Accelerating Data and Document Handover
Steve Pearson
Phusion IM ltd
10th November 2015
Accelerating Data and
Document Handover
Steve Pearson
Just another day in Industry!
Safety Flash
So what can we do to
be better prepared?
Take Away:
Major benefits and savings
Examples.
Two World Class Projects
• Two operators
• $100billion total spend
• ~750,000 items of equipment
Single Source of Truth
Project Scale and Equipment Commonality
~8,000 ~8,000 ~12,000
~400,000
Tagged Items
of Equipment
Project A Project B
~350,000
Tagged
Items of
Equipment
Unique Equipment = ~28,000
Every component part matters!
Where is this o-ring used on these two projects?
How many spares should I hold?
Follow a 7 step process and you can find out
=
Step 1 – Identify Data Standards
• Equipment Classifications
• UOM for maintenance
• Technical Characteristics
for maintenance
• Failure Codes
Maintenance World
• UOM standard but not ISO 1000
• Based loosely around ISO 15926
part 4
EPC World
• ISO 14224
• Taxonomy codes
• Company specific additions
Reliability World
• ANSI
• BS
• ISO
• IEC
OEM World
• Merged classes
• UOM Standard
• Change Control
Corporate HQ World
• Commodity/Sub - Commodity Codes
• Noun/Modifier
• NATO Standards
• Materials UOM
• Technical Characteristics for Materials
Materials World
• ISO 15926
• ISO 14224
• ISO 1000
• etc.
ISO World
Step 2 – Align and converge data standards.
• Equipment Classifications
• UOM for maintenance
• Technical Characteristics
for maintenance
• Failure Codes
Maintenance World
• UOM standard but not ISO 1000
• Based loosely around ISO 15926
part 4
EPC World
• ISO 14224
• Taxonomy codes
• Company specific additions
Reliability World
• ANSI
• BS
• ISO
• IEC
OEM World
• Merged classes
• UOM Standard
• Change Control
Corporate HQ World
• Commodity/Sub - Commodity Codes
• Noun/Modifier
• NATO Standards
• Materials UOM
• Technical Characteristics for Materials
Materials World
• ISO 15926
• ISO 14224
• ISO 1000
• etc.
ISO World
Step 3 – Define information handover requirements
Step 4 – Online collection and sharing
OEM
Model Object
Library
Online Collection Tool
EPC
Package
Vendor
OEM
SSOT
(Single
Source of
Truth)
Viewing Tool
Step 5 – Validate OEM Data (OEM Name)
Fisher-
Rosemount
Emerson -
Rosemount
Emerson
Rosemount Emerson
FisherRosemount
Step 5 – Validate OEM Data (OEM Model Number)
Raw Data In Processed Data Out
Raw OEM
Model Numbers
Validated to OEM
Specifications
Validation Tool
Add to Library
Raw OEM Model Number
3144P
3144PD1A10
3144PD1A11
3144PD1A1E5B4M5
3144PD1A1E5B4M5T1QT
3144PD1A1E5B4M5T1
3144PD1A1E5B4T1M5
3144PD1A1K5M5B4QTT1
3144PD1A2
3144PD1A2E5B4M5T1QT
3144PD1A2E5B4M5T1U1QT
3144PD1A2E5B5M5T1U1QT
3144PD1A2K5B4M5QTT1
3144PD1A2K5B4M5T1QT
Step 6 - Build Model Objects
Technical
Characteristics
Yokogawa
EXJ430A-FBS5C
-92DDN/EE/M01/SF2
Generic Documents
Components
Gauge Pressure
Transmitter
Step 6 - Build Model Objects (BOMS)
Step 7 - Linking Model Objects to Tags & Stock
Generic Documents Technical
Characteristics
Yokogawa
EXJ430A-FBS5C
-92DDN/EE/M01/SF2
Gauge Pressure
Transmitter
Components
Stock No: 135373
185 Tag Links
010PT-3042B
Pressure Transmitter
Construction Type
Functional Locations
Material Master
Start Up Delays and First Year Performance
Global
50%
100%
YEAR 1 10 20 30 40
Start up delay
$10M
$20M
$0.5 BILLIONLifting Beam
Re-Certification
Joint Integrity
Checks and
Certification
Critical Path
delays
Information
Error
Spares
Shortages
Best in class
95%
Average
82%
Achieved first year production
Estimated first year production
X 100
Missed
Lessons
Learned
50% of major capital projects have
significant operability problems in
the first year of operation
Industry Performance Data
Supplied by Independent Project Analysis, Inc. (IPA)
Major Benefits and Savings
Hard copy
production,
transportation
and
carbon offset
savings
• Earlier access to data to support commissioning
and “ready for start up” activities.
• Optimised spares holding.
• Reduced paper processing and storage costs!
• Eliminate inappropriate purchases.
• Avoid rework / reactive surveys
• Lower information handover costs
Ready in one week for the next project!
SSOT
(Single Source of Truth
Environment)
Online Collection Tool
Access to mapped existing
data standards and
requirements templates
Access to existing and
“current” library of OEM model
objects and OEM documents
Tools and reference data to validate
leading OEM model numbers.
Ability to validate project numbering
Ability to view all data,
documents, models and relationships
held in the SSOT
Secure environment to store all sources of data and documents
There is never enough time
and money to do it right…
…but there is always
enough time and
money to do it
again!
Thank You… Are There Any Questions?
Steve Pearson
Executive Chairman
Phusion IM Ltd
Steve.pearson@phusionim.com
www.phusionim.com
Accelerating Data and
Document Handover

