SlideShare a Scribd company logo
PPPaaagggeee 111 ooofff 333
RESUME
RAVINDRA SINGH
Mobile: +919660552837/+918955960616
E-Mail: rsk.2007@rediffmail.com
Address: 46/547 Din Dayal Awas
Kabir Nagar, Raipur, CG. India
Age- 40Year (DOB-17Jun 1976)
UIDAI No- 5405 1577 4121
 A Senior Level graduate Electrical Engineer with an experience of 16 Year 9 Month in Project
Management entailing Installation & Commissioning, Maintenance, Operations, Troubleshooting,
Quality Control and Team Management in Steel, Power and Solar Plant.
 Adept in managing Maintenance & operation activities involving resource planning, in-process
inspection, team building and co-ordination with internal / external departments.
 Demonstrated excellence in setting priorities, developing work schedule, monitoring progress
towards goals and tracking details/data/information/activities.
 An effective communicator and possess good experience in building relationships with different
country person like USA/France/UK/Germany/China/Russia during work.
Organizational Scan
 Rajasthan Sun Technique Energy Pvt Ltd. (Reliance Power), Dhursar, Rajasthan, India.
 AREVA Solar India Pvt. Ltd. (Multi National Company of France), Dhursar, Rajasthan, India.
 Lanco Solar Pvt. Ltd., Chawardhal- Mehroomkhurd, Rajnandgaon, India.
 Jayaswal Neco Industries Limited (Steel Plant Division), Raipur, India.
 Raipur Alloys & Steel Limited, (Sarda Energy & Mineral Ltd) Raipur, India.
KEY RESULT AREAS
Project Management
 Managing activities right from the conceptualization stage to the execution, involving finalization of
technical specifications, procurement, vendor development, scheduling, progress monitoring, site
management and manpower planning.
 Establishing project review, monitoring and status reporting procedures to accurately report
progress of the project to the stakeholders and end user clients.
 Handling activities involving working out various requirements & monitoring overall project
operations for ensuring timely completion.
Installation & Commissioning
 Managing installation and commissioning of the heavy equipment’s as well as conducting tests &
inspections to ensure operational effectiveness of plant & utilities.
 Reviewing engineering drawings, layouts, diagrams, technical specifications, cost estimates for
erection & commissioning of the plant.
Maintenance & Testing
 Planning and effecting predictive & preventive maintenance schedules for various equipment to
increase machine up time & equipment reliability.
 Identifying areas of bottlenecks / breakdowns and taking steps to rectify the equipment’s through
application of troubleshooting tools like root cause analysis.
 Maintaining and ensuring stringent adherence to quality standards, norms & practices, identifying
gaps and taking corrective actions.
 Carrying out overhauling work of equipment, modifications, and major repairs to improve
equipment efficiency by faultfinding.
Team Management
 Leading, mentoring & monitoring the performance of the team members to ensure efficiency in
process operations and meeting of individual & group targets.
 Creating and sustaining a dynamic environment that fosters development opportunities and
motivates high performance amongst team members.
PPPaaagggeee 222 ooofff 333
HIGHLIGHT
 At Rajasthan Sun Technique Energy Pvt Ltd. (Reliance Power) as Sr.Mgr.(Electrical)
(January 2016 to till date)
 Successfully Planning and Procurement carried out for Man power and resources requirement for
operation and maintenance of all the electrical equipment of HT breaker, HT Isolator, Transformer,
UPS and LT panel, Platform and gantry of 125MW CSP.
 Tracking of Daily Activity planning & execution and energy monitoring of Solar block, Power block
and 220KV switchyard.
 Improvement in field of cost saving like in house repair work of costly off-shore item Dunken
Motron equipment, Power distribution and energy conservation of plant.
 Operation and maintenance of Pre Engineering Building equipment 2x750 KVA, 250KVA, 7.5KVA
Diesel Generator and Manuel glass loading machine, compressor and robot.
 At AREVA Solar Pvt. Ltd., Dhursar, India as Electrical commissioning Incharge
(Jun 2013 to December 2015)
 Supervising and monitoring all equipment commissioning, testing and O&M planning (Systematic
maintenance plan, Standard operating procedure, History sheet, KPA, MTBF and check list as per
OEM) related to 125MW CSP project: 220KV Switch Yard, 133 MW Generators, Transformers up to
160MVA,HT & LT Breaker and motors of 125MW Solar Thermal power plant.
 Site acceptance test, commissioning and O&M planning of following electrical equipment of
35x25TPH AREVA Concentrated Solar Steam Generators: 6.6KV Megawin-HT switch Gear &
