McGee Group was employed as Principal Contractor to undertake the demolition and
asbestos removal works at 52 Lime Street.
The project involved the demolition of three existing 6-7 storey office block buildings and
its associated structures which were built in the 1950s-2002 and the construction of a new
36-storey commercial office tower with two basement levels plus all structural works associated
with the investigation works.
The demolition works generally consisted of the following works activities in 2 separate phases;
Phase 1 Demolition
•	 Demolition down to ground level of 52 – 54 Lime St & 21 – 26 Leadenhall St (an 8 storey
building with one level basement) with partial retention of the existing basement structures.
•	 Demolition down to ground level of 27 – 27A Leadenhall St (an 7 storey building with two
level basement) with partial retention of the existing basement structures.
•	 Demolition and relocation of 3 no. UKPN substations.
•	 Design, supply and installation of all associated temporary works etc.
•	 Asbestos removal works.
•	 Soft strip works.
Phase 2 Demolition
•	 Demolition down to ground level of 34 – 35 Leadenhall St and 4 -5 Billiter St (a 7 storey
building with two level basement) with partial retention of the existing basement structures.
•	 Phase 2 Site Investigation and Ground Investigation works.
•	 Demolition and relocation of 3 no. UKPN substations.
•	 Design, supply and installation of all associated temporary works etc.
•	 Asbestos removal works.
•	 Soft strip works.
52 LIME STREETTOWER
Client:WR Berkeley Development
Value: £8m
Duration: 52 Weeks
CONTRACTS MANAGER: BRIAN HAUGHTON
ROLES & RESPONSIBILITIES: Contract Management, primary responsibility for managing project team from Pre Construc-
tion phase thorough to Hand Over to client/main contractor. Primary Responsibly for Health and Safety, Environmental
responsibilities under Law and Company policies. Ultimate responsibility for Client/Contractor relationship, Project Team
management and delegation, contractual administration, program delivery, financial control, resource and task schedul-
ing, RA and MS quality, implementation & monitoring, quality & inspection control, sub-contractor governance and daily
on-site project management team.

More Related Content

What's hot

Civil Diploma Industrial Training Report
Civil Diploma Industrial Training ReportCivil Diploma Industrial Training Report
24 DAY INDUSTRIAL TRAINING- CIVIL DIPLOMA
24 DAY INDUSTRIAL TRAINING- CIVIL DIPLOMA24 DAY INDUSTRIAL TRAINING- CIVIL DIPLOMA
Tsps
TspsTsps
Rusty Adkins Resume
Rusty Adkins ResumeRusty Adkins Resume
Rusty Adkins ResumeRusty Adkins
 
PRESENTATION ON THE INTERNSHIP
 PRESENTATION ON THE INTERNSHIP PRESENTATION ON THE INTERNSHIP
PRESENTATION ON THE INTERNSHIP
SufiyanAhmedJeddy
 
Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...
Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...
Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...
McKenney's Inc
 
9. introduction to site preparation
9. introduction to site preparation9. introduction to site preparation
9. introduction to site preparation
Noshad Ahmed Wahocho
 
RGH Resume one page version 2016
RGH Resume one page version  2016RGH Resume one page version  2016
RGH Resume one page version 2016Robin Hoch
 

What's hot (9)

Civil Diploma Industrial Training Report
Civil Diploma Industrial Training ReportCivil Diploma Industrial Training Report
Civil Diploma Industrial Training Report
 
24 DAY INDUSTRIAL TRAINING- CIVIL DIPLOMA
24 DAY INDUSTRIAL TRAINING- CIVIL DIPLOMA24 DAY INDUSTRIAL TRAINING- CIVIL DIPLOMA
24 DAY INDUSTRIAL TRAINING- CIVIL DIPLOMA
 
Tsps
TspsTsps
Tsps
 
Rusty Adkins Resume
Rusty Adkins ResumeRusty Adkins Resume
Rusty Adkins Resume
 
PRESENTATION ON THE INTERNSHIP
 PRESENTATION ON THE INTERNSHIP PRESENTATION ON THE INTERNSHIP
PRESENTATION ON THE INTERNSHIP
 
Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...
Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...
Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...
 
