Raghvendra Kumar Singh
Mobile: 9907060785,9560222001
E-Mail: raghavrajvidya@yahoo.co.in , raghavrajvidya@gmail.com
Profile - (Project, Operation & Maintenance, Design & Engineering, Erection & Commissioning)-Ash
Handling System
B.E (Mechanical Engineering) with over 9+ years of experience in Project,O&M, Design & Engineering , Erection &
Commissioning currently associated with Reliance Power Limited-6x660 MW Sasan Power Limited.
Areas of Expertise
• Fly ash handling system (Pneumatic & vacuum system)
• Bottom ash conveying (Dry System-Through Scrapper & belt conveyor)
• Bottom Ash handling system (Slurry system -through jet pump)
• High concentrated Slurry Disposal system (HCSD system)
• Lean Slurry Disposal system (LCSD system)
• Water recovery system
Current Profile
Reliance Power Limited – 6x660 MW Sasan Power Limited
Sr. Manager - Ash Handling Plant (O&M)
(May 2015 – Till date)
Role:
• Operation & Maintenance of Ash Handling Plant
Responsible for Ash Handling plant smooth operations, plant performance to optimize financial results, rigorous
planning, execution and control of Ash Handling plant activities. Responsible for maintaining/ improving Ash
Handling Plant Parameters and equipment interlock protection to increase system safety and performance.
Manage emergencies in the Ash Handling Plant and take timely action to avoid system failures and improve
availability and reliability of the system. Effective monitoring of Ash handling plant operation related activity.To
cross check and validation of parameters and ensure all defects are registered properly & liquidated on timeTo
communicate appropriate instructions to Shift Incharges/AHP maintenance and communicate the status to
superior
• Modification of Pre-Installed Ash Handling System
As Existing system was not able to cater requirement of 6x660 MW. Major modifications have been suggested and
same has been implemented. System performance has been improved by 2 times
• Co-ordination with inter-departments
Co-ordinate with various departments like Mechanical maintenance, CI & Electrical for any technical issue to
resolve the problems for smooth working of AHP, Coordination with all related departments for timely actions like
scheduled maintenance to ensure the reliability & life of the equipment.
• Trouble Shooting
To conclude the various operating parameter and discover the resolutions and findings against the Trouble
shooting
• MIS
To check the every activity of Operation and maintenance, Prepare MIS and deliver it to Middle Management
Cadre and Higher Management Cadre for their review
Past Experiences
BSBK GROUP – (Macawber Beekay Pvt. Ltd.)
Role: Assistant Manager (Projects Engineering, Management & Commissioning, Ash Handling System)
Noida (Nov.2007 to jan. 2015)
• Design & Engineering
To Complete Engineering activities like Equipment selection & sizing, Basic Engineering, preparation of Process
Flow diagram & Piping Layouts, Equipment & piping layout, equipment data sheet & BOM for Ash Handling
System.
Preparation of design basis report & technical specification
Interdepartmental co-ordination for all engineering activities (i.e. Civil-Electrical-Instrumentation-Mechanical-
Engineering departments)
• Technical Co-ordination
Review of vendor Drawings/Documents/QAP’s/Data Sheets before submission to the Client/Consultant.
Review of IR’S/TC’S of Self Manufactured items before dispatches and arrange the inspection/mdcc from client
Review of IR’S/TC’S of Bought out items before dispatches and arrange the inspection/mdcc from client
• Project Management
Experience in various areas of Project Management like: Project scheduling, Project co-ordination, Procurement,
Engineering Co-ordination, Contracts Management & Site co-ordination. In-depth knowledge of Project
requirement, Scope, cost, schedule, billing process, payment terms
Submission of Drawing/Documents as per project schedule & arranging final approval of drawing/documents from
client
Preparation of Performance Guarantee Procedure for ash handling system
• Project Monitoring
Experience in all areas of Project Monitoring like: Execution of the Project as per schedule, Co-ordination with
Purchase Department/MBPL Works for the Procurement of material as well as on time dispatches as per project
schedule
Technical support to Execution team for the execution of project
• Technical support to Marketing team at Contractual Stages
Providing technical support to the marketing team for offer preparation and new developments
• Commissioning of Ash Handling System
Involved in Various commissioning activities of Ash Handling System and Handing Over of System with completion
of PG Test.
• Erection of Ash Handling System
Involved in Erection Activities in initial Phase of profession as well as involved in slow going projects and speeded
up the job.
MAJOR TRUNKEY PROJECTS HANDLED
• 3x18 MW Limestone & Bed Material Handling System For KPC-Indonesia, Client-PTPLI
• Ash Handling System for 2X660 MW TPCIL-Krihnapatanam Supercritical TPP
• Ash Handling System for 2x660 MW Lanco –MB Power Anuppur
• Ash Handling System for 1x600 MW BGR-Metur (TamilNadu)
• Ash Handling System package 2x 270 MW unit #1&2 APNRL project. (For Adhunik Power & Natural Resources
Ltd.)
• Ash handling system for 2 X 600 MW Kalisindh TPP, (For Rajasthan Rajya Vidyut Utpadan Nigam Limited
Jhalawar.)
• Ash Handling System package 1 x 500 MW unit #6 GSECL Ukai project. (For (BHEL) Gujrat State Electricity
corporation Ltd., Ukai Surat)
• Bottom Ash handling system for 2 X 250 MW Rajasthan Rajya Vidyut Utpadan Nigam Limited Chhabra. (For
PUNJLLOYD Gurgaon)
• Fly Ash handling system for 2 X 250 MW Rajasthan Rajya Vidyut Utpadan Nigam Limited Chhabra.(Unit 1 &2)
• Ash (Dense, Slurry & HCSD) Handling System for 1 X 120 MW (For Industrial Energy Limited, Jamshedpur)
• HCSD and Lean slurry system 1 x 500 MW unit #6 GSECL Ukai project. (For Gujrat State Electricity corporation
Ltd., Ukai Surat)
• Ash Handling System of Bokaro Steel Plant
• 1x120 MW Ash Handling & HCSD System System of Tata Power-Jojobera (Jamshedpur)-Unit-5
Academia
B.E : 1st Class , [ 62.18%]
(Mechanical) : Govt Engg College Bikaner
Computer Skills
• AUTO CAD 2010,MS PROJECTS,ERP/IFS APPLICATIONS/SAP APPLICATIONS
• MS OFFICE, etc.
Trainings Undertaken
• NTPC (Thermal power station), Faridabad for 45 Days
• Yamaha Motors Ltd.,Faridabaad-Manufacturing & assembly of automobiles
Personal Details
• Address(Permanent) - 4/16, Defense colony, Near Udasar Road, Bikaner
• Date of Birth - 01ST
Jan 1983
• Father’s name - Rajendra Prasad Singh
• Mother’s name - Vidya Singh
• Mother tongue - Hindi
• Language Known - Hindi, English
Declaration
I hereby declare that the above information is true to the best of my knowledge.
Raghvendra Kumar Singh