More Related Content

Similar to EDTP 2015 D14 Accelerating Data and Document Hand over - Steve Pearson, Phusion IM Ltd

Maxuni Presentation 2009 Us New
Maxuni Presentation 2009 Us NewMaxuni Presentation 2009 Us New
Maxuni Presentation 2009 Us New
sljlsjflsjljslsljlsdjf
 
Maxuni Presentation 2009 Us New
Maxuni Presentation 2009 Us NewMaxuni Presentation 2009 Us New
Maxuni Presentation 2009 Us New
sljlsjflsjljslsljlsdjf
 
54-Electrical-Spec-Writing-Jan-20-21.pdf
54-Electrical-Spec-Writing-Jan-20-21.pdf54-Electrical-Spec-Writing-Jan-20-21.pdf
54-Electrical-Spec-Writing-Jan-20-21.pdf
workinehali92
 
Presentación ISA 95
Presentación ISA 95 Presentación ISA 95
Presentación ISA 95
Gerardo Guiguet
 
II-SDV 2015, 20 - 21 April, in Nice
II-SDV 2015, 20 - 21 April, in NiceII-SDV 2015, 20 - 21 April, in Nice
II-SDV 2015, 20 - 21 April, in Nice
Dr. Haxel Consult
 
Lean_Basics_Part_II_Rev4.ppt
Lean_Basics_Part_II_Rev4.pptLean_Basics_Part_II_Rev4.ppt
Lean_Basics_Part_II_Rev4.ppt
Endi Kustamsi
 
Securing your supply chain from counterfeit parts through real time electroni...
Securing your supply chain from counterfeit parts through real time electroni...Securing your supply chain from counterfeit parts through real time electroni...
Securing your supply chain from counterfeit parts through real time electroni...
OptimalPlus
 
MFG4 2016 - Is Automation Right for Your Company - 4-2016
MFG4 2016 -  Is Automation Right for Your Company - 4-2016MFG4 2016 -  Is Automation Right for Your Company - 4-2016
MFG4 2016 - Is Automation Right for Your Company - 4-2016
Craig Salvalaggio
 
Omron Blackbird webinar-with voice recording_19112019
Omron Blackbird webinar-with voice recording_19112019Omron Blackbird webinar-with voice recording_19112019
Omron Blackbird webinar-with voice recording_19112019
BlackbirdApS
 
AUTOMATE 2015 - Is Automation Right for Your Company - Craig Salvalaggio 3-2015
AUTOMATE 2015 - Is Automation Right for Your Company - Craig Salvalaggio 3-2015AUTOMATE 2015 - Is Automation Right for Your Company - Craig Salvalaggio 3-2015
AUTOMATE 2015 - Is Automation Right for Your Company - Craig Salvalaggio 3-2015
Craig Salvalaggio
 
Digitizing Asset Management
Digitizing Asset ManagementDigitizing Asset Management
Digitizing Asset Management
Anete Skrebele
 
Predictive Maintenance - Predict the Unpredictable
Predictive Maintenance - Predict the UnpredictablePredictive Maintenance - Predict the Unpredictable
Predictive Maintenance - Predict the Unpredictable
Ivo Andreev
 
