PlateSpin® Migrate50 Migrations in less than 24 hoursJason Dea – Product Marketing Manager, Novell
Session OverviewBarriers to Platform AdoptionPlateSpin MigrateAccelerate ROIPlateSpin in Action - Essent®
Who cares?
Server Migration in the Real World“The PlateSpin solution from Novell saved Essent about €2 million for the data centre consolidation project alone”Marco Spoel, Project Manager, IT Infrastructure, Essent"Using PlateSpin we were able to complete 61 migrations within the targeted migration windows, saving an average of 4 hours migration time per server.“JorisHaverkort, Product Manager at Atos Origin Netherlands"The ability to perform the migrations remotely and over the WAN with no need to be physically in contact with the source and target servers saved us weeks if not months of work.“Neil Brindley, Senior Windows Systems Engineer, Midrange Services, AXA Tech Asia Pacific
Barriers to Platform Adoption:
Manual Rip and ReplaceHow do I get this stuff Up and Running?
Tools: Bare Metal Restore?Multiple Steps
Image Capture -> Image Deploy -> System Configuration -> Pray…
Error Prone
NOT Cross Platform
Downtime throughout the process
Labor IntensiveTools: Pre-Staging + ReplicationMultiple Steps
Configure Identical OS Target -> Data Replication – System State Copy -> Pray -> Cutover
Software licensing complexity and cost
Replication complexity and cost
Labor IntensiveTools: “Free” Migration toolExtra Manual steps
SysPrep
Lack of Network Optimization
Single Platform Support
Minimal Error LoggingFinally a Better Way PlateSpin Migrate
PlateSpin®MigrateWith PlateSpin Migrate, you can automatically migrate server workloads over the network.PhysicalServersBladeServersVirtualHostsImageArchivesWorkload Decoupledfrom HardwareDecouple workloadfrom hostinfrastructureLive peer-to-peer workload migrationMigration testingSync-up prior to cut-over
PlateSpin Migrate – Accelerate ROI
Automated Peer to Peer with PlateSpin Migrateetc...Direct Peer to Peer
Hypervisor agnostic, migrate to ESX, Hyper-V, Xen
Hardware agnostic, migrate to bare metal
Multi-OS support
Migrate over LAN or WAN
Fully Automated SolutionAccelerating Adoption with PlateSpin MigrateServer Migration project are time consuming. Challenges Manual rebuild process5-7 hrs per server (depending on application)Which workloads/applications go where?Single core onto Multi-core? CPU bottle necks, I/O contention, Memory?Solution ‏100% automated  Live migrations45 min. to 1 ½ hr migration timePeer to Peer across the networkUp to 20 migrations per Migrate server
Migration Project Cost vs Novell ROI 200 Server RefreshMigration time: 7 hours per server avg.200 x 7 = 1400 hours		   175 days8 man months!x $80hr = $112,000200 Server Refresh w/NovellMigration Time: 3 hours per server avg.200 x 3 = 600 hours3 Concurrent migrations = 200 hours						     25 days1 month!x $80hr = $16,000License Cost approx. = $40,000  Total  Project Cost = $40k + $16k ROI/Delta = $56,000
Customer Success Case StudyEssent
Case StudyThe CustomerThe leader in the Dutch energy market Turnover of EUR 6.4 billion in 2006Annual IT budget of EUR 130 million12,000 employees and 800+ IT staff700 servers and growing 100 per yearA mix of virtual and physical movesMoving from HP to IBM hardware
Case StudyThe ChallengeMandate to shrink 3 datacenters into oneWanted to standardize IT infrastructureFocus on minimizing risk
Case StudyThe SolutionLooked at VMware Converter initially – no P2P, V2PPlateSpin Recon to monitor the existing estate for new hardware planning and consolidationPlateSpin Migrate for 260 migrations (P2P and P2V) across sitesNew Site
Case Study“If we hadn’t gone with PlateSpin, it would have taken a team of 25 half a year to build all the applications in the new data center, an estimated cost of over EUR 3 million. With PlateSpin, we were able to migrate all of our servers in one month with a team of less than eight people. The PlateSpin solution brings a high return of investment. In retrospect, after seeing the time and cost savings, we would have been willing to pay a lot more for the PlateSpin solution.” Marco Spoel, Project Manager, IT Infrastructure, Essent
Helpful Hints and Best Practices

50 migrations in 24 hours

  • 1.
