SlideShare a Scribd company logo
Md. Iqbal Hossain
Mobile: +8801712254273
E-mail: iqbal.hossainjim@yahoo.com
I have over 18 years of experience as a mechanical maintenance engineer mostly
in Power plants as well as in Construction Firm & Automobile insurance. I have
been working as a Manager, Mechanical Maintenance in Summit Meghnaghat
Power Company Ltd., a 337MW CCPP since September 2013. Previously I
worked in Haripur Power Limited (HPL), a 360MW CCPP of Pendekar Energy limited (Ex AES, Ex
Globeleq). Asia Projects Engineering Pte, Ltd, Singapore (APECO),CCPP 2670MW and 35MW.
I want to build up my career as a successful engineer and participate in the advanced technology in a
multinational company. I want to widen my skills more on all aspects of static & rotating equipment’s.
EXPERIENCES
Experience – I
Duration: September 2013 to till date
Employer: Summit Meghnaghat Power Company Ltd.
Position: Manager, Mechanical Maintenance
Plant Capacity: 337MW CCPP
Scope of Work:
 Participating in the commissioning of GE gas turbine, Harbin steam turbine etc.
 Supervision of mechanical related commissioning of the plant.
 Preparing mechanical maintenance procedures & establishing maintenance policies.
 Preparing & listing gas turbine spares & consumables, general & special mechanical tools.
 Listing & setting workshop equipments.
Experience – II
Duration: September 2012 to August 2013
Employer: Haripur Power Ltd., Pendekar Energy Ltd.
Position: Mechanical Maintenance Engineer
Plant Capacity: 360MW CCPP
Scope of Work:
 Planning, supervision of MHI gas turbine overhauling
 Participating in the daily PMs, PdMs, CMs
 Organizing & participating in the stock take program
 Assisting Maintenance Manager preparing maintenance budgets
Special Mention: Supervision of MHI gas turbine M701F 100K major overhauling
Experience – III
Duration: July 2011 to August 2012
Employer: Asia Projects Engineering Pte, Ltd, Singapore (APECO); working under MHI in Tuas & Senoko
power plant.
Position: Maintenance Engineer (Gas Turbine Team)
Plant Capacity Tuas power plant 2670MW CCPP (dual-fuel) with MHI, M701F/3 239 x 4 unit, Steam
Turbine 600MW x 2unit, Toshiba. Senoko power plant 3500 MW CCPP dual-fuel (GT: M701F/4 410 x 2
unit),
Scope of Work:
 Experience on participating on outages in both plants (Tuas & Senoko) during GT Combustion
Inspections (CI) for six times & one Major Inspection (MI). [GT: MHI 701F/3, 247-MW & M701F/4, 410
MW]
 Carry out gas turbine general consumables’ & Hot parts’ planning and monitoring, organizing &
distribution of works, maintenance scheduling/planning and perform works with proper safety (As per
ISO & OHSAS standard) to maintain smooth and efficient running of the plants with high degree of
safety culture.
Experience – IV
Duration: January 2002 to June 2011
Employer: AES-Bangladesh (An US based global power company). It’s owned by Pendekar Energy Ltd. (A
Malaysian- based Power Company).
AES-Bangladesh handed over their ownership to Globeleq (U.K. based global emerging markets power
company) in 2004. It’s an ISO 14001:2004 & OHSAS 18001:2007 certified company. Globeleq again
handed over their ownership to Pendekar Energy Ltd. (Malaysia & Saudi Joint venture)
Position: Mechanical Maintenance Engineer
Plant Capacity: Pendekar Energy Ltd. has two combined cycle power plants & one barge mounted power
plant in Bangladesh. Both combined cycle power plants, Haripur & Meghnaghat are in operation since last
12 years & 11 years plus respectively.
A. Haripur Power Ltd (HPL): 360MW CCPP, Gas Fired with one GT, one HRSG & one ST)
B. Meghnaghat Power Ltd (MPL): 450MW CCPP, Gas Fired with Two GT, Two HRSG & one ST)
Scope of Work:
 To carry out the supervision of all types of maintenance works such as Preventive, Predictive,
Breakdown, Schedule maintenance and overhauling of Rotating & Stationary equipments as well as
sometimes involving with own hands as needed with other Team members.
 Experience on participating on outages in both plants (Haripur & Meghnaghat) during GT/ST Minor
Inspections, GT/ST (GT: MHI 701F 247MW, ST: Fuji 119MW Re-heat & Condensing Type in Haripur
and in Meghnaghat: GT: ANSALDO V94.2, 137.5-MW, 2 units & ST: Fuji 175-MW Re-heat &
Condensing Type). I had also worked in Hyundai HRSG inspection work (Tube replacement, Header
leakage repair, Boiler Drum inspection, Baffle plate replacement etc).
 Carry out spare parts planning and monitoring, assisting preparing maintenance budget, work orders
(Using D7i software) permit taking, organizing & distribution of works, maintenance scheduling/planning
and perform works with proper safety (As per ISO & OHSAS standard) to maintain smooth and efficient
