Kong Dejia is a civil engineer with experience in structural design, construction drawings, energy analysis, and cost estimating. He has a Master's degree in Civil Engineering from the University of Pittsburgh and a Bachelor's degree from the North University of China. His internship experiences include structural design, analysis, construction drawings, energy modeling, and site visits. He is proficient in Revit, AutoCAD, and other engineering software. His projects focused on structural design, energy efficiency improvements, cost estimating, and prestressed concrete design. He holds LEED and Engineer-in-Training certifications.
Kong Dejia is a civil engineer seeking opportunities in structural design and energy efficiency consulting. He has a Master's degree in Civil Engineering from the University of Pittsburgh and a Bachelor's degree from the North University of China. His internship experiences include designing warehouse structures, applying Revit for energy modeling, and assisting with construction site visits and drawings. Relevant experiences highlight projects in structural analysis, energy modeling, cost estimating, and prestressed concrete design. He has LEED and Engineer-in-Training certifications and is proficient in Revit, AutoCAD, and other BIM and energy modeling software.
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationFairfax County
The summary provides an update on the status of Phase 2 of the Dulles Corridor Metrorail Project Silver Line extension:
Phase 2 construction is 83% complete overall. Sections of the third rail have been energized. Issues have been discovered with precast concrete panels supplied by Universal Concrete Products that may impact the 100-year durability requirement. The project remains on schedule with an estimated substantial completion in August 2019 and revenue operations to be established by WMATA. Construction of station facilities, rail infrastructure, and support facilities like rail yards and garages continues across the phase.
McLean Metro Gravity Sewer Capacity ImprovementsFairfax County
The McLean Metro Gravity Sewer Capacity Improvements project was completed in April 2020. The project increased the carrying capacity of the gravity sewer near the McLean Metro Station by installing approximately 223 feet of new gravity sanitary sewer, with 124 feet installed using the jack and bore method. The project team included staff from the Wastewater Design and Construction Division, Utilities Design and Construction Division, and DPWES Director's Office. Patriot Development Corporation served as the contractor and Black & Veatch as the engineer.
This document provides summaries of 8 infrastructure projects being managed by the Infrastructure Project Management Division. It outlines the scope, status, schedule and budget for projects rehabilitating roads and bridges across Washington D.C., including Massachusetts Avenue NW, 31st Street Bridge over C&O Canal, Cleveland Park Streetscape, 16th Street NW Bridge, Maryland Avenue NE Reconstruction, Southeast/Southwest Freeway bridges, Martin Luther King Jr. Avenue SE Revitalization, and East Capitol Street Bridge rehabilitation. The projects range from design to construction phases and aim to improve safety, accessibility and drainage across the city.
This document provides an overview and details of the Route 606 Loudoun County Parkway / Old Ox Road Reconstruction and Widening Project. The project involves widening 5 miles of the roadway to four lanes with a raised median and shared use path. Major aspects of the project include modifying Horsepen Dam and spillway, relocating utilities, installing stormwater management facilities, and constructing box culverts. The project is estimated to cost $107.7 million and take 50 months to complete between 2014 and 2018, involving three construction stages.
High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations ProjectFairfax County
The work under this project included provision for the replacement of all pumping, piping, valves, generator, electrical, and mechanical equipment at each pump station. Each pump station also included structural and architectural repairs for the buildings as well as the installation of a security system. Miscellaneous site and civil modifications were also completed. This project was substantially complete on May 27, 2021.
The four pump stations (PS) included, Lakevale PS (10209 Kenbrooke Ct, Vienna), High Ridge PS (3890 Fairfax Ridge Rd, Fairfax), Weid PS (8418A Holly Leaf Drive, McLean), and Langley Oaks PS (6526 Heather Brook Ct, McLean)
Kong Dejia is a civil engineer with experience in structural design, construction drawings, energy analysis, and cost estimating. He has a Master's degree in Civil Engineering from the University of Pittsburgh and a Bachelor's degree from the North University of China. His internship experiences include structural design, analysis, construction drawings, energy modeling, and site visits. He is proficient in Revit, AutoCAD, and other engineering software. His projects focused on structural design, energy efficiency improvements, cost estimating, and prestressed concrete design. He holds LEED and Engineer-in-Training certifications.
Kong Dejia is a civil engineer seeking opportunities in structural design and energy efficiency consulting. He has a Master's degree in Civil Engineering from the University of Pittsburgh and a Bachelor's degree from the North University of China. His internship experiences include designing warehouse structures, applying Revit for energy modeling, and assisting with construction site visits and drawings. Relevant experiences highlight projects in structural analysis, energy modeling, cost estimating, and prestressed concrete design. He has LEED and Engineer-in-Training certifications and is proficient in Revit, AutoCAD, and other BIM and energy modeling software.