Penickker HT Isolator, Voltamp-Dry Transformer,Hirel UPS, LT Panel, HVAC (Voltas), Tractel-30Mtr
height Gantry and Platform for Solar steam generator, SSG Line control panel & Reflector control
panel and Dunker-Reflector servo control motor and Motorized operating Valve and Variable voltage
drive.
 Successfully coordinated and keep approach for zero punch point and 100% completion of
commissioning work by implementing ICAP with Reliance, Alstom, Siemens, Thermax in Power
block and Solar field as per Engineering India Ltd and USA engineering.
 Carried out quality check for all electrical equipment as per PO and specification during Goods
inspection.
 Identify spares for indigenization and list spares to be developed in coordination with operations
and maintenance and USA Engineering team.
 Successfully Planning and Procurement carried out for Man power and resources requirement for
project as well as for operation and maintenance of 125MW CSP.
 Tracking of Daily Activity planning & execution and energy monitoring of Power block as well as of
solar field.
 Improvement in field of cost saving like in house repair work of costly off shore item Dunken
Motron equipment, Power distribution and energy conservation of plant.
 Lanco Solar Pvt. Ltd, Rajnandgaon, CG. India as DY Manager (Electrical)
(Feburuary-2011 to Jun 2013)
 Operation and maintenance planning and Identify spare for indigenization and list spares to be
development at Solar 70MW PV module manufacturing unit.
 Pivotal in supervising and monitoring all electrical installation, commissioning, testing and updating
of drawings related to 1500TPA Polysilicon Project with 5 No’s. 11kv substation and 132kv
switchyard.
 Successfully coordinated and keep approach for zero punch point and 100% completion of erection
work and document accordingly with LANCO EPC, GT Solar and Fluor India USA based Engineering
Consultant for quality related issues.
 Factory acceptance test & Site acceptance test of various electrical equipment done at mfr.
industries and sites.
 Electrical reviewing done for Various Hi- technology equipment like CVD reactor, EURO-DIESEL
Rotary UPS, HITZINGER DE+M, SANDVIK, Hot Oil, waste water treatment Plant and CHROMOLOX
Heaters.
 Identify manufacturers of the spares and forward the technical drawing to the manufacturers for
developing samples of the same / for getting the cost details.
PPPaaagggeee 333 ooofff 333
 At Jayaswal Neco Industries Limited (Power Plant Division) as Assistant Manager (Elect)
(February 2011 to Jun 2013)
 Maintenance and operation of MRSS with 53MW Capital power plant (15x2MW, 7.5x2MW,4x2MW)
and plant load of Blast furnace, Arc furnace, DRI, cock oven and Sinter Plant
 Pivotal in managing 15 MW generator and exciter rewinding and testing work,
 Transformer up to 50MVA, erection, maintenance and testing work,11KV VCB, up to 220Kv
switchyard erection, maintenance and testing work,132Kv switchyard related equipment
maintenance.
 Maintenance and operation of MRSS with 53MW Capital power plant (15x2MW, 7.5x2MW,4x2MW)
and plant load of Blast furnace, Arc furnace, DRI, cock oven and Sinter Plant.
 Captive power plant (15x2MW,7.5x2MW,4x2MW) Generators, exciter and AVR maintenance.
 Performed system modification work like wireless communication between Grid & AVR, Woodward
Panel, etc.
 Executed erection, commissioning and maintenance of Thermex ESP.
 Well versed with different types of valve like AUMA & ROTORC make.
 Executed overall maintenance of Power Plant Equipment like Coal handling plant, Ash handling
system, Compressor, Pumps, and Fans.
 Stellar role in executing Root Cause Failure Analysis, Predictive/Preventive and Breakdown
Maintenance.
 At Raipur Alloys & Steel Limited (Sharda Energy & Minerals Ltd.) as Engineer (Elect)
(October 1999 to January 2007)
 Executed electrical maintenance /commissioning of:
 30x3MW Power Plant BTG and BOP .
 Load Control Management System.
 Diesel Generator up to 1200 KVA.
 EOT crane up to 65T & L.T. & H. T. Motor
 VVVF Drive.
 2X100TPD and 2x500TPD Kiln electrical equipment.
 Recognized for carrying out project work planning of 15X 4T Induction Furnace like:
 HT, LT cable scheduling and laying, cable tray scheduling and erection.
 Commissioning of electrical installation of 15X 4T Induction Furnace.
 PCC and MCC drawing design and procurement.
 11kv VCB erection, commissioning and relay coordination with Power Plant Division.
 Layout designing for HT breaker, PCC and MCC room.
 Transformer erection and commissioning including bus bar & bus duct arrangement for
15 x 4 T Induction Furnace of rating 7.5MVA.
 Transformer, complete testing work including Factory Test and Site Test.
 Lighting installation, lighting DB and welding DB with dual supply source.

