LECTURE 1
MALAYSIAN STANDARD METHODS
OF MEASUREMENT FOR CIVIL
ENGINEERING WORKS
(CESMM)
-FUNDAMENTAL PRINCIPLES-
Scope of civil engineering works
 Civil engineering is a professional engineering
discipline that deals with the construction and
design of public and private sector works such as
bridges, roads, dams and buildings.
 General civil engineers work closely with surveyors
and specialized civil engineers to fit and serve
fixed projects within their given site, community
and terrain by designing grading, drainage,
pavement, water supply, sewer service, electric and
communications supply and land (real property)
divisions.
Scope of civil engineering works
(continued)
 Construction engineers engage in the design of
structures temporary, cost estimating, planning and
scheduling, materials procurement, selection of
equipment, and cost control.
Measurement for Civil Engineering
Works
 The civil works measurement referred to a document called 'Civil
Engineering Standard Method of Measurement '(CESMM).
 Before this document is produced, the party who responsible for the
working measurement refers to the method adopted in the United
Kingdom named ‘CESMM 2nd Edition or 3rd Edition’.
 There are a large part of the measurement refer to methods used in
building works or more unfortunate, they use their own
measurement system. This led to inconsistencies in measurement
procedures. As a result, contractors have difficulty to appreciate
the tender.
 The actual measurement work must take into account the level of
complexity of work undertaken. Work measurement for any one
item of work is also closely related to the methodology and
construction activities
Malaysian Standard Method of Measurement
for Civil Engineering Works
 MALAYSIAN STANDARD METHODS
OF MEASUREMENT FOR CIVIL
ENGINEERING WORKS is to be used in
conjunction with the Conditions Of
Contract for Civil Engineering Works.
 Does not deal with the preparation of BQ
for mechanical & electrical engineering
work, building work or work which is
seldom encountered in civil engineering
contracts.
 If any such work to be included in the
contract, such work shall be measured in
accordance with their respective SMM
and shall be stated in the Preambles to
the BQ.
Development Of Civil Engineering
Codes Of Measurement
1933 – ICE provide the 1st time a standard procedure for drafting BQ for
civil engineering works – no uniformity of practice & engineers
worked up their own systems.
1953 - Revised documents named Standard Method of Measurement of
Civil Engineering Quantities
1963 – reissued with slight amendments
1968 – reissued with metric addendum
1976 – reappraisal of the civil engineering code of measurement by
consultation of the construction industry, relevant bodies &
person produced Civil Engineering Standard Method of
Measurement
Contract Documentation for Civil
Engineering
1. Conditions of contract –a written agreement intended to
be enforceable by law to bind the appointed contractor with
the employer based on an agreed conditions.
2. Contract Drawings – technical / detailed construction
drawings for measurement / costing by QS / engineers –
prepared by architect / engineers.
3. Specification / Preambles - A concise description of
materials and workmanship, standard or quality of
workmanship. It must convey the architect and engineer’s
requirements.
4. Bill of Quantities – prepared by Quantity Surveyor based
on measurement from the construction drawings / building
plans This document were itemized all the quantities for each
categories of works applied in constructing the buildings. E.g.
building works, mechanical, electrical works, civil, structural
works, infrastructure works, etc. The contractor will priced
/estimate all the works associated in completing the buildings
during pre-construction stage.
Reasons for Bills of Quantities
 All tendering contractors base their prices on the same
information & therefore tenders are strictly comparable
(even if an error exists in the Bill)
 Contractors are saved the costly exercise of each having to
take off quantities for themselves.
 Bills provide a fair basis for valuing variations and
adjustments for the final account.
 Bills may provide a convenient basis for valuation of
certificated stage payments during the contract, before the
accurate re-measurement figures are available.
 Bills provide an approximate checklist for the contractor to
order materials and other resources.
 Bills can provide data for cost analysis for use in cost
planning of future projects.
Comparison of Civil Engineering and
Building Methods of Measurement
CESMM SMM
 provides a standard format, either in
the form of items components and
how they should be measured.
 various stages of introducing CESMM
classification or space for description
of the work that can be developed.
 CESMM measurement method using
the concept of method-related charges
to present the cost of construction at
the site in more obvious, such
as covering the cost of site
preparation and building machinery
operating costs, labor force and so on.
 The details of building works are
more in precise stage at the time
preparing BQ.
 Building work covers more work
sections in consequence subject
to more detailed measurement.
Scope of measurement based on
CESMM