Case Studies
Case StudiesCase Studies
Case Studies
 
9. introduction to site preparation
9. introduction to site preparation9. introduction to site preparation
9. introduction to site preparation
 
RGH Resume one page version 2016
RGH Resume one page version  2016RGH Resume one page version  2016
RGH Resume one page version 2016
 

Viewers also liked

GIA Projects
GIA ProjectsGIA Projects
TYPOLOGY OF IRAQ’S TRADITIONAL COURTYARDS HOUSES AS ISLAMIC FUNCTIONAL SPACES...
TYPOLOGY OF IRAQ’S TRADITIONAL COURTYARDS HOUSES AS ISLAMIC FUNCTIONAL SPACES...TYPOLOGY OF IRAQ’S TRADITIONAL COURTYARDS HOUSES AS ISLAMIC FUNCTIONAL SPACES...
TYPOLOGY OF IRAQ’S TRADITIONAL COURTYARDS HOUSES AS ISLAMIC FUNCTIONAL SPACES...
Hayder Haraty
 
High rise building
High rise buildingHigh rise building
High rise building
Er. Ashis Kashyap
 
analysis of high rise building
analysis of high rise buildinganalysis of high rise building
analysis of high rise building
ishant_kukreja
 
Effect of wind Load On High Rise Building
Effect of wind Load On High Rise BuildingEffect of wind Load On High Rise Building
Effect of wind Load On High Rise BuildingVikas Patre
 
High Rise Building Research Document
High Rise Building Research DocumentHigh Rise Building Research Document
High Rise Building Research Document
Nicholas Socrates
 
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Prateek Srivastava
 

Viewers also liked (8)

GIA Projects
GIA ProjectsGIA Projects
GIA Projects
 
Beijing revised 4
Beijing revised 4Beijing revised 4
Beijing revised 4
 
TYPOLOGY OF IRAQ’S TRADITIONAL COURTYARDS HOUSES AS ISLAMIC FUNCTIONAL SPACES...
TYPOLOGY OF IRAQ’S TRADITIONAL COURTYARDS HOUSES AS ISLAMIC FUNCTIONAL SPACES...TYPOLOGY OF IRAQ’S TRADITIONAL COURTYARDS HOUSES AS ISLAMIC FUNCTIONAL SPACES...
TYPOLOGY OF IRAQ’S TRADITIONAL COURTYARDS HOUSES AS ISLAMIC FUNCTIONAL SPACES...
 
High rise building
High rise buildingHigh rise building
High rise building
 
analysis of high rise building
analysis of high rise buildinganalysis of high rise building
analysis of high rise building
 
Effect of wind Load On High Rise Building
Effect of wind Load On High Rise BuildingEffect of wind Load On High Rise Building
Effect of wind Load On High Rise Building
 
High Rise Building Research Document
High Rise Building Research DocumentHigh Rise Building Research Document
High Rise Building Research Document
 
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
 

Similar to 52 Lime Street Tower

Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Fairfax County
 
Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)
DC Department of General Services
 
Linkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian GnysinskiLinkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian GnysinskiKrystian Gnysinski
 
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1
Eamon Hannaway
 
Richard Batts CV 2017
Richard Batts CV 2017Richard Batts CV 2017
Richard Batts CV 2017Richard Batts
 
Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)
DC Department of General Services
 
case study on failed construction projects
case study on failed construction projectscase study on failed construction projects
case study on failed construction projects
SULAKSHYA GAUR
 
Item # 4 - 117 Claywell (Significance & Compatibility Review)
Item # 4 - 117 Claywell (Significance & Compatibility Review)Item # 4 - 117 Claywell (Significance & Compatibility Review)
Item # 4 - 117 Claywell (Significance & Compatibility Review)
ahcitycouncil
 
New Jersey Projects
New Jersey ProjectsNew Jersey Projects
New Jersey Projects
Gilsanz Murray Steficek
 
Washington Plaza Culvert Repair
Washington Plaza Culvert RepairWashington Plaza Culvert Repair
Washington Plaza Culvert Repair
Fairfax County
 
Walkie Talkie.pptx
Walkie Talkie.pptxWalkie Talkie.pptx
Walkie Talkie.pptx
Vigneshwarsankar2
 
Christian akl cv typ
Christian akl cv typChristian akl cv typ
Christian akl cv typ
Christian Akl
 
Christian akl cv typ
Christian akl cv typChristian akl cv typ
Christian akl cv typ
Christian Akl
 