Training & Professional skill
 Good knowledge of IE Rules and regulations, Electricity Act, Electrical supply code.
 Familiar with ISO 9001-2000, ISO 14001, ISO 18001, Energy Management ISO 50001.
 5 days training on Project management at Lanco Solar, Rajnandgaon, Chhattisgarh.
 5 Days Training on Energy management under AIPNPC, New Delhi, India.
 Electrical safety training (NFPA-70E) done at AREVA Solar, Jodhpur, Rajasthan
Academic Credentials
2012 Diploma in management (Operations Management) from IGNOU, India.
2007 B.Tech. Electrical from IASE DU Sardarsahar, (Rajasthan), India.
1998 Diploma in Electrical Engineering from MP Board of Technical Education, Bhopal, India.
IT Forte: Good knowledge of MS-Office, Windows XP Professional and Internet Applications.

More Related Content

What's hot

Resume (1)
Resume (1)Resume (1)
Resume (1)
SUDESH KUMAR
 
Pdv narasimha rao 7+
Pdv narasimha rao 7+Pdv narasimha rao 7+
Pdv narasimha rao 7+
Narasimha Pasupuleti
 
Gensol Rooftop EPC - Steps & Quality Management
Gensol Rooftop EPC - Steps & Quality ManagementGensol Rooftop EPC - Steps & Quality Management
Gensol Rooftop EPC - Steps & Quality Management
Gensol Engineering Limited
 
Solar Power Engineering & Operation Maintenances
Solar Power Engineering & Operation Maintenances Solar Power Engineering & Operation Maintenances
Solar Power Engineering & Operation Maintenances
krishna mohan
 

What's hot (20)

Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 
SASIdharan p CV
SASIdharan p CVSASIdharan p CV
SASIdharan p CV
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
gopi chandra sahu, Resume
gopi  chandra sahu,  Resumegopi  chandra sahu,  Resume
gopi chandra sahu, Resume
 
Pdv narasimha rao 7+
Pdv narasimha rao 7+Pdv narasimha rao 7+
Pdv narasimha rao 7+
 
CV_Gopalakrishna
CV_GopalakrishnaCV_Gopalakrishna
CV_Gopalakrishna
 
hari_new resume
hari_new resumehari_new resume
hari_new resume
 
PDV narasimha Rao 6+ (2)
PDV narasimha Rao 6+ (2)PDV narasimha Rao 6+ (2)
PDV narasimha Rao 6+ (2)
 