More Related Content

What's hot

Resume for the Instrumentation Engineer
Resume for the Instrumentation EngineerResume for the Instrumentation Engineer
Resume for the Instrumentation EngineerAkash Patel
 
MECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUMEMECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUMEAKSHAY SHARMA
 
Resume for Plant Maintenance-Management position
Resume for Plant Maintenance-Management positionResume for Plant Maintenance-Management position
Resume for Plant Maintenance-Management positionSohail Hassan Rana
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP SupervisorArun Arun
 
TESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERTESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERsaravanan muthu
 
Resume electrical & instrumentation engg 10+ yrs exp
Resume  electrical & instrumentation engg 10+ yrs expResume  electrical & instrumentation engg 10+ yrs exp
Resume electrical & instrumentation engg 10+ yrs expSudipto Majumder
 
Manoj New Resume
Manoj New ResumeManoj New Resume
Manoj New ResumeManoj Patel
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineerKRISHNAMOORTHY A
 
Mechanical Engineer having 5+ years experience in Erection & Commissioning En...
Mechanical Engineer having 5+ years experience in Erection & Commissioning En...Mechanical Engineer having 5+ years experience in Erection & Commissioning En...
Mechanical Engineer having 5+ years experience in Erection & Commissioning En...Qamar Ahmad
 
Electrical-power-engineer-CV
Electrical-power-engineer-CVElectrical-power-engineer-CV
Electrical-power-engineer-CVYousif Alanazi
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)Mohammad Khan
 

What's hot (20)

Resume for the Instrumentation Engineer
Resume for the Instrumentation EngineerResume for the Instrumentation Engineer
Resume for the Instrumentation Engineer
 
RESUME
RESUMERESUME
RESUME
 
Electrical Engineer CV (2)
Electrical Engineer CV (2)Electrical Engineer CV (2)
Electrical Engineer CV (2)
 
MECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUMEMECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUME
 
Resume for Plant Maintenance-Management position
Resume for Plant Maintenance-Management positionResume for Plant Maintenance-Management position
Resume for Plant Maintenance-Management position
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP Supervisor
 
TESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERTESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEER
 
Resume electrical & instrumentation engg 10+ yrs exp
Resume  electrical & instrumentation engg 10+ yrs expResume  electrical & instrumentation engg 10+ yrs exp
Resume electrical & instrumentation engg 10+ yrs exp
 
Manoj New Resume
Manoj New ResumeManoj New Resume
Manoj New Resume
 
Ram resume
Ram resumeRam resume
Ram resume
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C Engineer
 
Cv pdf
Cv pdfCv pdf
Cv pdf
 
Bilal.cv
Bilal.cvBilal.cv
Bilal.cv
 
resume for panel or field operation.
resume for panel or field operation.resume for panel or field operation.
resume for panel or field operation.
 
Cv mm
Cv mmCv mm
Cv mm
 
Resume
ResumeResume
Resume
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
Mechanical Engineer having 5+ years experience in Erection & Commissioning En...
Mechanical Engineer having 5+ years experience in Erection & Commissioning En...Mechanical Engineer having 5+ years experience in Erection & Commissioning En...
Mechanical Engineer having 5+ years experience in Erection & Commissioning En...
 
Electrical-power-engineer-CV
Electrical-power-engineer-CVElectrical-power-engineer-CV
Electrical-power-engineer-CV
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 

Viewers also liked

Training presentation
Training presentation Training presentation
Training presentation Keyur Patel
 
Mukesh kumar Singh ..
Mukesh kumar Singh ..Mukesh kumar Singh ..
Mukesh kumar Singh ..Mukesh Singh
 
C.V._GouriShankar
C.V._GouriShankarC.V._GouriShankar
C.V._GouriShankargsm0021
 
Mechanical resume (1)
Mechanical resume (1)Mechanical resume (1)
Mechanical resume (1)jesu lambert
 
Steam turbine engineering india private limited company profile
Steam turbine engineering india private limited company profileSteam turbine engineering india private limited company profile
Steam turbine engineering india private limited company profileBhavin Trivedi
 
Power plant performance_efficiency
Power plant performance_efficiencyPower plant performance_efficiency
Power plant performance_efficiencyKeyur Patel
 
Captive Power Plants India - For Sealing Compounds for Power Stations Call +9...
Captive Power Plants India - For Sealing Compounds for Power Stations Call +9...Captive Power Plants India - For Sealing Compounds for Power Stations Call +9...
Captive Power Plants India - For Sealing Compounds for Power Stations Call +9...Project Sales Corp
 

Viewers also liked (14)

srini resume Jun 2015
srini resume Jun 2015srini resume Jun 2015
srini resume Jun 2015
 
Training presentation
Training presentation Training presentation
Training presentation
 
Resume 1
Resume 1Resume 1
Resume 1
 
Resume
ResumeResume
Resume
 
nkp resume
nkp resumenkp resume
nkp resume
 
Mukesh kumar Singh ..
Mukesh kumar Singh ..Mukesh kumar Singh ..
Mukesh kumar Singh ..
 
Experience Cert..PDF
Experience Cert..PDFExperience Cert..PDF
Experience Cert..PDF
 
C.V._GouriShankar
C.V._GouriShankarC.V._GouriShankar
C.V._GouriShankar
 
Mechanical resume (1)
Mechanical resume (1)Mechanical resume (1)
Mechanical resume (1)
 
Steam turbine engineering india private limited company profile
Steam turbine engineering india private limited company profileSteam turbine engineering india private limited company profile
Steam turbine engineering india private limited company profile
 
Power plant performance_efficiency
Power plant performance_efficiencyPower plant performance_efficiency
Power plant performance_efficiency
 
Captive Power Plants India - For Sealing Compounds for Power Stations Call +9...
Captive Power Plants India - For Sealing Compounds for Power Stations Call +9...Captive Power Plants India - For Sealing Compounds for Power Stations Call +9...
Captive Power Plants India - For Sealing Compounds for Power Stations Call +9...
 