Leghe Leggere Lavorate Brochure 2019
Leghe Leggere Lavorate Brochure 2019Leghe Leggere Lavorate Brochure 2019
Leghe Leggere Lavorate Brochure 2019
Franco D. Biella
 
Linkedin Defense And Aerospace Procurement
Linkedin Defense And Aerospace  ProcurementLinkedin Defense And Aerospace  Procurement
Linkedin Defense And Aerospace Procurement
Christian Yanarella
 
Company profile 2018
Company profile 2018Company profile 2018
Company profile 2018
福佑電機 FULLTECH
 
ROI Calculations
ROI CalculationsROI Calculations
ROI Calculations
Balluff, Inc.
 
SMED - 6.pptx.pptx
SMED - 6.pptx.pptxSMED - 6.pptx.pptx
SMED - 6.pptx.pptx
ssuser820b7a
 
Peter holditch devops
Peter holditch   devopsPeter holditch   devops
Peter holditch devops
Peter Holditch
 
Vtech cms divisonal presentation may 2014 represented by htcs
Vtech cms divisonal presentation may 2014 represented by htcsVtech cms divisonal presentation may 2014 represented by htcs
Vtech cms divisonal presentation may 2014 represented by htcs
HTCS LLC
 
IoT Adaptive Inventory in Manufacturing SCM Mahindra and Mahindra
IoT Adaptive Inventory in Manufacturing SCM Mahindra and MahindraIoT Adaptive Inventory in Manufacturing SCM Mahindra and Mahindra
IoT Adaptive Inventory in Manufacturing SCM Mahindra and Mahindra
Surendra Kancherla
 

Similar to EDTP 2015 D14 Accelerating Data and Document Hand over - Steve Pearson, Phusion IM Ltd (20)

Maxuni Presentation 2009 Us New
Maxuni Presentation 2009 Us NewMaxuni Presentation 2009 Us New
Maxuni Presentation 2009 Us New
 
Maxuni Presentation 2009 Us New
Maxuni Presentation 2009 Us NewMaxuni Presentation 2009 Us New
Maxuni Presentation 2009 Us New
 
54-Electrical-Spec-Writing-Jan-20-21.pdf
54-Electrical-Spec-Writing-Jan-20-21.pdf54-Electrical-Spec-Writing-Jan-20-21.pdf
54-Electrical-Spec-Writing-Jan-20-21.pdf
 
Presentación ISA 95
Presentación ISA 95 Presentación ISA 95
Presentación ISA 95
 
II-SDV 2015, 20 - 21 April, in Nice
II-SDV 2015, 20 - 21 April, in NiceII-SDV 2015, 20 - 21 April, in Nice
II-SDV 2015, 20 - 21 April, in Nice
 
Lean_Basics_Part_II_Rev4.ppt
Lean_Basics_Part_II_Rev4.pptLean_Basics_Part_II_Rev4.ppt
Lean_Basics_Part_II_Rev4.ppt
 
Securing your supply chain from counterfeit parts through real time electroni...
Securing your supply chain from counterfeit parts through real time electroni...Securing your supply chain from counterfeit parts through real time electroni...
Securing your supply chain from counterfeit parts through real time electroni...
 
MFG4 2016 - Is Automation Right for Your Company - 4-2016
MFG4 2016 -  Is Automation Right for Your Company - 4-2016MFG4 2016 -  Is Automation Right for Your Company - 4-2016
MFG4 2016 - Is Automation Right for Your Company - 4-2016
 
Omron Blackbird webinar-with voice recording_19112019
Omron Blackbird webinar-with voice recording_19112019Omron Blackbird webinar-with voice recording_19112019
Omron Blackbird webinar-with voice recording_19112019
 
AUTOMATE 2015 - Is Automation Right for Your Company - Craig Salvalaggio 3-2015
AUTOMATE 2015 - Is Automation Right for Your Company - Craig Salvalaggio 3-2015AUTOMATE 2015 - Is Automation Right for Your Company - Craig Salvalaggio 3-2015
AUTOMATE 2015 - Is Automation Right for Your Company - Craig Salvalaggio 3-2015
 
Digitizing Asset Management
Digitizing Asset ManagementDigitizing Asset Management
Digitizing Asset Management
 