 Various civil engineering works including
roads, railway, bridges, artificial channels,
canals and drainage, shipyard, ports, bases,
embankments, structure-breaking waves and
drainage work.
 Apart from that it also includes projects such
as structural engineering among others, metal
work, reinforced concrete work, stone work,
wood work and brick work
Procedures and Practices of
CESMM
 Include the scope of most project management such as:
 selection types of contracts,
 documentation,
 preparation of drawings,
 specifications,
 project information,
 contract terms and list of quantities,
 preparation of list of material requirements / quantities,
 Method statement - detailed list of detailed construction
work with short explanation with quantity measured by
CESMM
 Explanation on the scope of work that will be implemented
by the contractor and then be the basis for pricing the
tender.
Purpose of CESMM
 The main purpose of the measurement
based on CESMM is for coordinating and
planning of the quantity list, to list the
details of work to ensure consistency
and systematic and to state the new
techniques of construction clearly.
FUNDAMENTAL PRINCIPLES OF CESMM
CESMM; Section 1
Definitions
 A number of definitions are contained.
 Referring to words / expression that will be
defined in the CESMM and preparation of bill of
Quantities.
 Words and expression defined in the CESMM
shall have the same meaning when defining the
words / expression in the Conditions of Contract
and the Specifications
 Please refer to CESMM-Section 1: definitions.
FUNDAMENTAL PRINCIPLES OF CESMM
CESMM; Section 2
General Principles
 In this section , it clarify the following:
 The application and extent of CESMM
 Objective of CESMM
 Objectives of the Bill of Quantities
 Malaysian Standard Method of
Measurement for Civil Engineering Works
(CESMM) to be used in conjunction with the
conditions of contract for Civil Engineering
works.
 Refer to CESMM-SECTION 2
FUNDAMENTAL PRINCIPLES OF CESMM
CESMM; Section 3
Application of the Work Classification
 Work classification divides work into 18 main
classes; Class A- Class R
 Each class comprises up to 3 division which classify
work at successive level of detail.
 First division
 Second division
 Third division
 Each division comprises a list of up to 8 descriptive
features of work.
 Each item description shall identify the component
of work covered with respect to one feature from
each division of the relevant class.
FUNDAMENTAL PRINCIPLES OF CESMM
CESMM; Section 4
Coding & Numbering of Items
 Each item in the work classification has been placed with
the code and numbering system that alphabetically and not
more than three digits.
 The letter corresponds to the class in the work
classification in which the items occurs and the digits give
the position of the item in the first, second and third
divisions of the class.
 E.g. Code F.3.1.0 identifies an item as
Class F concrete works
1st Division 3 precast concrete
2nd Division 1 beams
3rd Divison 0
 Description: F.3.1.0 - Precast concrete, in beams
FUNDAMENTAL PRINCIPLES OF CESMM
CESMM; Section 4
Coding & Numbering of Items
 Reasons:
 It gives an advantage to the tendered contractors due
to bills that have code.
 Quantity surveyor feels that they are assisted by the
code and numbering system and can be used as a brief
reference to the file system and data costs.
 Each class work contains a set of measurements,
definitions, coverage, additional rules of measurement
that expands and clarify all information and evidence.
 Every classification of work explains every units for each
item of work, within the total allocation and numbering
system for each item, the items in units of meters long, in
units of square meters of area (hectares for cleaning
site), unit volume and weight and metric units.
CESMM; SECTION 4
(Code & Numbering of Items)
Applications for Bridge Work
CESMM; SECTION 4
(Code & Numbering of Items)
Applications for Road works
FUNDAMENTAL PRINCIPLES OF CESMM
CESMM; Section 5
Preparations of the Bill of Quantities
 The preparation of BQ shall be started prior
to the completion of measurement works.
 Section of the bill of Quantities:
 Preamble
 Work items – division of the BQ into parts.
 Day work schedule
 Grand summary / tender summary
Form & Setting of BQ
FUNDAMENTAL PRINCIPLES OF CESMM
CESMM; Section 6
Completion, Pricing and Use of the BQ
 Rates and prices shall be inserted in the
rate column in Ringgit Malaysia with Sen
inserted as decimal fractions of one
Ringgit.
 Each part of the BQ shall be totaled
and the total carried to the Grand
Summary
FUNDAMENTAL PRINCIPLES OF CESMM
CESMM; Section 7
Method-Related Charges
 Meaning: the sum for an item inserted in the BQ by a
tenderer.
 Two types:
 Time-related charges – a method-related charge for
work, the cost of which is to be considered as
proportional to the length of time taken to execute the
work
 Fixed charge- a method-related charge which is not a
time related charge.
 A tenderer may insert in the BQ the method related charges
as he may decide to cover items of works relating to his
intended method of executing the works, the cost of which
are not to be considered as proportional to the quantities of
the other items and for which he has not allowed in the rates
and prices for the other items.

