McKenney’s leveraged in-house design, BIM, prefabrication and turnkey project management to turn over a sophisticated, fully operational Central Utility Plant (CUP) with automated controls.
Leveraging BIM, Prefab to Achieve Turnkey SuccessMcKenney's Inc
McKenney’s leveraged in-house design, BIM, prefabrication and turnkey project management to turn over a sophisticated, fully operational Central Utility Plant (CUP) with automated controls.
Rena Cummings has over 20 years of experience in project management and engineering. She has an MS in Project Management and Technology Management and has achieved significant cost savings on multiple projects through Lean and Six Sigma applications. She is proficient in Agile methodologies and has experience managing global teams and cloud-based technology projects.
Using Retro-Commissioning to Improve Operations and Energy Use through Climat...Paladino and Company
Paladino and Company’s higher education market leader Bronwen Carpenter and BuildPulse’s Brice Kosnik present “Improving Operations and Energy Use at Universities.” The presentation covers how facility managers can use analytics and modern fault detection and diagnostics to identify energy savings and operational improvements in a higher education setting. Using Seattle Pacific University as an example, this presentation demonstrates how building automation technology can help campuses determine inefficiencies in facilities and reach their climate goals.
Kong Dejia is a civil engineer with experience in structural design, construction drawings, energy analysis, and cost estimating. He has a Master's degree in Civil Engineering from the University of Pittsburgh and a Bachelor's degree from the North University of China. His internship experiences include structural design, analysis, construction drawings, energy modeling, and site visits. He is proficient in Revit, AutoCAD, and other engineering software. His projects focused on structural design, energy efficiency improvements, cost estimating, and prestressed concrete design. He holds LEED and Engineer-in-Training certifications.
Generating a Reliable Backup Plan - Data Center Retrofit ProjectMcKenney's Inc
The McKenney's team replaced scrubbers for generators at a large data center to help the facility meet new emission standards on an expedited schedule. They devised an assembly line approach to efficiently remove each generator enclosure and install the new scrubbers and piping. This allowed them to complete the work in 7 months instead of 11 months, saving costs for the customer while keeping the backup generators operational throughout the project.
Kong Dejia is a civil engineer seeking opportunities in structural design and energy efficiency consulting. He has a Master's degree in Civil Engineering from the University of Pittsburgh and a Bachelor's degree from the North University of China. His internship experiences include designing warehouse structures, applying Revit for energy modeling, and assisting with construction site visits and drawings. Relevant experiences highlight projects in structural analysis, energy modeling, cost estimating, and prestressed concrete design. He has LEED and Engineer-in-Training certifications and is proficient in Revit, AutoCAD, and other BIM and energy modeling software.
This document provides a list of major projects led by Kashif Dada between 2010-2014. It summarizes 10 projects from various sectors including oil and gas, engineering, and agriculture. Key details provided for each project include the client, location, timelines, and how Mr. Dada successfully completed projects on time and under budget by expediting engineering, coordinating construction, and assisting with design.
Leveraging BIM, Prefab to Achieve Turnkey SuccessMcKenney's Inc
McKenney’s leveraged in-house design, BIM, prefabrication and turnkey project management to turn over a sophisticated, fully operational Central Utility Plant (CUP) with automated controls.
Rena Cummings has over 20 years of experience in project management and engineering. She has an MS in Project Management and Technology Management and has achieved significant cost savings on multiple projects through Lean and Six Sigma applications. She is proficient in Agile methodologies and has experience managing global teams and cloud-based technology projects.
Using Retro-Commissioning to Improve Operations and Energy Use through Climat...Paladino and Company
Paladino and Company’s higher education market leader Bronwen Carpenter and BuildPulse’s Brice Kosnik present “Improving Operations and Energy Use at Universities.” The presentation covers how facility managers can use analytics and modern fault detection and diagnostics to identify energy savings and operational improvements in a higher education setting. Using Seattle Pacific University as an example, this presentation demonstrates how building automation technology can help campuses determine inefficiencies in facilities and reach their climate goals.
Kong Dejia is a civil engineer with experience in structural design, construction drawings, energy analysis, and cost estimating. He has a Master's degree in Civil Engineering from the University of Pittsburgh and a Bachelor's degree from the North University of China. His internship experiences include structural design, analysis, construction drawings, energy modeling, and site visits. He is proficient in Revit, AutoCAD, and other engineering software. His projects focused on structural design, energy efficiency improvements, cost estimating, and prestressed concrete design. He holds LEED and Engineer-in-Training certifications.
Generating a Reliable Backup Plan - Data Center Retrofit ProjectMcKenney's Inc
The McKenney's team replaced scrubbers for generators at a large data center to help the facility meet new emission standards on an expedited schedule. They devised an assembly line approach to efficiently remove each generator enclosure and install the new scrubbers and piping. This allowed them to complete the work in 7 months instead of 11 months, saving costs for the customer while keeping the backup generators operational throughout the project.