running of the plants with high degree of safety culture.
 Proactively participate in and contribute to the ISO 14001 & OSHAS 18001 programs as one of the
member of HPL HSE committee.
 Troubleshooting, repairing & overhauling of plant mechanical equipment such as 247MW (MHI), 119
MW steam turbine (Fuji), Multistage Boiler Feed Water & Condensate Extraction Pumps (KSB), Cooling
Water Pumps (Hyundai), Heat Recovery Steam Generator (Hyundai), various types of centrifugal &
positive displacement pumps, fuel gas compressor, vessels etc. on normal plant operation.
Experience – V
Duration: April 2000 to June 2001
Employer: AES / HYUNDAI 360 MW CCPP Haripur Power Construction Project, Narayanganj, Bangladesh
Position: Mechanical Supervisor
Plant Capacity: Haripur Power Ltd (HPL), 360MW CCPP, Gas Fired with one GT, one HRSG & one ST
Scope of Work:
 To carry out the supervision of all types of Rotating & Stationary equipments installation.
 During this period I had worked (Mechanical) on Erection of Gas Turbine, Steam Turbine, HRSG, Water
treatment Plant, Different type of pumps installation & commissioning Work.
Experience – VI
Duration: September 1999 to April 2000
Employer: GE Energy
Position: Mechanical foremen
Scope of work:
 I had worked as a Mechanical foreman for construction & installation of 30MWx2=60MW Gas turbine &
Generator project-of GE Energy(Frame 6B) at Shaji-Bazar Power Station, Bangladesh.
Experience – VII
Duration: April 1997 to August 1999.
Employer: Deutsche Babcock
Position: Sub-Assistant Engineer
Scope of work:
 I had worked as a Sub-Assistant Engineer for Major overhauling Gas turbine & Generator project-of
Deutsche Babcock-GMBH at Bheramara Power Station, Bangladesh.
 I had also experience on alignment of Gas turbine to Generator, overhaul of Detroit Generator, overhaul
of Detroit A77 500 Hp Diesel engine, Installation of torque converter and gearbox, Complete
Refurbishment of the frame 5001 Main Gas turbine.
Experience – VIII
Duration: October 1995 to March 1997.
Employer: Cath well Construction Ltd
Position: Site Engineer
Scope of work:
 I had worked as a Site Engineer for construction & installation of Total Gas storage project-of at Bara
Kumira, Chittagong, Bangladesh. I had experience on commissioning & installment of piping’s from
LPG tank to Jetty, Erection of LPG tanks, etc.
TRAINING
 Industrial Training on Renwick Jajneswer & Co (BD) Ltd, Kushtia, Duration: 2-Months, Date: 22nd
January to 24th
March 1994.
 General power plant theory & water treatment plant, Hyundai engineering & construction at AES
Meghnaghat plant site, Duration: 2-Weeks, Date: 16th
March, 2002 to 29th
March 2002.
 ‘Vibration Technology and its application in troubleshooting of rotating machine’: Duration:2-weeks,
10th
August 2003 to 21st
August, 2003. (T.I.C.I)
 Inspection & troubleshooting of rotating machine, Duration: 2-weeks, 12th Mar 2006 to 23rd March
2006. (T.I.C.I)
 Maintenance of BTG valves of SULZER Hydraulic units, Duration: 1-Days, Date: 28th Feb 2006.
 HRSG fundamentals, Duration: 1-Day, Date: 16th Jan 2006.
 First Aid Training by Bangladesh Red Crescent Society, Duration: 1-Day, Location: Dhaka.
 Fork Lift Safety & Operation Training, Duration: 1-Day, Location: Dhaka.
 Basic Fall Protection Course & Confined Space Rescue, Duration: 02 Days, Date: 4th
& 5th
June 2008.
 Safety Instruction Course Confined Space (MANHOLE) for supervisor, Duration: 1-Day Absolute
Kinetics Consultancy, Ltd. Singapore Duration: 2-Days, 25th
Jul 2011 to 26th
July 2011.
 Training course on Construction & Oil/Petrochemical Safety Orientation in NTUC Learning Hub,
Singapore. I also
 Emergency response & safety professionals training. (Chlorine, Confined Space, Fire Brigade,
Scaffolding Course). Foster Enterprise, Duration: 1-Days
I got the best performance award form Haripur Power Limited, (HPL) on 2006.
EDUCATION
 Diploma in Engineering (Mechanical), 1993
Kushtia Polytechnic Institute
Dhaka Board
First Division
 Secondary School Certificate (SSC), 1990
PDB High School, Bheramara Power Station
Bheramar, Jessore
Second Division
COMPUTER SKILLS
MS Office Package, CMMS (Datastream7i)
INTERESTS & LANGUAGE
Traveling & Listening Songs, etc.
English & Bengali (both written & verbal)
BIOGRAPHY
Name : Md. Iqbal Hossain
Father’s Name : Md. Mozaharul Haque
Mailing Address : H-48, R-16, Sector-14,(4th
floor)Uttara, Dhaka.
Permanent Address : Village: Vatshala (Modyaha Boyra) Post Office: Vatshala, Police Station:
Sherpur Sadar, District: Sharper
Nationality : Bangladeshi (By birth).
Marital Status : Married.
Passport No : AA5626504
FIN No : G5131285L
Date of Birth : 31.12.1975
----------------------
(Md. Iqbal Hossain)