Resume
ResumeResume
Resume
 
SRao_cv
SRao_cvSRao_cv
SRao_cv
 
Resume mohan
Resume mohanResume mohan
Resume mohan
 
selfcv NEw
selfcv NEwselfcv NEw
selfcv NEw
 
Resume_kalika
Resume_kalikaResume_kalika
Resume_kalika
 
Sadanand dubey
Sadanand dubeySadanand dubey
Sadanand dubey
 
Gensol Rooftop EPC - Steps & Quality Management
Gensol Rooftop EPC - Steps & Quality ManagementGensol Rooftop EPC - Steps & Quality Management
Gensol Rooftop EPC - Steps & Quality Management
 
ajay cv new (3)
ajay cv new (3)ajay cv new (3)
ajay cv new (3)
 
CV Solar
CV SolarCV Solar
CV Solar
 
Chaithanya Potluri
Chaithanya PotluriChaithanya Potluri
Chaithanya Potluri
 
Solar Power Engineering & Operation Maintenances
Solar Power Engineering & Operation Maintenances Solar Power Engineering & Operation Maintenances
Solar Power Engineering & Operation Maintenances
 

Viewers also liked

Top 8 fuel operator resume samples
Top 8 fuel operator resume samplesTop 8 fuel operator resume samples
Top 8 fuel operator resume samplesKimHeechul999
 
Jack huang's resume
Jack huang's resumeJack huang's resume
Jack huang's resumeJack Huang
 
Larry Resume updated 01 (2)
Larry Resume updated 01 (2)Larry Resume updated 01 (2)
Larry Resume updated 01 (2)Larry Cleek
 
Terry Burgess resume
Terry Burgess resume Terry Burgess resume
Terry Burgess resume Terry Burgess
 
Resume - Keith L Bailey(Jan 15)
Resume - Keith L Bailey(Jan 15)Resume - Keith L Bailey(Jan 15)
Resume - Keith L Bailey(Jan 15)keith bailey
 

Viewers also liked (6)

Top 8 fuel operator resume samples
Top 8 fuel operator resume samplesTop 8 fuel operator resume samples
Top 8 fuel operator resume samples
 
Alfred Sullivan Resume
Alfred Sullivan ResumeAlfred Sullivan Resume
Alfred Sullivan Resume
 
Jack huang's resume
Jack huang's resumeJack huang's resume
Jack huang's resume
 
Larry Resume updated 01 (2)
Larry Resume updated 01 (2)Larry Resume updated 01 (2)
Larry Resume updated 01 (2)
 
Terry Burgess resume
Terry Burgess resume Terry Burgess resume
Terry Burgess resume
 
Resume - Keith L Bailey(Jan 15)
Resume - Keith L Bailey(Jan 15)Resume - Keith L Bailey(Jan 15)
Resume - Keith L Bailey(Jan 15)
 

Similar to Resume_Ravindra

SUDIP DHAR Resume electrical Engineering
SUDIP DHAR  Resume electrical EngineeringSUDIP DHAR  Resume electrical Engineering
SUDIP DHAR Resume electrical Engineering
Sudip Dhar
 
Avtar_singh CV 2016
Avtar_singh  CV 2016Avtar_singh  CV 2016
Avtar_singh CV 2016Avtar Singh
 
Resume_Latif Khan
Resume_Latif KhanResume_Latif Khan
Resume_Latif KhanLatif Khan
 
RESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLRESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLBISWAJYOTI SWAIN
 
SuryaMohan_Resume_2016
SuryaMohan_Resume_2016SuryaMohan_Resume_2016
SuryaMohan_Resume_2016Surya Mohan
 
RESUME - RAKESH PATEL
RESUME - RAKESH PATELRESUME - RAKESH PATEL
RESUME - RAKESH PATELRakesh patel
 
Shashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_IndiaShashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_IndiaShashank Janbandhu
 
CV Mahboob Updated 24.10.15
CV Mahboob Updated  24.10.15CV Mahboob Updated  24.10.15
CV Mahboob Updated 24.10.15Mahboob Iqbal
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
Venkatesh D
 
Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Resume Power project planning & maintenance.
Resume Power project planning & maintenance.
Prashant Maulikar
 
BALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUMEBALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUMEAnil Kumar
 

Similar to Resume_Ravindra (20)

SUDIP DHAR Resume electrical Engineering
SUDIP DHAR  Resume electrical EngineeringSUDIP DHAR  Resume electrical Engineering
SUDIP DHAR Resume electrical Engineering
 
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 
Satish_Reddy_resume
Satish_Reddy_resumeSatish_Reddy_resume
Satish_Reddy_resume
 
Avtar_singh CV 2016
Avtar_singh  CV 2016Avtar_singh  CV 2016
Avtar_singh CV 2016
 
resume 04092015
resume 04092015resume 04092015
resume 04092015
 
Resume_Latif Khan
Resume_Latif KhanResume_Latif Khan
Resume_Latif Khan
 
RESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLRESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPL
 
Bhushan warghane 1_
Bhushan warghane 1_Bhushan warghane 1_
Bhushan warghane 1_
 
SUDHAKAR DIVYAPATI
SUDHAKAR DIVYAPATISUDHAKAR DIVYAPATI
SUDHAKAR DIVYAPATI
 
Sankar_ Vaid
Sankar_ VaidSankar_ Vaid
Sankar_ Vaid
 
SuryaMohan_Resume_2016
SuryaMohan_Resume_2016SuryaMohan_Resume_2016
SuryaMohan_Resume_2016
 
vishwassharma5yearexp
vishwassharma5yearexpvishwassharma5yearexp
vishwassharma5yearexp
 
RESUME - RAKESH PATEL
RESUME - RAKESH PATELRESUME - RAKESH PATEL
RESUME - RAKESH PATEL
 
Shashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_IndiaShashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_India
 
Resume
ResumeResume
Resume
 
CV Mahboob Updated 24.10.15
CV Mahboob Updated  24.10.15CV Mahboob Updated  24.10.15
CV Mahboob Updated 24.10.15
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Resume Power project planning & maintenance.
Resume Power project planning & maintenance.
 
BALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUMEBALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUME
 
RESUME october 2016 F
RESUME october 2016 FRESUME october 2016 F
RESUME october 2016 F
 

