SlideShare a Scribd company logo
AMANDEEP SHARMA
Mobile: 8872037053 ,9464922257, E-Mail: er.amanattri83@gmail.com
Present address: #32882,stno:5,Paras Ram Nagar ,Bathinda, Punjab-151001
Assistant Manager
Seeking challenging assignments in Process / Power Industry in the field of Electrical
Maintenance, Engineering and Project.
 Assistant Manager with more than 11 yrs. of experience in the fieldof Electrical Engineering.
Well versedwith efficiently handling all activities involving, Maintenance, Project execution,
Commissioning& Power Export / Import related issues. Ability to manage human and
material resources.
CORE COMPETENCIES
 Maintenance (Preventive, Predictive,
Breakdown and Annual shutdown).
 Project Construction, Installation,
testing & Commissioning
 Schedule and quality control
 Technical Analysis
 Fault finding and quick restoration
 Failure & Why-why analysis.
 SAP MM & PM Module
 ISO 9001 & OHSAS
 Vendor development for spares &
Services.
 Spares identification, planning &
Inventory control
 Documentation work (Planning,
scheduling, Making SOPs/SMPs,
Various reports & History)
 Steam Turbine & Gas Turbine
construction & maintenance.
 Switchyard & Transmission Line
construction & maintenance.
 Engineering & Project of ABB- ECS.
 Safety
CAREER HIGHLIGHTS
 Handle the following projects and then maintenance of same plant:
STEAG Energy Services (INDIA) Pvt. Limited – HMEL (GURU GOBIND SINGH REFINERY)
 Leading Refinery Substation Electrical Maintenance Team.
 Worked in commissioning & maintenance of 220 KV Switchyard.
 Testing, commissioning of Areva & Siemens make 6.6 KV System.
 Worked in 173.5 MW combined cycle power plant.
 Execution of Electrical Control System of ABB. [ ECS]
 Review & modification of Relay Coordination of electrical systems.
 Liaising with PSPCL & PSTCL.
Abhishek Industries Ltd., Barnala
 Commissioning & Maintenance of 50 MW Co Generation Power Plants.
 Operation & Maintenance of 66 kV/ 11 kV Sub Station.
 Preventive, predictive, breakdown, daily & shut down maintenance, technical & analysis.
 Load Management & Peak Load Monitoring.
 5S & KAIZEN Activities.
ABC Paper Industries Ltd.Hoshiarpur
 Commissioning & Engineering for New 10MW Power plant.
 Testing &Commissioning of Generator Island Relays.
 Preventive, predictive, breakdown, daily & shut down maintenance, technical & analysis.
 Operation & Maintenance of 66 kV/ 11 kV Sub Station.