Kong Dejia is a civil engineer seeking opportunities in structural design and energy efficiency consulting. He has a Master's degree in Civil Engineering from the University of Pittsburgh and a Bachelor's degree from the North University of China. His internship experiences include designing warehouse structures, applying Revit for energy modeling, and assisting with construction site visits and drawings. Relevant experiences highlight projects in structural analysis, energy modeling, cost estimating, and prestressed concrete design. He has LEED and Engineer-in-Training certifications and is proficient in Revit, AutoCAD, and other BIM and energy modeling software.
This document provides a list of major projects led by Kashif Dada between 2010-2014. It summarizes 10 projects from various sectors including oil and gas, engineering, and agriculture. Key details provided for each project include the client, location, timelines, and how Mr. Dada successfully completed projects on time and under budget by expediting engineering, coordinating construction, and assisting with design.
Avik Sen is seeking new challenging assignments as an Assistant Engineer with over 3 years of experience in construction. He currently works for McNally Bharat Engineering Company Limited, where he has executed and monitored civil field works, prepared client invoices and measurement sheets, and generated progress reports. Some of his responsibilities have included coordinating with site managers, monitoring project progress and cash flow, and understanding contracts to work in ERP and MS Project systems. He holds a Diploma in Civil Engineering and has worked on projects like the civil, structural and architectural works for a 250 MW thermal power plant worth Rs. 243 crores in Bihar.
Snyder's Lance hired SmartWatt to implement energy efficiency improvements at its 30,000 square foot food processing plant in Hyannis, Massachusetts. The $203,000 project included retro-commissioning existing HVAC equipment and controls, adding roof top units, and providing on-site training to plant associates on operating the new systems optimally. The upgrades are expected to save 151,068 kWh and 63,037 therms annually, reducing energy costs by $77,510 per year.
BIFM Event: Intelligent Big Data in Building Facilities & ServicesIES VE
Mark Gifford, Consultancy Development Manager at IES, presented on the application and status of Intelligent Big Data in the fields of building facilities and services at the BIFM Scotland Region half day training event.
Kevin focuses on sustainable design, energy optimization and building physics for laboratory, educational, commercial and healthcare projects. He has participated in large-scale and complex projects across Canada, the United States, the UAE and China. Kevin is a principal at B+H Architects; and situated in their Shanghai office. He studied architecture at the University of Waterloo and studied Building Science at the University of Toronto. He is a licensed architect, Building Science Specialist of Ontario (BSSO) and a LEED accredited professional. He served on the CaGBC Energy & Engineering Technical Advisory Group and on the UN Sustainable Buildings & Climate Initiative Task Force.
In this talk Kevin talks about Chinese and Canadian Sustainable Design Practices compared through optimized HVAC.
This document provides a case study of the building services systems at the Pertubuhan Akitek Malaysia Centre (PAM Centre) in Kuala Lumpur, Malaysia. It includes an analysis of the centre's active and passive fire protection systems, mechanical ventilation systems, air conditioning systems, mechanical transportation systems, and mechanical parking systems. The study involved literature reviews, a site visit, data collection, and reporting to analyze how the building's services comply with regulations and were designed considering sustainability. The PAM Centre achieved platinum certification from the Green Building Index due to its passive design strategies and emphasis on natural ventilation.
DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2GreenData.IO
Microsoft Project Server was implemented by an oil company to improve scheduling of drilling rigs and frac cores for safety and productivity. The old manual scheduling process limited efficiency and the ability to ensure safe distances between activities given the large number involved. The solution involved scheduling all activities in Project Professional and Project Server, transforming rig performance data, enabling replanning and reporting in Project Server. This allowed early identification of unsafe placements, maintaining production with fewer resources and costs through increased efficiency.
Richard J. Larrabee has over 40 years of experience in building maintenance and engineering. He has held roles such as Chief Engineer and Maintenance Superintendent for properties ranging from 50 unit apartment complexes to 800,000 square foot lab buildings. His experience includes managing HVAC, electrical, and other building systems, as well as supervising staff, implementing maintenance programs, and completing capital projects. He has extensive training in areas such as HVAC, building codes, asbestos handling, and construction.
Creative Install for Data Center - Charlotte, North CarolinaMcKenney's Inc
A major telecommunications company needed a new 175,000 square foot data facility completed in less than a year. McKenney's was responsible for the aggressive project schedule and tight deadline. They used BIM to prefabricate 80-90% of the mechanical piping off-site to save time and money. Custom pipe dollies were also fabricated to move the prefabricated pipes easily. Through these efforts, McKenney's completed the project on schedule and on budget and was hired for future expansions.