Resume_Ravindra

  • 1. PPPaaagggeee 111 ooofff 333 RESUME RAVINDRA SINGH Mobile: +919660552837/+918955960616 E-Mail: rsk.2007@rediffmail.com Address: 46/547 Din Dayal Awas Kabir Nagar, Raipur, CG. India Age- 40Year (DOB-17Jun 1976) UIDAI No- 5405 1577 4121  A Senior Level graduate Electrical Engineer with an experience of 16 Year 9 Month in Project Management entailing Installation & Commissioning, Maintenance, Operations, Troubleshooting, Quality Control and Team Management in Steel, Power and Solar Plant.  Adept in managing Maintenance & operation activities involving resource planning, in-process inspection, team building and co-ordination with internal / external departments.  Demonstrated excellence in setting priorities, developing work schedule, monitoring progress towards goals and tracking details/data/information/activities.  An effective communicator and possess good experience in building relationships with different country person like USA/France/UK/Germany/China/Russia during work. Organizational Scan  Rajasthan Sun Technique Energy Pvt Ltd. (Reliance Power), Dhursar, Rajasthan, India.  AREVA Solar India Pvt. Ltd. (Multi National Company of France), Dhursar, Rajasthan, India.  Lanco Solar Pvt. Ltd., Chawardhal- Mehroomkhurd, Rajnandgaon, India.  Jayaswal Neco Industries Limited (Steel Plant Division), Raipur, India.  Raipur Alloys & Steel Limited, (Sarda Energy & Mineral Ltd) Raipur, India. KEY RESULT AREAS Project Management  Managing activities right from the conceptualization stage to the execution, involving finalization of technical specifications, procurement, vendor development, scheduling, progress monitoring, site management and manpower planning.  Establishing project review, monitoring and status reporting procedures to accurately report progress of the project to the stakeholders and end user clients.  Handling activities involving working out various requirements & monitoring overall project operations for ensuring timely completion. Installation & Commissioning  Managing installation and commissioning of the heavy equipment’s as well as conducting tests & inspections to ensure operational effectiveness of plant & utilities.  Reviewing engineering drawings, layouts, diagrams, technical specifications, cost estimates for erection & commissioning of the plant. Maintenance & Testing  Planning and effecting predictive & preventive maintenance schedules for various equipment to increase machine up time & equipment reliability.  Identifying areas of bottlenecks / breakdowns and taking steps to rectify the equipment’s through application of troubleshooting tools like root cause analysis.  Maintaining and ensuring stringent adherence to quality standards, norms & practices, identifying gaps and taking corrective actions.  Carrying out overhauling work of equipment, modifications, and major repairs to improve equipment efficiency by faultfinding. Team Management  Leading, mentoring & monitoring the performance of the team members to ensure efficiency in process operations and meeting of individual & group targets.  Creating and sustaining a dynamic environment that fosters development opportunities and motivates high performance amongst team members.
  • 2. PPPaaagggeee 222 ooofff 333 HIGHLIGHT  At Rajasthan Sun Technique Energy Pvt Ltd. (Reliance Power) as Sr.Mgr.(Electrical) (January 2016 to till date)  Successfully Planning and Procurement carried out for Man power and resources requirement for operation and maintenance of all the electrical equipment of HT breaker, HT Isolator, Transformer, UPS and LT panel, Platform and gantry of 125MW CSP.  Tracking of Daily Activity planning & execution and energy monitoring of Solar block, Power block and 220KV switchyard.  Improvement in field of cost saving like in house repair work of costly off-shore item Dunken Motron equipment, Power distribution and energy conservation of plant.  Operation and maintenance of Pre Engineering Building equipment 2x750 KVA, 250KVA, 7.5KVA Diesel Generator and Manuel glass loading machine, compressor and robot.  At AREVA Solar Pvt. Ltd., Dhursar, India as Electrical commissioning Incharge (Jun 2013 to December 2015)  Supervising and monitoring all equipment commissioning, testing and O&M planning (Systematic maintenance plan, Standard operating procedure, History sheet, KPA, MTBF and check list as per OEM) related to 125MW CSP project: 220KV Switch Yard, 133 MW Generators, Transformers up to 160MVA,HT & LT Breaker and motors of 125MW Solar Thermal power plant.  Site acceptance test, commissioning and O&M planning of following electrical equipment of 35x25TPH AREVA Concentrated Solar Steam Generators: 6.6KV Megawin-HT switch Gear & Penickker HT Isolator, Voltamp-Dry Transformer,Hirel UPS, LT Panel, HVAC (Voltas), Tractel-30Mtr height Gantry and Platform for Solar steam generator, SSG Line control panel & Reflector control panel and Dunker-Reflector servo control motor and Motorized operating Valve and Variable voltage drive.  