PROFESSIONAL EXPERIENCE
(A) Since Nov. 2011 to till date with STEAG Energy Services (INDIA) Pvt. Limited – HMEL(GURU
GOBIND SINGH REFINERY),Bhatinda.
With exposure to following working fields:
a. Leading Operation & Maintenance Refinery Substations Team, including Shift activity
management, Spare Management & S/D Planning.
b. Testing & Commissioning of Siemens, MICOM, P & B Make Numerical Relays.
c. Working & coordination with Vendors for successful & timely commissioning &
maintenance of respective equipments.
d. Coordination with Project Engineering Team to rectify the necessary engineering issues
e. Preparing necessary spare list for the equipment.
f. Coordination with respective Vendors to carry out Planned / Breakdown maintenance for
all equipments of CPP.
g. Rectification of the interlocks of the 33 KV GIS & 220 KV Switchyard as per EIL/BHEL.
h. Prepare maintenance schedule for 220 kV Switchyard & CPP electrical system & guiding
entire team regarding adherence to the same.
i. Modification & implementation of ‘Programming’ changes of Areva/Siemens/ABB
numerical relays for safe operation & troubleshooting.
j. Prepare maintenance schedule for Gas Turbine Electrical System, coordination with
Principle Vendor [BHEL] regarding the same & planning for timely completion of the
same.
k. Managing technicians & Engineers of respective contractors for proper commissioning &
maintenance activities of Power Plant & Sub Station.
l. Commissioning, spare management & maintenance of 220/33 kV, 33kV /11 kV, 33/ 6.6
kV & 6.6kV / 0.433 kV Transformers.
m. Erection, commissioning & maintenance of Control & Relay panel for 220 kV Switchyard.
n. Erection, commissioning & maintenance of Generator Relay panels.
o. Erection, commissioning & maintenance of all the LT panels of Power Plant along with
interconnection with DCS.
p. Necessary engineering modifications, erection and commissioning of HT VCB along with
interconnection with DCS &maintenance of the same.
q. Necessary engineering modifications, erection, testing & commissioning of all the
equipment of Power plant.
r. Erection, commissioning & now maintenance of HT motors up to1800 KW. [6.6 kV]
s. Synchronizing of own Power Plant with Grid. [ At 33 KV Level]
t. Monitoring of Power Import & Export & analyzing the same for Penalty & Gain.
u. Part of the core team of planning the generation as per Process Plant
v. Execution of Electrical Control System of ABB. [ ECS]
w. Finalizing AMC & ARC contracts with respective vendors to avail timely service &
maintain system reliability.
x. Review, finalization & implementation of Relay Coordination for Entire Power Plant to
increase better reliability of the system.
(B) Since OCT 2007 to NOV2011 with Abhishek Industries Ltd., Barnala as Executive – Electrical
With exposure to following working fields:
a) Follow maintenance schedule for CPP electrical system.
b) Follow maintenance schedule for 66 kV Switchyard & 66 kV Transmission Line project
&maintenance of the same.
c) Preparing necessary spare list for the equipment.
d) Synchronizing of own Power Plant with Grid. [ At 11 KV Level]
e) Maintenance of HT motors up to900 KW. [11 kV]
f) Maintenance of Generator Relay panels
g) Execution of Load Management System. [ LMS]
(C) Since Aug 2005 to Oct 2007 with ABC Paper Industries Ltd., Hoshiarpur as Asstt. Engineer-
Cogeneration Plant – Electrical
With exposure to following working fields:
h) Follow maintenance schedule for CPP electrical system.
i) Follow maintenance schedule for 33 kV Switchyard project &maintenance of the same.
j) Preparing necessary spare list for the equipment.
k) Synchronizing of own Power Plant with Grid. [ At 11 KV Level]
l) Maintenance of LT motors.
m) Maintenance of Generator Relay panels
Energy Conservation
 Study & Implementation of energy conservation ideas to ensure operation with optimum
efficiency.
 Consistent monitoring in the field of energy conservation thru journals & Internet to bring
out the ideas for saving potentials.
Man & Resource Management
 Motivating my team of Engineers & workmen to give their best at all times so that
equipment utilization in close to 100%.
 Developing entire electrical team to achieve maximum reliability for each & every
electrical system.
 Ensuring optimized usage of all available resources of man & machines to achieve highest
reliability of the system.
Quality Control/Assurance
 Ensuring adherence to quality standards like ISO9001, OHSAS 18001 and maintaining all
related documents.
 Identifying areas of quality failures and take steps to rectify the system.
 Practicing quality standards with key emphasis on improving quality.
Attainments:
 Played a pivotal role in organizing in house training for the department team members about the plant
equipment.
 Achieved the best Electrical engineer award for the year of 2014-15 in Steag Energy Services (I) Pvt.
Limited.
EDUCATION
 Bachelor of Technology in Electrical from Guru Tegh Bhadur Khalsa Engineering & Technology
affiliated by AICTE under Punjab Technical University in 2005.
TRAINING
INDUSTRIAL TRAINING
 3 Months Industrial Training at Lehera Mohhbat Thermal Power plant 220X2 MW.
 3 Months Industrial Training at NFL Bathinda.
 Electrical Control System (S800) Training at ABB Factory, Bangalore.
 Attend the one day workshop of BEE Meerut (UP)
PERSONAL DETAILS
NAME : AmandeepSharma
FATHERS NAME : Kewal Krishan
MARITAL STATUS : Married
LANGUAGE KNOWN : English, Hindi & Punjabi
Total experience : 11Years
Relevant Experience : Same
CTC/Salary : 9.5 Lacs
NOTICE PERIOD : Three Months
Location : Guru Gobind Singh Refinery. Bathinda
Reason for Change : For future growth
______________________
Amandeep Sharma Date:-

More Related Content

What's hot

Resume ravindra
Resume ravindraResume ravindra
Resume ravindra
Ravindra Singh
 
AOCG 05-2016 Kazadi, Michel
AOCG 05-2016 Kazadi, MichelAOCG 05-2016 Kazadi, Michel
AOCG 05-2016 Kazadi, MichelMichel Kazadi
 