More Related Content

What's hot

vijay resume QEC
vijay resume  QECvijay resume  QEC
vijay resume QEC
vijaya kumar venugopal
 
Resume-up-Aug-16
Resume-up-Aug-16Resume-up-Aug-16
Resume-up-Aug-16
SUNIL KUMAR JENA
 
Resume_vishwesh_April 16
Resume_vishwesh_April 16Resume_vishwesh_April 16
Resume_vishwesh_April 16
Vishwesh Patel
 
Amit resume
Amit resumeAmit resume
Amit resume
amit kumar singh
 
hari_new resume
hari_new resumehari_new resume
hari_new resume
hariseshukumar Tenali
 
Resume Vinoth
Resume VinothResume Vinoth
Resume Vinoth
VINOTH KUMAR
 
RESUME
RESUMERESUME
RESUME
Shishir Jha
 
Pioneer of thermal power(o&m).
Pioneer of thermal power(o&m).Pioneer of thermal power(o&m).
Pioneer of thermal power(o&m).
any thermal power plant
 
amit resume - Copy
amit resume - Copyamit resume - Copy
amit resume - Copy
amit kumar singh
 
Manish_Sagar 4 Year
Manish_Sagar 4 YearManish_Sagar 4 Year
Manish_Sagar 4 Year
Manish Sagar
 
ANUPAM RESUME
ANUPAM RESUMEANUPAM RESUME
ANUPAM RESUME
Anupam Kumar Singh
 
Sumesh's CV-R6
Sumesh's  CV-R6Sumesh's  CV-R6
Sumesh's CV-R6
Sumesh Savale
 
William _Satek_Manager_Resume_May_2016
William _Satek_Manager_Resume_May_2016William _Satek_Manager_Resume_May_2016
William _Satek_Manager_Resume_May_2016
Bill Satek
 
Magdy Hussine CV
Magdy Hussine CVMagdy Hussine CV
Magdy Hussine CV
Magdy Hussine
 
Rajnish_Yadav_-_Curriculum_Vitae
Rajnish_Yadav_-_Curriculum_VitaeRajnish_Yadav_-_Curriculum_Vitae
Rajnish_Yadav_-_Curriculum_Vitae
Rajnish Kumar Yadav
 
ayman's CV
ayman's CVayman's CV
ayman's CV
ayman elbaz
 
Turbine and Auxillaries
Turbine and AuxillariesTurbine and Auxillaries
Turbine and Auxillaries
VIVEK PATHAK
 
Ali update CV-18-05-2016
Ali update CV-18-05-2016Ali update CV-18-05-2016
Ali update CV-18-05-2016
NAZAKATH ALI
 
Design of Gear For Hg13 Gear Box used in Marine Engine
Design of Gear  For Hg13 Gear Box used in Marine EngineDesign of Gear  For Hg13 Gear Box used in Marine Engine
Design of Gear For Hg13 Gear Box used in Marine Engine
IRJET Journal
 
nazeemres
nazeemresnazeemres

What's hot (20)

vijay resume QEC
vijay resume  QECvijay resume  QEC
vijay resume QEC
 
Resume-up-Aug-16
Resume-up-Aug-16Resume-up-Aug-16
Resume-up-Aug-16
 
Resume_vishwesh_April 16
Resume_vishwesh_April 16Resume_vishwesh_April 16
Resume_vishwesh_April 16
 
Amit resume
Amit resumeAmit resume
Amit resume
 
hari_new resume
hari_new resumehari_new resume
hari_new resume
 
Resume Vinoth
Resume VinothResume Vinoth
Resume Vinoth
 
RESUME
RESUMERESUME
RESUME
 
Pioneer of thermal power(o&m).
Pioneer of thermal power(o&m).Pioneer of thermal power(o&m).
Pioneer of thermal power(o&m).
 