Renovation Project at Chick-fil-A’s Corporate Campus in College ParkMcKenney's Inc
McKenney's construction team renovated a 77,000 square foot parking deck warehouse at Chick-fil-A's corporate campus into office and computer lab space. They maintained the industrial aesthetic while coordinating installation with aesthetics. McKenney's engineering and automation teams provided value engineering options to achieve the design within budget. Through 3D modeling, field experience, and coordination, McKenney's delivered the HVAC and plumbing systems on time and under budget, seamlessly integrating them with the architectural design.
Thinking, Delivering On-the-fly - Data Center Mechanical InstallationMcKenney's Inc
The McKenney's team was tasked with installing piping, plumbing and HVAC systems for a new data center in Kings Mountain, North Carolina on a tight schedule. They developed a plan to prefabricate and stage pipe off-site and rig the pipe into a deep trench below the building. Additionally, they coordinated the Building Information Modeling remotely from their Charlotte office near the project site. The owner was impressed with McKenney's ability to complete the project on schedule and on budget through their piping prefabrication and coordination efforts.
This document discusses how building information modeling (BIM) can help building owners save time and money over the lifetime of a building project. It provides examples of how BIM has helped reduce costs in the design, construction, and management phases through tools like early energy analysis, pre-fabrication, and facilities management. The document also cites data showing that BIM adoption is increasing for owners and can provide returns on investment as high as 500%.
This document discusses how building information modeling (BIM) can help building owners save time and money over the entire building lifecycle. It provides examples of how BIM has helped reduce costs in design, construction, and facility management. Specifically, BIM allows for improved coordination and pre-fabrication, which can reduce errors and rework. It also enables analysis and optimization during operations. The document argues adoption of BIM by owners is increasing due to its potential for significant returns on investment.
This document discusses how building information modeling (BIM) can help building owners save time and money over the lifetime of a building project. It provides examples of how BIM has helped reduce costs in the design, construction, and management phases through tools like early energy analysis, pre-fabrication, and facilities management. The document also notes that BIM adoption by owners is increasing due to its potential for significant returns on investment.
Building information modeling (BIM) can help building owners save time and money over the building lifecycle. BIM uses 3D models and shared data to improve design coordination, reduce construction errors and costs, and optimize building operations. Studies show BIM can reduce construction costs by up to 30% and project durations by up to 36% for owners through improved planning, prefabrication and reduced conflicts. BIM also enables owners to better manage facilities and reduce lifetime energy and maintenance costs through data-driven analytics of the building model.
Tailored design, team approach achieved at Chick-fil-A officesMcKenney's Inc
McKenney's was contracted to renovate a 77,000 square foot warehouse space into offices for Chick-fil-A's corporate campus. McKenney's coordinated with the architect and engineer using BIM modeling to transform the space while staying within budget. Their experienced team planned and installed HVAC and plumbing systems seamlessly with the architectural design. The project was completed on time and under budget, showcasing McKenney's workmanship.
McKenney’s installed a highly complex HVAC system at the Riverside EpiCenter multipurpose venue—a facility designed to serve its members and the community.
Ron wilkinson cx for new and exist bldgsEllieNowels
The document provides definitions and explanations of commissioning from various industry sources such as ASHRAE and USGBC. It discusses how commissioning verifies that building systems are planned, designed, installed, tested, operated and maintained according to the owner's requirements. It also explains how commissioning improves building quality, reduces callbacks and operating costs, provides better documentation, improves occupant productivity and verifies system performance. Commissioning is described as a collaborative, systematic process that begins in the planning phase and continues through construction and occupancy.
The Cargill Foam Application Testing Lab project involved renovating an existing 18,500 square foot facility to serve as a research and development lab for bio-based polyols foam testing. Key challenges included addressing hazardous chemical storage and emissions requirements, constructing support structures for large carbon absorbers, and accommodating schedule changes. Through close collaboration between Cargill, the architect, and contractor, solutions such as containment pits, revised structural designs, and temporary occupancy were implemented to resolve issues and keep the project on track.
The document is a BIM execution plan for an elementary school project. It includes the project mission statement, goals for using BIM, the project schedule, roles and responsibilities of team members, software to be used, file naming conventions, and quality control processes. It discusses developing the BIM model, updating it during each phase, coordinating between disciplines, and ensuring model integrity.
Avik Sen is seeking new challenging assignments as an Assistant Engineer with over 3 years of experience in construction. He currently works for McNally Bharat Engineering Company Limited, where he has executed and monitored civil field works, prepared client invoices and measurement sheets, and generated progress reports. Some of his responsibilities have included coordinating with site managers, monitoring project progress and cash flow, and understanding contracts to work in ERP and MS Project systems. He holds a Diploma in Civil Engineering and has worked on projects like the civil, structural and architectural works for a 250 MW thermal power plant worth Rs. 243 crores in Bihar.