More Related Content

What's hot

Development of unfired bricks using industrial waste
Development of unfired bricks using industrial waste Development of unfired bricks using industrial waste
Development of unfired bricks using industrial waste Sandeep Jain
 
ROOF & WALL INSULATION
ROOF & WALL INSULATIONROOF & WALL INSULATION
ROOF & WALL INSULATIONAwais Sikandar
 
Building bye laws CIVIL ENGINEERING DRAWING
Building bye laws CIVIL ENGINEERING DRAWINGBuilding bye laws CIVIL ENGINEERING DRAWING
Building bye laws CIVIL ENGINEERING DRAWINGjay231287
 
Tension members
Tension membersTension members
Tension memberssky hawk
 
Ceramic Presentation of Building Materials
Ceramic Presentation of Building MaterialsCeramic Presentation of Building Materials
Ceramic Presentation of Building MaterialsI'mMiss Lily
 
MODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSMODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSShourya Puri
 
Non destructive testing of structures
Non destructive testing of structuresNon destructive testing of structures
Non destructive testing of structuressanjanam9
 
Lecture 3, constituents of concrete-fine aggregate
Lecture 3, constituents of concrete-fine aggregateLecture 3, constituents of concrete-fine aggregate
Lecture 3, constituents of concrete-fine aggregateDr. H.M.A. Mahzuz
 
1# introduction to Quantity Surveying
1# introduction to Quantity Surveying1# introduction to Quantity Surveying
1# introduction to Quantity SurveyingLIJI A
 
(S) Week 3 - Preliminary Works.pptx
(S) Week 3  - Preliminary Works.pptx(S) Week 3  - Preliminary Works.pptx
(S) Week 3 - Preliminary Works.pptxKIMLIANGSIM
 
Sp34 STRUCTURAL DRAWING FOR DETAILING
Sp34 STRUCTURAL DRAWING FOR DETAILINGSp34 STRUCTURAL DRAWING FOR DETAILING
Sp34 STRUCTURAL DRAWING FOR DETAILINGAnkammarao Yanam
 
IRJET- A Review on Self-Healing Concrete
IRJET- A Review on Self-Healing ConcreteIRJET- A Review on Self-Healing Concrete
IRJET- A Review on Self-Healing ConcreteIRJET Journal
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveyingAwanish Shukla
 

What's hot (20)

Development of unfired bricks using industrial waste
Development of unfired bricks using industrial waste Development of unfired bricks using industrial waste
Development of unfired bricks using industrial waste
 
