Binod kumar yadav
E-Mail: binodyadav09@gmail.com ~ Contact: +919589358186,9777443014
Senior level assignments in Project Management / Fabrication / Erection & Commissioning with an
organisation of repute.
Professional Overview
 A dynamic professional with nearly 8 years of extensive experience in Project Management, Erection
& Commissioning, Fabrication & Man Management.
 Presently Working with JINDAL STEEL & POWER LTD. as an Asst. Manager.
 Simulators Training & Plant Operations (2 Months)-Simulators of 135 MW, 250 MW & 600 MW
generating units. Routine Plant start up / shut down operations, cold-warm-hot start-up, coasting down
from full load to a lower load, handling plant emergencies and engineering analysis and some
functional/maintenance aspects of major plant equipments are the salient features of the installed
simulator.
 Responsible for fabrication, erection and commissioning of B.O.P. of 4x600MW Power Plant.
 Responsible for fabrication, erection and commissioning of Water treatment plant.
 Expertise in handling the complete project operations entailing planning, resource utilization,
maintenance, quality management & manpower management.
 Skilled in managing Completed various pipeline such as piping, Raw water piping,CW & ACW
fabrication / local manufacturing at different sites as per the requirements including converting
material into finished components.
 Proficient in managing erection & commissioning of various equipments and maintenance of the same
for reducing breakdown / downtime & enhancing operational effectiveness of equipment.
 Skilled in managing fabrication / local manufacturing at different sites as per the requirements
including converting material into finished components.
 An effective communicator with good analytical, negotiation, relationship management and problem
solving skills.
Employment Recital
Since May 2011 with Jindal steel & Power Ltd as Asst. Manager.
1. 4X135MW Power project at Tamnar, Raigarh, Chhattisgarh.
2. 4X600 MW power project at Tamnar, Raigarh, Chhattisgarh.
*Responsible for Fabrication, Erection and Commissioning of B.O.P. of 4x135MW Power Plant.
* Fabrication, Erection of Acw,Cw Pipeline, Intake water pipe line,Fuel handling systems.
*Fabrication, Erection of Pipe rack.
*Fabrication,Erection and testing of various gas pipe line.( Syn gas,Bof gas,Coke oven
gas,Nitrogen gas, Service air,Instruments air
* Fabrication ,Erection of various Tanks (Dm,Hfo,Ldo,Cst,Potable,Fire water storage Tanks)
*Fabrication,Erection of DM Plant,Etp Plant,Cpu Plant,Clarifier etc.
3. From June 2010 to May 2011 with Bgr Energy Systems Ltd. As an Engineer.
*Responsible for Fabrication ,Erection and Commissioning of B.O.P. of 4x135MW Power Plant.
* Fabrication ,Erection of Acw,Cw Pipeline,Intake water pipe line,Fuel handling systems.
* Fabrication ,Erection of various Tanks (Dm,Hfo,Ldo,Cst,Potable,Fire water storage Tanks)
*Fabrication,Erection of DM Plant,Etp Plant,Cpu Plant,Clarifier etc.
2. From Nov 2007 to May 2010 with Triveni Engg. & Industries Ltd.(TEIL) as an Site Engineer.
Some of the major project Executed
*Fabrication ,erection of RO Plant(500 MW) Pragati Power Corporation Ltd.(Delhi).
* Fabrication ,erection of DM Plant (50MW) Maheswari Ispat Ltd.(Orissa).
*Fabrication ,erection of DM & RO Plant (15MW) Sukhbir Agro Energy Ltd.(U.P.).
* Fabrication ,erection of CMF & RO Plant (43MW) ksk Energy Ltd.(Chattisgarh)
* Fabrication ,erection of DM and RO Plant (45MW) jsw (Mumbai).
Education
 Diploma - 2007 (Full Time) (Mechanical Engineering.)