Snyder's Lance hired SmartWatt to implement energy efficiency improvements at its 30,000 square foot food processing plant in Hyannis, Massachusetts. The $203,000 project included retro-commissioning existing HVAC equipment and controls, adding roof top units, and providing on-site training to plant associates on operating the new systems optimally. The upgrades are expected to save 151,068 kWh and 63,037 therms annually, reducing energy costs by $77,510 per year.
BIFM Event: Intelligent Big Data in Building Facilities & ServicesIES VE
Mark Gifford, Consultancy Development Manager at IES, presented on the application and status of Intelligent Big Data in the fields of building facilities and services at the BIFM Scotland Region half day training event.
Kevin focuses on sustainable design, energy optimization and building physics for laboratory, educational, commercial and healthcare projects. He has participated in large-scale and complex projects across Canada, the United States, the UAE and China. Kevin is a principal at B+H Architects; and situated in their Shanghai office. He studied architecture at the University of Waterloo and studied Building Science at the University of Toronto. He is a licensed architect, Building Science Specialist of Ontario (BSSO) and a LEED accredited professional. He served on the CaGBC Energy & Engineering Technical Advisory Group and on the UN Sustainable Buildings & Climate Initiative Task Force.
In this talk Kevin talks about Chinese and Canadian Sustainable Design Practices compared through optimized HVAC.
This document provides a case study of the building services systems at the Pertubuhan Akitek Malaysia Centre (PAM Centre) in Kuala Lumpur, Malaysia. It includes an analysis of the centre's active and passive fire protection systems, mechanical ventilation systems, air conditioning systems, mechanical transportation systems, and mechanical parking systems. The study involved literature reviews, a site visit, data collection, and reporting to analyze how the building's services comply with regulations and were designed considering sustainability. The PAM Centre achieved platinum certification from the Green Building Index due to its passive design strategies and emphasis on natural ventilation.
DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2GreenData.IO
Microsoft Project Server was implemented by an oil company to improve scheduling of drilling rigs and frac cores for safety and productivity. The old manual scheduling process limited efficiency and the ability to ensure safe distances between activities given the large number involved. The solution involved scheduling all activities in Project Professional and Project Server, transforming rig performance data, enabling replanning and reporting in Project Server. This allowed early identification of unsafe placements, maintaining production with fewer resources and costs through increased efficiency.
Richard J. Larrabee has over 40 years of experience in building maintenance and engineering. He has held roles such as Chief Engineer and Maintenance Superintendent for properties ranging from 50 unit apartment complexes to 800,000 square foot lab buildings. His experience includes managing HVAC, electrical, and other building systems, as well as supervising staff, implementing maintenance programs, and completing capital projects. He has extensive training in areas such as HVAC, building codes, asbestos handling, and construction.
Creative Install for Data Center - Charlotte, North CarolinaMcKenney's Inc
A major telecommunications company needed a new 175,000 square foot data facility completed in less than a year. McKenney's was responsible for the aggressive project schedule and tight deadline. They used BIM to prefabricate 80-90% of the mechanical piping off-site to save time and money. Custom pipe dollies were also fabricated to move the prefabricated pipes easily. Through these efforts, McKenney's completed the project on schedule and on budget and was hired for future expansions.
Renovation Project at Chick-fil-A’s Corporate Campus in College ParkMcKenney's Inc
McKenney's construction team renovated a 77,000 square foot parking deck warehouse at Chick-fil-A's corporate campus into office and computer lab space. They maintained the industrial aesthetic while coordinating installation with aesthetics. McKenney's engineering and automation teams provided value engineering options to achieve the design within budget. Through 3D modeling, field experience, and coordination, McKenney's delivered the HVAC and plumbing systems on time and under budget, seamlessly integrating them with the architectural design.
Thinking, Delivering On-the-fly - Data Center Mechanical InstallationMcKenney's Inc
The McKenney's team was tasked with installing piping, plumbing and HVAC systems for a new data center in Kings Mountain, North Carolina on a tight schedule. They developed a plan to prefabricate and stage pipe off-site and rig the pipe into a deep trench below the building. Additionally, they coordinated the Building Information Modeling remotely from their Charlotte office near the project site. The owner was impressed with McKenney's ability to complete the project on schedule and on budget through their piping prefabrication and coordination efforts.
This document discusses how building information modeling (BIM) can help building owners save time and money over the lifetime of a building project. It provides examples of how BIM has helped reduce costs in the design, construction, and management phases through tools like early energy analysis, pre-fabrication, and facilities management. The document also cites data showing that BIM adoption is increasing for owners and can provide returns on investment as high as 500%.