ROOF & WALL INSULATION
ROOF & WALL INSULATIONROOF & WALL INSULATION
ROOF & WALL INSULATION
 
Building bye laws CIVIL ENGINEERING DRAWING
Building bye laws CIVIL ENGINEERING DRAWINGBuilding bye laws CIVIL ENGINEERING DRAWING
Building bye laws CIVIL ENGINEERING DRAWING
 
Foundry sand
Foundry sandFoundry sand
Foundry sand
 
Tiles
TilesTiles
Tiles
 
Tension members
Tension membersTension members
Tension members
 
Ceramic Presentation of Building Materials
Ceramic Presentation of Building MaterialsCeramic Presentation of Building Materials
Ceramic Presentation of Building Materials
 
MODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSMODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODS
 
elements of civil engineering Chapter 1
elements of civil engineering Chapter 1elements of civil engineering Chapter 1
elements of civil engineering Chapter 1
 
Non destructive testing of structures
Non destructive testing of structuresNon destructive testing of structures
Non destructive testing of structures
 
Lecture 3, constituents of concrete-fine aggregate
Lecture 3, constituents of concrete-fine aggregateLecture 3, constituents of concrete-fine aggregate
Lecture 3, constituents of concrete-fine aggregate
 
1# introduction to Quantity Surveying
1# introduction to Quantity Surveying1# introduction to Quantity Surveying
1# introduction to Quantity Surveying
 
Civil drawing detail
Civil drawing detailCivil drawing detail
Civil drawing detail
 
(S) Week 3 - Preliminary Works.pptx
(S) Week 3  - Preliminary Works.pptx(S) Week 3  - Preliminary Works.pptx
(S) Week 3 - Preliminary Works.pptx
 
Sp34 STRUCTURAL DRAWING FOR DETAILING
Sp34 STRUCTURAL DRAWING FOR DETAILINGSp34 STRUCTURAL DRAWING FOR DETAILING
Sp34 STRUCTURAL DRAWING FOR DETAILING
 
Rice husk ash brick
Rice husk ash brickRice husk ash brick
Rice husk ash brick
 
IRJET- A Review on Self-Healing Concrete
IRJET- A Review on Self-Healing ConcreteIRJET- A Review on Self-Healing Concrete
IRJET- A Review on Self-Healing Concrete
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
 
White cement pp
White cement ppWhite cement pp
White cement pp
 
Estimation_and_Costing.ppt
Estimation_and_Costing.pptEstimation_and_Costing.ppt
Estimation_and_Costing.ppt
 

Similar to 95123497-CESMM-Malaysia.ppt

CE6704_uw.pdf
CE6704_uw.pdfCE6704_uw.pdf
CE6704_uw.pdfhitusp
 
lecture ppt for contract administration and governing
lecture ppt for contract administration and governinglecture ppt for contract administration and governing
lecture ppt for contract administration and governing2cd
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDFIDHAMUKI
 
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...CCT International
 
Unit 1 - General Items used for building
Unit 1 - General Items used for buildingUnit 1 - General Items used for building
Unit 1 - General Items used for buildingHimani762003
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.pptBALAMURUGANR53
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.pptSOUMITRAMUDI
 
Quantity Surveying & valuation.ppt
Quantity Surveying & valuation.pptQuantity Surveying & valuation.ppt
Quantity Surveying & valuation.pptTauheedKhan45
 
Episode 30 : Project Execution ( Part 1 )
Episode 30 :  Project Execution ( Part 1 ) Episode 30 :  Project Execution ( Part 1 )
Episode 30 : Project Execution ( Part 1 ) SAJJAD KHUDHUR ABBAS
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBESahl Buhary
 
A BIM-based Detailed Electrical Load Estimation, Costing and Code Checking
A BIM-based Detailed Electrical Load Estimation, Costing and Code Checking A BIM-based Detailed Electrical Load Estimation, Costing and Code Checking
A BIM-based Detailed Electrical Load Estimation, Costing and Code Checking IJECEIAES
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - BriefKai Yun Pang
 
Introduction to estimation
Introduction to estimationIntroduction to estimation
Introduction to estimationDhavalMithaiwala
 
