1. DEEPAK FULPAGARE
Contact: +91-9301849605 / 7489776436
E-mail: deepakfulpagare@gmaill.com
Date :- 10/02/2015
Deepak Fulpagare
Manager ( E & A )
Kalika steel
MIDC Jalna
Jalna Maharashtra
Dear sir / madam
This is in reference to the advertisement / publication / telephonic conversation, I am writing to express my interest
in joining your team as a ( Head Of Electrical Maintenance Department). My resume is enclosed for your review and
consideration.
To describe myself in a nutshell, I am hardworking, astute & result oriented professional, with qualitative &
invaluable experience of 8.5 years’ experience in diverse areas encompassing Commissioning and Erection, Testing,
Maintenance, Operations and project Management of Transformers, Controllers & Rolling Mill Block Motor;
currently spearheading with KALIKA STEEL. as Manager - Rolling Mill Division.
My basic objective is to hone in my skills for comprehensive personality development and be an epitome of trust and
reliability in the corporate world. Planning & implementing the preventive, predictive & breakdown maintenance
schedules for improving the overall reliability and safety of electrical equipments & machinery.
My prime goal is to understand professional environment and capitalize on opportunities. My core competencies
include:
Project Management ~ Planning & Scheduling ~ Power Plant Management ~ Preventive Maintenance ~ Predictive
Maintenance ~ Erection/Commissioning ~ Testing/Installation ~ Statutory Compliance ~ Shutdown/Start up
Operations ~ Safety Management ~ Quality Assurance ~ Crisis Management ~ Procurement/Analysis ~ Training &
Development ~ Cross Functional Coordination
Professionally I am looking for an opportunity that will help me utilizing my skills in the above areas. My detailed
resume is enclosed herewith for your kind perusal and consideration.
I am confident that you would find my strong initiatives and commitments to excellence coupled with demonstrated
experience and exposure ideal for the position.
I would welcome a personal meeting to further discuss your requirements and my ability to meet the same.
Thanking you for your consideration and forthcoming response.
Yours Sincerely
Deepak Fulpagare
2. DEEPAK FULPAGARE
Contact: +91-9301849605 / 7489776436
E-mail: deepakfulpagare@gmaill.com
ERECTION, COMMISSIONING, OPERATIONS & MAINTENANCE PROFESSIONAL
Offering experience in Rolling Mill / Blast Furnace / Power plant; seeking challenging assignments with growth-
oriented organizations across the industry
PROFILE
Dynamic & result-oriented professional offering 8.5 years’ experience in diverse areas encompassing
Commissioning and Erection, Testing, Maintenuance, Operations and project Management of Transformers,
Controllers & Rolling Mill Block Motor.
Currently spearheading with KALIKA STEEL JALNA as Manager - Rolling Mill Division execution and
implemantation of new Rolling Mill project with the co-ordination with siemens (Electrical and automation
,Mechnical).
Before KALIKA STEEL I was working with JAYASWAL NECO IND LTD as Asst Manager - Rolling Mill Division with
proficiency in planning & implementing the preventive, predictive & breakdown maintenance schedules for
improving the overall reliability and safety of equipments & machinery.
Understanding of all aspects governing operational and maintenance activities and up to date knowledge of
latest technological advancements, regulations/ guidelines and statutory compliances in the industry.
Technical skilled in MM module (Material management) & PM (Preventive maintenance module) on SAP
application and ETAP software & Computer application program. Ability to conceptualize the processing for the
product development with careful & sophisticated quality control measures. Demonstrated capabilities in
conducting systematic analysis of electric faults and implementing quick breakdown solutions to make the
system operational. Plan and manage work programs & to lead, motivate and provide effective guidance to a
team of professional and support staff.
Key Competencies:
Project Management ~ Planning & Scheduling ~ Power Plant Management ~ Preventive Maintenance ~ Predictive
Maintenance ~ Erection/Commissioning ~ Testing/Installation ~ Statutory Compliance ~ Shutdown/Start up
Operations ~ Safety Management ~ Quality Assurance ~ Crisis Management ~ Procurement/Analysis ~ Training &
Development ~ Cross Functional Coordination
CAREER GLIMPSE
KALIKA STEEL. Jan. -2015 to till date
Key Responsibilities
Identified resources and requirement, assigned responsibilities and coordinated directly/indirectly with project
staff to ensure successful completion of the project.
