2. Project Details
Description:
The Washington Plaza Culvert Repair project was substantially completed on June 24, 2013. This
project consisted of repairing a 21 foot section of damaged concrete culvert, which lies underneath
Washington Plaza, within the Historic District. The deteriorated culvert posed a danger both to the public
and to the historic structures surrounding it. The completion of this project will maximize use of the storm
culvert and provide protection for Washington Plaza.
Project Overview:
• Removal, storage, and replacement of brickwork
• Removal of damaged top and side sections of culvert
• Placement of new rigid piping for fountain’s leaking water lines
• Placement of rebar
• Water-proofing membrane placed on top of culvert to prevent deterioration.
DPWES Project Team:
Design Engineer: Bill Schell
Project Manager: Qais Bashir
Construction Engineer: Mannan Qureshi
Construction Inspector: Keith Ferrell