Predictive Maintenance - Predict the Unpredictable
Predictive Maintenance - Predict the UnpredictablePredictive Maintenance - Predict the Unpredictable
Predictive Maintenance - Predict the Unpredictable
 
Leghe Leggere Lavorate Brochure 2019
Leghe Leggere Lavorate Brochure 2019Leghe Leggere Lavorate Brochure 2019
Leghe Leggere Lavorate Brochure 2019
 
Linkedin Defense And Aerospace Procurement
Linkedin Defense And Aerospace  ProcurementLinkedin Defense And Aerospace  Procurement
Linkedin Defense And Aerospace Procurement
 
Company profile 2018
Company profile 2018Company profile 2018
Company profile 2018
 
ROI Calculations
ROI CalculationsROI Calculations
ROI Calculations
 
SMED - 6.pptx.pptx
SMED - 6.pptx.pptxSMED - 6.pptx.pptx
SMED - 6.pptx.pptx
 
Peter holditch devops
Peter holditch   devopsPeter holditch   devops
Peter holditch devops
 
Vtech cms divisonal presentation may 2014 represented by htcs
Vtech cms divisonal presentation may 2014 represented by htcsVtech cms divisonal presentation may 2014 represented by htcs
Vtech cms divisonal presentation may 2014 represented by htcs
 
IoT Adaptive Inventory in Manufacturing SCM Mahindra and Mahindra
IoT Adaptive Inventory in Manufacturing SCM Mahindra and MahindraIoT Adaptive Inventory in Manufacturing SCM Mahindra and Mahindra
IoT Adaptive Inventory in Manufacturing SCM Mahindra and Mahindra
 

More from Comit Projects Ltd

COMIT Community Day at O2 - September 2019, Full Slidedeck
COMIT Community Day at O2 - September 2019, Full SlidedeckCOMIT Community Day at O2 - September 2019, Full Slidedeck
COMIT Community Day at O2 - September 2019, Full Slidedeck
Comit Projects Ltd
 
Success through Failure: The Paradox of Innovation
Success through Failure: The Paradox of InnovationSuccess through Failure: The Paradox of Innovation
Success through Failure: The Paradox of Innovation
Comit Projects Ltd
 
Waste to Wealth #COMIT2019
Waste to Wealth #COMIT2019Waste to Wealth #COMIT2019
Waste to Wealth #COMIT2019
Comit Projects Ltd
 
Design Engineer Construct for the World's Infrastructure #COMIT2019
Design Engineer Construct for the World's Infrastructure #COMIT2019Design Engineer Construct for the World's Infrastructure #COMIT2019
Design Engineer Construct for the World's Infrastructure #COMIT2019
Comit Projects Ltd
 
KISS: The Key to Igniting Digital Change Among Field Workers #COMIT2019
KISS: The Key to Igniting Digital Change Among Field Workers #COMIT2019KISS: The Key to Igniting Digital Change Among Field Workers #COMIT2019
KISS: The Key to Igniting Digital Change Among Field Workers #COMIT2019
Comit Projects Ltd
 
Immersive Learning for Tunnelling and Highways #COMIT2019
Immersive Learning for Tunnelling and Highways #COMIT2019Immersive Learning for Tunnelling and Highways #COMIT2019
Immersive Learning for Tunnelling and Highways #COMIT2019
Comit Projects Ltd
 
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
Comit Projects Ltd
 
Tiger (AO4) AWP Implementation #COMIT2019
Tiger (AO4) AWP Implementation #COMIT2019Tiger (AO4) AWP Implementation #COMIT2019
Tiger (AO4) AWP Implementation #COMIT2019
Comit Projects Ltd
 
The use of Asset Management and BIM to Generate Information Requirements #COM...
The use of Asset Management and BIM to Generate Information Requirements #COM...The use of Asset Management and BIM to Generate Information Requirements #COM...
The use of Asset Management and BIM to Generate Information Requirements #COM...
Comit Projects Ltd
 
It's all a Matter of Educating #COMIT2019
It's all a Matter of Educating #COMIT2019It's all a Matter of Educating #COMIT2019
It's all a Matter of Educating #COMIT2019
Comit Projects Ltd
 
Greater Efficiency in Design for Project Delivery #COMIT2019
Greater Efficiency in Design for Project Delivery #COMIT2019Greater Efficiency in Design for Project Delivery #COMIT2019
Greater Efficiency in Design for Project Delivery #COMIT2019
Comit Projects Ltd
 