Darren Sahlen Resume June 2014 formatted
Darren Sahlen Resume June 2014 formattedDarren Sahlen Resume June 2014 formatted
Darren Sahlen Resume June 2014 formatteddarren sahlen
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15Joe Fain
 
Avnish Pandey Resume
Avnish Pandey ResumeAvnish Pandey Resume
Avnish Pandey ResumeAvnish Pandey
 
HV Testing
HV TestingHV Testing

What's hot (18)

ResumeFeb2015
ResumeFeb2015ResumeFeb2015
ResumeFeb2015
 
cv of Shohid
cv of Shohidcv of Shohid
cv of Shohid
 
NEW CV
NEW CVNEW CV
NEW CV
 
UPDATED CV-1
UPDATED CV-1UPDATED CV-1
UPDATED CV-1
 
comising
comisingcomising
comising
 
rakesh resume_10.03.2016
rakesh resume_10.03.2016rakesh resume_10.03.2016
rakesh resume_10.03.2016
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
Resume
ResumeResume
Resume
 
Sushil podia Ahm
Sushil podia AhmSushil podia Ahm
Sushil podia Ahm
 
SASIdharan p CV
SASIdharan p CVSASIdharan p CV
SASIdharan p CV
 
Resume ravindra
Resume ravindraResume ravindra
Resume ravindra
 
AOCG 05-2016 Kazadi, Michel
AOCG 05-2016 Kazadi, MichelAOCG 05-2016 Kazadi, Michel
AOCG 05-2016 Kazadi, Michel
 
Darren Sahlen Resume June 2014 formatted
Darren Sahlen Resume June 2014 formattedDarren Sahlen Resume June 2014 formatted
Darren Sahlen Resume June 2014 formatted
 
RESUME october 2016 F
RESUME october 2016 FRESUME october 2016 F
RESUME october 2016 F
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15
 
Avnish Pandey Resume
Avnish Pandey ResumeAvnish Pandey Resume
Avnish Pandey Resume
 
HV Testing
HV TestingHV Testing
HV Testing
 
Sankar_ Vaid
Sankar_ VaidSankar_ Vaid
Sankar_ Vaid
 

Similar to Sharma Resume

RESUME - RAKESH PATEL
RESUME - RAKESH PATELRESUME - RAKESH PATEL
RESUME - RAKESH PATELRakesh patel
 
Shashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_IndiaShashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_IndiaShashank Janbandhu
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Upendra Kumar Yadav
 
SUDIP DHAR Resume electrical Engineering
SUDIP DHAR  Resume electrical EngineeringSUDIP DHAR  Resume electrical Engineering
SUDIP DHAR Resume electrical Engineering
Sudip Dhar
 
BALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUMEBALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUMEAnil Kumar
 
CV Mahboob Updated 24.10.15
CV Mahboob Updated  24.10.15CV Mahboob Updated  24.10.15
CV Mahboob Updated 24.10.15Mahboob Iqbal
 
T.chandramouli O & M_ele
T.chandramouli O & M_eleT.chandramouli O & M_ele
T.chandramouli O & M_ele
Chandramouli Tadepalli
 
T.chandramouli O & M_Electrical
T.chandramouli O & M_ElectricalT.chandramouli O & M_Electrical
T.chandramouli O & M_Electrical
Chandramouli Tadepalli
 
ARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_UpdtdARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_UpdtdAritra Ghosh
 

Similar to Sharma Resume (20)

SRao_cv
SRao_cvSRao_cv
SRao_cv
 
RESUME - RAKESH PATEL
RESUME - RAKESH PATELRESUME - RAKESH PATEL
RESUME - RAKESH PATEL
 
Satish_Reddy_resume
Satish_Reddy_resumeSatish_Reddy_resume
Satish_Reddy_resume
 
Resume_Ravindra
Resume_RavindraResume_Ravindra
Resume_Ravindra
 
Shashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_IndiaShashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_India
 
resume 04092015
resume 04092015resume 04092015
resume 04092015
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
SUDIP DHAR Resume electrical Engineering
SUDIP DHAR  Resume electrical EngineeringSUDIP DHAR  Resume electrical Engineering
SUDIP DHAR Resume electrical Engineering
 