Bps 5205 sustainability construction and maintainability velpandi & maria
Bps 5205  sustainability construction and maintainability  velpandi & mariaBps 5205  sustainability construction and maintainability  velpandi & maria
Bps 5205 sustainability construction and maintainability velpandi & maria
Maria Archana
 

Similar to 52 Lime Street Tower (20)

1 New Street Square
1 New Street Square1 New Street Square
1 New Street Square
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)
 
Linkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian GnysinskiLinkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian Gnysinski
 
Marie Reed Project Update (February 24, 2017)
Marie Reed Project Update (February 24, 2017)Marie Reed Project Update (February 24, 2017)
Marie Reed Project Update (February 24, 2017)
 
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1
 
fpbcurrent1
fpbcurrent1fpbcurrent1
fpbcurrent1
 
DaveGriffithsCV
DaveGriffithsCVDaveGriffithsCV
DaveGriffithsCV
 
Richard Batts CV 2017
Richard Batts CV 2017Richard Batts CV 2017
Richard Batts CV 2017
 
Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)
 
case study on failed construction projects
case study on failed construction projectscase study on failed construction projects
case study on failed construction projects
 
johns new cv 1
johns new cv 1johns new cv 1
johns new cv 1
 
Item # 4 - 117 Claywell (Significance & Compatibility Review)
Item # 4 - 117 Claywell (Significance & Compatibility Review)Item # 4 - 117 Claywell (Significance & Compatibility Review)
Item # 4 - 117 Claywell (Significance & Compatibility Review)
 
New Jersey Projects
New Jersey ProjectsNew Jersey Projects
New Jersey Projects
 
Washington Plaza Culvert Repair
Washington Plaza Culvert RepairWashington Plaza Culvert Repair
Washington Plaza Culvert Repair
 
Walkie Talkie.pptx
Walkie Talkie.pptxWalkie Talkie.pptx
Walkie Talkie.pptx
 
Christian akl cv typ
Christian akl cv typChristian akl cv typ
Christian akl cv typ
 
Christian akl cv typ
Christian akl cv typChristian akl cv typ
Christian akl cv typ
 
2016
20162016
2016
 
Bps 5205 sustainability construction and maintainability velpandi & maria
Bps 5205  sustainability construction and maintainability  velpandi & mariaBps 5205  sustainability construction and maintainability  velpandi & maria
Bps 5205 sustainability construction and maintainability velpandi & maria
 

52 Lime Street Tower

  • 1. McGee Group was employed as Principal Contractor to undertake the demolition and asbestos removal works at 52 Lime Street. The project involved the demolition of three existing 6-7 storey office block buildings and its associated structures which were built in the 1950s-2002 and the construction of a new 36-storey commercial office tower with two basement levels plus all structural works associated with the investigation works. The demolition works generally consisted of the following works activities in 2 separate phases; Phase 1 Demolition • Demolition down to ground level of 52 – 54 Lime St & 21 – 26 Leadenhall St (an 8 storey building with one level basement) with partial retention of the existing basement structures. • Demolition down to ground level of 27 – 27A Leadenhall St (an 7 storey building with two level basement) with partial retention of the existing basement structures. • Demolition and relocation of 3 no. UKPN substations. • Design, supply and installation of all associated temporary works etc. • Asbestos removal works. • Soft strip works. Phase 2 Demolition • Demolition down to ground level of 34 – 35 Leadenhall St and 4 -5 Billiter St (a 7 storey building with two level basement) with partial retention of the existing basement structures. • Phase 2 Site Investigation and Ground Investigation works. • Demolition and relocation of 3 no. UKPN substations. • Design, supply and installation of all associated temporary works etc. • Asbestos removal works. • Soft strip works. 52 LIME STREETTOWER Client:WR Berkeley Development Value: £8m Duration: 52 Weeks CONTRACTS MANAGER: BRIAN HAUGHTON ROLES & RESPONSIBILITIES: Contract Management, primary responsibility for managing project team from Pre Construc- tion phase thorough to Hand Over to client/main contractor. Primary Responsibly for Health and Safety, Environmental responsibilities under Law and Company policies. Ultimate responsibility for Client/Contractor relationship, Project Team management and delegation, contractual administration, program delivery, financial control, resource and task schedul- ing, RA and MS quality, implementation & monitoring, quality & inspection control, sub-contractor governance and daily on-site project management team.