    PlateSpin® Migrate50 Migrationsin less than 24 hoursJason Dea – Product Marketing Manager, Novell
  • 2.
    Session OverviewBarriers toPlatform AdoptionPlateSpin MigrateAccelerate ROIPlateSpin in Action - Essent®
  • 3.
  • 4.
    Server Migration inthe Real World“The PlateSpin solution from Novell saved Essent about €2 million for the data centre consolidation project alone”Marco Spoel, Project Manager, IT Infrastructure, Essent"Using PlateSpin we were able to complete 61 migrations within the targeted migration windows, saving an average of 4 hours migration time per server.“JorisHaverkort, Product Manager at Atos Origin Netherlands"The ability to perform the migrations remotely and over the WAN with no need to be physically in contact with the source and target servers saved us weeks if not months of work.“Neil Brindley, Senior Windows Systems Engineer, Midrange Services, AXA Tech Asia Pacific
  • 5.
  • 6.
    Manual Rip andReplaceHow do I get this stuff Up and Running?
  • 7.
    Tools: Bare MetalRestore?Multiple Steps
  • 8.
    Image Capture ->Image Deploy -> System Configuration -> Pray…
  • 9.
  • 10.
  • 11.
  • 12.
    Labor IntensiveTools: Pre-Staging+ ReplicationMultiple Steps
  • 13.
    Configure Identical OSTarget -> Data Replication – System State Copy -> Pray -> Cutover
  • 14.
  • 15.
  • 16.
    Labor IntensiveTools: “Free”Migration toolExtra Manual steps
  • 17.
  • 18.
    Lack of NetworkOptimization
  • 19.
  • 20.
    Minimal Error LoggingFinallya Better Way PlateSpin Migrate
  • 21.
    PlateSpin®MigrateWith PlateSpin Migrate,you can automatically migrate server workloads over the network.PhysicalServersBladeServersVirtualHostsImageArchivesWorkload Decoupledfrom HardwareDecouple workloadfrom hostinfrastructureLive peer-to-peer workload migrationMigration testingSync-up prior to cut-over
  • 22.
    PlateSpin Migrate –Accelerate ROI
  • 23.
    Automated Peer toPeer with PlateSpin Migrateetc...Direct Peer to Peer
  • 24.
    Hypervisor agnostic, migrateto ESX, Hyper-V, Xen
  • 25.
  • 26.
  • 27.
  • 28.
    Fully Automated SolutionAcceleratingAdoption with PlateSpin MigrateServer Migration project are time consuming. Challenges Manual rebuild process5-7 hrs per server (depending on application)Which workloads/applications go where?Single core onto Multi-core? CPU bottle necks, I/O contention, Memory?Solution ‏100% automated Live migrations45 min. to 1 ½ hr migration timePeer to Peer across the networkUp to 20 migrations per Migrate server
  • 29.
    Migration Project Costvs Novell ROI 200 Server RefreshMigration time: 7 hours per server avg.200 x 7 = 1400 hours 175 days8 man months!x $80hr = $112,000200 Server Refresh w/NovellMigration Time: 3 hours per server avg.200 x 3 = 600 hours3 Concurrent migrations = 200 hours 25 days1 month!x $80hr = $16,000License Cost approx. = $40,000 Total Project Cost = $40k + $16k ROI/Delta = $56,000
  • 30.
  • 31.
    Case StudyThe CustomerTheleader in the Dutch energy market Turnover of EUR 6.4 billion in 2006Annual IT budget of EUR 130 million12,000 employees and 800+ IT staff700 servers and growing 100 per yearA mix of virtual and physical movesMoving from HP to IBM hardware
  • 32.
    Case StudyThe ChallengeMandateto shrink 3 datacenters into oneWanted to standardize IT infrastructureFocus on minimizing risk
  • 33.
    Case StudyThe SolutionLookedat VMware Converter initially – no P2P, V2PPlateSpin Recon to monitor the existing estate for new hardware planning and consolidationPlateSpin Migrate for 260 migrations (P2P and P2V) across sitesNew Site
  • 34.
    Case Study“If wehadn’t gone with PlateSpin, it would have taken a team of 25 half a year to build all the applications in the new data center, an estimated cost of over EUR 3 million. With PlateSpin, we were able to migrate all of our servers in one month with a team of less than eight people. The PlateSpin solution brings a high return of investment. In retrospect, after seeing the time and cost savings, we would have been willing to pay a lot more for the PlateSpin solution.” Marco Spoel, Project Manager, IT Infrastructure, Essent