This document discusses how building information modeling (BIM) can help building owners save time and money over the entire building lifecycle. It provides examples of how BIM has helped reduce costs in design, construction, and facility management. Specifically, BIM allows for improved coordination and pre-fabrication, which can reduce errors and rework. It also enables analysis and optimization during operations. The document argues adoption of BIM by owners is increasing due to its potential for significant returns on investment.
This document discusses how building information modeling (BIM) can help building owners save time and money over the lifetime of a building project. It provides examples of how BIM has helped reduce costs in the design, construction, and management phases through tools like early energy analysis, pre-fabrication, and facilities management. The document also notes that BIM adoption by owners is increasing due to its potential for significant returns on investment.
Building information modeling (BIM) can help building owners save time and money over the building lifecycle. BIM uses 3D models and shared data to improve design coordination, reduce construction errors and costs, and optimize building operations. Studies show BIM can reduce construction costs by up to 30% and project durations by up to 36% for owners through improved planning, prefabrication and reduced conflicts. BIM also enables owners to better manage facilities and reduce lifetime energy and maintenance costs through data-driven analytics of the building model.
Tailored design, team approach achieved at Chick-fil-A officesMcKenney's Inc
McKenney's was contracted to renovate a 77,000 square foot warehouse space into offices for Chick-fil-A's corporate campus. McKenney's coordinated with the architect and engineer using BIM modeling to transform the space while staying within budget. Their experienced team planned and installed HVAC and plumbing systems seamlessly with the architectural design. The project was completed on time and under budget, showcasing McKenney's workmanship.
McKenney’s installed a highly complex HVAC system at the Riverside EpiCenter multipurpose venue—a facility designed to serve its members and the community.
Ron wilkinson cx for new and exist bldgsEllieNowels
The document provides definitions and explanations of commissioning from various industry sources such as ASHRAE and USGBC. It discusses how commissioning verifies that building systems are planned, designed, installed, tested, operated and maintained according to the owner's requirements. It also explains how commissioning improves building quality, reduces callbacks and operating costs, provides better documentation, improves occupant productivity and verifies system performance. Commissioning is described as a collaborative, systematic process that begins in the planning phase and continues through construction and occupancy.
The Cargill Foam Application Testing Lab project involved renovating an existing 18,500 square foot facility to serve as a research and development lab for bio-based polyols foam testing. Key challenges included addressing hazardous chemical storage and emissions requirements, constructing support structures for large carbon absorbers, and accommodating schedule changes. Through close collaboration between Cargill, the architect, and contractor, solutions such as containment pits, revised structural designs, and temporary occupancy were implemented to resolve issues and keep the project on track.
The document is a BIM execution plan for an elementary school project. It includes the project mission statement, goals for using BIM, the project schedule, roles and responsibilities of team members, software to be used, file naming conventions, and quality control processes. It discusses developing the BIM model, updating it during each phase, coordinating between disciplines, and ensuring model integrity.
Resume of Spence stockbridge mechanical engineering professionalsstockbridge
Spence Stockbridge is an engineering manager with over 25 years of experience leading teams and improving engineering processes. He has a proven track record of increasing productivity, reducing costs, and improving quality. Through process improvements such as implementing new software and standardizing designs, he increased productivity by 22% and reduced engineering costs by 36% at one company. At another company, he developed an engineering solution that reduced development time by 95% and increased capacity by 25%, generating $9 million in additional revenue. Stockbridge has expertise in engineering management, automation, knowledge engineering, coaching teams, and mechanical design fields including plastics and metals. He holds an Associate of Science degree in Engineering and various technical certificates.
BIM Projects provides building information modeling (BIM) services using Autodesk Revit. They have experience delivering BIM solutions for construction projects and facilities management. Their services include BIM planning, implementation, modeling, coordination, training, and technical support. Some of their major projects include the Al Jahra Court Complex in Kuwait, the Al Andulus Schools Complex in Qatar, the New Assiut Barrage in Egypt, and the Al Haditha City housing development in Saudi Arabia.
This document summarizes a construction project completed by McCarthy for Sigma-Aldrich Corporation. McCarthy renovated cold rooms and replaced boilers within an operating plant on time and under budget through self-performance, daily issue meetings, and a quality and safety plan that resulted in zero injuries over 40,000 man hours of work. The client was pleased with McCarthy's professional services and performance exceeding their expectations.
CRAC Units Installation for a Data Center Project in Alpharetta, GAMcKenney's Inc
McKenney’s installed very complex, industry-leading computer room air conditioning (CRAC) units at a new data center under construction in Alpharetta, Georgia.
