SlideShare a Scribd company logo
1 of 3
Frank P. Bohan
319 West End Avenue
Old Bridge, New Jersey 08857
732-723-1110 (H)
732-632-7690 (C)
frankbohan@outlook.com
Summary of Accomplishments:
• Graduate of Pace University, B.B.A. Degree, New York, NY
• Certificate of Qualification, Refrigeration Engineer.
• 12 years experience in Property Management.
• 15 years experience as an Operating Engineer.
• Oversaw demolition/abatements, renovations, tenant build-outs, equipment upgrades and installations.
• Built and maintained productive tenant relationships with both office and retail tenants.
Sierra Real Estate, 600 Madison Ave. NY, NY –Vice President, Director of Property Operations (4/2014-2/16)
• Supervision and operation of 8 commercial office properties.
• Assist in hiring, training, evaluation, mentoring and direction of all property management staff.
• Coordination of projects as it relates to management properties.
• Participate in due diligence for all potential acquisitions and development.
• Develop relationships with tenants, clients and communicate with ownership.
• Assistance to Leasing Dept. in matters relating to Property Management.
• Enforcement of building rules and regulations; administration of municipal codes and violations.
Able Engineering Services, 708 Third Ave., NY, NY -World Trade Center Site Manager (10/2010-4/2014)
• Full charge and supervision of Local 94 Crew to ensure projects are completed in a timely manner.
• Central Chiller Plant – Supervise Engineers to ensure all equipment and systems are maintained and operating at
optimum levels.
• Daily interaction with all sub contractors on site.
• Assist Logistics Crew with all ongoing field work.
• Perform administrative duties including:
o Site Certification for all employees
o Generate daily reports.
o Supervising various projects on an as needed basis.
o Accident/Incident Reports.
• Supervise shift porters making certain all work is completed on a timely, daily basis.
Cathedral of Saint Patrick, 14 East 51 Street, NY, NY – Property Manager (4/2007 – 7/2010) 350,000 sq. ft.
• Full charge of Maintenance and Security Departments.
• Trained maintenance crew to perform work currently being done by outside contractors, resulting in significant
savings for the Cathedral.
• Daily interaction with outside trades, i.e. plumbers, electricians, H.V.A.C., painters, etc. Negotiated pricing of all work.
• Coordinated $250,000,000 construction management project.
• Reviewed existing contracts and discovered significant waste due to two contractors employed to do exact same
work.
• Implemented energy savings program by repairing/replacing steam traps and using energy efficient lighting
throughout.
Swig Equities, 44 Wall Street, 80 Broad Street & 90 Broad Street NY, NY - Property Manager (0 1/05 – 03/07)
• Managed three commercial office buildings totaling 1.5 million sq. ft.
• Hired and supervised 60 employees including Engineering, Security and Maintenance staff.
• Allocate budgets for all three buildings ($12 MM).
• Through thorough investigative research, uncovered major tenant charge-backs due Swig Equities.
• Responsible for convincing upper management to disregard original plan to replace two cooling towers at 44 Wall
Street. Worked with engineering staff and contractors to rebuild existing towers resulting in substantial cost savings
for Swig Equities.
• Involved with multi-million dollar building renovation projects i.e., building lobby renovations, Class "E" fire safety
system upgrade, elevator modernizations, cooling tower replacements and landlord/tenant build-outs.
Boston Properties, 90 Church Street NY, NY - Property Manager, (10/02 – 01/05)
• Hired to direct the demolition/abatement phase ($11 MM) of the renovation of a 17story 1.1 million sq. ft. office
building severely damaged on 9/11/2001.
• Provided critical support to the rebuilding ($60 MM), and supervised the tenant move-in phase.
• Oversaw an $8.2 MM budget.
• Managed Engineering, Security and Maintenance staff consisting of 40 employees.
• Ensured compliance with all Federal, State and City regulations, acting as liaison with officials during inspections, and
coordinating the removal of over 900 tractor-trailers of debris.
• Led the rebuilding of a $1 MM Class "E" fire safety system.
• Completed project and played an instrumental role in 90 Church Street earning nomination for the BOMA Pinnacle
Award for Government Building of The Year, 2004 – 2005.
Grubb & Ellis, Hammacher Schlemmer Building, 145 East 57th
Street, NY, NY -Building Manager (9/99 -10/02)
Assumed full responsibility for the day-to-day operations of the Hammacher Schlemmer Building, comprised of 12 stories and
65,000 sq. ft., including 3 floors of retail space. Hired, trained and supervised the building staff.
Coordinated an asbestos abatement project.
Launched a series of initiatives to improve operations, create a functional and safe working environment and responded to
repairs in a prompt and efficient manner.
Established credibility with vendors and subcontractors due to engineering background, which led to significant cost
reductions and enhancements in service quality.
Instituted and managed a comprehensive preventive maintenance program that ensured proper functioning of all systems
while minimizing downtime.
Negotiated a substantial rebate from the vendor for the service contract regarding the A/C units.
E.J. Minskoff Equities, IBM Building, 590 Madison Avenue, NY, NY - Engineer (3/88 - 9/99)
• Performed various engineering duties for office building encompassing 42 stories and 1.25 million sq. ft., executed the
start-up and shutdown of two York electric drive and one steam driven turbine refrigeration machines
• Acted as liaison with demolition and construction contractors during major renovations while the building was
occupied.
• Engaged in troubleshooting of all control devices and performed preventative maintenance on all mechanical
equipment.
Gerald D. Hines Interest, 53rd
at 3rd
, NY, NY - Engineer (10/86 - 3/88)
• Original member of start-up crew for 35-story office building encompassing 600,000 sq. ft., handled the daily
monitoring and shutdown of three Trane Center Vac electric drive refrigeration machines.
• Assigned by management to oversee a variety of functions, which included punch- listing work done by construction
crews, implementing P.M. program for mechanical equipment and chemical treatment of water systems.
Waldorf-Astoria, 301 Park Avenue, NY, NY - Engineer (7/84 - 10/86) 1.2 million sq. ft.
• Responsible for the daily monitoring and operation of Carrier, electric drive: four 750 ton refrigeration units. Worked
on building fans, pumps and various other equipment.
CERTIFICATIONS:
Service Maintenance Administration Diploma (BOMA)
Service Maintenance Technician Diploma (BOMA)
Certificate of Fitness, Fire Safety Director
Certificate of Qualification, Refrigeration Engineer
OSHA 30
Confined Space Certification
IUOE, Local #94 Hazmat Training Program
Carrier Achievement Award in Applied Electrical Course Certificate of Training,
Leslie Steam Control Equipment Seminar
Certificate of Fitness FDNY, F21, Sprinkler with Booster Pump
Certificate of Fitness FDNYF 12, Standpipe/Fire Pump/Roof Tank
Pesticide Applicator ID, Category 7G, Industrial, Institutional and Structural; Cooling Towers Operating and Maintenance
Engineers, EPA Technician Certification, Universal
AFFILIATION:
National Association of Power Engineers - President of New York Chapter NO.1 (2001-2002)
Former Member of the Executive Board
BOMA, New York, NY – Member