Unit 9 - Measurung & Estimating & Tendering Process.pdf
Unit 9 - Measurung & Estimating & Tendering Process.pdfUnit 9 - Measurung & Estimating & Tendering Process.pdf
Unit 9 - Measurung & Estimating & Tendering Process.pdfmuhammadadli28
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantitiesBt Lee
 

Similar to 95123497-CESMM-Malaysia.ppt (20)

Scope of work
Scope of workScope of work
Scope of work
 
NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014
 
CE6704_uw.pdf
CE6704_uw.pdfCE6704_uw.pdf
CE6704_uw.pdf
 
lecture ppt for contract administration and governing
lecture ppt for contract administration and governinglecture ppt for contract administration and governing
lecture ppt for contract administration and governing
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDF
 
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
 
Unit 1 - General Items used for building
Unit 1 - General Items used for buildingUnit 1 - General Items used for building
Unit 1 - General Items used for building
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.ppt
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.ppt
 
Quantity Surveying & valuation.ppt
Quantity Surveying & valuation.pptQuantity Surveying & valuation.ppt
Quantity Surveying & valuation.ppt
 
Episode 30 : Project Execution ( Part 1 )
Episode 30 :  Project Execution ( Part 1 ) Episode 30 :  Project Execution ( Part 1 )
Episode 30 : Project Execution ( Part 1 )
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBE
 
Construction Management - New Trends
Construction Management - New TrendsConstruction Management - New Trends
Construction Management - New Trends
 
Eca workshop
Eca workshopEca workshop
Eca workshop
 
Ecv
EcvEcv
Ecv
 
A BIM-based Detailed Electrical Load Estimation, Costing and Code Checking
A BIM-based Detailed Electrical Load Estimation, Costing and Code Checking A BIM-based Detailed Electrical Load Estimation, Costing and Code Checking
A BIM-based Detailed Electrical Load Estimation, Costing and Code Checking
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
 
Introduction to estimation
Introduction to estimationIntroduction to estimation
Introduction to estimation
 
Unit 9 - Measurung & Estimating & Tendering Process.pdf
Unit 9 - Measurung & Estimating & Tendering Process.pdfUnit 9 - Measurung & Estimating & Tendering Process.pdf
Unit 9 - Measurung & Estimating & Tendering Process.pdf
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantities
 

More from Mohd Zulhairi Mohd Noor

273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx
273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx
273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptxMohd Zulhairi Mohd Noor
 
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptxFUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptxMohd Zulhairi Mohd Noor
 
230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).ppt230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).pptMohd Zulhairi Mohd Noor
 
59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt
59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt
59794367-JENTERA-PEMBINAAN-JALAN-RAYA.pptMohd Zulhairi Mohd Noor
 
20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt
20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt
20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.pptMohd Zulhairi Mohd Noor
 
525412627-2-Project-Management-2018-BAIS-3-4.ppt
525412627-2-Project-Management-2018-BAIS-3-4.ppt525412627-2-Project-Management-2018-BAIS-3-4.ppt
525412627-2-Project-Management-2018-BAIS-3-4.pptMohd Zulhairi Mohd Noor
 
271710575-Lecture-14-Project-Monitoring.ppt
271710575-Lecture-14-Project-Monitoring.ppt271710575-Lecture-14-Project-Monitoring.ppt
271710575-Lecture-14-Project-Monitoring.pptMohd Zulhairi Mohd Noor
 
258681760-Asphaltic-Concrete-Mix-Design.ppt
258681760-Asphaltic-Concrete-Mix-Design.ppt258681760-Asphaltic-Concrete-Mix-Design.ppt
258681760-Asphaltic-Concrete-Mix-Design.pptMohd Zulhairi Mohd Noor
 

More from Mohd Zulhairi Mohd Noor (20)

(1)_Terminologi_Kuasa.pdf
(1)_Terminologi_Kuasa.pdf(1)_Terminologi_Kuasa.pdf
(1)_Terminologi_Kuasa.pdf
 