Automated Construction - Why manufacturing is the future of the sector #COMIT...
Automated Construction - Why manufacturing is the future of the sector #COMIT...Automated Construction - Why manufacturing is the future of the sector #COMIT...
Automated Construction - Why manufacturing is the future of the sector #COMIT...
Comit Projects Ltd
 
A Digital Future for the Infrastructure Industry #COMIT2019
A Digital Future for the Infrastructure Industry #COMIT2019A Digital Future for the Infrastructure Industry #COMIT2019
A Digital Future for the Infrastructure Industry #COMIT2019
Comit Projects Ltd
 
Wizardry - Creating Magical Changes in the full lifecycle of Infrastructure #...
Wizardry - Creating Magical Changes in the full lifecycle of Infrastructure #...Wizardry - Creating Magical Changes in the full lifecycle of Infrastructure #...
Wizardry - Creating Magical Changes in the full lifecycle of Infrastructure #...
Comit Projects Ltd
 
Cross Functional working defines our future #COMIT2019
Cross Functional working defines our future #COMIT2019Cross Functional working defines our future #COMIT2019
Cross Functional working defines our future #COMIT2019
Comit Projects Ltd
 
New technologies & techniques in remote surveying #COMIT2019
New technologies & techniques in remote surveying #COMIT2019New technologies & techniques in remote surveying #COMIT2019
New technologies & techniques in remote surveying #COMIT2019
Comit Projects Ltd
 
Kings Scholar Pond - The Bridge in a Bottle #COMIT2019
Kings Scholar Pond - The Bridge in a Bottle #COMIT2019Kings Scholar Pond - The Bridge in a Bottle #COMIT2019
Kings Scholar Pond - The Bridge in a Bottle #COMIT2019
Comit Projects Ltd
 
Making the Most of the Construction Tech Funding Boom #COMIT2019
Making the Most of the Construction Tech Funding Boom #COMIT2019Making the Most of the Construction Tech Funding Boom #COMIT2019
Making the Most of the Construction Tech Funding Boom #COMIT2019
Comit Projects Ltd
 
Using drones to survey our past, HS2 London #COMIT2019
Using drones to survey our past, HS2 London #COMIT2019Using drones to survey our past, HS2 London #COMIT2019
Using drones to survey our past, HS2 London #COMIT2019
Comit Projects Ltd
 
Digital Contracts - The Emperor's New Clothes? #COMIT2019
Digital Contracts - The Emperor's New Clothes? #COMIT2019Digital Contracts - The Emperor's New Clothes? #COMIT2019
Digital Contracts - The Emperor's New Clothes? #COMIT2019
Comit Projects Ltd
 

More from Comit Projects Ltd (20)

COMIT Community Day at O2 - September 2019, Full Slidedeck
COMIT Community Day at O2 - September 2019, Full SlidedeckCOMIT Community Day at O2 - September 2019, Full Slidedeck
COMIT Community Day at O2 - September 2019, Full Slidedeck
 
Success through Failure: The Paradox of Innovation
Success through Failure: The Paradox of InnovationSuccess through Failure: The Paradox of Innovation
Success through Failure: The Paradox of Innovation
 
Waste to Wealth #COMIT2019
Waste to Wealth #COMIT2019Waste to Wealth #COMIT2019
Waste to Wealth #COMIT2019
 
Design Engineer Construct for the World's Infrastructure #COMIT2019
Design Engineer Construct for the World's Infrastructure #COMIT2019Design Engineer Construct for the World's Infrastructure #COMIT2019
Design Engineer Construct for the World's Infrastructure #COMIT2019
 
KISS: The Key to Igniting Digital Change Among Field Workers #COMIT2019
KISS: The Key to Igniting Digital Change Among Field Workers #COMIT2019KISS: The Key to Igniting Digital Change Among Field Workers #COMIT2019
KISS: The Key to Igniting Digital Change Among Field Workers #COMIT2019
 
Immersive Learning for Tunnelling and Highways #COMIT2019
Immersive Learning for Tunnelling and Highways #COMIT2019Immersive Learning for Tunnelling and Highways #COMIT2019
Immersive Learning for Tunnelling and Highways #COMIT2019
 
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
 
Tiger (AO4) AWP Implementation #COMIT2019
Tiger (AO4) AWP Implementation #COMIT2019Tiger (AO4) AWP Implementation #COMIT2019
Tiger (AO4) AWP Implementation #COMIT2019
 
The use of Asset Management and BIM to Generate Information Requirements #COM...
The use of Asset Management and BIM to Generate Information Requirements #COM...The use of Asset Management and BIM to Generate Information Requirements #COM...
The use of Asset Management and BIM to Generate Information Requirements #COM...
 