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationFairfax County
The summary provides an update on the status of Phase 2 of the Dulles Corridor Metrorail Project Silver Line extension:
Phase 2 construction is 83% complete overall. Sections of the third rail have been energized. Issues have been discovered with precast concrete panels supplied by Universal Concrete Products that may impact the 100-year durability requirement. The project remains on schedule with an estimated substantial completion in August 2019 and revenue operations to be established by WMATA. Construction of station facilities, rail infrastructure, and support facilities like rail yards and garages continues across the phase.
McLean Metro Gravity Sewer Capacity ImprovementsFairfax County
The McLean Metro Gravity Sewer Capacity Improvements project was completed in April 2020. The project increased the carrying capacity of the gravity sewer near the McLean Metro Station by installing approximately 223 feet of new gravity sanitary sewer, with 124 feet installed using the jack and bore method. The project team included staff from the Wastewater Design and Construction Division, Utilities Design and Construction Division, and DPWES Director's Office. Patriot Development Corporation served as the contractor and Black & Veatch as the engineer.
This document provides summaries of 8 infrastructure projects being managed by the Infrastructure Project Management Division. It outlines the scope, status, schedule and budget for projects rehabilitating roads and bridges across Washington D.C., including Massachusetts Avenue NW, 31st Street Bridge over C&O Canal, Cleveland Park Streetscape, 16th Street NW Bridge, Maryland Avenue NE Reconstruction, Southeast/Southwest Freeway bridges, Martin Luther King Jr. Avenue SE Revitalization, and East Capitol Street Bridge rehabilitation. The projects range from design to construction phases and aim to improve safety, accessibility and drainage across the city.
This document provides an overview and details of the Route 606 Loudoun County Parkway / Old Ox Road Reconstruction and Widening Project. The project involves widening 5 miles of the roadway to four lanes with a raised median and shared use path. Major aspects of the project include modifying Horsepen Dam and spillway, relocating utilities, installing stormwater management facilities, and constructing box culverts. The project is estimated to cost $107.7 million and take 50 months to complete between 2014 and 2018, involving three construction stages.
High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations ProjectFairfax County
The work under this project included provision for the replacement of all pumping, piping, valves, generator, electrical, and mechanical equipment at each pump station. Each pump station also included structural and architectural repairs for the buildings as well as the installation of a security system. Miscellaneous site and civil modifications were also completed. This project was substantially complete on May 27, 2021.
The four pump stations (PS) included, Lakevale PS (10209 Kenbrooke Ct, Vienna), High Ridge PS (3890 Fairfax Ridge Rd, Fairfax), Weid PS (8418A Holly Leaf Drive, McLean), and Langley Oaks PS (6526 Heather Brook Ct, McLean)
Brentcliffe to Victoria Park Construction Liaison Committee Meeting - January...Crosstown TO
The document summarizes plans for the Crosstown LRT project, including:
- It will include 15 underground stations, 10 surface stops, along a 19 km route separated from regular traffic, linking to 54 bus routes and transit stations.
- Construction updates provided for the Sunnybrook stop and the Brentcliffe portal area, where preparatory works are underway.
- The Science Centre station will be built using a cut-and-cover methodology, with form work continuing in the main entrance and traffic staging expected to change in the coming weeks to stage 6.
McKenney’s has proven time and again that it is a valuable partner and resource when it comes to complicated Training Barracks Upgrade Program (TBUP) barracks renovation projects.
This document provides information about a stream restoration project on Pike Branch at Wilton Road in Fairfax County, Virginia. It outlines the project area limits, typical restoration practices that will be used such as native vegetation planting, reinforced streambeds, and instream rock structures. It also shows examples of construction efforts like access roads and channel grading. The presentation discusses the project overview, current steps being taken to get approvals, and outlines a timeline for advertising, beginning, and completing construction over the next 2-3 years.
Pharmacy to Kennedy Construction Liaison Committee Meeting - January 2018Crosstown TO
This document provides an update on the Crosstown LRT project including:
1) Work is underway on utility relocations and road improvements between Pharmacy Ave and Rosemount Ave. Tree removals and temporary traffic signals are also being installed.
2) Plans for Kennedy Station include a main entrance and secondary entrance with connections to subway, GO Transit and UP Express. Construction will use the cut and cover method.
3) In 2018, work will include utility relocations, demolition of the existing TTC north entrance, road widening and support of excavation activities at Kennedy Station. The bus loop and platforms will be relocated during construction.
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementFairfax County
This project included removal and replacement of fuel storage tanks for stand by generators at the Long Branch Sanitary Sewer Pump Station and New Alexandria Stormwater Pump Station. Existing underground storage tanks were replaced with new above ground fuel tanks. The project included installation of piping, valves, fuel polishing systems, day tanks, and appurtenances, as well as associated site work. This project was substantially complete on October 29, 2021.
This document provides information about an upcoming meeting to discuss the Route 7 Widening and Rehabilitation project in Northern Virginia. It includes the agenda, which covers an introduction to the project team, background on the project, key milestones, and a project overview. Construction will involve widening Route 7 and replacing bridges in four phases, with traffic maintained on the Dulles Toll Road and Route 7 through lane shifts and nightly lane closures. The goal is to complete the project by Spring 2018.
Lakevale Sewer Improvements Community MeetingFairfax County
The document summarizes sewer improvement plans for Lakevale, VA following a sewer backup event. Short term plans include installing backflow devices on homes impacted by the backup and maintenance before storms. Mid term plans involve temporary pump station modifications. Long term plans include hydraulic modeling of system alternatives, preliminary engineering and design reports, and construction which may include upsizing pipes and storage. Community input will be gathered during planning, design, and construction through public meetings and an online project website.
Terry Banta has over 28 years of experience in electrical and mechanical design, primarily for power generation, transmission and distribution systems. He has extensive experience leading design projects and coordinating construction. Banta is skilled in 3D modeling, drafting, and design of electrical, mechanical, and civil systems. He is proficient in many design software programs and adaptable to learning new technologies.
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectFairfax County
2019 study evaluated several alternatives for replacement
Selected alternative would:
Eliminate the exposed sewer/stream crossing
Maintain level of sewer services to the community
Provide future access ease to Fairfax County’s wastewater operator
Improve system’s reliability in the area
Reduce future risk of sanitary sewer overflows
Reduce risk to public health and the environment
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
Benefits of Consolidated Facility
Building and Site Efficiencies
Operational Efficiencies
Addresses Space Deficiencies
Addresses Renovations and Capital Renewal Requirements
for WCD
Provides for a Centrally Located Site that Accommodates Program
Consolidates Integrated Services on One Centrally Located Site
Alexand Brussich is a senior electrical designer with over 42 years of experience in electrical design, drafting, and project management for various industrial plants. He has extensive experience designing electrical systems for petrochemical, gas pipeline, power, and pharmaceutical facilities. His responsibilities have included managing electrical design groups, developing construction packages, and serving as a lead designer. He is proficient in AutoCAD and has worked on projects involving instrumentation, power distribution, control systems, and more.
The Public Works Director provided updates on several local transportation projects, including the completion of the Green River Widening Project by the end of March, anticipated completion of the Foothill Parkway Widening Project in June which requires relocation of utilities and traffic signals, and planned closures and detours for bridge work on the Maple Street bridge, Serfas Club Road, Buena Vista bridge, and Sherman Avenue through March and Pomona Road through May.
McLean Hunt Estates Pond Improvement ProjectFairfax County
The McLean Hunt Estates Pond Improvement Project consisted of retrofitting an existing dry pond to an extended detention dry pond. The goals of the project were to stabilize the incoming degraded channel constructing a step pool conveyance system; replace the existing corrugated metal pipe principal spillway pipe with reinforced concrete pipe; install a new riser structure with BMP plate to provide water quality benefits; and upgrade the asphalt trail into an access road to accommodate equipment/vehicles for future maintenance.
The document summarizes the Northgate Water Master Plan Update for City Council. It notes that the previous 2010 plan underestimated development in the Northgate area. The 2013 update revises density projections and models water demands and system impacts. Hydraulic modeling shows the current system is sufficient with planned developments but more supply will be needed if growth continues rapidly. The recommendation is to construct a new 18-24" water line at an estimated $6.5 million to supply Northgate and the nearby Bio-Corridor as development progresses. Alternatives like new pumps or storage will be studied further in an FY14 master plan update.
Potomac Meadow Water Quality Improvement July 2016Fairfax County
The Potomac Meadow Water Quality Improvements Project retrofitted an existing stormwater pond in Fairfax County, VA to improve water quality. The project included installing bioswales, replacing culverts, constructing stormwater wetlands, and modifying the pond structure. The project was completed on time and within budget in March 2016 to treat stormwater runoff from surrounding residential areas and reduce pollution entering Pond Branch Watershed.
Kennedy Station and East At-Grade Section Open House - December 2017Crosstown TO
The document provides information about the Eglinton Crosstown LRT project being built by Metrolinx and Crosslinx Transit Solutions. It discusses plans to build a 19-kilometre light rail line along Eglinton Avenue in Toronto, including 15 underground stations and 10 surface stops. It outlines safety measures and design principles for the project. It also discusses community benefits programs and upcoming construction activities at various stations and surface stops along the route in 2017-2018.
Alex Cox has over 5 years of experience as a civil and structural engineer, working on projects such as the construction of containment vessels for a nuclear power plant. He was selected for an engineering training program focused on developing leadership skills. Cox has expertise in areas such as field engineering, subsurface design, and preliminary bridge design. He is proficient in engineering software such as AutoCAD, Risa 3D, and MathCAD.
The document provides information about a district cooling plant located on the rooftop of the Curve in Mutiara Damansara. The plant has a peak cooling capacity of 7,600 tons and can supply cooling to three customer buildings: The Curve, Cineleisure, and The Royale Bintang Hotel. It describes the facilities and systems used at the plant, including chillers, pumps, cooling towers, heat exchangers, and an ice storage tank. The document also summarizes the chilled water revenue from 2006 for each customer building.
This document outlines a vision for the future development of district heating and cooling in Europe from 2020 to 2050. It envisions district heating and cooling networks providing an increasing share of Europe's energy needs and transitioning to lower carbon and fully carbon neutral solutions over time. By 2020, the vision forecasts district heating avoiding 9.3% of European CO2 emissions and district cooling providing additional 40-50 million tonnes of annual reductions. By 2030, 25% of district heating could come from renewable sources. By 2050, fully carbon neutral regional networks integrating multiple low carbon energy sources could be realized.
Brentcliffe to Victoria Park Construction Liaison Committee Meeting - January...Crosstown TO
The document summarizes plans for the Crosstown LRT project, including:
- It will include 15 underground stations, 10 surface stops, along a 19 km route separated from regular traffic, linking to 54 bus routes and transit stations.
- Construction updates provided for the Sunnybrook stop and the Brentcliffe portal area, where preparatory works are underway.
- The Science Centre station will be built using a cut-and-cover methodology, with form work continuing in the main entrance and traffic staging expected to change in the coming weeks to stage 6.
McKenney’s has proven time and again that it is a valuable partner and resource when it comes to complicated Training Barracks Upgrade Program (TBUP) barracks renovation projects.
This document provides information about a stream restoration project on Pike Branch at Wilton Road in Fairfax County, Virginia. It outlines the project area limits, typical restoration practices that will be used such as native vegetation planting, reinforced streambeds, and instream rock structures. It also shows examples of construction efforts like access roads and channel grading. The presentation discusses the project overview, current steps being taken to get approvals, and outlines a timeline for advertising, beginning, and completing construction over the next 2-3 years.
Pharmacy to Kennedy Construction Liaison Committee Meeting - January 2018Crosstown TO
This document provides an update on the Crosstown LRT project including:
1) Work is underway on utility relocations and road improvements between Pharmacy Ave and Rosemount Ave. Tree removals and temporary traffic signals are also being installed.
2) Plans for Kennedy Station include a main entrance and secondary entrance with connections to subway, GO Transit and UP Express. Construction will use the cut and cover method.
3) In 2018, work will include utility relocations, demolition of the existing TTC north entrance, road widening and support of excavation activities at Kennedy Station. The bus loop and platforms will be relocated during construction.
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementFairfax County
This project included removal and replacement of fuel storage tanks for stand by generators at the Long Branch Sanitary Sewer Pump Station and New Alexandria Stormwater Pump Station. Existing underground storage tanks were replaced with new above ground fuel tanks. The project included installation of piping, valves, fuel polishing systems, day tanks, and appurtenances, as well as associated site work. This project was substantially complete on October 29, 2021.
This document provides information about an upcoming meeting to discuss the Route 7 Widening and Rehabilitation project in Northern Virginia. It includes the agenda, which covers an introduction to the project team, background on the project, key milestones, and a project overview. Construction will involve widening Route 7 and replacing bridges in four phases, with traffic maintained on the Dulles Toll Road and Route 7 through lane shifts and nightly lane closures. The goal is to complete the project by Spring 2018.
Lakevale Sewer Improvements Community MeetingFairfax County
The document summarizes sewer improvement plans for Lakevale, VA following a sewer backup event. Short term plans include installing backflow devices on homes impacted by the backup and maintenance before storms. Mid term plans involve temporary pump station modifications. Long term plans include hydraulic modeling of system alternatives, preliminary engineering and design reports, and construction which may include upsizing pipes and storage. Community input will be gathered during planning, design, and construction through public meetings and an online project website.
Terry Banta has over 28 years of experience in electrical and mechanical design, primarily for power generation, transmission and distribution systems. He has extensive experience leading design projects and coordinating construction. Banta is skilled in 3D modeling, drafting, and design of electrical, mechanical, and civil systems. He is proficient in many design software programs and adaptable to learning new technologies.
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectFairfax County
2019 study evaluated several alternatives for replacement
Selected alternative would:
Eliminate the exposed sewer/stream crossing
Maintain level of sewer services to the community
Provide future access ease to Fairfax County’s wastewater operator
Improve system’s reliability in the area
Reduce future risk of sanitary sewer overflows
Reduce risk to public health and the environment
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
Benefits of Consolidated Facility
Building and Site Efficiencies
Operational Efficiencies
Addresses Space Deficiencies
Addresses Renovations and Capital Renewal Requirements
for WCD
Provides for a Centrally Located Site that Accommodates Program
Consolidates Integrated Services on One Centrally Located Site
Alexand Brussich is a senior electrical designer with over 42 years of experience in electrical design, drafting, and project management for various industrial plants. He has extensive experience designing electrical systems for petrochemical, gas pipeline, power, and pharmaceutical facilities. His responsibilities have included managing electrical design groups, developing construction packages, and serving as a lead designer. He is proficient in AutoCAD and has worked on projects involving instrumentation, power distribution, control systems, and more.
The Public Works Director provided updates on several local transportation projects, including the completion of the Green River Widening Project by the end of March, anticipated completion of the Foothill Parkway Widening Project in June which requires relocation of utilities and traffic signals, and planned closures and detours for bridge work on the Maple Street bridge, Serfas Club Road, Buena Vista bridge, and Sherman Avenue through March and Pomona Road through May.
McLean Hunt Estates Pond Improvement ProjectFairfax County
The McLean Hunt Estates Pond Improvement Project consisted of retrofitting an existing dry pond to an extended detention dry pond. The goals of the project were to stabilize the incoming degraded channel constructing a step pool conveyance system; replace the existing corrugated metal pipe principal spillway pipe with reinforced concrete pipe; install a new riser structure with BMP plate to provide water quality benefits; and upgrade the asphalt trail into an access road to accommodate equipment/vehicles for future maintenance.
The document summarizes the Northgate Water Master Plan Update for City Council. It notes that the previous 2010 plan underestimated development in the Northgate area. The 2013 update revises density projections and models water demands and system impacts. Hydraulic modeling shows the current system is sufficient with planned developments but more supply will be needed if growth continues rapidly. The recommendation is to construct a new 18-24" water line at an estimated $6.5 million to supply Northgate and the nearby Bio-Corridor as development progresses. Alternatives like new pumps or storage will be studied further in an FY14 master plan update.
Potomac Meadow Water Quality Improvement July 2016Fairfax County
The Potomac Meadow Water Quality Improvements Project retrofitted an existing stormwater pond in Fairfax County, VA to improve water quality. The project included installing bioswales, replacing culverts, constructing stormwater wetlands, and modifying the pond structure. The project was completed on time and within budget in March 2016 to treat stormwater runoff from surrounding residential areas and reduce pollution entering Pond Branch Watershed.
Kennedy Station and East At-Grade Section Open House - December 2017Crosstown TO
The document provides information about the Eglinton Crosstown LRT project being built by Metrolinx and Crosslinx Transit Solutions. It discusses plans to build a 19-kilometre light rail line along Eglinton Avenue in Toronto, including 15 underground stations and 10 surface stops. It outlines safety measures and design principles for the project. It also discusses community benefits programs and upcoming construction activities at various stations and surface stops along the route in 2017-2018.
Alex Cox has over 5 years of experience as a civil and structural engineer, working on projects such as the construction of containment vessels for a nuclear power plant. He was selected for an engineering training program focused on developing leadership skills. Cox has expertise in areas such as field engineering, subsurface design, and preliminary bridge design. He is proficient in engineering software such as AutoCAD, Risa 3D, and MathCAD.
The document provides information about a district cooling plant located on the rooftop of the Curve in Mutiara Damansara. The plant has a peak cooling capacity of 7,600 tons and can supply cooling to three customer buildings: The Curve, Cineleisure, and The Royale Bintang Hotel. It describes the facilities and systems used at the plant, including chillers, pumps, cooling towers, heat exchangers, and an ice storage tank. The document also summarizes the chilled water revenue from 2006 for each customer building.
This document outlines a vision for the future development of district heating and cooling in Europe from 2020 to 2050. It envisions district heating and cooling networks providing an increasing share of Europe's energy needs and transitioning to lower carbon and fully carbon neutral solutions over time. By 2020, the vision forecasts district heating avoiding 9.3% of European CO2 emissions and district cooling providing additional 40-50 million tonnes of annual reductions. By 2030, 25% of district heating could come from renewable sources. By 2050, fully carbon neutral regional networks integrating multiple low carbon energy sources could be realized.
District Cooling Service - Presentation to Qatar RailJaygopal Kottilil
This document discusses district cooling services in the GCC region. It provides background on district cooling, including its history in North America and Europe. It then discusses the growth of district cooling in the GCC, forecasting a need for 2 million refrigerant tons of cooling capacity for new construction projects over the next 8-10 years. The document analyzes the benefits of district cooling systems over individual building cooling systems, such as improved reliability and reduced energy usage. It also provides several case studies comparing the capital and operating costs of district cooling versus other cooling solutions. The analysis shows that district cooling can be economically viable for large developments if capital costs are optimized and utilities such as treated seawater are consistently available.
District cooling involves providing cooling to multiple buildings from a central plant via pipes. It started in the 1930s and provides energy savings compared to individual building cooling systems. A case study examines a residential area in Kuwait, finding the district cooling plant would save 50% on peak power and 40% annually on energy versus individual air-cooled systems. An inner-city case study in Kuwait also finds savings on energy and costs over a 30-year period from a district cooling system serving office, commercial and residential buildings.
The document discusses district cooling systems (DCS), including:
1. DCS involve centralized chilled water production and distribution to multiple buildings through underground pipes for air conditioning. This is more efficient than individual building chillers.
2. Examples of DCS in Malaysia include serving Kuala Lumpur International Airport since 1997 and government buildings in Putrajaya since 1999.
3. The Bangsar DCS in Kuala Lumpur uses thermal energy storage at night to take advantage of lower electricity rates, supplying hotels, offices and other buildings during the day.
This document discusses different types of air conditioning systems and their components. It describes window air conditioning systems, split air conditioning systems, centralized air conditioning systems, and packaged air conditioning systems. It also discusses new technologies like district cooling systems and chilled beam systems. The cooling cycle/refrigeration cycle is explained through its key components: compressor, condenser, expansion valve, and evaporator. Requirements for coolants used in air conditioning systems are outlined.
Generating a Reliable Backup Plan - Data Center Retrofit ProjectMcKenney's Inc
The McKenney's team replaced scrubbers for generators at a large data center to help the facility meet new emission standards on an expedited schedule. They devised an assembly line approach to efficiently remove each generator enclosure and install the new scrubbers and piping. This allowed them to complete the work in 7 months instead of 11 months, saving costs for the customer while keeping the backup generators operational throughout the project.
Blowing the Lid Off City Hall - Energy Savings Performance ContractingMcKenney's Inc
McKenney's developed energy conservation measures and overhauled the HVAC system of a landmark municipal building. They replaced hard-to-access air handling units and chillers after hours to ensure no disruptions. Over 30 ECMs were developed and the customer selected projects providing the best ROI. Replacements were done safely, on schedule and budget and the ECMs are beginning to pay for themselves through utility savings.
Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...McKenney's Inc
Starting in April 2009, McKenney’s, Inc performed HVAC, sheet metal and piping installation on multiple energy-efficient barracks, which included a total of 125 dorm-style rooms with kitchenettes at Fort Benning, a US Army Base in Georgia.
The document provides a summary of qualifications for a facilities management position. It includes over 25 years of experience in distribution management, project management, and environmental compliance experience. Key skills include underground utility design, construction management, and troubleshooting systems. Recent projects led at MIT include upgrades to steam, chilled water, and demineralized water systems.
McKenney’s installed HVAC ductwork and piping at a nanotechnology research and training facility under renovation at the Georgia Institute of Technology.
Creative Install for Data Center - Charlotte, North CarolinaMcKenney's Inc
A major telecommunications company needed a new 175,000 square foot data facility completed in less than a year. McKenney's was responsible for the aggressive project schedule and tight deadline. They used BIM to prefabricate 80-90% of the mechanical piping off-site to save time and money. Custom pipe dollies were also fabricated to move the prefabricated pipes easily. Through these efforts, McKenney's completed the project on schedule and on budget and was hired for future expansions.
Chamath Wijeratne has over 10 years of experience as a Project Manager for Ausgrid, managing projects over $10 million related to rebuilding and upgrading substations and transmission infrastructure. Some of the key projects he led included rebuilding the Canterbury substation ($45 million), installing circuit breakers at Marrickville and St. Peters substations ($18.6 million and $22.5 million respectively), and replacing switchgear at Dulwich Hill substation ($25.5 million). For each project, he was responsible for planning, risk analysis, design, construction, testing, commissioning and closeout.
This curriculum vitae summarizes the qualifications and extensive experience of Klaus Walter Kucyk over 35 years working on major infrastructure projects across Australia, Asia, the Middle East, and Europe with a focus on project management, construction management, and quality assurance. He has managed projects with a total value over $5 billion and brings expertise in areas such as road, rail, water, and building construction. Currently he works as Assistant General Manager of Engineering for Qingjian International in Myanmar, overseeing various infrastructure and building projects.
McKenney’s provided a turnkey design/build solution to replace an outdated chiller plant in the operating classroom complex of a government training center.
Central Utility Plant Design and ConstructionMcKenney's Inc
McKenney’s leveraged in-house design, BIM, prefabrication and turnkey project management to turn over a sophisticated, fully operational Central Utility Plant (CUP) with automated controls.
Paul Willey is a principal engineer with over 44 years of experience in engineering projects across New Zealand, Australia, the Middle East, and the UK. He has extensive experience managing large infrastructure projects including roads, bridges, water and sewage treatment plants. Some of his responsibilities have included contract management, project supervision, resolving claims, and ensuring projects are delivered on time and on budget.
CRAC Units Installation for a Data Center Project in Alpharetta, GAMcKenney's Inc
McKenney’s installed very complex, industry-leading computer room air conditioning (CRAC) units at a new data center under construction in Alpharetta, Georgia.
Mission Critical Data Center Retrofit Project - Catawaba County, NCMcKenney's Inc
The McKenney's team replaced scrubbers for generators at a large data center campus to comply with new emission standards. They devised an assembly line approach to quickly lift and move each generator enclosure to install the new scrubbers and piping, finishing the retrofit in 7 months instead of the planned 11 months to minimize downtime for the facility with only N+1 redundancy. Working closely with the customer and crane contractor, the coordinated team was able to keep the backup generators operational throughout the project.
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)McKenney's Inc
A zero-energy building (ZEB) produces enough renewable energy to meet its own annual energy consumption requirements by using all cost-effective measures to reduce energy usage through energy efficiency. Learn more at http://blog.mckenneys.com/2018/06/reducing-building-energy-consumption-in-zero-energy-buildings-zeb/
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectMcKenney's Inc
Through an energy savings performance contract, McKenney’s Building Performance Solutions provided a turnkey solution to an aging, inefficient heating system at a large maximum security prison in Georgia.
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney's Inc
McKenney’s, Inc. Critical Systems offers a comprehensive approach for constructing or renovating high-quality mechanical systems for data centers and operations centers that meet the most exacting demands and schedules.
Efficient Solutions for Rainwater and Condensate HarvestingMcKenney's Inc
McKenney’s is the right choice for reliable, well-designed rainwater and condensate harvesting systems because they bring a powerful combination of experience, commitment and innovation.
Plumbing Preventive Maintenance in Commercial BuildingsMcKenney's Inc
Protect your investment and consider a plumbing preventive maintenance program for your facility. Check out our plumbing services page for more information at http://plumbing.mckenneys.com/
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney's Inc
McKenney’s Interiors & Special Projects (ISP) team responds quickly to a wide range of mechanical needs, including interior renovations, infrastructure repairs, replacements and retrocommissioning projects.
Creating a Showstopper in Charlotte - Mechanical Systems InstallationMcKenney's Inc
McKenney's installed mechanical systems at a high-rise office building in downtown Charlotte that faced a tight schedule for completion. Extensive planning and coordination allowed McKenney's to sequence the work and overcome equipment issues to finish installation on time, allowing the owners to lease spaces as scheduled. The project team worked creatively within the compressed timeline for startup and commissioning of key mechanical equipment.
McKenney’s is building a wide range of energy-efficient mechanical systems using green practices for the 325,000-square-foot medical center in Braselton, Georgia.
A High Rise Game Changer - Mixed-Use ConstructionMcKenney's Inc
The McKenney’s team installed plumbing and HVAC systems for a new 10-story, mixed-use office and retail tower at a high-profile destination in Atlanta, Georgia.
Timely Collaboration Covers All Bases | Mechanical Systems InstallationMcKenney's Inc
The McKenney’s team was in charge of installing a stadium’s mechanical systems to meet an extremely aggressive construction schedule that couldn’t be delayed.
3 Simple Steps To Buy Verified Payoneer Account In 2024SEOSMMEARTH
Buy Verified Payoneer Account: Quick and Secure Way to Receive Payments
Buy Verified Payoneer Account With 100% secure documents, [ USA, UK, CA ]. Are you looking for a reliable and safe way to receive payments online? Then you need buy verified Payoneer account ! Payoneer is a global payment platform that allows businesses and individuals to send and receive money in over 200 countries.
If You Want To More Information just Contact Now:
Skype: SEOSMMEARTH
Telegram: @seosmmearth
Gmail: seosmmearth@gmail.com
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfthesiliconleaders
In the recent edition, The 10 Most Influential Leaders Guiding Corporate Evolution, 2024, The Silicon Leaders magazine gladly features Dejan Štancer, President of the Global Chamber of Business Leaders (GCBL), along with other leaders.
Navigating the world of forex trading can be challenging, especially for beginners. To help you make an informed decision, we have comprehensively compared the best forex brokers in India for 2024. This article, reviewed by Top Forex Brokers Review, will cover featured award winners, the best forex brokers, featured offers, the best copy trading platforms, the best forex brokers for beginners, the best MetaTrader brokers, and recently updated reviews. We will focus on FP Markets, Black Bull, EightCap, IC Markets, and Octa.
The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...ABHILASH DUTTA
This presentation provides a thorough examination of Over-the-Top (OTT) platforms, focusing on their development and substantial influence on the entertainment industry, with a particular emphasis on the Indian market.We begin with an introduction to OTT platforms, defining them as streaming services that deliver content directly over the internet, bypassing traditional broadcast channels. These platforms offer a variety of content, including movies, TV shows, and original productions, allowing users to access content on-demand across multiple devices.The historical context covers the early days of streaming, starting with Netflix's inception in 1997 as a DVD rental service and its transition to streaming in 2007. The presentation also highlights India's television journey, from the launch of Doordarshan in 1959 to the introduction of Direct-to-Home (DTH) satellite television in 2000, which expanded viewing choices and set the stage for the rise of OTT platforms like Big Flix, Ditto TV, Sony LIV, Hotstar, and Netflix. The business models of OTT platforms are explored in detail. Subscription Video on Demand (SVOD) models, exemplified by Netflix and Amazon Prime Video, offer unlimited content access for a monthly fee. Transactional Video on Demand (TVOD) models, like iTunes and Sky Box Office, allow users to pay for individual pieces of content. Advertising-Based Video on Demand (AVOD) models, such as YouTube and Facebook Watch, provide free content supported by advertisements. Hybrid models combine elements of SVOD and AVOD, offering flexibility to cater to diverse audience preferences.
Content acquisition strategies are also discussed, highlighting the dual approach of purchasing broadcasting rights for existing films and TV shows and investing in original content production. This section underscores the importance of a robust content library in attracting and retaining subscribers.The presentation addresses the challenges faced by OTT platforms, including the unpredictability of content acquisition and audience preferences. It emphasizes the difficulty of balancing content investment with returns in a competitive market, the high costs associated with marketing, and the need for continuous innovation and adaptation to stay relevant.
The impact of OTT platforms on the Bollywood film industry is significant. The competition for viewers has led to a decrease in cinema ticket sales, affecting the revenue of Bollywood films that traditionally rely on theatrical releases. Additionally, OTT platforms now pay less for film rights due to the uncertain success of films in cinemas.
Looking ahead, the future of OTT in India appears promising. The market is expected to grow by 20% annually, reaching a value of ₹1200 billion by the end of the decade. The increasing availability of affordable smartphones and internet access will drive this growth, making OTT platforms a primary source of entertainment for many viewers.
Storytelling is an incredibly valuable tool to share data and information. To get the most impact from stories there are a number of key ingredients. These are based on science and human nature. Using these elements in a story you can deliver information impactfully, ensure action and drive change.
Company Valuation webinar series - Tuesday, 4 June 2024FelixPerez547899
This session provided an update as to the latest valuation data in the UK and then delved into a discussion on the upcoming election and the impacts on valuation. We finished, as always with a Q&A
At Techbox Square, in Singapore, we're not just creative web designers and developers, we're the driving force behind your brand identity. Contact us today.
Understanding User Needs and Satisfying ThemAggregage
https://www.productmanagementtoday.com/frs/26903918/understanding-user-needs-and-satisfying-them
We know we want to create products which our customers find to be valuable. Whether we label it as customer-centric or product-led depends on how long we've been doing product management. There are three challenges we face when doing this. The obvious challenge is figuring out what our users need; the non-obvious challenges are in creating a shared understanding of those needs and in sensing if what we're doing is meeting those needs.
In this webinar, we won't focus on the research methods for discovering user-needs. We will focus on synthesis of the needs we discover, communication and alignment tools, and how we operationalize addressing those needs.
Industry expert Scott Sehlhorst will:
• Introduce a taxonomy for user goals with real world examples
• Present the Onion Diagram, a tool for contextualizing task-level goals
• Illustrate how customer journey maps capture activity-level and task-level goals
• Demonstrate the best approach to selection and prioritization of user-goals to address
• Highlight the crucial benchmarks, observable changes, in ensuring fulfillment of customer needs
B2B payments are rapidly changing. Find out the 5 key questions you need to be asking yourself to be sure you are mastering B2B payments today. Learn more at www.BlueSnap.com.
SATTA MATKA SATTA FAST RESULT KALYAN TOP MATKA RESULT KALYAN SATTA MATKA FAST RESULT MILAN RATAN RAJDHANI MAIN BAZAR MATKA FAST TIPS RESULT MATKA CHART JODI CHART PANEL CHART FREE FIX GAME SATTAMATKA ! MATKA MOBI SATTA 143 spboss.in TOP NO1 RESULT FULL RATE MATKA ONLINE GAME PLAY BY APP SPBOSS
buy old yahoo accounts buy yahoo accountsSusan Laney
As a business owner, I understand the importance of having a strong online presence and leveraging various digital platforms to reach and engage with your target audience. One often overlooked yet highly valuable asset in this regard is the humble Yahoo account. While many may perceive Yahoo as a relic of the past, the truth is that these accounts still hold immense potential for businesses of all sizes.