More Related Content

What's hot (20)

AnthonyCurrent HTR
AnthonyCurrent HTRAnthonyCurrent HTR
AnthonyCurrent HTR
 
Simon Murphy CV
Simon Murphy CVSimon Murphy CV
Simon Murphy CV
 
Rich Gesimondo
Rich GesimondoRich Gesimondo
Rich Gesimondo
 
James Boyd resume 12.2015
James Boyd resume 12.2015James Boyd resume 12.2015
James Boyd resume 12.2015
 
Cv SF van Zyl - December 2015
Cv SF van Zyl - December 2015Cv SF van Zyl - December 2015
Cv SF van Zyl - December 2015
 
Rob Resume (1)
Rob Resume (1)Rob Resume (1)
Rob Resume (1)
 
CM Resume
CM Resume CM Resume
CM Resume
 
Davis Gary 0415 PM-LIR
Davis Gary 0415 PM-LIRDavis Gary 0415 PM-LIR
Davis Gary 0415 PM-LIR
 
stu's resume
stu's resumestu's resume
stu's resume
 
cv17 uk
cv17 ukcv17 uk
cv17 uk
 
Roof replacement and internal remedial works
Roof replacement and internal remedial worksRoof replacement and internal remedial works
Roof replacement and internal remedial works
 