Mission Critical Data Center Retrofit Project - Catawaba County, NCMcKenney's Inc
The McKenney's team replaced scrubbers for generators at a large data center campus to comply with new emission standards. They devised an assembly line approach to quickly lift and move each generator enclosure to install the new scrubbers and piping, finishing the retrofit in 7 months instead of the planned 11 months to minimize downtime for the facility with only N+1 redundancy. Working closely with the customer and crane contractor, the coordinated team was able to keep the backup generators operational throughout the project.
Blowing the Lid Off City Hall - Energy Savings Performance ContractingMcKenney's Inc
McKenney's developed energy conservation measures and overhauled the HVAC system of a landmark municipal building. They replaced hard-to-access air handling units and chillers after hours to ensure no disruptions. Over 30 ECMs were developed and the customer selected projects providing the best ROI. Replacements were done safely, on schedule and budget and the ECMs are beginning to pay for themselves through utility savings.
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)McKenney's Inc
A zero-energy building (ZEB) produces enough renewable energy to meet its own annual energy consumption requirements by using all cost-effective measures to reduce energy usage through energy efficiency. Learn more at http://blog.mckenneys.com/2018/06/reducing-building-energy-consumption-in-zero-energy-buildings-zeb/
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectMcKenney's Inc
Through an energy savings performance contract, McKenney’s Building Performance Solutions provided a turnkey solution to an aging, inefficient heating system at a large maximum security prison in Georgia.
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney's Inc
McKenney’s, Inc. Critical Systems offers a comprehensive approach for constructing or renovating high-quality mechanical systems for data centers and operations centers that meet the most exacting demands and schedules.
Efficient Solutions for Rainwater and Condensate HarvestingMcKenney's Inc
McKenney’s is the right choice for reliable, well-designed rainwater and condensate harvesting systems because they bring a powerful combination of experience, commitment and innovation.
Plumbing Preventive Maintenance in Commercial BuildingsMcKenney's Inc
Protect your investment and consider a plumbing preventive maintenance program for your facility. Check out our plumbing services page for more information at http://plumbing.mckenneys.com/
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney's Inc
McKenney’s Interiors & Special Projects (ISP) team responds quickly to a wide range of mechanical needs, including interior renovations, infrastructure repairs, replacements and retrocommissioning projects.
Creating a Showstopper in Charlotte - Mechanical Systems InstallationMcKenney's Inc
McKenney's installed mechanical systems at a high-rise office building in downtown Charlotte that faced a tight schedule for completion. Extensive planning and coordination allowed McKenney's to sequence the work and overcome equipment issues to finish installation on time, allowing the owners to lease spaces as scheduled. The project team worked creatively within the compressed timeline for startup and commissioning of key mechanical equipment.
McKenney’s is building a wide range of energy-efficient mechanical systems using green practices for the 325,000-square-foot medical center in Braselton, Georgia.
A High Rise Game Changer - Mixed-Use ConstructionMcKenney's Inc
The McKenney’s team installed plumbing and HVAC systems for a new 10-story, mixed-use office and retail tower at a high-profile destination in Atlanta, Georgia.
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Final ank Satta Matka Dpbos Final ank Satta Matta Matka 143 Kalyan Matka Guessing Final Matka Final ank Today Matka 420 Satta Batta Satta 143 Kalyan Chart Main Bazar Chart vip Matka Guessing Dpboss 143 Guessing Kalyan night
Best practices for project execution and deliveryCLIVE MINCHIN
A select set of project management best practices to keep your project on-track, on-cost and aligned to scope. Many firms have don't have the necessary skills, diligence, methods and oversight of their projects; this leads to slippage, higher costs and longer timeframes. Often firms have a history of projects that simply failed to move the needle. These best practices will help your firm avoid these pitfalls but they require fortitude to apply.
Call8328958814 satta matka Kalyan result satta guessing➑➌➋➑➒➎➑➑➊➍
Satta Matka Kalyan Main Mumbai Fastest Results
Satta Matka ❋ Sattamatka ❋ New Mumbai Ratan Satta Matka ❋ Fast Matka ❋ Milan Market ❋ Kalyan Matka Results ❋ Satta Game ❋ Matka Game ❋ Satta Matka ❋ Kalyan Satta Matka ❋ Mumbai Main ❋ Online Matka Results ❋ Satta Matka Tips ❋ Milan Chart ❋ Satta Matka Boss❋ New Star Day ❋ Satta King ❋ Live Satta Matka Results ❋ Satta Matka Company ❋ Indian Matka ❋ Satta Matka 143❋ Kalyan Night Matka..
At Techbox Square, in Singapore, we're not just creative web designers and developers, we're the driving force behind your brand identity. Contact us today.
