This document provides an update on the Crosstown LRT project including:
1) Work is underway on utility relocations and road improvements between Pharmacy Ave and Rosemount Ave. Tree removals and temporary traffic signals are also being installed.
2) Plans for Kennedy Station include a main entrance and secondary entrance with connections to subway, GO Transit and UP Express. Construction will use the cut and cover method.
3) In 2018, work will include utility relocations, demolition of the existing TTC north entrance, road widening and support of excavation activities at Kennedy Station. The bus loop and platforms will be relocated during construction.
Station Design Update Meeting: East Open HouseCrosstown TO
This consultation will cover preliminary station and stop designs from Laird Drive to Wynford Drive, as well as information on the future construction of a tunnel boring machine launch shaft that will be located east of Brentcliffe Road. - See more at: http://thecrosstown.ca/news-media/whats-new/station-design-update-meeting-east-open-house#sthash.EPZLP0rl.dpuf
The following construction update for Pharmacy to Kennedy stations has been updated as recently as November 30, 2021. You can view the presentation here:
Station Design Update Meeting: East Open HouseCrosstown TO
This consultation will cover preliminary station and stop designs from Laird Drive to Wynford Drive, as well as information on the future construction of a tunnel boring machine launch shaft that will be located east of Brentcliffe Road. - See more at: http://thecrosstown.ca/news-media/whats-new/station-design-update-meeting-east-open-house#sthash.EPZLP0rl.dpuf
The following construction update for Pharmacy to Kennedy stations has been updated as recently as November 30, 2021. You can view the presentation here:
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCrosstown TO
This is a meeting invite for the Brentcliffe-Victoria Park CLC (Construction Liaison Committee) Monthly Meeting, covering the Brentcliffe Portal, Sunnybrook Park, Science Centre, Aga Khan, Wynford, Sloane and O’ Connor Stops.
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCrosstown TO
Construction updates for the following locations/stops: Brentcliffe Portal, Sunnybrook Park, Science Centre, Aga Khan Park & Museum, Wynford, Sloane and O'Connor.
A process server is a authorized person for delivering legal documents, such as summons, complaints, subpoenas, and other court papers, to peoples involved in legal proceedings.
This session provides a comprehensive overview of the latest updates to the Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (commonly known as the Uniform Guidance) outlined in the 2 CFR 200.
With a focus on the 2024 revisions issued by the Office of Management and Budget (OMB), participants will gain insight into the key changes affecting federal grant recipients. The session will delve into critical regulatory updates, providing attendees with the knowledge and tools necessary to navigate and comply with the evolving landscape of federal grant management.
Learning Objectives:
- Understand the rationale behind the 2024 updates to the Uniform Guidance outlined in 2 CFR 200, and their implications for federal grant recipients.
- Identify the key changes and revisions introduced by the Office of Management and Budget (OMB) in the 2024 edition of 2 CFR 200.
- Gain proficiency in applying the updated regulations to ensure compliance with federal grant requirements and avoid potential audit findings.
- Develop strategies for effectively implementing the new guidelines within the grant management processes of their respective organizations, fostering efficiency and accountability in federal grant administration.
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
What is the point of small housing associations.pptxPaul Smith
Given the small scale of housing associations and their relative high cost per home what is the point of them and how do we justify their continued existance
ZGB - The Role of Generative AI in Government transformation.pdfSaeed Al Dhaheri
This keynote was presented during the the 7th edition of the UAE Hackathon 2024. It highlights the role of AI and Generative AI in addressing government transformation to achieve zero government bureaucracy
Canadian Immigration Tracker March 2024 - Key SlidesAndrew Griffith
Highlights
Permanent Residents decrease along with percentage of TR2PR decline to 52 percent of all Permanent Residents.
March asylum claim data not issued as of May 27 (unusually late). Irregular arrivals remain very small.
Study permit applications experiencing sharp decrease as a result of announced caps over 50 percent compared to February.
Citizenship numbers remain stable.
Slide 3 has the overall numbers and change.
Russian anarchist and anti-war movement in the third year of full-scale warAntti Rautiainen
Anarchist group ANA Regensburg hosted my online-presentation on 16th of May 2024, in which I discussed tactics of anti-war activism in Russia, and reasons why the anti-war movement has not been able to make an impact to change the course of events yet. Cases of anarchists repressed for anti-war activities are presented, as well as strategies of support for political prisoners, and modest successes in supporting their struggles.
Thumbnail picture is by MediaZona, you may read their report on anti-war arson attacks in Russia here: https://en.zona.media/article/2022/10/13/burn-map
Links:
Autonomous Action
http://Avtonom.org
Anarchist Black Cross Moscow
http://Avtonom.org/abc
Solidarity Zone
https://t.me/solidarity_zone
Memorial
https://memopzk.org/, https://t.me/pzk_memorial
OVD-Info
https://en.ovdinfo.org/antiwar-ovd-info-guide
RosUznik
https://rosuznik.org/
Uznik Online
http://uznikonline.tilda.ws/
Russian Reader
https://therussianreader.com/
ABC Irkutsk
https://abc38.noblogs.org/
Send mail to prisoners from abroad:
http://Prisonmail.online
YouTube: https://youtu.be/c5nSOdU48O8
Spotify: https://podcasters.spotify.com/pod/show/libertarianlifecoach/episodes/Russian-anarchist-and-anti-war-movement-in-the-third-year-of-full-scale-war-e2k8ai4
Understanding the Challenges of Street ChildrenSERUDS INDIA
By raising awareness, providing support, advocating for change, and offering assistance to children in need, individuals can play a crucial role in improving the lives of street children and helping them realize their full potential
Donate Us
https://serudsindia.org/how-individuals-can-support-street-children-in-india/
#donatefororphan, #donateforhomelesschildren, #childeducation, #ngochildeducation, #donateforeducation, #donationforchildeducation, #sponsorforpoorchild, #sponsororphanage #sponsororphanchild, #donation, #education, #charity, #educationforchild, #seruds, #kurnool, #joyhome
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
Up the Ratios Bylaws - a Comprehensive Process of Our Organizationuptheratios
Up the Ratios is a non-profit organization dedicated to bridging the gap in STEM education for underprivileged students by providing free, high-quality learning opportunities in robotics and other STEM fields. Our mission is to empower the next generation of innovators, thinkers, and problem-solvers by offering a range of educational programs that foster curiosity, creativity, and critical thinking.