Resume
ResumeResume
Resume
 
Kevin Ionta Resume 1-2016
Kevin Ionta Resume 1-2016Kevin Ionta Resume 1-2016
Kevin Ionta Resume 1-2016
 
MichaelGrigsby_Resume
MichaelGrigsby_ResumeMichaelGrigsby_Resume
MichaelGrigsby_Resume
 
Kevin Ionta Resume 1-2016
Kevin Ionta Resume 1-2016Kevin Ionta Resume 1-2016
Kevin Ionta Resume 1-2016
 
Gary Affleck Ward CV
Gary Affleck Ward CVGary Affleck Ward CV
Gary Affleck Ward CV
 
Potomac Place Shopping Center
Potomac Place Shopping CenterPotomac Place Shopping Center
Potomac Place Shopping Center
 
N Miksic Resume 2016
N Miksic Resume 2016N Miksic Resume 2016
N Miksic Resume 2016
 
ROBERT NEW AND LAST RESUME!!!
ROBERT NEW AND LAST RESUME!!!ROBERT NEW AND LAST RESUME!!!
ROBERT NEW AND LAST RESUME!!!
 
Jacobs Curriculum Vitae
Jacobs Curriculum VitaeJacobs Curriculum Vitae
Jacobs Curriculum Vitae
 

Viewers also liked

Thesis presentation proposal
Thesis presentation proposalThesis presentation proposal
Thesis presentation proposalOttavio
 
Van Hoa Phat Giao 172
Van Hoa Phat Giao 172Van Hoa Phat Giao 172
Van Hoa Phat Giao 172Hill sg
 
Tc+Rozenburg+Presentatie
Tc+Rozenburg+PresentatieTc+Rozenburg+Presentatie
Tc+Rozenburg+Presentatietcr_presentatie
 
Class 9 & 10 biology lesson 8 lesson 8 class 3 kidney stone
Class 9 & 10 biology lesson 8 lesson 8 class 3 kidney stoneClass 9 & 10 biology lesson 8 lesson 8 class 3 kidney stone
Class 9 & 10 biology lesson 8 lesson 8 class 3 kidney stoneCambriannews
 
Ideology - Social Institutions and Stereotypes
Ideology - Social Institutions and StereotypesIdeology - Social Institutions and Stereotypes
Ideology - Social Institutions and StereotypesKimberlyQuinn
 
Dräger x zone 5000
Dräger x zone 5000Dräger x zone 5000
Dräger x zone 5000ICOdata Shop
 
Calculo de letrina
Calculo de letrinaCalculo de letrina
Calculo de letrinaDuglimar
 
Hojita evangelio domingo de pentecostes c serie
Hojita evangelio domingo de pentecostes c serieHojita evangelio domingo de pentecostes c serie
Hojita evangelio domingo de pentecostes c serieNelson Gómez
 
Prometeo sustentable: diagnóstico de resiliencia empresarial y sustentabilidad
Prometeo sustentable: diagnóstico de resiliencia  empresarial y sustentabilidadPrometeo sustentable: diagnóstico de resiliencia  empresarial y sustentabilidad
Prometeo sustentable: diagnóstico de resiliencia empresarial y sustentabilidadRoberto Carvallo
 

Viewers also liked (15)

Thesis presentation proposal
Thesis presentation proposalThesis presentation proposal
Thesis presentation proposal
 
Abdul Wahab... (1)
Abdul Wahab... (1)Abdul Wahab... (1)
Abdul Wahab... (1)
 
07.03.2008, NEWSWIRE, Issue 16
07.03.2008, NEWSWIRE, Issue 1607.03.2008, NEWSWIRE, Issue 16
07.03.2008, NEWSWIRE, Issue 16
 
wahab cv
wahab cvwahab cv
wahab cv
 
Van Hoa Phat Giao 172
Van Hoa Phat Giao 172Van Hoa Phat Giao 172
Van Hoa Phat Giao 172
 
SHAMIM PROFILE
SHAMIM PROFILESHAMIM PROFILE
SHAMIM PROFILE
 
Tc+Rozenburg+Presentatie
Tc+Rozenburg+PresentatieTc+Rozenburg+Presentatie
Tc+Rozenburg+Presentatie
 