ASAS_KAWALAN.ppt
ASAS_KAWALAN.pptASAS_KAWALAN.ppt
ASAS_KAWALAN.ppt
 
Dental_Chair_2.doc
Dental_Chair_2.docDental_Chair_2.doc
Dental_Chair_2.doc
 
CONVENTIONS_OF_CASE_WRITING.ppt
CONVENTIONS_OF_CASE_WRITING.pptCONVENTIONS_OF_CASE_WRITING.ppt
CONVENTIONS_OF_CASE_WRITING.ppt
 
120595370-CARA-PEMBINAAN-RUMAH.pptx
120595370-CARA-PEMBINAAN-RUMAH.pptx120595370-CARA-PEMBINAAN-RUMAH.pptx
120595370-CARA-PEMBINAAN-RUMAH.pptx
 
273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx
273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx
273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx
 
All-about-Tokyo.pptx
All-about-Tokyo.pptxAll-about-Tokyo.pptx
All-about-Tokyo.pptx
 
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptxFUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
 
61973559-Unit-5-Kerja-Tanah.ppt
61973559-Unit-5-Kerja-Tanah.ppt61973559-Unit-5-Kerja-Tanah.ppt
61973559-Unit-5-Kerja-Tanah.ppt
 
230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).ppt230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).ppt
 
59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt
59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt
59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt
 
22513791-Lantai.ppt
22513791-Lantai.ppt22513791-Lantai.ppt
22513791-Lantai.ppt
 
57910334-5-MEP-Fire-Protection-rev.ppt
57910334-5-MEP-Fire-Protection-rev.ppt57910334-5-MEP-Fire-Protection-rev.ppt
57910334-5-MEP-Fire-Protection-rev.ppt
 
20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt
20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt
20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt
 
525412627-2-Project-Management-2018-BAIS-3-4.ppt
525412627-2-Project-Management-2018-BAIS-3-4.ppt525412627-2-Project-Management-2018-BAIS-3-4.ppt
525412627-2-Project-Management-2018-BAIS-3-4.ppt
 
271710575-Lecture-14-Project-Monitoring.ppt
271710575-Lecture-14-Project-Monitoring.ppt271710575-Lecture-14-Project-Monitoring.ppt
271710575-Lecture-14-Project-Monitoring.ppt
 
258681760-Asphaltic-Concrete-Mix-Design.ppt
258681760-Asphaltic-Concrete-Mix-Design.ppt258681760-Asphaltic-Concrete-Mix-Design.ppt
258681760-Asphaltic-Concrete-Mix-Design.ppt
 
372601839 boq-vrf
372601839 boq-vrf372601839 boq-vrf
372601839 boq-vrf
 
29629597 psychrometric-course
29629597 psychrometric-course29629597 psychrometric-course
29629597 psychrometric-course
 
316825480 diffuser-tech data
316825480 diffuser-tech data316825480 diffuser-tech data
316825480 diffuser-tech data
 

Recently uploaded

power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 

Recently uploaded (20)