amit resume - Copy
amit resume - Copyamit resume - Copy
amit resume - Copy
 
Manish_Sagar 4 Year
Manish_Sagar 4 YearManish_Sagar 4 Year
Manish_Sagar 4 Year
 
ANUPAM RESUME
ANUPAM RESUMEANUPAM RESUME
ANUPAM RESUME
 
Sumesh's CV-R6
Sumesh's  CV-R6Sumesh's  CV-R6
Sumesh's CV-R6
 
William _Satek_Manager_Resume_May_2016
William _Satek_Manager_Resume_May_2016William _Satek_Manager_Resume_May_2016
William _Satek_Manager_Resume_May_2016
 
Magdy Hussine CV
Magdy Hussine CVMagdy Hussine CV
Magdy Hussine CV
 
Rajnish_Yadav_-_Curriculum_Vitae
Rajnish_Yadav_-_Curriculum_VitaeRajnish_Yadav_-_Curriculum_Vitae
Rajnish_Yadav_-_Curriculum_Vitae
 
ayman's CV
ayman's CVayman's CV
ayman's CV
 
Turbine and Auxillaries
Turbine and AuxillariesTurbine and Auxillaries
Turbine and Auxillaries
 
Ali update CV-18-05-2016
Ali update CV-18-05-2016Ali update CV-18-05-2016
Ali update CV-18-05-2016
 
Design of Gear For Hg13 Gear Box used in Marine Engine
Design of Gear  For Hg13 Gear Box used in Marine EngineDesign of Gear  For Hg13 Gear Box used in Marine Engine
Design of Gear For Hg13 Gear Box used in Marine Engine
 
nazeemres
nazeemresnazeemres
nazeemres
 

Similar to Iqbal cv...final

CV _Rizwan
CV _RizwanCV _Rizwan
Mohammed h. dawood resume
Mohammed h. dawood resumeMohammed h. dawood resume
Mohammed h. dawood resume
Mohammed Dawood
 
Mohammed H. Dawood resume
Mohammed H. Dawood resumeMohammed H. Dawood resume
Mohammed H. Dawood resume
Mohammed Dawood
 
MohammadShafique (1)
MohammadShafique (1)MohammadShafique (1)
MohammadShafique (1)
Muhammad Shafique
 
Ashutosh CV
Ashutosh CVAshutosh CV
Ashutosh CV
ashutosh nandan
 
RESUME - Abhay Paranjape
RESUME - Abhay ParanjapeRESUME - Abhay Paranjape
RESUME - Abhay Paranjape
Abhay Paranjape
 
Nizami cv
Nizami cvNizami cv
sanjay sharan CV2015
sanjay sharan CV2015sanjay sharan CV2015
sanjay sharan CV2015
SANJAY SHARAN
 
MY CV 09 May . 2016
MY CV 09 May . 2016MY CV 09 May . 2016
MY CV 09 May . 2016
Abdul Salam
 
100005_Ibrahim Ahmed Osman El-Sedy
100005_Ibrahim Ahmed Osman El-Sedy100005_Ibrahim Ahmed Osman El-Sedy
100005_Ibrahim Ahmed Osman El-Sedy
Eng. Ibrahim Ahmed Osman
 
Ahmad Ridwan - Updated CV.
Ahmad Ridwan - Updated CV.Ahmad Ridwan - Updated CV.
Ahmad Ridwan - Updated CV.
Ahmad Ridwan Binchair
 
ResumeFeb2015
ResumeFeb2015ResumeFeb2015
ResumeFeb2015
pervez ahmed memon
 
Sonu resume 2015
Sonu resume 2015Sonu resume 2015
Sonu resume 2015
Sonu Singh
 
Prasad_Naik__International 1
Prasad_Naik__International 1Prasad_Naik__International 1
Prasad_Naik__International 1
Prasad naik
 
CustomerCopy final
CustomerCopy finalCustomerCopy final
CustomerCopy final
Dwarka Prasad Kawde
 
Lead HRSG Commissioning TFA
Lead HRSG Commissioning TFALead HRSG Commissioning TFA
Lead HRSG Commissioning TFA
AhmedAttia136
 
Ronald saldanha (1)
Ronald saldanha (1)Ronald saldanha (1)
Ronald saldanha (1)
Ronald Saldanha
 
M. T. R. Azad
M. T. R. AzadM. T. R. Azad
M. T. R. Azad
M.T.R. Azad
 
MK BANSAL- Resume (1) - Copy
MK BANSAL- Resume (1) - CopyMK BANSAL- Resume (1) - Copy
MK BANSAL- Resume (1) - Copy
Manoj kumar Bansal
 