 MBA - 2011(Part Time) (Project Management)
Core Competencies
Project Management
 Spearheading project activities involving working out various requirements & monitoring overall
project operations for ensuring timely completion.
 Coordinating projects for the set up standards with accountability for strategic utilization &
deployment of available resources to achieve organizational objectives.
 Monitoring the project at sites and review of project schedule, ensuring cost control within budget,
planning for cash flow requirements etc.
Fabrication
 Finalising basic & layout engineering along with design for the projects.
 Testing of the equipments to ensure that they are precise, and meeting the agreed specifications.
 Eliminating redundant / obsolete processes involved in the design, development processes and
working towards value-addition.
 Installing and commissioning as well as demonstrating the performance tests & inspections to ensure
operational effectiveness of utilities; planning & effectuating maintenance plans for machines and
equipments, including the planning of the spares.
Erection & Commissioning
 Ensuring effective site management and discipline to ensure safe execution of the projects.
 Erection, testing and commissioning of equipments, also providing utility services to the equipments.
 Planning, procurement, erection & commissioning of complete Water treatment plant.
 Troubleshooting problems arising in the total execution of job with minimum time lag.
 Taking stringent quality measures including preparation / maintaining necessary documents and to
ensure compliance with standards.
 Erection of DM Plant, RO Plant, UF Plant, CMF Plant, Clarifier and pumps.
Man Management
 Assessing the training needs of the various employees in co-ordination with the various department
heads in the respective departments.
 Coaching employees & counselling, appraising & reviewing performance to ensuring optimum
performance & achievement of organisational goals.
Personal Vitae
 Name : Binod kumar yadav
 Father’s name : Ghanshyam yadav
 Date of Birth : 1st May 1983
 Sex : Male
 Marital Status : Married
 Nationality : Indian
 Language Known : Hindi, English
 Address : Room. No. 56/12, Pac Colony Naini, Dist.- Allahabad (U.P.) – 211008
Declaration: I hereby declare that information here provided by me is true to the best of my knowledge
and belief.
Dt:
Place: Binod kumar yadav

BINOD UPDATED RESUME (2)

  • 1.
    Binod kumar yadav E-Mail:binodyadav09@gmail.com ~ Contact: +919589358186,9777443014 Senior level assignments in Project Management / Fabrication / Erection & Commissioning with an organisation of repute. Professional Overview  A dynamic professional with nearly 8 years of extensive experience in Project Management, Erection & Commissioning, Fabrication & Man Management.  Presently Working with JINDAL STEEL & POWER LTD. as an Asst. Manager.  Simulators Training & Plant Operations (2 Months)-Simulators of 135 MW, 250 MW & 600 MW generating units. Routine Plant start up / shut down operations, cold-warm-hot start-up, coasting down from full load to a lower load, handling plant emergencies and engineering analysis and some functional/maintenance aspects of major plant equipments are the salient features of the installed simulator.  Responsible for fabrication, erection and commissioning of B.O.P. of 4x600MW Power Plant.  Responsible for fabrication, erection and commissioning of Water treatment plant.  Expertise in handling the complete project operations entailing planning, resource utilization, maintenance, quality management & manpower management.  Skilled in managing Completed various pipeline such as piping, Raw water piping,CW & ACW fabrication / local manufacturing at different sites as per the requirements including converting material into finished components.  Proficient in managing erection & commissioning of various equipments and maintenance of the same for reducing breakdown / downtime & enhancing operational effectiveness of equipment.  Skilled in managing fabrication / local manufacturing at different sites as per the requirements including converting material into finished components.  