power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 

95123497-CESMM-Malaysia.ppt

  • 1. LECTURE 1 MALAYSIAN STANDARD METHODS OF MEASUREMENT FOR CIVIL ENGINEERING WORKS (CESMM) -FUNDAMENTAL PRINCIPLES-
  • 2. Scope of civil engineering works  Civil engineering is a professional engineering discipline that deals with the construction and design of public and private sector works such as bridges, roads, dams and buildings.  General civil engineers work closely with surveyors and specialized civil engineers to fit and serve fixed projects within their given site, community and terrain by designing grading, drainage, pavement, water supply, sewer service, electric and communications supply and land (real property) divisions.
  • 3. Scope of civil engineering works (continued)  Construction engineers engage in the design of structures temporary, cost estimating, planning and scheduling, materials procurement, selection of equipment, and cost control.
  • 4. Measurement for Civil Engineering Works  The civil works measurement referred to a document called 'Civil Engineering Standard Method of Measurement '(CESMM).  Before this document is produced, the party who responsible for the working measurement refers to the method adopted in the United Kingdom named ‘CESMM 2nd Edition or 3rd Edition’.  There are a large part of the measurement refer to methods used in building works or more unfortunate, they use their own measurement system. This led to inconsistencies in measurement procedures. As a result, contractors have difficulty to appreciate the tender.  The actual measurement work must take into account the level of complexity of work undertaken. Work measurement for any one item of work is also closely related to the methodology and construction activities
  • 5. Malaysian Standard Method of Measurement for Civil Engineering Works  MALAYSIAN STANDARD METHODS OF MEASUREMENT FOR CIVIL ENGINEERING WORKS is to be used in conjunction with the Conditions Of Contract for Civil Engineering Works.  Does not deal with the preparation of BQ for mechanical & electrical engineering work, building work or work which is seldom encountered in civil engineering contracts.  If any such work to be included in the contract, such work shall be measured in accordance with their respective SMM and shall be stated in the Preambles to the BQ.
  • 6. Development Of Civil Engineering Codes Of Measurement 1933 – ICE provide the 1st time a standard procedure for drafting BQ for civil engineering works – no uniformity of practice & engineers worked up their own systems. 1953 - Revised documents named Standard Method of Measurement of Civil Engineering Quantities 1963 – reissued with slight amendments 1968 – reissued with metric addendum 1976 – reappraisal of the civil engineering code of measurement by consultation of the construction industry, relevant bodies & person produced Civil Engineering Standard Method of Measurement
  • 7. Contract Documentation for Civil Engineering 1. Conditions of contract –a written agreement intended to be enforceable by law to bind the appointed contractor with the employer based on an agreed conditions. 2. Contract Drawings – technical / detailed construction drawings for measurement / costing by QS / engineers – prepared by architect / engineers. 3. Specification / Preambles - A concise description of materials and workmanship, standard or quality of workmanship. It must convey the architect and engineer’s requirements. 4. Bill of Quantities – prepared by Quantity Surveyor based on measurement from the construction drawings / building plans This document were itemized all the quantities for each categories of works applied in constructing the buildings. E.g. building works, mechanical, electrical works, civil, structural works, infrastructure works, etc. The contractor will priced /estimate all the works associated in completing the buildings during pre-construction stage.
  • 8. Reasons for Bills of Quantities  All tendering contractors base their prices on the same information & therefore tenders are strictly comparable (even if an error exists in the Bill)  Contractors are saved the costly exercise of each having to take off quantities for themselves.  Bills provide a fair basis for valuing variations and adjustments for the final account.  Bills may provide a convenient basis for valuation of certificated stage payments during the contract, before the accurate re-measurement figures are available.  Bills provide an approximate checklist for the contractor to order materials and other resources.  Bills can provide data for cost analysis for use in cost planning of future projects.
  • 9. Comparison of Civil Engineering and Building Methods of Measurement CESMM SMM  provides a standard format, either in the form of items components and how they should be measured.  various stages of introducing CESMM classification or space for description of the work that can be developed.  CESMM measurement method using the concept of method-related charges to present the cost of construction at the site in more obvious, such as covering the cost of site preparation and building machinery operating costs, labor force and so on.  The details of building works are more in precise stage at the time preparing BQ.  Building work covers more work sections in consequence subject to more detailed measurement.