It's all a Matter of Educating #COMIT2019
It's all a Matter of Educating #COMIT2019It's all a Matter of Educating #COMIT2019
It's all a Matter of Educating #COMIT2019
 
Greater Efficiency in Design for Project Delivery #COMIT2019
Greater Efficiency in Design for Project Delivery #COMIT2019Greater Efficiency in Design for Project Delivery #COMIT2019
Greater Efficiency in Design for Project Delivery #COMIT2019
 
Automated Construction - Why manufacturing is the future of the sector #COMIT...
Automated Construction - Why manufacturing is the future of the sector #COMIT...Automated Construction - Why manufacturing is the future of the sector #COMIT...
Automated Construction - Why manufacturing is the future of the sector #COMIT...
 
A Digital Future for the Infrastructure Industry #COMIT2019
A Digital Future for the Infrastructure Industry #COMIT2019A Digital Future for the Infrastructure Industry #COMIT2019
A Digital Future for the Infrastructure Industry #COMIT2019
 
Wizardry - Creating Magical Changes in the full lifecycle of Infrastructure #...
Wizardry - Creating Magical Changes in the full lifecycle of Infrastructure #...Wizardry - Creating Magical Changes in the full lifecycle of Infrastructure #...
Wizardry - Creating Magical Changes in the full lifecycle of Infrastructure #...
 
Cross Functional working defines our future #COMIT2019
Cross Functional working defines our future #COMIT2019Cross Functional working defines our future #COMIT2019
Cross Functional working defines our future #COMIT2019
 
New technologies & techniques in remote surveying #COMIT2019
New technologies & techniques in remote surveying #COMIT2019New technologies & techniques in remote surveying #COMIT2019
New technologies & techniques in remote surveying #COMIT2019
 
Kings Scholar Pond - The Bridge in a Bottle #COMIT2019
Kings Scholar Pond - The Bridge in a Bottle #COMIT2019Kings Scholar Pond - The Bridge in a Bottle #COMIT2019
Kings Scholar Pond - The Bridge in a Bottle #COMIT2019
 
Making the Most of the Construction Tech Funding Boom #COMIT2019
Making the Most of the Construction Tech Funding Boom #COMIT2019Making the Most of the Construction Tech Funding Boom #COMIT2019
Making the Most of the Construction Tech Funding Boom #COMIT2019
 
Using drones to survey our past, HS2 London #COMIT2019
Using drones to survey our past, HS2 London #COMIT2019Using drones to survey our past, HS2 London #COMIT2019
Using drones to survey our past, HS2 London #COMIT2019
 
Digital Contracts - The Emperor's New Clothes? #COMIT2019
Digital Contracts - The Emperor's New Clothes? #COMIT2019Digital Contracts - The Emperor's New Clothes? #COMIT2019
Digital Contracts - The Emperor's New Clothes? #COMIT2019
 

Recently uploaded

Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
shyamraj55
 
GenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizationsGenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizations
kumardaparthi1024
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
panagenda
 
Building Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and MilvusBuilding Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and Milvus
Zilliz
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
名前 です男
 
Webinar: Designing a schema for a Data Warehouse
Webinar: Designing a schema for a Data WarehouseWebinar: Designing a schema for a Data Warehouse
Webinar: Designing a schema for a Data Warehouse
Federico Razzoli
 
Energy Efficient Video Encoding for Cloud and Edge Computing Instances
Energy Efficient Video Encoding for Cloud and Edge Computing InstancesEnergy Efficient Video Encoding for Cloud and Edge Computing Instances
Energy Efficient Video Encoding for Cloud and Edge Computing Instances
Alpen-Adria-Universität
 
June Patch Tuesday
June Patch TuesdayJune Patch Tuesday
June Patch Tuesday
Ivanti
 
Choosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptxChoosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptx
Brandon Minnick, MBA
 
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAUHCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
panagenda
 