Execution of Mill area equipment like Stands ,Shears,Media system and Finishing area from Electrical and
Automation side.
Co-ordination with the consultant (Korus) and Automation Engg ( Siemens ).
Co-ordination with Maharastra State Electricity Board for HT Supply in Rolling Mill.
Execution of HT distridution in internal mill and transformer erection and commissioing.
Independ responsidility to execute all project from Electrical and Automation side.
JAYASWAL NECO INDUSTRIES LTD. Sept. 2007- Jan. 2015 Growth-path:
Asstt. Manager Rolling Mill Division: Oct. 2011 - till now
Engineer. : Sept. 2008 – Sept. 2011
Trainee Engineer. : Sept. 2007 – Aug. 2008
Key Responsibilities:
Accountable for detailed planning & scheduling and coordinating activities to ensure smooth work progress and
timely execution of projects and successful implementation of approved Quality Control Inspection Plan.
Identified resources and requirement, assigned responsibilities and coordinated directly/indirectly with project
staff to ensure successful completion of the project.
Executed job directly with a team of members at site. Actively handled as Project Engineer Inspection staff and
monitored fabrication works in accordance with the approved Project Quality Plan.
3. Performed regular checks and ensured that all safety regulations were followed. Deftly handled erection works
maintaining QA/QC standards.
Prepared contracts for equipment acquisition in construction process. Involved in daily work planning and
coordination with Project Manager. Arranged for Tools, Machinery and Material well in advance to complete the
work in schedule time.
Interacted with the clients and Third Party Inspector to expedite the acceptance/ approval of jobs.
Monitored site work, prepared daily progress and consumption report on spares utilized in the plant on monthly
& yearly basis. Deftly handled the task of timely delivery of the product within the stipulated time provided by
the customers.
Project details:
Project Rolling Mill / Blast Furnace / Power plant
Designation Manager (E&A)
Responsibilities
(Project role)
Commissioning of DC(ABB DCS800) And AC DRIVE(ABB 355,550,850 multidrive, Siemens
MM 440 Danfoss 5000 )
Commissioning of RMHS MCC & PH MCC PLC inter locked with all safety devices of
conveyor belt.
Looking after the erection & commissioning (testing before dispatch inspection) of:
o 50, 16, 3 MVA Transformer
o HT Motor 1.2 MW and 2MW for rolling mill Block motor
Commissioning of ESP (Make: ACC) with Allen Bradley PLC logic controller of rapper &
HIRECT Tr. Controller.
Erection & commissioning of VVVF drive (testing before dispatch inspection) (Make: ABB
DCS800 ABB 355,550,850 multi-drive).
Fully auto Coil Handling area in rolling mill (Sund Birsta).
Communication in between PLC and DRIVE, inter CPU, PLC and energy meter with
harmonics monitoring.
Handling installation of mill sensor like HMD, LOOP SCANNER, PYROMETR, RTD,
THERMOCOUPLE with PLC communication.
Conducting Plant illumination (only supervision); coordinating with outside agencies.
Responsibilities
(Operation &
Maintenance)
Carrying out the analysis failures and taking remedial action; attending major breakdowns.
Implementing modification, erection of new equipment.
Preparing detailed work instructions & maintenance scheduling for the maintenance of
equipment and after discussion with seniors monitoring its implementation.
Analyzing failures and respective breakdowns.
Preparing defect list and plans for spares, tools tackles for correcting the defects during
shutdown.
Distributing man power & planning for scheduling maintenance of all critical or running
drive; planning & scheduling for the shut down job.
Preparing indent or maintaining spare of critical drive; handling corrective action plan for
the brake down.
Maintaining the ISO 9000:2008 and ISO/TS 16949:2009 documentations on monthly basis.
Maintaining preventive maintenance logbooks, history logbooks & other documents
related to maintenance.
Maintaining overall co-ordination with shifts and other departments.
Planning for the implementation of improvement of plant efficiency.
Preparing & scheduling the training for workers of Awareness of criticality & Importance of
the system programs.