Class 9 & 10 biology lesson 8 lesson 8 class 3 kidney stone
Class 9 & 10 biology lesson 8 lesson 8 class 3 kidney stoneClass 9 & 10 biology lesson 8 lesson 8 class 3 kidney stone
Class 9 & 10 biology lesson 8 lesson 8 class 3 kidney stone
 
Ideology - Social Institutions and Stereotypes
Ideology - Social Institutions and StereotypesIdeology - Social Institutions and Stereotypes
Ideology - Social Institutions and Stereotypes
 
Tajweed lesson7
Tajweed lesson7Tajweed lesson7
Tajweed lesson7
 
Dräger x zone 5000
Dräger x zone 5000Dräger x zone 5000
Dräger x zone 5000
 
Calculo de letrina
Calculo de letrinaCalculo de letrina
Calculo de letrina
 
Hojita evangelio domingo de pentecostes c serie
Hojita evangelio domingo de pentecostes c serieHojita evangelio domingo de pentecostes c serie
Hojita evangelio domingo de pentecostes c serie
 
Prometeo sustentable: diagnóstico de resiliencia empresarial y sustentabilidad
Prometeo sustentable: diagnóstico de resiliencia  empresarial y sustentabilidadPrometeo sustentable: diagnóstico de resiliencia  empresarial y sustentabilidad
Prometeo sustentable: diagnóstico de resiliencia empresarial y sustentabilidad
 
Training Guide Video1
Training Guide Video1Training Guide Video1
Training Guide Video1
 

Similar to fpbcurrent1

Rick Stinnett Resume
Rick Stinnett ResumeRick Stinnett Resume
Rick Stinnett Resumerstinnett
 
Rick Russell Resume 150406
Rick Russell Resume 150406Rick Russell Resume 150406
Rick Russell Resume 150406Rick Russell
 
Glenn Caron Resume Aug 2016
Glenn Caron Resume Aug 2016Glenn Caron Resume Aug 2016
Glenn Caron Resume Aug 2016Glenn Caron
 
Kris anderson 2016 resume docx
Kris anderson 2016 resume docxKris anderson 2016 resume docx
Kris anderson 2016 resume docxKris Anderson
 
Bryant scott-resume-2016
Bryant scott-resume-2016Bryant scott-resume-2016
Bryant scott-resume-2016Scott Bryant
 
Glenn Caron Resume May 2016
Glenn Caron Resume May 2016Glenn Caron Resume May 2016
Glenn Caron Resume May 2016Glenn Caron
 
Vincent Bono_Resume.mod 11-03-16
Vincent Bono_Resume.mod 11-03-16Vincent Bono_Resume.mod 11-03-16
Vincent Bono_Resume.mod 11-03-16Vincent Bono
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager ResumeJack Dickerson
 
RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15Roman Rozek
 
William Faoro - 4pResumeM1
William Faoro - 4pResumeM1William Faoro - 4pResumeM1
William Faoro - 4pResumeM1William Faoro PE
 
PMR Career Experience 2016
PMR Career Experience 2016PMR Career Experience 2016
PMR Career Experience 2016Pedro Rosario
 
Koblinsky BW Resume 12-11 -14
Koblinsky BW Resume 12-11 -14Koblinsky BW Resume 12-11 -14
Koblinsky BW Resume 12-11 -14Bernard Koblinsky
 

Similar to fpbcurrent1 (20)

Rick Stinnett Resume
Rick Stinnett ResumeRick Stinnett Resume
Rick Stinnett Resume
 
Rick Russell Resume 150406
Rick Russell Resume 150406Rick Russell Resume 150406
Rick Russell Resume 150406
 
Long Resume
Long ResumeLong Resume
Long Resume
 
Glenn Caron Resume Aug 2016
Glenn Caron Resume Aug 2016Glenn Caron Resume Aug 2016
Glenn Caron Resume Aug 2016
 
Kris anderson 2016 resume docx
Kris anderson 2016 resume docxKris anderson 2016 resume docx
Kris anderson 2016 resume docx
 
Bryant scott-resume-2016
Bryant scott-resume-2016Bryant scott-resume-2016
Bryant scott-resume-2016
 
Linkedin-Doc
Linkedin-DocLinkedin-Doc
Linkedin-Doc
 
James Hoove1 (1)
James Hoove1 (1)James Hoove1 (1)
James Hoove1 (1)
 