Generating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and MilvusGenerating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and Milvus
Zilliz
 
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Speck&Tech
 
Ocean lotus Threat actors project by John Sitima 2024 (1).pptx
Ocean lotus Threat actors project by John Sitima 2024 (1).pptxOcean lotus Threat actors project by John Sitima 2024 (1).pptx
Ocean lotus Threat actors project by John Sitima 2024 (1).pptx
SitimaJohn
 
Your One-Stop Shop for Python Success: Top 10 US Python Development Providers
Your One-Stop Shop for Python Success: Top 10 US Python Development ProvidersYour One-Stop Shop for Python Success: Top 10 US Python Development Providers
Your One-Stop Shop for Python Success: Top 10 US Python Development Providers
akankshawande
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
Quotidiano Piemontese
 
Introduction of Cybersecurity with OSS at Code Europe 2024
Introduction of Cybersecurity with OSS  at Code Europe 2024Introduction of Cybersecurity with OSS  at Code Europe 2024
Introduction of Cybersecurity with OSS at Code Europe 2024
Hiroshi SHIBATA
 
How to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For FlutterHow to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For Flutter
Daiki Mogmet Ito
 
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
Edge AI and Vision Alliance
 
Taking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdfTaking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdf
ssuserfac0301
 
Monitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdfMonitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdf
Tosin Akinosho
 

Recently uploaded (20)

Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
 
GenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizationsGenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizations
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
 
Building Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and MilvusBuilding Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and Milvus
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
 
Webinar: Designing a schema for a Data Warehouse
Webinar: Designing a schema for a Data WarehouseWebinar: Designing a schema for a Data Warehouse
Webinar: Designing a schema for a Data Warehouse
 
Energy Efficient Video Encoding for Cloud and Edge Computing Instances
Energy Efficient Video Encoding for Cloud and Edge Computing InstancesEnergy Efficient Video Encoding for Cloud and Edge Computing Instances
Energy Efficient Video Encoding for Cloud and Edge Computing Instances
 
June Patch Tuesday
June Patch TuesdayJune Patch Tuesday
June Patch Tuesday
 
Choosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptxChoosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptx
 
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAUHCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
 
Generating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and MilvusGenerating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and Milvus
 
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
 
Ocean lotus Threat actors project by John Sitima 2024 (1).pptx
Ocean lotus Threat actors project by John Sitima 2024 (1).pptxOcean lotus Threat actors project by John Sitima 2024 (1).pptx
Ocean lotus Threat actors project by John Sitima 2024 (1).pptx
 
Your One-Stop Shop for Python Success: Top 10 US Python Development Providers
Your One-Stop Shop for Python Success: Top 10 US Python Development ProvidersYour One-Stop Shop for Python Success: Top 10 US Python Development Providers
Your One-Stop Shop for Python Success: Top 10 US Python Development Providers
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
 
Introduction of Cybersecurity with OSS at Code Europe 2024
Introduction of Cybersecurity with OSS  at Code Europe 2024Introduction of Cybersecurity with OSS  at Code Europe 2024
Introduction of Cybersecurity with OSS at Code Europe 2024
 
How to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For FlutterHow to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For Flutter
 
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
 
Taking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdfTaking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdf
 
Monitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdfMonitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdf
 

EDTP 2015 D14 Accelerating Data and Document Hand over - Steve Pearson, Phusion IM Ltd

