of Assistant Manager
(Operations). Here I am responsible for operations of 2X120TPH Travelling grate boilers
supplied by IJT and 24MW (SKODA MAKE), 22MW (FIN CANTRRI MAKE) Turbines.
.
Since Jun’97 to March 2008: worked with M/sNava Bharat Ventures Limited , Paloncha,
Andhra Pradesh in the cadre of Jr. Manager (Power Plant) and performed following
responsibilities.
Noteworthy Initiatives
⇒ Job responsibilities like
oOperations of power plant, Process Improvement Plans and Implementation.
o Ensuring Quality Assurance.
o Quality Initiatives like ISO: 9002 & ISO: 14001.
o Increasing machine up-time.
⇒ Preparing Trip/Fault Analysis Reports, conducting Technical Discussion Meets and preparing the
Operational Procedures for various equipments.
⇒ Hands on experience in
- Desk Operation of 2 nos. of CFBC Boilers rated 151TPH, 93 Kg/Cm2, 520 0C&2 no’s of
110TPH AFBC Boilers and Operation
- Trouble shooting of 55MW single cylinder condensing type Steam Turbine (LMZ make,
Russia) having seven uncontrolled extractions equipped with Electro hydraulic Governing
System & 32MW Turbine supplied by (SNM make: Japan).
- Operation and Trouble Shooting of 55 MW & 32 MW TG when synchronized with Grid and
Island mode, Load Shedding during these operations manually by taking timely decisions.
- Managing parallel operations of 2x151T PHCFBC & 110TPH AFBC Boilers. Have completely
atomized the Distributed Control System CS-3000 package of Yokogawa, Japan,
incorporated with number of control loops (closed & open) such as draft, boiler drum level,
main stream outlet temp. etc.
⇒ Implemented Training Course for new recruits — Trouble Shooting & Emergency Situations in
Operation of 2nos. of CFBC Boilers rated 151TPH, 92 Kg/Cm2, 520 0C and 55MW Steam
Turbine&110TPH AFBC Boiler,32MW Turbine.
⇒ Attending Annual Statutory Shut – Downs, Emergency Break Downs of Boilers and Turbine.
⇒ Implementing & executing Safety Initiatives to develop, maintain and improve safe work
environment with the department and the plant.
3. ⇒ Executed Erection, Testing & Commissioning of 2 x 151TPH CFBC&AFBC (110TPH) Boilers.
Since June’95 – May’97 Indwell Constructions Pvt. Ltd Jr. Engineer.
⇒ Actively involved in the following:
- Erection of 2 x 250 MW KTPS V stage
- Erection of TG main building and miscellaneous structures.
- Erection of Bunker bay sections.
EDUCATION
Completed Diploma in Mechanical Engineering from State Board of Tech. Education & Training,
A.P., Hyderabad Govt. Polytechnic, Rudrampur in 1995 (Secured 71%)
PERSONAL VITAE
Date of Birth : 28th
August, 1975
Address : Jagruti Nilayam, Indira nagar colony, Khammam(District), Telangana.
Language Known : Telugu, Hindi, English