Glenn Caron Resume May 2016
Glenn Caron Resume May 2016Glenn Caron Resume May 2016
Glenn Caron Resume May 2016
 
resume'2016.docx
resume'2016.docxresume'2016.docx
resume'2016.docx
 
JohnRSmithJr _ Portfolio 5F S
JohnRSmithJr _ Portfolio 5F SJohnRSmithJr _ Portfolio 5F S
JohnRSmithJr _ Portfolio 5F S
 
Vincent Bono_Resume.mod 11-03-16
Vincent Bono_Resume.mod 11-03-16Vincent Bono_Resume.mod 11-03-16
Vincent Bono_Resume.mod 11-03-16
 
JOEY_STEPHENSON_(R1136)
JOEY_STEPHENSON_(R1136)JOEY_STEPHENSON_(R1136)
JOEY_STEPHENSON_(R1136)
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager Resume
 
RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15
 
William Faoro - 4pResumeM1
William Faoro - 4pResumeM1William Faoro - 4pResumeM1
William Faoro - 4pResumeM1
 
PMR Career Experience 2016
PMR Career Experience 2016PMR Career Experience 2016
PMR Career Experience 2016
 
Resume_Bobby_Horan
Resume_Bobby_HoranResume_Bobby_Horan
Resume_Bobby_Horan
 
Koblinsky BW Resume 12-11 -14
Koblinsky BW Resume 12-11 -14Koblinsky BW Resume 12-11 -14
Koblinsky BW Resume 12-11 -14
 