CV-Project Manager
CV-Project ManagerCV-Project Manager
CV-Project Manager
Charernsook Siriyong
 

Similar to Iqbal cv...final (20)

CV _Rizwan
CV _RizwanCV _Rizwan
CV _Rizwan
 
Mohammed h. dawood resume
Mohammed h. dawood resumeMohammed h. dawood resume
Mohammed h. dawood resume
 
Mohammed H. Dawood resume
Mohammed H. Dawood resumeMohammed H. Dawood resume
Mohammed H. Dawood resume
 
MohammadShafique (1)
MohammadShafique (1)MohammadShafique (1)
MohammadShafique (1)
 
Ashutosh CV
Ashutosh CVAshutosh CV
Ashutosh CV
 
RESUME - Abhay Paranjape
RESUME - Abhay ParanjapeRESUME - Abhay Paranjape
RESUME - Abhay Paranjape
 
Nizami cv
Nizami cvNizami cv
Nizami cv
 
sanjay sharan CV2015
sanjay sharan CV2015sanjay sharan CV2015
sanjay sharan CV2015
 
MY CV 09 May . 2016
MY CV 09 May . 2016MY CV 09 May . 2016
MY CV 09 May . 2016
 
100005_Ibrahim Ahmed Osman El-Sedy
100005_Ibrahim Ahmed Osman El-Sedy100005_Ibrahim Ahmed Osman El-Sedy
100005_Ibrahim Ahmed Osman El-Sedy
 
Ahmad Ridwan - Updated CV.
Ahmad Ridwan - Updated CV.Ahmad Ridwan - Updated CV.
Ahmad Ridwan - Updated CV.
 
ResumeFeb2015
ResumeFeb2015ResumeFeb2015
ResumeFeb2015
 
Sonu resume 2015
Sonu resume 2015Sonu resume 2015
Sonu resume 2015
 
Prasad_Naik__International 1
Prasad_Naik__International 1Prasad_Naik__International 1
Prasad_Naik__International 1
 
CustomerCopy final
CustomerCopy finalCustomerCopy final
CustomerCopy final
 
Lead HRSG Commissioning TFA
Lead HRSG Commissioning TFALead HRSG Commissioning TFA
Lead HRSG Commissioning TFA
 
Ronald saldanha (1)
Ronald saldanha (1)Ronald saldanha (1)
Ronald saldanha (1)
 
M. T. R. Azad
M. T. R. AzadM. T. R. Azad
M. T. R. Azad
 
MK BANSAL- Resume (1) - Copy
MK BANSAL- Resume (1) - CopyMK BANSAL- Resume (1) - Copy
MK BANSAL- Resume (1) - Copy
 
CV-Project Manager
CV-Project ManagerCV-Project Manager
CV-Project Manager
 

Recently uploaded

一比一原版(YU毕业证)约克大学毕业证如何办理
一比一原版(YU毕业证)约克大学毕业证如何办理一比一原版(YU毕业证)约克大学毕业证如何办理
一比一原版(YU毕业证)约克大学毕业证如何办理
yuhofha
 
一比一原版(UBC毕业证)不列颠哥伦比亚大学毕业证如何办理
一比一原版(UBC毕业证)不列颠哥伦比亚大学毕业证如何办理一比一原版(UBC毕业证)不列颠哥伦比亚大学毕业证如何办理
一比一原版(UBC毕业证)不列颠哥伦比亚大学毕业证如何办理
pxyhy
 
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
dsnow9802
 
lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789
Ghh
 
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
yuhofha
 
thyroid case presentation.pptx Kamala's Lakshaman palatial
thyroid case presentation.pptx Kamala's Lakshaman palatialthyroid case presentation.pptx Kamala's Lakshaman palatial
thyroid case presentation.pptx Kamala's Lakshaman palatial
Aditya Raghav
 
Status of Women in Pakistan.pptxStatus of Women in Pakistan.pptx
Status of Women in Pakistan.pptxStatus of Women in Pakistan.pptxStatus of Women in Pakistan.pptxStatus of Women in Pakistan.pptx
Status of Women in Pakistan.pptxStatus of Women in Pakistan.pptx
MuhammadWaqasBaloch1
 
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
2zjra9bn
 
Lbs last rank 2023 9988kr47h4744j445.pdf
Lbs last rank 2023 9988kr47h4744j445.pdfLbs last rank 2023 9988kr47h4744j445.pdf
Lbs last rank 2023 9988kr47h4744j445.pdf
ashiquepa3
 
5 Common Mistakes to Avoid During the Job Application Process.pdf
5 Common Mistakes to Avoid During the Job Application Process.pdf5 Common Mistakes to Avoid During the Job Application Process.pdf
5 Common Mistakes to Avoid During the Job Application Process.pdf
Alliance Jobs
 
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdfRECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
AlessandroMartins454470
 
labb123456789123456789123456789123456789
labb123456789123456789123456789123456789labb123456789123456789123456789123456789
labb123456789123456789123456789123456789
Ghh
 
0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf
Thomas GIRARD BDes
 
Leadership Ambassador club Adventist module
Leadership Ambassador club Adventist moduleLeadership Ambassador club Adventist module
Leadership Ambassador club Adventist module
kakomaeric00
 
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
atwvhyhm
 
A Guide to a Winning Interview June 2024
A Guide to a Winning Interview June 2024A Guide to a Winning Interview June 2024
A Guide to a Winning Interview June 2024
Bruce Bennett
 
一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理
一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理
一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理
pxyhy
 
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
2zjra9bn
 
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
pxyhy
 
Introducing Gopay Mobile App For Environment.pptx
Introducing Gopay Mobile App For Environment.pptxIntroducing Gopay Mobile App For Environment.pptx
Introducing Gopay Mobile App For Environment.pptx
FauzanHarits1
 

Recently uploaded (20)

一比一原版(YU毕业证)约克大学毕业证如何办理
一比一原版(YU毕业证)约克大学毕业证如何办理一比一原版(YU毕业证)约克大学毕业证如何办理
一比一原版(YU毕业证)约克大学毕业证如何办理
 
一比一原版(UBC毕业证)不列颠哥伦比亚大学毕业证如何办理
一比一原版(UBC毕业证)不列颠哥伦比亚大学毕业证如何办理一比一原版(UBC毕业证)不列颠哥伦比亚大学毕业证如何办理
一比一原版(UBC毕业证)不列颠哥伦比亚大学毕业证如何办理
 
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
 
lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789
 
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
 
thyroid case presentation.pptx Kamala's Lakshaman palatial
thyroid case presentation.pptx Kamala's Lakshaman palatialthyroid case presentation.pptx Kamala's Lakshaman palatial
thyroid case presentation.pptx Kamala's Lakshaman palatial
 
Status of Women in Pakistan.pptxStatus of Women in Pakistan.pptx
Status of Women in Pakistan.pptxStatus of Women in Pakistan.pptxStatus of Women in Pakistan.pptxStatus of Women in Pakistan.pptx
Status of Women in Pakistan.pptxStatus of Women in Pakistan.pptx
 
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
 
Lbs last rank 2023 9988kr47h4744j445.pdf
Lbs last rank 2023 9988kr47h4744j445.pdfLbs last rank 2023 9988kr47h4744j445.pdf
Lbs last rank 2023 9988kr47h4744j445.pdf
 
5 Common Mistakes to Avoid During the Job Application Process.pdf
5 Common Mistakes to Avoid During the Job Application Process.pdf5 Common Mistakes to Avoid During the Job Application Process.pdf
5 Common Mistakes to Avoid During the Job Application Process.pdf
 
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdfRECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
 
labb123456789123456789123456789123456789
labb123456789123456789123456789123456789labb123456789123456789123456789123456789
labb123456789123456789123456789123456789
 
0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf
 
Leadership Ambassador club Adventist module
Leadership Ambassador club Adventist moduleLeadership Ambassador club Adventist module
Leadership Ambassador club Adventist module
 
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
 
A Guide to a Winning Interview June 2024
A Guide to a Winning Interview June 2024A Guide to a Winning Interview June 2024
A Guide to a Winning Interview June 2024
 
一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理
一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理
一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理
 
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
 
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
 
Introducing Gopay Mobile App For Environment.pptx
Introducing Gopay Mobile App For Environment.pptxIntroducing Gopay Mobile App For Environment.pptx
Introducing Gopay Mobile App For Environment.pptx
 

