MARINA BFC PHASE 2 – COMMERCIAL TOWER (T3)
Marina BFC Phase 2 - Commercial Tower (T3) At Marina Boulevard/Central Boulevard
Developer Central Boulevard Development
Architect Architects 61 Pte Ltd
Engineer Meinhardt (Singapore) Pte Ltd
Main Contractor L&M Foundation Specialist Pte Ltd
Contract Sum Approximately S$ 100.0 M
Construction Period From January '08 to March '09
Scope of Works Diaphragm Wall, Bored Pile Works &
Deep Cement Mixing
Location At Marina Boulevard/Central Boulevard
Your Partner
In Ground Engineering
L&M Foundation Specialist Pte Ltd
( a member of CSC Holdings Limited)
Your Partner
In Ground Engineering
Marina BFC Phase 2
Commercial Tower (T3)
Less than 5,000 tons
Ultimate Load Test works
The foundation works for the construction of the Marina Bay Financial Center (Phase 2) at Marina Bay
consists of 338 bored piles, 426 m of 1,000mm thick diaphragm walls and 3,965 JGP points. Site works had to
be executed in close liaisons with adjacent contractors for the construction of MBFC Phase 1,Tower 1 and 4,
the DTL1 MRT tunnels and the existing Common Services Tunnel. Construction of the Diaphragm Wall,
Bored piles and Ground Improvement foundation Works were carried out in compliance to the stringent
movement criteria's of the LTA M&W Specifications and the Common Services Tunnels.
The major challenges encountered in MBFC Phase 2 diaphragm wall , ground improvement and bored piling
works includes the following :
 Adjacent Tower 1 construction of deep excavations in conjunction
MBFC Phase 2 with Jet Grouting activities.
 Adjacent Tower 3 construction of MRT tunnel linkage to MBFC Phase 2.
 Encroachment of existing bored piles and sheet Piling works into
MBFC Phase 2.
 Movement criteria and close tunnel monitoring and liaisons with
the adjacent Common Services Tunnel.
 Presence of existing underground old seawalls.

More Related Content

Similar to projects_highlights_marina_bfc_phase_2

ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptxAditya Mane
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptxAditya Mane
 
Presentation - 1240 Villas
Presentation - 1240 VillasPresentation - 1240 Villas
Presentation - 1240 VillasIssam M. Faqir
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)jamsheer p
 
Deep basement excavation
Deep basement excavation Deep basement excavation
Deep basement excavation Davis Ciprikis
 
Ur-GeoTech / Geotechnical Consultations
Ur-GeoTech / Geotechnical ConsultationsUr-GeoTech / Geotechnical Consultations
Ur-GeoTech / Geotechnical ConsultationsMazin Alhamrany
 
50 MW METRO WIND POWER PROJECT
50 MW METRO WIND POWER PROJECT50 MW METRO WIND POWER PROJECT
50 MW METRO WIND POWER PROJECTTilal Ahmed
 
Morocco Mall Post Tensioned Concrete Case Study
Morocco Mall Post Tensioned Concrete Case StudyMorocco Mall Post Tensioned Concrete Case Study
Morocco Mall Post Tensioned Concrete Case StudyCCL Concrete
 
9. Brochure Centre Point
9. Brochure Centre Point9. Brochure Centre Point
9. Brochure Centre PointMatthew Warr
 
projects_highlights_fusionopolis_2a
projects_highlights_fusionopolis_2aprojects_highlights_fusionopolis_2a
projects_highlights_fusionopolis_2aSaiful Islam
 
Torino Metro Experience
Torino Metro ExperienceTorino Metro Experience
Torino Metro Experiencegifanta
 
internship review .pdf
internship review .pdfinternship review .pdf
internship review .pdfPAYALINAMDAR
 
Peter McGough CV 2010
Peter McGough CV 2010Peter McGough CV 2010
Peter McGough CV 2010pmcgough
 
Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...
Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...
Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...IJERA Editor
 
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1Eamon Hannaway
 
Mahakali Bridge Project Presentation (2077 chaitra 11)
Mahakali Bridge Project Presentation (2077 chaitra 11)Mahakali Bridge Project Presentation (2077 chaitra 11)
Mahakali Bridge Project Presentation (2077 chaitra 11)Rabindra Shrestha
 

Similar to projects_highlights_marina_bfc_phase_2 (20)

ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
Resume vinoth kumar
Resume   vinoth kumarResume   vinoth kumar
Resume vinoth kumar
 
Presentation - 1240 Villas
Presentation - 1240 VillasPresentation - 1240 Villas
Presentation - 1240 Villas
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)
 
Deep basement excavation
Deep basement excavation Deep basement excavation
Deep basement excavation
 
CV_Oscar_Bandeira
CV_Oscar_BandeiraCV_Oscar_Bandeira
CV_Oscar_Bandeira
 
Ur-GeoTech / Geotechnical Consultations
Ur-GeoTech / Geotechnical ConsultationsUr-GeoTech / Geotechnical Consultations
Ur-GeoTech / Geotechnical Consultations
 
Muhammad_Aslam_CV
Muhammad_Aslam_CVMuhammad_Aslam_CV
Muhammad_Aslam_CV
 
50 MW METRO WIND POWER PROJECT
50 MW METRO WIND POWER PROJECT50 MW METRO WIND POWER PROJECT
50 MW METRO WIND POWER PROJECT
 
Morocco Mall Post Tensioned Concrete Case Study
Morocco Mall Post Tensioned Concrete Case StudyMorocco Mall Post Tensioned Concrete Case Study
Morocco Mall Post Tensioned Concrete Case Study
 
9. Brochure Centre Point
9. Brochure Centre Point9. Brochure Centre Point
9. Brochure Centre Point
 
projects_highlights_fusionopolis_2a
projects_highlights_fusionopolis_2aprojects_highlights_fusionopolis_2a
projects_highlights_fusionopolis_2a
 
Torino Metro Experience
Torino Metro ExperienceTorino Metro Experience
Torino Metro Experience
 
internship review .pdf
internship review .pdfinternship review .pdf
internship review .pdf
 
Peter McGough CV 2010
Peter McGough CV 2010Peter McGough CV 2010
Peter McGough CV 2010
 
Shiraz nawaz cv.
Shiraz nawaz cv.Shiraz nawaz cv.
Shiraz nawaz cv.
 
Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...
Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...
Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...
 
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1
 
Mahakali Bridge Project Presentation (2077 chaitra 11)
Mahakali Bridge Project Presentation (2077 chaitra 11)Mahakali Bridge Project Presentation (2077 chaitra 11)
Mahakali Bridge Project Presentation (2077 chaitra 11)
 

projects_highlights_marina_bfc_phase_2

  • 1. MARINA BFC PHASE 2 – COMMERCIAL TOWER (T3) Marina BFC Phase 2 - Commercial Tower (T3) At Marina Boulevard/Central Boulevard Developer Central Boulevard Development Architect Architects 61 Pte Ltd Engineer Meinhardt (Singapore) Pte Ltd Main Contractor L&M Foundation Specialist Pte Ltd Contract Sum Approximately S$ 100.0 M Construction Period From January '08 to March '09 Scope of Works Diaphragm Wall, Bored Pile Works & Deep Cement Mixing Location At Marina Boulevard/Central Boulevard Your Partner In Ground Engineering L&M Foundation Specialist Pte Ltd ( a member of CSC Holdings Limited)
  • 2. Your Partner In Ground Engineering Marina BFC Phase 2 Commercial Tower (T3) Less than 5,000 tons Ultimate Load Test works The foundation works for the construction of the Marina Bay Financial Center (Phase 2) at Marina Bay consists of 338 bored piles, 426 m of 1,000mm thick diaphragm walls and 3,965 JGP points. Site works had to be executed in close liaisons with adjacent contractors for the construction of MBFC Phase 1,Tower 1 and 4, the DTL1 MRT tunnels and the existing Common Services Tunnel. Construction of the Diaphragm Wall, Bored piles and Ground Improvement foundation Works were carried out in compliance to the stringent movement criteria's of the LTA M&W Specifications and the Common Services Tunnels. The major challenges encountered in MBFC Phase 2 diaphragm wall , ground improvement and bored piling works includes the following :  Adjacent Tower 1 construction of deep excavations in conjunction MBFC Phase 2 with Jet Grouting activities.  Adjacent Tower 3 construction of MRT tunnel linkage to MBFC Phase 2.  Encroachment of existing bored piles and sheet Piling works into MBFC Phase 2.  Movement criteria and close tunnel monitoring and liaisons with the adjacent Common Services Tunnel.  Presence of existing underground old seawalls.