Successfully coordinated and keep approach for zero punch point and 100% completion of commissioning work by implementing ICAP with Reliance, Alstom, Siemens, Thermax in Power block and Solar field as per Engineering India Ltd and USA engineering.  Carried out quality check for all electrical equipment as per PO and specification during Goods inspection.  Identify spares for indigenization and list spares to be developed in coordination with operations and maintenance and USA Engineering team.  Successfully Planning and Procurement carried out for Man power and resources requirement for project as well as for operation and maintenance of 125MW CSP.  Tracking of Daily Activity planning & execution and energy monitoring of Power block as well as of solar field.  Improvement in field of cost saving like in house repair work of costly off shore item Dunken Motron equipment, Power distribution and energy conservation of plant.  Lanco Solar Pvt. Ltd, Rajnandgaon, CG. India as DY Manager (Electrical) (Feburuary-2011 to Jun 2013)  Operation and maintenance planning and Identify spare for indigenization and list spares to be development at Solar 70MW PV module manufacturing unit.  Pivotal in supervising and monitoring all electrical installation, commissioning, testing and updating of drawings related to 1500TPA Polysilicon Project with 5 No’s. 11kv substation and 132kv switchyard.  Successfully coordinated and keep approach for zero punch point and 100% completion of erection work and document accordingly with LANCO EPC, GT Solar and Fluor India USA based Engineering Consultant for quality related issues.  Factory acceptance test & Site acceptance test of various electrical equipment done at mfr. industries and sites.  Electrical reviewing done for Various Hi- technology equipment like CVD reactor, EURO-DIESEL Rotary UPS, HITZINGER DE+M, SANDVIK, Hot Oil, waste water treatment Plant and CHROMOLOX Heaters.  Identify manufacturers of the spares and forward the technical drawing to the manufacturers for developing samples of the same / for getting the cost details.
  • 3. PPPaaagggeee 333 ooofff 333  At Jayaswal Neco Industries Limited (Power Plant Division) as Assistant Manager (Elect) (February 2011 to Jun 2013)  Maintenance and operation of MRSS with 53MW Capital power plant (15x2MW, 7.5x2MW,4x2MW) and plant load of Blast furnace, Arc furnace, DRI, cock oven and Sinter Plant  Pivotal in managing 15 MW generator and exciter rewinding and testing work,  Transformer up to 50MVA, erection, maintenance and testing work,11KV VCB, up to 220Kv switchyard erection, maintenance and testing work,132Kv switchyard related equipment maintenance.  Maintenance and operation of MRSS with 53MW Capital power plant (15x2MW, 7.5x2MW,4x2MW) and plant load of Blast furnace, Arc furnace, DRI, cock oven and Sinter Plant.  Captive power plant (15x2MW,7.5x2MW,4x2MW) Generators, exciter and AVR maintenance.  Performed system modification work like wireless communication between Grid & AVR, Woodward Panel, etc.  Executed erection, commissioning and maintenance of Thermex ESP.  Well versed with different types of valve like AUMA & ROTORC make.  Executed overall maintenance of Power Plant Equipment like Coal handling plant, Ash handling system, Compressor, Pumps, and Fans.  Stellar role in executing Root Cause Failure Analysis, Predictive/Preventive and Breakdown Maintenance.  At Raipur Alloys & Steel Limited (Sharda Energy & Minerals Ltd.) as Engineer (Elect) (October 1999 to January 2007)  Executed electrical maintenance /commissioning of:  30x3MW Power Plant BTG and BOP .  Load Control Management System.  Diesel Generator up to 1200 KVA.  EOT crane up to 65T & L.T. & H. T. Motor  VVVF Drive.  2X100TPD and 2x500TPD Kiln electrical equipment.  Recognized for carrying out project work planning of 15X 4T Induction Furnace like:  HT, LT cable scheduling and laying, cable tray scheduling and erection.  Commissioning of electrical installation of 15X 4T Induction Furnace.  PCC and MCC drawing design and procurement.  11kv VCB erection, commissioning and relay coordination with Power Plant Division.  Layout designing for HT breaker, PCC and MCC room.  Transformer erection and commissioning including bus bar & bus duct arrangement for 15 x 4 T Induction Furnace of rating 7.5MVA.  Transformer, complete testing work including Factory Test and Site Test.  Lighting installation, lighting DB and welding DB with dual supply source.  Training & Professional skill  Good knowledge of IE Rules and regulations, Electricity Act, Electrical supply code.  Familiar with ISO 9001-2000, ISO 14001, ISO 18001, Energy Management ISO 50001.  5 days training on Project management at Lanco Solar, Rajnandgaon, Chhattisgarh.  5 Days Training on Energy management under AIPNPC, New Delhi, India.  Electrical safety training (NFPA-70E) done at AREVA Solar, Jodhpur, Rajasthan Academic Credentials 2012 Diploma in management (Operations Management) from IGNOU, India. 2007 B.Tech. Electrical from IASE DU Sardarsahar, (Rajasthan), India. 1998 Diploma in Electrical Engineering from MP Board of Technical Education, Bhopal, India. IT Forte: Good knowledge of MS-Office, Windows XP Professional and Internet Applications.