Manoj__Kumar_Yadav Resume
Manoj__Kumar_Yadav ResumeManoj__Kumar_Yadav Resume
Manoj__Kumar_Yadav Resume
 
JSPL RAIGARHS HR PROJECT
JSPL RAIGARHS HR PROJECTJSPL RAIGARHS HR PROJECT
JSPL RAIGARHS HR PROJECT
 

Similar to Raghvendra Resume-8+ (20)

Satish Resume (21062016)
Satish Resume (21062016)Satish Resume (21062016)
Satish Resume (21062016)
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
 
Pawan Resume-2014(rev)
Pawan Resume-2014(rev)Pawan Resume-2014(rev)
Pawan Resume-2014(rev)
 
Deepak Resume
Deepak ResumeDeepak Resume
Deepak Resume
 
Resume11
Resume11Resume11
Resume11
 
RESUME
RESUMERESUME
RESUME
 
Resume
ResumeResume
Resume
 
Sachin Mohelay
Sachin MohelaySachin Mohelay
Sachin Mohelay
 
Resume
ResumeResume
Resume
 
nazeemres
nazeemresnazeemres
nazeemres
 
Sachin Mohelay
Sachin MohelaySachin Mohelay
Sachin Mohelay
 
Engr,imran cv.cement.
Engr,imran cv.cement.Engr,imran cv.cement.
Engr,imran cv.cement.
 
Alzagon engineering solutions
Alzagon engineering solutionsAlzagon engineering solutions
Alzagon engineering solutions
 
Project Details
Project DetailsProject Details
Project Details
 
Arvinder Singh CV
Arvinder Singh CVArvinder Singh CV
Arvinder Singh CV
 
Arun_Mangal_cv Feb 2015
Arun_Mangal_cv Feb 2015Arun_Mangal_cv Feb 2015
Arun_Mangal_cv Feb 2015
 
AK+CV
AK+CVAK+CV
AK+CV
 
arco.cv
arco.cvarco.cv
arco.cv
 
Resume Nikhil Sudan
Resume Nikhil SudanResume Nikhil Sudan
Resume Nikhil Sudan
 
Naushad Bhatti (CV) (1)
Naushad Bhatti (CV) (1)Naushad Bhatti (CV) (1)
Naushad Bhatti (CV) (1)
 