SKS ISPAT & POWER LTD. Aug. 2006 – Sept. 2007
Assistant Engineer
Project details:
4. Project 30 MW AFBC - 30 MW 110TPH Power Plant
Designation Assistant Engineer
Responsibilities
(Project role)
Managed the responsibility of erection & commissioning of the entire electrical Equipment
HT panel, LT & HT induction motor, MCC, PCC, Aux. transformer (5MVA & 3MVA) &30 MW
TG set.
Handled erection & commissioning of:
o VVVF drive (Make : ABB 800)
o ESP(Make : CVL)
o Coal handling plant with all safety of conveyor belt.
Commissioning of 132/11 KV sub-station.
Supervision the job to complete in planned time duration (Day by day reporting to GM
through proper channel).
Responsibilities
(Operation &
Maintenance)
Handled the maintenance of all the critical drives schedule maintenance.
Observed the running parameter & analyzing the data before the fault coming.
Managed proper changeover of the critical drive in running condition as per the schedule.
Took-over the project pending job and prepared schedule for it.
Technical Proficiency:
Breakers VCB, ACB, SF6CB
Starting Methods Variable voltage variable frequency drives, Soft Starter, STAR – DELTA, DOL
Operation:
Generators Bharat Heavy Electrical Limited, Jinan Power Equipment Factory
Transformers Voltage, Current
Relay MICOM P111,P121, MM30 (L&T)
EDUCATIONAL & PROFESSIONAL CREDENTIALS
M.E. (Power System), 2008-2010 Shri Shankaracharya College of Engineering and Technology (CSVTU, Bhilai); 67%
B.E. (E&E), 2002-2006 Chhatrapati Shivaji Institute of Technology (Pt. Ravishankar Shukla University, Raipur); 64.3%
12th
Class, 2002 Advani Orelicon Govt. School Birgaon Raipur (C. G. Board); 71%
10th
Class, 2000 Saraswati Gyanodya Mandir (M.P. Board); 70%
Professional Certifications:
Certified auditor of DNV in ISO 9001-2008.(1st
position in plant level).
Certified auditor of DNV in TS/ ISO 16949-2009 (Technical specification) it is most important certification for
steel plant as per the customer requirement. It is designed by IATF (International Automotive Task Force).
Appearing in Energy Auditor certification which is conducted by “Bureau of Energy Efficiency”.
Computer Skills:
Operating Environments WIN 95 / 98 / 2000, WIN XP, VISTA, WINDOWS 7
Languages C, C++
Software MS Excel, MS Word, Power Point, MAT SIMULATION LAB, Mi POWER
Projects / Training:
Project Title Automation in Energy Meter Reading
Organization Chhattishgarh State Electricity Board
Duration 14-days (Power Plant & Substation)
Paper Presentation:
5. International paper presentation on Design And Simulation of Harmonics filter for AC Drive using Mat Lab.(ISSN
2249-6343)
Achieved 2nd
position in National level project presentation in “YANTRIKI 2006”.
Extra-curricular Accolades:
Presented the CSIT in State Level Quiz Competition “GUNIUS 2”.
Attended the National Level Seminar in “POWER QUALITY” in MPCCET DURG.
Date of Birth: 5th
June 1984
Hobbies / Interests: Playing Cricket, Watching Advertisement
Languages Known: Hindi, English, Marathi (Chhttishgari Boli also)
Address: C/o Late Shri Vasant Fulpagare, C-35, Sector – 1, Ekta Nagar, Gudiyari, Raipur (C.G.)
References: Available on Request
6. International paper presentation on Design And Simulation of Harmonics filter for AC Drive using Mat Lab.(ISSN
2249-6343)
Achieved 2nd
position in National level project presentation in “YANTRIKI 2006”.
Extra-curricular Accolades:
Presented the CSIT in State Level Quiz Competition “GUNIUS 2”.
Attended the National Level Seminar in “POWER QUALITY” in MPCCET DURG.
Date of Birth: 5th
June 1984
Hobbies / Interests: Playing Cricket, Watching Advertisement
Languages Known: Hindi, English, Marathi (Chhttishgari Boli also)
Address: C/o Late Shri Vasant Fulpagare, C-35, Sector – 1, Ekta Nagar, Gudiyari, Raipur (C.G.)
References: Available on Request