Sadanand dubey
Sadanand dubeySadanand dubey
Sadanand dubey
 
BALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUMEBALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUME
 
utsav cv
utsav cvutsav cv
utsav cv
 
Resume 25.09.15
Resume 25.09.15Resume 25.09.15
Resume 25.09.15
 
CV Mahboob Updated 24.10.15
CV Mahboob Updated  24.10.15CV Mahboob Updated  24.10.15
CV Mahboob Updated 24.10.15
 
vishwassharma5yearexp
vishwassharma5yearexpvishwassharma5yearexp
vishwassharma5yearexp
 
ajay cv new (3)
ajay cv new (3)ajay cv new (3)
ajay cv new (3)
 
T.chandramouli O & M_ele
T.chandramouli O & M_eleT.chandramouli O & M_ele
T.chandramouli O & M_ele
 
T.chandramouli O & M_Electrical
T.chandramouli O & M_ElectricalT.chandramouli O & M_Electrical
T.chandramouli O & M_Electrical
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
ARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_UpdtdARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_Updtd
 

Sharma Resume

  • 1. AMANDEEP SHARMA Mobile: 8872037053 ,9464922257, E-Mail: er.amanattri83@gmail.com Present address: #32882,stno:5,Paras Ram Nagar ,Bathinda, Punjab-151001 Assistant Manager Seeking challenging assignments in Process / Power Industry in the field of Electrical Maintenance, Engineering and Project.  Assistant Manager with more than 11 yrs. of experience in the fieldof Electrical Engineering. Well versedwith efficiently handling all activities involving, Maintenance, Project execution, Commissioning& Power Export / Import related issues. Ability to manage human and material resources. CORE COMPETENCIES  Maintenance (Preventive, Predictive, Breakdown and Annual shutdown).  Project Construction, Installation, testing & Commissioning  Schedule and quality control  Technical Analysis  Fault finding and quick restoration  Failure & Why-why analysis.  SAP MM & PM Module  ISO 9001 & OHSAS  Vendor development for spares & Services.  Spares identification, planning & Inventory control  Documentation work (Planning, scheduling, Making SOPs/SMPs, Various reports & History)  Steam Turbine & Gas Turbine construction & maintenance.  Switchyard & Transmission Line construction & maintenance.  Engineering & Project of ABB- ECS.  Safety CAREER HIGHLIGHTS  Handle the following projects and then maintenance of same plant: STEAG Energy Services (INDIA) Pvt. Limited – HMEL (GURU GOBIND SINGH REFINERY)  Leading Refinery Substation Electrical Maintenance Team.  Worked in commissioning & maintenance of 220 KV Switchyard.  Testing, commissioning of Areva & Siemens make 6.6 KV System.  Worked in 173.5 MW combined cycle power plant.  Execution of Electrical Control System of ABB. [ ECS]  Review & modification of Relay Coordination of electrical systems.  Liaising with PSPCL & PSTCL. Abhishek Industries Ltd., Barnala  Commissioning & Maintenance of 50 MW Co Generation Power Plants.  Operation & Maintenance of 66 kV/ 11 kV Sub Station.  Preventive, predictive, breakdown, daily & shut down maintenance, technical & analysis.  Load Management & Peak Load Monitoring.  5S & KAIZEN Activities. ABC Paper Industries Ltd.Hoshiarpur  Commissioning & Engineering for New 10MW Power plant.  Testing &Commissioning of Generator Island Relays.  Preventive, predictive, breakdown, daily & shut down maintenance, technical & analysis.  Operation & Maintenance of 66 kV/ 11 kV Sub Station. 
  • 2. PROFESSIONAL EXPERIENCE (A) Since Nov. 2011 to till date with STEAG Energy Services (INDIA) Pvt. Limited – HMEL(GURU GOBIND SINGH REFINERY),Bhatinda. With exposure to following working fields: a. Leading Operation & Maintenance Refinery Substations Team, including Shift activity management, Spare Management & S/D Planning. b. Testing & Commissioning of Siemens, MICOM, P & B Make Numerical Relays. c. Working & coordination with Vendors for successful & timely commissioning & maintenance of respective equipments. d. Coordination with Project Engineering Team to rectify the necessary engineering issues e. Preparing necessary spare list for the equipment. f. Coordination with respective Vendors to carry out Planned / Breakdown maintenance for all equipments of CPP. g. Rectification of the interlocks of the 33 KV GIS & 220 KV Switchyard as per EIL/BHEL. h. Prepare maintenance schedule for 220 kV Switchyard & CPP electrical system & guiding entire team regarding adherence to the same. i. Modification & implementation of ‘Programming’ changes of Areva/Siemens/ABB numerical relays for safe operation & troubleshooting. j. Prepare maintenance schedule for Gas