At Up the Ratios, we believe that every student, regardless of their socio-economic background, should have access to the tools and knowledge needed to succeed in today's technology-driven world. To achieve this, we host a variety of free classes, workshops, summer camps, and live lectures tailored to students from underserved communities. Our programs are designed to be engaging and hands-on, allowing students to explore the exciting world of robotics and STEM through practical, real-world applications.
Our free classes cover fundamental concepts in robotics, coding, and engineering, providing students with a strong foundation in these critical areas. Through our interactive workshops, students can dive deeper into specific topics, working on projects that challenge them to apply what they've learned and think creatively. Our summer camps offer an immersive experience where students can collaborate on larger projects, develop their teamwork skills, and gain confidence in their abilities.
In addition to our local programs, Up the Ratios is committed to making a global impact. We take donations of new and gently used robotics parts, which we then distribute to students and educational institutions in other countries. These donations help ensure that young learners worldwide have the resources they need to explore and excel in STEM fields. By supporting education in this way, we aim to nurture a global community of future leaders and innovators.
Our live lectures feature guest speakers from various STEM disciplines, including engineers, scientists, and industry professionals who share their knowledge and experiences with our students. These lectures provide valuable insights into potential career paths and inspire students to pursue their passions in STEM.
Up the Ratios relies on the generosity of donors and volunteers to continue our work. Contributions of time, expertise, and financial support are crucial to sustaining our programs and expanding our reach. Whether you're an individual passionate about education, a professional in the STEM field, or a company looking to give back to the community, there are many ways to get involved and make a difference.
We are proud of the positive impact we've had on the lives of countless students, many of whom have gone on to pursue higher education and careers in STEM. By providing these young minds with the tools and opportunities they need to succeed, we are not only changing their futures but also contributing to the advancement of technology and innovation on a broader scale.
3. 3
What Are We Building
• 15 underground stations and 10 surface stops – 9 km below ground and 10 km
above ground
• A maintenance and storage facility
• A 19-kilometre route separated from regular traffic
• Transit communications system
• Links to 54 bus routes, three subway stations, GO Transit, and a new UP Express
station
4. 4
East At-Grade (Pharmacy to Rosemount) Update
• Median Removals mid-block complete between Pharmacy and DVP;
Intersection work underway.
• Preparatory works continue
– Tree Protection and Removals
• Utility Relocations continue; Planned Hydro Outages complete.
• Installation of Temporary Signals underway.
• Well decommissioning scheduled to start.
• Removal of street furniture across Eglinton Ave. E. will continue on
an as-need basis.
6. 6
How we’re building: Interchange Stations
• Eglinton, Cedarvale &
Kennedy are “Interchange
Stations”
• Interchange stations
connect to the subway, and
at Kennedy Station with GO
Transit, allowing riders to
seamlessly transfer
between systems
• Interchange stations will be
built using the Cut and
Cover method.
Kennedy Station
7. 7
2018
Closure of Pedestrian Tunnel from North Entrance complete
• Dry utility relocations (Telecommunications)
• Toronto Hydro relocations
• Wet utility relocations (Water, Sanitary Sewer, Storm Sewer)
• Road works around TTC’s Kennedy Station
• Demolition of Existing TTC North Entrance
• Eglinton Ave road widening
• Start of support of excavation activities
Additional Notes
• Nearby residents and businesses can expect noise and vibration in the area
caused by a pile drill, crane, loaders, trucks and other construction equipment, as
well as dust from drilling activity and debris removal.
• In general, haul routes to and from the site will travel along Kennedy Road to and
from Highway 401.
What to expect in 2018: Kennedy Station
8. 8
Kennedy Station Update
• The existing bus loop and passenger platform has been relocated to the
South Parking Lot to allow for construction of the new bus loop and
platform.
• The North Entrance will be closed and demolished to make room for the
new Main Entrance. Work is scheduled to begin this winter.
• The existing passenger tunnel is closed to allow for Support of Excavation
to be installed. A new pedestrian tunnel will be constructed as part of the
new Kennedy Station infrastructure. Work is scheduled to begin this
winter.
• Wet utilities are underway.
9. 9
What to Expect in 2018
Kennedy Station Stage 2: Winter/Spring 2018
10. 10
What to Expect in 2018
Kennedy Station Stage 3: Spring/Summer 2018
11. 11
Kennedy Rd & Eglinton Ave E Intersection Set up
Stage 1A – 1D: 2018-01-02 – 2018-05-17
Wet Utilities and Civil Works
16. 16
GO Transit Improvements Update
• A new west platform
• Rebuild entire existing east platform
• Build new entrance for GO Station
• Build new south Pedestrian Underpass
17. 17
The GO platform closure is scheduled for Feb 9, 2018 until
May 2018. The closure will take place after the last train to
minimize impact to service.
Editor's Notes
These relocations will take place in order to allow for construction and excavation of the future station.