  • 10. Scope of measurement based on CESMM  Various civil engineering works including roads, railway, bridges, artificial channels, canals and drainage, shipyard, ports, bases, embankments, structure-breaking waves and drainage work.  Apart from that it also includes projects such as structural engineering among others, metal work, reinforced concrete work, stone work, wood work and brick work
  • 11. Procedures and Practices of CESMM  Include the scope of most project management such as:  selection types of contracts,  documentation,  preparation of drawings,  specifications,  project information,  contract terms and list of quantities,  preparation of list of material requirements / quantities,  Method statement - detailed list of detailed construction work with short explanation with quantity measured by CESMM  Explanation on the scope of work that will be implemented by the contractor and then be the basis for pricing the tender.
  • 12. Purpose of CESMM  The main purpose of the measurement based on CESMM is for coordinating and planning of the quantity list, to list the details of work to ensure consistency and systematic and to state the new techniques of construction clearly.
  • 13. FUNDAMENTAL PRINCIPLES OF CESMM CESMM; Section 1 Definitions  A number of definitions are contained.  Referring to words / expression that will be defined in the CESMM and preparation of bill of Quantities.  Words and expression defined in the CESMM shall have the same meaning when defining the words / expression in the Conditions of Contract and the Specifications  Please refer to CESMM-Section 1: definitions.
  • 14. FUNDAMENTAL PRINCIPLES OF CESMM CESMM; Section 2 General Principles  In this section , it clarify the following:  The application and extent of CESMM  Objective of CESMM  Objectives of the Bill of Quantities  Malaysian Standard Method of Measurement for Civil Engineering Works (CESMM) to be used in conjunction with the conditions of contract for Civil Engineering works.  Refer to CESMM-SECTION 2
  • 15. FUNDAMENTAL PRINCIPLES OF CESMM CESMM; Section 3 Application of the Work Classification  Work classification divides work into 18 main classes; Class A- Class R  Each class comprises up to 3 division which classify work at successive level of detail.  First division  Second division  Third division  Each division comprises a list of up to 8 descriptive features of work.  Each item description shall identify the component of work covered with respect to one feature from each division of the relevant class.
  • 16. FUNDAMENTAL PRINCIPLES OF CESMM CESMM; Section 4 Coding & Numbering of Items  Each item in the work classification has been placed with the code and numbering system that alphabetically and not more than three digits.  The letter corresponds to the class in the work classification in which the items occurs and the digits give the position of the item in the first, second and third divisions of the class.  E.g. Code F.3.1.0 identifies an item as Class F concrete works 1st Division 3 precast concrete 2nd Division 1 beams 3rd Divison 0  Description: F.3.1.0 - Precast concrete, in beams
  • 17. FUNDAMENTAL PRINCIPLES OF CESMM CESMM; Section 4 Coding & Numbering of Items  Reasons:  It gives an advantage to the tendered contractors due to bills that have code.  Quantity surveyor feels that they are assisted by the code and numbering system and can be used as a brief reference to the file system and data costs.  Each class work contains a set of measurements, definitions, coverage, additional rules of measurement that expands and clarify all information and evidence.  Every classification of work explains every units for each item of work, within the total allocation and numbering system for each item, the items in units of meters long, in units of square meters of area (hectares for cleaning site), unit volume and weight and metric units.
  • 18. CESMM; SECTION 4 (Code & Numbering of Items) Applications for Bridge Work
  • 19. CESMM; SECTION 4 (Code & Numbering of Items) Applications for Road works
  • 20. FUNDAMENTAL PRINCIPLES OF CESMM CESMM; Section 5 Preparations of the Bill of Quantities  The preparation of BQ shall be started prior to the completion of measurement works.  Section of the bill of Quantities:  Preamble  Work items – division of the BQ into parts.  Day work schedule  Grand summary / tender summary
  • 21. Form & Setting of BQ
  • 22. FUNDAMENTAL PRINCIPLES OF CESMM CESMM; Section 6 Completion, Pricing and Use of the BQ  Rates and prices shall be inserted in the rate column in Ringgit Malaysia with Sen inserted as decimal fractions of one Ringgit.  Each part of the BQ shall be totaled and the total carried to the Grand Summary
  • 23. FUNDAMENTAL PRINCIPLES OF CESMM CESMM; Section 7 Method-Related Charges  Meaning: the sum for an item inserted in the BQ by a tenderer.  Two types:  Time-related charges – a method-related charge for work, the cost of which is to be considered as proportional to the length of time taken to execute the work  Fixed charge- a method-related charge which is not a time related charge.  A tenderer may insert in the BQ the method related charges as he may decide to cover items of works relating to his intended method of executing the works, the cost of which are not to be considered as proportional to the quantities of the other items and for which he has not allowed in the rates and prices for the other items.