Turbine Electrical System, coordination with Principle Vendor [BHEL] regarding the same & planning for timely completion of the same. k. Managing technicians & Engineers of respective contractors for proper commissioning & maintenance activities of Power Plant & Sub Station. l. Commissioning, spare management & maintenance of 220/33 kV, 33kV /11 kV, 33/ 6.6 kV & 6.6kV / 0.433 kV Transformers. m. Erection, commissioning & maintenance of Control & Relay panel for 220 kV Switchyard. n. Erection, commissioning & maintenance of Generator Relay panels. o. Erection, commissioning & maintenance of all the LT panels of Power Plant along with interconnection with DCS. p. Necessary engineering modifications, erection and commissioning of HT VCB along with interconnection with DCS &maintenance of the same. q. Necessary engineering modifications, erection, testing & commissioning of all the equipment of Power plant. r. Erection, commissioning & now maintenance of HT motors up to1800 KW. [6.6 kV] s. Synchronizing of own Power Plant with Grid. [ At 33 KV Level] t. Monitoring of Power Import & Export & analyzing the same for Penalty & Gain. u. Part of the core team of planning the generation as per Process Plant v. Execution of Electrical Control System of ABB. [ ECS] w. Finalizing AMC & ARC contracts with respective vendors to avail timely service & maintain system reliability. x. Review, finalization & implementation of Relay Coordination for Entire Power Plant to increase better reliability of the system. (B) Since OCT 2007 to NOV2011 with Abhishek Industries Ltd., Barnala as Executive – Electrical With exposure to following working fields: a) Follow maintenance schedule for CPP electrical system. b) Follow maintenance schedule for 66 kV Switchyard & 66 kV Transmission Line project &maintenance of the same. c) Preparing necessary spare list for the equipment. d) Synchronizing of own Power Plant with Grid. [ At 11 KV Level] e) Maintenance of HT motors up to900 KW. [11 kV] f) Maintenance of Generator Relay panels g) Execution of Load Management System. [ LMS]
  • 3. (C) Since Aug 2005 to Oct 2007 with ABC Paper Industries Ltd., Hoshiarpur as Asstt. Engineer- Cogeneration Plant – Electrical With exposure to following working fields: h) Follow maintenance schedule for CPP electrical system. i) Follow maintenance schedule for 33 kV Switchyard project &maintenance of the same. j) Preparing necessary spare list for the equipment. k) Synchronizing of own Power Plant with Grid. [ At 11 KV Level] l) Maintenance of LT motors. m) Maintenance of Generator Relay panels Energy Conservation  Study & Implementation of energy conservation ideas to ensure operation with optimum efficiency.  Consistent monitoring in the field of energy conservation thru journals & Internet to bring out the ideas for saving potentials. Man & Resource Management  Motivating my team of Engineers & workmen to give their best at all times so that equipment utilization in close to 100%.  Developing entire electrical team to achieve maximum reliability for each & every electrical system.  Ensuring optimized usage of all available resources of man & machines to achieve highest reliability of the system. Quality Control/Assurance  Ensuring adherence to quality standards like ISO9001, OHSAS 18001 and maintaining all related documents.  Identifying areas of quality failures and take steps to rectify the system.  Practicing quality standards with key emphasis on improving quality. Attainments:  Played a pivotal role in organizing in house training for the department team members about the plant equipment.  Achieved the best Electrical engineer award for the year of 2014-15 in Steag Energy Services (I) Pvt. Limited. EDUCATION  Bachelor of Technology in Electrical from Guru Tegh Bhadur Khalsa Engineering & Technology affiliated by AICTE under Punjab Technical University in 2005.
  • 4. TRAINING INDUSTRIAL TRAINING  3 Months Industrial Training at Lehera Mohhbat Thermal Power plant 220X2 MW.  3 Months Industrial Training at NFL Bathinda.  Electrical Control System (S800) Training at ABB Factory, Bangalore.  Attend the one day workshop of BEE Meerut (UP) PERSONAL DETAILS NAME : AmandeepSharma FATHERS NAME : Kewal Krishan MARITAL STATUS : Married LANGUAGE KNOWN : English, Hindi & Punjabi Total experience : 11Years Relevant Experience : Same CTC/Salary : 9.5 Lacs NOTICE PERIOD : Three Months Location : Guru Gobind Singh Refinery. Bathinda Reason for Change : For future growth ______________________ Amandeep Sharma Date:-