Res414
Res414Res414
Res414
 

fpbcurrent1

  • 1. Frank P. Bohan 319 West End Avenue Old Bridge, New Jersey 08857 732-723-1110 (H) 732-632-7690 (C) frankbohan@outlook.com Summary of Accomplishments: • Graduate of Pace University, B.B.A. Degree, New York, NY • Certificate of Qualification, Refrigeration Engineer. • 12 years experience in Property Management. • 15 years experience as an Operating Engineer. • Oversaw demolition/abatements, renovations, tenant build-outs, equipment upgrades and installations. • Built and maintained productive tenant relationships with both office and retail tenants. Sierra Real Estate, 600 Madison Ave. NY, NY –Vice President, Director of Property Operations (4/2014-2/16) • Supervision and operation of 8 commercial office properties. • Assist in hiring, training, evaluation, mentoring and direction of all property management staff. • Coordination of projects as it relates to management properties. • Participate in due diligence for all potential acquisitions and development. • Develop relationships with tenants, clients and communicate with ownership. • Assistance to Leasing Dept. in matters relating to Property Management. • Enforcement of building rules and regulations; administration of municipal codes and violations. Able Engineering Services, 708 Third Ave., NY, NY -World Trade Center Site Manager (10/2010-4/2014) • Full charge and supervision of Local 94 Crew to ensure projects are completed in a timely manner. • Central Chiller Plant – Supervise Engineers to ensure all equipment and systems are maintained and operating at optimum levels. • Daily interaction with all sub contractors on site. • Assist Logistics Crew with all ongoing field work. • Perform administrative duties including: o Site Certification for all employees o Generate daily reports. o Supervising various projects on an as needed basis. o Accident/Incident Reports. • Supervise shift porters making certain all work is completed on a timely, daily basis. Cathedral of Saint Patrick, 14 East 51 Street, NY, NY – Property Manager (4/2007 – 7/2010) 350,000 sq. ft. • Full charge of Maintenance and Security Departments. • Trained maintenance crew to perform work currently being done by outside contractors, resulting in significant savings for the Cathedral. • Daily interaction with outside trades, i.e. plumbers, electricians, H.V.A.C., painters, etc. Negotiated pricing of all work. • Coordinated $250,000,000 construction management project. • Reviewed existing contracts and discovered significant waste due to two contractors employed to do exact same work. • Implemented energy savings program by repairing/replacing steam traps and using energy efficient lighting throughout. Swig Equities, 44 Wall Street, 80 Broad Street & 90 Broad Street NY, NY - Property Manager (0 1/05 – 03/07) • Managed three commercial office buildings totaling 1.5 million sq. ft. • Hired and supervised 60 employees including Engineering, Security and Maintenance staff. • Allocate budgets for all three buildings ($12 MM). • Through thorough investigative research, uncovered major tenant charge-backs due Swig Equities. • Responsible for convincing upper management to disregard original plan to replace two cooling towers at 44 Wall Street. Worked with engineering staff and contractors to rebuild existing towers resulting in substantial cost savings for Swig Equities.
  • 2. • Involved with multi-million dollar building renovation projects i.e., building lobby renovations, Class "E" fire safety system upgrade, elevator modernizations, cooling tower replacements and landlord/tenant build-outs. Boston Properties, 90 Church Street NY, NY - Property Manager, (10/02 – 01/05) • Hired to direct the demolition/abatement phase ($11 MM) of the renovation of a 17story 1.1 million sq. ft. office building severely damaged on 9/11/2001. • Provided critical support to the rebuilding ($60 MM), and supervised the tenant move-in phase. • Oversaw an $8.2 MM budget. • Managed Engineering, Security and Maintenance staff consisting of 40 employees. • Ensured compliance with all Federal, State and City regulations, acting as liaison with officials during inspections, and coordinating the removal of over 900 tractor-trailers of debris. • Led the rebuilding of a $1 MM Class "E" fire safety system. • Completed project and played an instrumental role in 90 Church Street earning nomination for the BOMA Pinnacle Award for Government Building of The Year, 2004 – 2005. Grubb & Ellis, Hammacher Schlemmer Building, 145 East 57th Street, NY, NY -Building Manager (9/99 -10/02) Assumed full responsibility for the day-to-day operations of the Hammacher Schlemmer Building, comprised of 12 stories and 65,000 sq. ft., including 3 floors of retail space. Hired, trained and supervised the building staff. Coordinated an asbestos abatement project. Launched a series of initiatives to improve operations, create a functional and safe working environment and responded to repairs in a prompt and efficient manner. Established credibility with vendors and subcontractors due to engineering background, which led to significant cost reductions and enhancements in service quality. Instituted and managed a comprehensive preventive maintenance program that ensured proper functioning of all systems while minimizing downtime. Negotiated a substantial rebate from the vendor for the service contract regarding the A/C units. E.J. Minskoff Equities, IBM Building, 590 Madison Avenue, NY, NY - Engineer (3/88 - 9/99) • Performed various engineering duties for office building encompassing 42 stories and 1.25 million sq. ft., executed the start-up and shutdown of two York electric drive and one steam driven turbine refrigeration machines • Acted as liaison with demolition and construction contractors during major renovations while the building was occupied. • Engaged in troubleshooting of all control devices and performed preventative maintenance on all mechanical equipment. Gerald D. Hines Interest, 53rd at 3rd , NY, NY - Engineer (10/86 - 3/88) • Original member of start-up crew for 35-story office building encompassing 600,000 sq. ft., handled the daily monitoring and shutdown of three Trane Center Vac electric drive refrigeration machines. • Assigned by management to oversee a variety of functions, which included punch- listing work done by construction crews, implementing P.M. program for mechanical equipment and chemical treatment of water systems. Waldorf-Astoria, 301 Park Avenue, NY, NY - Engineer (7/84 - 10/86) 1.2 million sq. ft. • Responsible for the daily monitoring and operation of Carrier, electric drive: four 750 ton refrigeration units. Worked on building fans, pumps and various other equipment. CERTIFICATIONS: Service Maintenance Administration Diploma (BOMA) Service Maintenance Technician Diploma (BOMA) Certificate of Fitness, Fire Safety Director Certificate of Qualification, Refrigeration Engineer OSHA 30 Confined Space Certification IUOE, Local #94 Hazmat Training Program Carrier Achievement Award in Applied Electrical Course Certificate of Training, Leslie Steam Control Equipment Seminar Certificate of Fitness FDNY, F21, Sprinkler with Booster Pump Certificate of Fitness FDNYF 12, Standpipe/Fire Pump/Roof Tank Pesticide Applicator ID, Category 7G, Industrial, Institutional and Structural; Cooling Towers Operating and Maintenance Engineers, EPA Technician Certification, Universal AFFILIATION:
  • 3. National Association of Power Engineers - President of New York Chapter NO.1 (2001-2002) Former Member of the Executive Board BOMA, New York, NY – Member