Iqbal cv...final

  • 1. Md. Iqbal Hossain Mobile: +8801712254273 E-mail: iqbal.hossainjim@yahoo.com I have over 18 years of experience as a mechanical maintenance engineer mostly in Power plants as well as in Construction Firm & Automobile insurance. I have been working as a Manager, Mechanical Maintenance in Summit Meghnaghat Power Company Ltd., a 337MW CCPP since September 2013. Previously I worked in Haripur Power Limited (HPL), a 360MW CCPP of Pendekar Energy limited (Ex AES, Ex Globeleq). Asia Projects Engineering Pte, Ltd, Singapore (APECO),CCPP 2670MW and 35MW. I want to build up my career as a successful engineer and participate in the advanced technology in a multinational company. I want to widen my skills more on all aspects of static & rotating equipment’s. EXPERIENCES Experience – I Duration: September 2013 to till date Employer: Summit Meghnaghat Power Company Ltd. Position: Manager, Mechanical Maintenance Plant Capacity: 337MW CCPP Scope of Work:  Participating in the commissioning of GE gas turbine, Harbin steam turbine etc.  Supervision of mechanical related commissioning of the plant.  Preparing mechanical maintenance procedures & establishing maintenance policies.  Preparing & listing gas turbine spares & consumables, general & special mechanical tools.  Listing & setting workshop equipments. Experience – II Duration: September 2012 to August 2013 Employer: Haripur Power Ltd., Pendekar Energy Ltd. Position: Mechanical Maintenance Engineer
  • 2. Plant Capacity: 360MW CCPP Scope of Work:  Planning, supervision of MHI gas turbine overhauling  Participating in the daily PMs, PdMs, CMs  Organizing & participating in the stock take program  Assisting Maintenance Manager preparing maintenance budgets Special Mention: Supervision of MHI gas turbine M701F 100K major overhauling Experience – III Duration: July 2011 to August 2012 Employer: Asia Projects Engineering Pte, Ltd, Singapore (APECO); working under MHI in Tuas & Senoko power plant. Position: Maintenance Engineer (Gas Turbine Team) Plant Capacity Tuas power plant 2670MW CCPP (dual-fuel) with MHI, M701F/3 239 x 4 unit, Steam Turbine 600MW x 2unit, Toshiba. Senoko power plant 3500 MW CCPP dual-fuel (GT: M701F/4 410 x 2 unit), Scope of Work:  Experience on participating on outages in both plants (Tuas & Senoko) during GT Combustion Inspections (CI) for six times & one Major Inspection (MI). [GT: MHI 701F/3, 247-MW & M701F/4, 410 MW]  Carry out gas turbine general consumables’ & Hot parts’ planning and monitoring, organizing & distribution of works, maintenance scheduling/planning and perform works with proper safety (As per ISO & OHSAS standard) to maintain smooth and efficient running of the plants with high degree of safety culture. Experience – IV Duration: January 2002 to June 2011 Employer: AES-Bangladesh (An US based global power company). It’s owned by Pendekar Energy Ltd. (A Malaysian- based Power Company). AES-Bangladesh handed over their ownership to Globeleq (U.K. based global emerging markets power company) in 2004. It’s an ISO 14001:2004 & OHSAS 18001:2007 certified company. Globeleq again handed over their ownership to Pendekar Energy Ltd. (Malaysia & Saudi Joint venture) Position: Mechanical Maintenance Engineer Plant Capacity: Pendekar Energy Ltd. has two combined cycle power plants & one barge mounted power plant in Bangladesh. Both combined cycle power plants, Haripur & Meghnaghat are in operation since last 12 years & 11 years plus respectively.
  • 3. A. Haripur Power Ltd (HPL): 360MW CCPP, Gas Fired with one GT, one HRSG & one ST) B. Meghnaghat Power Ltd (MPL): 450MW CCPP, Gas Fired with Two GT, Two HRSG & one ST) Scope of Work:  To carry out the supervision of all types of maintenance works such as Preventive, Predictive, Breakdown, Schedule maintenance and overhauling of Rotating & Stationary equipments as well as sometimes involving with own hands as needed with other Team members.  Experience on participating on outages in both plants (Haripur & Meghnaghat) during GT/ST Minor Inspections, GT/ST (GT: MHI 701F 247MW, ST: Fuji 119MW Re-heat & Condensing Type in Haripur and in Meghnaghat: GT: ANSALDO V94.2, 137.5-MW, 2 units & ST: Fuji 175-MW Re-heat & Condensing Type). I had also worked in Hyundai HRSG inspection work (Tube replacement, Header leakage repair, Boiler Drum inspection, Baffle plate replacement etc).  Carry out spare parts planning and monitoring, assisting preparing maintenance budget, work orders (Using D7i software) permit taking, organizing & distribution of works, maintenance scheduling/planning and perform works with proper safety (As per ISO & OHSAS standard) to maintain smooth and efficient running of the plants with high degree of safety culture.  