An effective communicator with good analytical, negotiation, relationship management and problem solving skills. Employment Recital Since May 2011 with Jindal steel & Power Ltd as Asst. Manager. 1. 4X135MW Power project at Tamnar, Raigarh, Chhattisgarh. 2. 4X600 MW power project at Tamnar, Raigarh, Chhattisgarh. *Responsible for Fabrication, Erection and Commissioning of B.O.P. of 4x135MW Power Plant. * Fabrication, Erection of Acw,Cw Pipeline, Intake water pipe line,Fuel handling systems. *Fabrication, Erection of Pipe rack. *Fabrication,Erection and testing of various gas pipe line.( Syn gas,Bof gas,Coke oven gas,Nitrogen gas, Service air,Instruments air * Fabrication ,Erection of various Tanks (Dm,Hfo,Ldo,Cst,Potable,Fire water storage Tanks) *Fabrication,Erection of DM Plant,Etp Plant,Cpu Plant,Clarifier etc. 3. From June 2010 to May 2011 with Bgr Energy Systems Ltd. As an Engineer. *Responsible for Fabrication ,Erection and Commissioning of B.O.P. of 4x135MW Power Plant. * Fabrication ,Erection of Acw,Cw Pipeline,Intake water pipe line,Fuel handling systems. * Fabrication ,Erection of various Tanks (Dm,Hfo,Ldo,Cst,Potable,Fire water storage Tanks) *Fabrication,Erection of DM Plant,Etp Plant,Cpu Plant,Clarifier etc. 2. From Nov 2007 to May 2010 with Triveni Engg. & Industries Ltd.(TEIL) as an Site Engineer. Some of the major project Executed
  • 2.
    *Fabrication ,erection ofRO Plant(500 MW) Pragati Power Corporation Ltd.(Delhi). * Fabrication ,erection of DM Plant (50MW) Maheswari Ispat Ltd.(Orissa). *Fabrication ,erection of DM & RO Plant (15MW) Sukhbir Agro Energy Ltd.(U.P.). * Fabrication ,erection of CMF & RO Plant (43MW) ksk Energy Ltd.(Chattisgarh) * Fabrication ,erection of DM and RO Plant (45MW) jsw (Mumbai). Education  Diploma - 2007 (Full Time) (Mechanical Engineering.)  MBA - 2011(Part Time) (Project Management) Core Competencies Project Management  Spearheading project activities involving working out various requirements & monitoring overall project operations for ensuring timely completion.  Coordinating projects for the set up standards with accountability for strategic utilization & deployment of available resources to achieve organizational objectives.  Monitoring the project at sites and review of project schedule, ensuring cost control within budget, planning for cash flow requirements etc. Fabrication  Finalising basic & layout engineering along with design for the projects.  Testing of the equipments to ensure that they are precise, and meeting the agreed specifications.  Eliminating redundant / obsolete processes involved in the design, development processes and working towards value-addition.  Installing and commissioning as well as demonstrating the performance tests & inspections to ensure operational effectiveness of utilities; planning & effectuating maintenance plans for machines and equipments, including the planning of the spares. Erection & Commissioning  Ensuring effective site management and discipline to ensure safe execution of the projects.  Erection, testing and commissioning of equipments, also providing utility services to the equipments.  Planning, procurement, erection & commissioning of complete Water treatment plant.  Troubleshooting problems arising in the total execution of job with minimum time lag.  Taking stringent quality measures including preparation / maintaining necessary documents and to ensure compliance with standards.  Erection of DM Plant, RO Plant, UF Plant, CMF Plant, Clarifier and pumps. Man Management  Assessing the training needs of the various employees in co-ordination with the various department heads in the respective departments.  Coaching employees & counselling, appraising & reviewing performance to ensuring optimum performance & achievement of organisational goals. Personal Vitae  Name : Binod kumar yadav
  • 3.
     Father’s name: Ghanshyam yadav  Date of Birth : 1st May 1983  Sex : Male  Marital Status : Married  Nationality : Indian  Language Known : Hindi, English  Address : Room. No. 56/12, Pac Colony Naini, Dist.- Allahabad (U.P.) – 211008 Declaration: I hereby declare that information here provided by me is true to the best of my knowledge and belief. Dt: Place: Binod kumar yadav