Raghvendra Resume-8+

  • 1. Raghvendra Kumar Singh Mobile: 9907060785,9560222001 E-Mail: raghavrajvidya@yahoo.co.in , raghavrajvidya@gmail.com Profile - (Project, Operation & Maintenance, Design & Engineering, Erection & Commissioning)-Ash Handling System B.E (Mechanical Engineering) with over 9+ years of experience in Project,O&M, Design & Engineering , Erection & Commissioning currently associated with Reliance Power Limited-6x660 MW Sasan Power Limited. Areas of Expertise • Fly ash handling system (Pneumatic & vacuum system) • Bottom ash conveying (Dry System-Through Scrapper & belt conveyor) • Bottom Ash handling system (Slurry system -through jet pump) • High concentrated Slurry Disposal system (HCSD system) • Lean Slurry Disposal system (LCSD system) • Water recovery system Current Profile Reliance Power Limited – 6x660 MW Sasan Power Limited Sr. Manager - Ash Handling Plant (O&M) (May 2015 – Till date) Role: • Operation & Maintenance of Ash Handling Plant Responsible for Ash Handling plant smooth operations, plant performance to optimize financial results, rigorous planning, execution and control of Ash Handling plant activities. Responsible for maintaining/ improving Ash Handling Plant Parameters and equipment interlock protection to increase system safety and performance. Manage emergencies in the Ash Handling Plant and take timely action to avoid system failures and improve availability and reliability of the system. Effective monitoring of Ash handling plant operation related activity.To cross check and validation of parameters and ensure all defects are registered properly & liquidated on timeTo communicate appropriate instructions to Shift Incharges/AHP maintenance and communicate the status to superior • Modification of Pre-Installed Ash Handling System As Existing system was not able to cater requirement of 6x660 MW. Major modifications have been suggested and same has been implemented. System performance has been improved by 2 times • Co-ordination with inter-departments Co-ordinate with various departments like Mechanical maintenance, CI & Electrical for any technical issue to resolve the problems for smooth working of AHP, Coordination with all related departments for timely actions like scheduled maintenance to ensure the reliability & life of the equipment. • Trouble Shooting To conclude the various operating parameter and discover the resolutions and findings against the Trouble shooting • MIS To check the every activity of Operation and maintenance, Prepare MIS and deliver it to Middle Management Cadre and Higher Management Cadre for their review
  • 2. Past Experiences BSBK GROUP – (Macawber Beekay Pvt. Ltd.) Role: Assistant Manager (Projects Engineering, Management & Commissioning, Ash Handling System) Noida (Nov.2007 to jan. 2015) • Design & Engineering To Complete Engineering activities like Equipment selection & sizing, Basic Engineering, preparation of Process Flow diagram & Piping Layouts, Equipment & piping layout, equipment data sheet & BOM for Ash Handling System. Preparation of design basis report & technical specification Interdepartmental co-ordination for all engineering activities (i.e. Civil-Electrical-Instrumentation-Mechanical- Engineering departments) • Technical Co-ordination Review of vendor Drawings/Documents/QAP’s/Data Sheets before submission to the Client/Consultant. Review of IR’S/TC’S of Self Manufactured items before dispatches and arrange the inspection/mdcc from client Review of IR’S/TC’S of Bought out items before dispatches and arrange the inspection/mdcc from client • Project Management Experience in various areas of Project Management like: Project scheduling, Project co-ordination, Procurement, Engineering Co-ordination, Contracts Management & Site co-ordination. In-depth knowledge of Project requirement, Scope, cost, schedule, billing process, payment terms Submission of Drawing/Documents as per project schedule & arranging final approval of drawing/documents from client Preparation of Performance Guarantee Procedure for ash handling system • Project Monitoring Experience in all areas of Project Monitoring like: Execution of the Project as per schedule, Co-ordination with Purchase Department/MBPL Works for the Procurement of material as well as on time dispatches as per project schedule Technical support to Execution team for the execution of project • Technical support to Marketing team at Contractual Stages Providing technical support to the marketing team for offer preparation and new developments • Commissioning of Ash Handling System Involved in Various commissioning activities of Ash Handling System and Handing Over of System with completion of PG Test. • Erection of Ash Handling System Involved in Erection Activities in initial Phase of profession as well as involved in slow going projects and speeded up the job. MAJOR TRUNKEY PROJECTS HANDLED • 3x18 MW Limestone & Bed Material Handling System For KPC-Indonesia, Client-PTPLI • Ash Handling System for 2X660 MW TPCIL-Krihnapatanam Supercritical TPP • Ash Handling System for 2x660 MW Lanco –MB Power Anuppur • Ash Handling System for 1x600 MW BGR-Metur (TamilNadu) • Ash Handling System package 2x 270 MW unit #1&2 APNRL project. (For Adhunik Power & Natural Resources Ltd.) • Ash handling system for 2 X 600 MW Kalisindh TPP, (For Rajasthan Rajya Vidyut Utpadan Nigam Limited Jhalawar.) • Ash Handling System package 1 x 500 MW unit #6 GSECL Ukai project. (For (BHEL) Gujrat State Electricity corporation Ltd., Ukai Surat) • Bottom Ash handling system for 2 X 250 MW Rajasthan Rajya Vidyut Utpadan Nigam Limited Chhabra. (For PUNJLLOYD Gurgaon) • Fly Ash handling system for 2 X 250 MW Rajasthan Rajya Vidyut Utpadan Nigam Limited Chhabra.(Unit 1 &2) • Ash (Dense, Slurry & HCSD) Handling System for 1 X 120 MW (For Industrial Energy Limited, Jamshedpur)
  • 3. • HCSD and Lean slurry system 1 x 500 MW unit #6 GSECL Ukai project. (For Gujrat State Electricity corporation Ltd., Ukai Surat) • Ash Handling System of Bokaro Steel Plant • 1x120 MW Ash Handling & HCSD System System of Tata Power-Jojobera (Jamshedpur)-Unit-5 Academia B.E : 1st Class , [ 62.18%] (Mechanical) : Govt Engg College Bikaner Computer Skills • AUTO CAD 2010,MS PROJECTS,ERP/IFS APPLICATIONS/SAP APPLICATIONS • MS OFFICE, etc. Trainings Undertaken • NTPC (Thermal power station), Faridabad for 45 Days • Yamaha Motors Ltd.,Faridabaad-Manufacturing & assembly of automobiles Personal Details • Address(Permanent) - 4/16, Defense colony, Near Udasar Road, Bikaner • Date of Birth - 01ST Jan 1983 • Father’s name - Rajendra Prasad Singh • Mother’s name - Vidya Singh • Mother tongue - Hindi • Language Known - Hindi, English Declaration I hereby declare that the above information is true to the best of my knowledge. Raghvendra Kumar Singh