Proactively participate in and contribute to the ISO 14001 & OSHAS 18001 programs as one of the member of HPL HSE committee.  Troubleshooting, repairing & overhauling of plant mechanical equipment such as 247MW (MHI), 119 MW steam turbine (Fuji), Multistage Boiler Feed Water & Condensate Extraction Pumps (KSB), Cooling Water Pumps (Hyundai), Heat Recovery Steam Generator (Hyundai), various types of centrifugal & positive displacement pumps, fuel gas compressor, vessels etc. on normal plant operation. Experience – V Duration: April 2000 to June 2001 Employer: AES / HYUNDAI 360 MW CCPP Haripur Power Construction Project, Narayanganj, Bangladesh Position: Mechanical Supervisor Plant Capacity: Haripur Power Ltd (HPL), 360MW CCPP, Gas Fired with one GT, one HRSG & one ST Scope of Work:  To carry out the supervision of all types of Rotating & Stationary equipments installation.  During this period I had worked (Mechanical) on Erection of Gas Turbine, Steam Turbine, HRSG, Water treatment Plant, Different type of pumps installation & commissioning Work. Experience – VI Duration: September 1999 to April 2000 Employer: GE Energy Position: Mechanical foremen
  • 4. Scope of work:  I had worked as a Mechanical foreman for construction & installation of 30MWx2=60MW Gas turbine & Generator project-of GE Energy(Frame 6B) at Shaji-Bazar Power Station, Bangladesh. Experience – VII Duration: April 1997 to August 1999. Employer: Deutsche Babcock Position: Sub-Assistant Engineer Scope of work:  I had worked as a Sub-Assistant Engineer for Major overhauling Gas turbine & Generator project-of Deutsche Babcock-GMBH at Bheramara Power Station, Bangladesh.  I had also experience on alignment of Gas turbine to Generator, overhaul of Detroit Generator, overhaul of Detroit A77 500 Hp Diesel engine, Installation of torque converter and gearbox, Complete Refurbishment of the frame 5001 Main Gas turbine. Experience – VIII Duration: October 1995 to March 1997. Employer: Cath well Construction Ltd Position: Site Engineer Scope of work:  I had worked as a Site Engineer for construction & installation of Total Gas storage project-of at Bara Kumira, Chittagong, Bangladesh. I had experience on commissioning & installment of piping’s from LPG tank to Jetty, Erection of LPG tanks, etc. TRAINING  Industrial Training on Renwick Jajneswer & Co (BD) Ltd, Kushtia, Duration: 2-Months, Date: 22nd January to 24th March 1994.  General power plant theory & water treatment plant, Hyundai engineering & construction at AES Meghnaghat plant site, Duration: 2-Weeks, Date: 16th March, 2002 to 29th March 2002.
  • 5.  ‘Vibration Technology and its application in troubleshooting of rotating machine’: Duration:2-weeks, 10th August 2003 to 21st August, 2003. (T.I.C.I)  Inspection & troubleshooting of rotating machine, Duration: 2-weeks, 12th Mar 2006 to 23rd March 2006. (T.I.C.I)  Maintenance of BTG valves of SULZER Hydraulic units, Duration: 1-Days, Date: 28th Feb 2006.  HRSG fundamentals, Duration: 1-Day, Date: 16th Jan 2006.  First Aid Training by Bangladesh Red Crescent Society, Duration: 1-Day, Location: Dhaka.  Fork Lift Safety & Operation Training, Duration: 1-Day, Location: Dhaka.  Basic Fall Protection Course & Confined Space Rescue, Duration: 02 Days, Date: 4th & 5th June 2008.  Safety Instruction Course Confined Space (MANHOLE) for supervisor, Duration: 1-Day Absolute Kinetics Consultancy, Ltd. Singapore Duration: 2-Days, 25th Jul 2011 to 26th July 2011.  Training course on Construction & Oil/Petrochemical Safety Orientation in NTUC Learning Hub, Singapore. I also  Emergency response & safety professionals training. (Chlorine, Confined Space, Fire Brigade, Scaffolding Course). Foster Enterprise, Duration: 1-Days I got the best performance award form Haripur Power Limited, (HPL) on 2006. EDUCATION  Diploma in Engineering (Mechanical), 1993 Kushtia Polytechnic Institute Dhaka Board First Division  Secondary School Certificate (SSC), 1990 PDB High School, Bheramara Power Station Bheramar, Jessore Second Division COMPUTER SKILLS MS Office Package, CMMS (Datastream7i) INTERESTS & LANGUAGE
  • 6. Traveling & Listening Songs, etc. English & Bengali (both written & verbal) BIOGRAPHY Name : Md. Iqbal Hossain Father’s Name : Md. Mozaharul Haque Mailing Address : H-48, R-16, Sector-14,(4th floor)Uttara, Dhaka. Permanent Address : Village: Vatshala (Modyaha Boyra) Post Office: Vatshala, Police Station: Sherpur Sadar, District: Sharper Nationality : Bangladeshi (By birth). Marital Status : Married. Passport No : AA5626504 FIN No : G5131285L Date of Birth : 31.12.1975 ---------------------- (Md. Iqbal Hossain)