[To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
This PowerPoint compilation offers a comprehensive overview of 20 leading innovation management frameworks and methodologies, selected for their broad applicability across various industries and organizational contexts. These frameworks are valuable resources for a wide range of users, including business professionals, educators, and consultants.
Each framework is presented with visually engaging diagrams and templates, ensuring the content is both informative and appealing. While this compilation is thorough, please note that the slides are intended as supplementary resources and may not be sufficient for standalone instructional purposes.
This compilation is ideal for anyone looking to enhance their understanding of innovation management and drive meaningful change within their organization. Whether you aim to improve product development processes, enhance customer experiences, or drive digital transformation, these frameworks offer valuable insights and tools to help you achieve your goals.
INCLUDED FRAMEWORKS/MODELS:
1. Stanford’s Design Thinking
2. IDEO’s Human-Centered Design
3. Strategyzer’s Business Model Innovation
4. Lean Startup Methodology
5. Agile Innovation Framework
6. Doblin’s Ten Types of Innovation
7. McKinsey’s Three Horizons of Growth
8. Customer Journey Map
9. Christensen’s Disruptive Innovation Theory
10. Blue Ocean Strategy
11. Strategyn’s Jobs-To-Be-Done (JTBD) Framework with Job Map
12. Design Sprint Framework
13. The Double Diamond
14. Lean Six Sigma DMAIC
15. TRIZ Problem-Solving Framework
16. Edward de Bono’s Six Thinking Hats
17. Stage-Gate Model
18. Toyota’s Six Steps of Kaizen
19. Microsoft’s Digital Transformation Framework
20. Design for Six Sigma (DFSS)
To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations
Easily Verify Compliance and Security with Binance KYCAny kyc Account
Use our simple KYC verification guide to make sure your Binance account is safe and compliant. Discover the fundamentals, appreciate the significance of KYC, and trade on one of the biggest cryptocurrency exchanges with confidence.
Discover timeless style with the 2022 Vintage Roman Numerals Men's Ring. Crafted from premium stainless steel, this 6mm wide ring embodies elegance and durability. Perfect as a gift, it seamlessly blends classic Roman numeral detailing with modern sophistication, making it an ideal accessory for any occasion.
https://rb.gy/usj1a2
How to Implement a Strategy: Transform Your Strategy with BSC Designer's Comp...Aleksey Savkin
The Strategy Implementation System offers a structured approach to translating stakeholder needs into actionable strategies using high-level and low-level scorecards. It involves stakeholder analysis, strategy decomposition, adoption of strategic frameworks like Balanced Scorecard or OKR, and alignment of goals, initiatives, and KPIs.
Key Components:
- Stakeholder Analysis
- Strategy Decomposition
- Adoption of Business Frameworks
- Goal Setting
- Initiatives and Action Plans
- KPIs and Performance Metrics
- Learning and Adaptation
- Alignment and Cascading of Scorecards
Benefits:
- Systematic strategy formulation and execution.
- Framework flexibility and automation.
- Enhanced alignment and strategic focus across the organization.
Industrial Tech SW: Category Renewal and CreationChristian Dahlen
Every industrial revolution has created a new set of categories and a new set of players.
Multiple new technologies have emerged, but Samsara and C3.ai are only two companies which have gone public so far.
Manufacturing startups constitute the largest pipeline share of unicorns and IPO candidates in the SF Bay Area, and software startups dominate in Germany.
[To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
This presentation is a curated compilation of PowerPoint diagrams and templates designed to illustrate 20 different digital transformation frameworks and models. These frameworks are based on recent industry trends and best practices, ensuring that the content remains relevant and up-to-date.
Key highlights include Microsoft's Digital Transformation Framework, which focuses on driving innovation and efficiency, and McKinsey's Ten Guiding Principles, which provide strategic insights for successful digital transformation. Additionally, Forrester's framework emphasizes enhancing customer experiences and modernizing IT infrastructure, while IDC's MaturityScape helps assess and develop organizational digital maturity. MIT's framework explores cutting-edge strategies for achieving digital success.
These materials are perfect for enhancing your business or classroom presentations, offering visual aids to supplement your insights. Please note that while comprehensive, these slides are intended as supplementary resources and may not be complete for standalone instructional purposes.
Frameworks/Models included:
Microsoft’s Digital Transformation Framework
McKinsey’s Ten Guiding Principles of Digital Transformation
Forrester’s Digital Transformation Framework
IDC’s Digital Transformation MaturityScape
MIT’s Digital Transformation Framework
Gartner’s Digital Transformation Framework
Accenture’s Digital Strategy & Enterprise Frameworks
Deloitte’s Digital Industrial Transformation Framework
Capgemini’s Digital Transformation Framework
PwC’s Digital Transformation Framework
Cisco’s Digital Transformation Framework
Cognizant’s Digital Transformation Framework
DXC Technology’s Digital Transformation Framework
The BCG Strategy Palette
McKinsey’s Digital Transformation Framework
Digital Transformation Compass
Four Levels of Digital Maturity
Design Thinking Framework
Business Model Canvas
Customer Journey Map
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Tastemy Pandit
Know what your zodiac sign says about your taste in food! Explore how the 12 zodiac signs influence your culinary preferences with insights from MyPandit. Dive into astrology and flavors!