  • 1. Accelerating Data and Document Handover Steve Pearson Phusion IM ltd 10th November 2015
  • 2. Accelerating Data and Document Handover Steve Pearson
  • 3. Just another day in Industry! Safety Flash So what can we do to be better prepared? Take Away: Major benefits and savings Examples.
  • 4. Two World Class Projects • Two operators • $100billion total spend • ~750,000 items of equipment
  • 6. Project Scale and Equipment Commonality ~8,000 ~8,000 ~12,000 ~400,000 Tagged Items of Equipment Project A Project B ~350,000 Tagged Items of Equipment Unique Equipment = ~28,000
  • 7.
  • 8. Every component part matters! Where is this o-ring used on these two projects? How many spares should I hold? Follow a 7 step process and you can find out =
  • 9. Step 1 – Identify Data Standards • Equipment Classifications • UOM for maintenance • Technical Characteristics for maintenance • Failure Codes Maintenance World • UOM standard but not ISO 1000 • Based loosely around ISO 15926 part 4 EPC World • ISO 14224 • Taxonomy codes • Company specific additions Reliability World • ANSI • BS • ISO • IEC OEM World • Merged classes • UOM Standard • Change Control Corporate HQ World • Commodity/Sub - Commodity Codes • Noun/Modifier • NATO Standards • Materials UOM • Technical Characteristics for Materials Materials World • ISO 15926 • ISO 14224 • ISO 1000 • etc. ISO World
  • 10. Step 2 – Align and converge data standards. • Equipment Classifications • UOM for maintenance • Technical Characteristics for maintenance • Failure Codes Maintenance World • UOM standard but not ISO 1000 • Based loosely around ISO 15926 part 4 EPC World • ISO 14224 • Taxonomy codes • Company specific additions Reliability World • ANSI • BS • ISO • IEC OEM World • Merged classes • UOM Standard • Change Control Corporate HQ World • Commodity/Sub - Commodity Codes • Noun/Modifier • NATO Standards • Materials UOM • Technical Characteristics for Materials Materials World • ISO 15926 • ISO 14224 • ISO 1000 • etc. ISO World
  • 11. Step 3 – Define information handover requirements
  • 12. Step 4 – Online collection and sharing OEM Model Object Library Online Collection Tool EPC Package Vendor OEM SSOT (Single Source of Truth) Viewing Tool
  • 13. Step 5 – Validate OEM Data (OEM Name) Fisher- Rosemount Emerson - Rosemount Emerson Rosemount Emerson FisherRosemount
  • 14. Step 5 – Validate OEM Data (OEM Model Number) Raw Data In Processed Data Out Raw OEM Model Numbers Validated to OEM Specifications Validation Tool Add to Library Raw OEM Model Number 3144P 3144PD1A10 3144PD1A11 3144PD1A1E5B4M5 3144PD1A1E5B4M5T1QT 3144PD1A1E5B4M5T1 3144PD1A1E5B4T1M5 3144PD1A1K5M5B4QTT1 3144PD1A2 3144PD1A2E5B4M5T1QT 3144PD1A2E5B4M5T1U1QT 3144PD1A2E5B5M5T1U1QT 3144PD1A2K5B4M5QTT1 3144PD1A2K5B4M5T1QT
  • 15. Step 6 - Build Model Objects Technical Characteristics Yokogawa EXJ430A-FBS5C -92DDN/EE/M01/SF2 Generic Documents Components Gauge Pressure Transmitter
  • 16. Step 6 - Build Model Objects (BOMS)
  • 17. Step 7 - Linking Model Objects to Tags & Stock Generic Documents Technical Characteristics Yokogawa EXJ430A-FBS5C -92DDN/EE/M01/SF2 Gauge Pressure Transmitter Components Stock No: 135373 185 Tag Links 010PT-3042B Pressure Transmitter Construction Type Functional Locations Material Master
  • 18. Start Up Delays and First Year Performance Global 50% 100% YEAR 1 10 20 30 40 Start up delay $10M $20M $0.5 BILLIONLifting Beam Re-Certification Joint Integrity Checks and Certification Critical Path delays Information Error Spares Shortages Best in class 95% Average 82% Achieved first year production Estimated first year production X 100 Missed Lessons Learned 50% of major capital projects have significant operability problems in the first year of operation Industry Performance Data Supplied by Independent Project Analysis, Inc. (IPA)
  • 19. Major Benefits and Savings Hard copy production, transportation and carbon offset savings • Earlier access to data to support commissioning and “ready for start up” activities. • Optimised spares holding. • Reduced paper processing and storage costs! • Eliminate inappropriate purchases. • Avoid rework / reactive surveys • Lower information handover costs
  • 20. Ready in one week for the next project! SSOT (Single Source of Truth Environment) Online Collection Tool Access to mapped existing data standards and requirements templates Access to existing and “current” library of OEM model objects and OEM documents Tools and reference data to validate leading OEM model numbers. Ability to validate project numbering Ability to view all data, documents, models and relationships held in the SSOT Secure environment to store all sources of data and documents
  • 21. There is never enough time and money to do it right…
  • 22. …but there is always enough time and money to do it again!
  • 23. Thank You… Are There Any Questions? Steve Pearson Executive Chairman Phusion IM Ltd Steve.pearson@phusionim.com www.phusionim.com Accelerating Data and Document Handover