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...Neil Horowitz
On episode 272 of the Digital and Social Media Sports Podcast, Neil chatted with Brian Fitzsimmons, Director of Licensing and Business Development for Barstool Sports.
What follows is a collection of snippets from the podcast. To hear the full interview and more, check out the podcast on all podcast platforms and at www.dsmsports.net
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesHolger Mueller
Holger Mueller of Constellation Research shares his key takeaways from SAP's Sapphire confernece, held in Orlando, June 3rd till 5th 2024, in the Orange Convention Center.
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...APCO
The Radar reflects input from APCO’s teams located around the world. It distils a host of interconnected events and trends into insights to inform operational and strategic decisions. Issues covered in this edition include:
Building Your Employer Brand with Social MediaLuanWise
Presented at The Global HR Summit, 6th June 2024
In this keynote, Luan Wise will provide invaluable insights to elevate your employer brand on social media platforms including LinkedIn, Facebook, Instagram, X (formerly Twitter) and TikTok. You'll learn how compelling content can authentically showcase your company culture, values, and employee experiences to support your talent acquisition and retention objectives. Additionally, you'll understand the power of employee advocacy to amplify reach and engagement – helping to position your organization as an employer of choice in today's competitive talent landscape.
2. Every minute mattered for the McKenney’s team as they worked to
design, build, test and guarantee 24/7 operation of a 30,000-square-
foot central utility plant for one of the world’s largest manufacturers of
carbon fibers. This large complex project, located on 600 acres in
Moore, South Carolina had a tight 18-month completion schedule in
order to support the owner’s production schedule.
3. As prime contractor, McKenney’s leveraged in-house design, building
information modeling (BIM) and prefabrication capabilities to develop
a turnkey solution that met the requirements of this fast paced, multi-
faceted project.
The scope for the McKenney’s team included site work, plant facility
construction, hardscape and landscape, HVAC, plumbing, process
piping, and plant-wide controls. The completed plant supplies: 85,000
pounds per hour high-pressure steam, 280 GPM reverse osmosis water,
1750 GPM process condenser water, 2250 GPM process chilled water
and 5600 SCFM compressed air to the new state of the art
manufacturing facility.
4. The team completed the detailed system design in 3D space and also
assisted with the design of the automated process control and
metering system. This automation system allows plant operators to
continuously monitor and control the energy delivery of all five utilities
—all in real time.
The team partnered with well-established general contractor Brasfield
& Gorrie to build the 30,000- square-foot facility that would house the
required process equipment.
However, due to the density of piping required and the tight timeline,
there was only one path to success. The McKenney’s team leveraged
in-house virtual construction (VC) resources to construct BIM models
and prefabricate nearly 100 percent of the plant piping which allowed
the systems to be constructed concurrently with the construction of
the plant, saving significant time and labor on the jobsite.
5. Prefabrication of the piping including over 50,000 diameter inches of
welds in five different metal alloys was done at the pipe shop on the
Atlanta campus. The attention to design, quality and pipe shop
efficiency allowed the team to build the plant in 3D space and then ship
it to the jobsite in South Carolina just in time for installation.
By leveraging “in-house” BIM, prefabrication and turnkey project
management, the team was able to turn over a sophisticated, fully
operational CUP with automated controls— on time and on budget.
The content of this document is not intended as an endorsement.
6. `
Build a central utility plant (CUP)
from the ground up in 18 months
while managing complexities
with scope and subcontractors
The Challenge
Complete the detailed mechanical
design and assist in the design of
automated controls for complete
process control and metering
Acted as prime contractor and
partnered with a well-established
GC for building construction
The Solution
Applied virtual construction
processes to create accurate
BIM models
Specializations
Building Information Modeling
(BIM)
Design/Assist
Pipe Shop Prefab
The Results
Completed project on time
and on budget
Delivered a sophisticated CUP
with automated controls
Leveraged BIM to prefabricate
nearly all piping in the Atlanta
pipe shop
Shipped fabricated piping to CUP
in South Carolina just in time
7. 1056 Moreland Industrial Boulevard
Atlanta, GA 30316
P: 404-622-5000
sales@mckenneys.com
www.mckenneys.com
3601 Performance Road
Charlotte, North Carolina 28214
P: 704-357-1200
Atlanta Office:
Charlotte Office: