CONTENT
• Meeting dates
• Gantt card
• Literature & Chapter 7 review
• Brainstorming
• Fishbone diagram
• Matrix diagram
• Focussing on the main problem
• Survey
• Data analysis
• Suggestions
• Limitation
• References
MEETING DATES
12.10.2015
21.10.2015 25.10.2015
27.10.2015 02.11.2015
04.11.2015 06.11.2015
08.11.2015
GANTT CARD
TASKS 12.10.2015 21.10.2015 25.10.2015 27.10.2015 02.11.2015 04.11.2015 06.11.2015 08.11.2015 09.11.2015
PLAN
Topic
Selection
Determinatio
n of problem
Literature
reviews
Identifying
targets
DO
Survey data
Interview
data
CHECK
Causes of
problem
Interview
data
Survey data
Self
assessment
ACT PPT
presentation
EXPECTED OBSERVED
Lets watch our interviews
LITERATURE & CHAPTER
REVIEW
“If school is not inviting, if the tasks are not clear,
interesting, and at an appropriate level, how can we
expect pupils to be on task?”
William Morse (1987)
Effectively planned, well-paced, relevant, and
interesting instruction is a key aspect of effective
classroom management.
Key Issues in Student
Motivation to Learn
Understanding the research on motivation and its
relationship to student academic needs enables
teachers to implement instruction that results in
virtually all students’ obtaining feeling of worth within
the school setting.
motivation = expectation x
value x climate
Students Academic Needs
According to Eugene Garcia, teachers behavior
should include
•focusing instruction to some degree on what has
meaning to students
•using a thematic approach to instruction
•implementing cooperative/collaborative learning
activities
•developing warm, caring relationships with students
•creating opportunities for cross-age tutoring
Understand and Value the
Learning Goal
“ The quality of the time students spend engaged in
academic work depends on the tasks they are
expected to accomplish and extend to which
students understand what they are doing.”
Walter Doyle (1983)
Understand the Learning
Process
•Develop a functional definition of learning
•Appreciate and use one’s special abilities
•Learn how to study efficiently
Be Actively Involved in the
Learning Process
According to some studies, researchers indicated
that majority of students spend their time in
noninteractive activities such as listening the
lectures but not involving the lectures. However,
when they are engaged in interactive activities,
their success are higher.
Experience Success
Differentiated Instruction
is a currently popular term for developing classroom
instructional activities that enable all students to
experience academic success.
According to Carol Tomlinson, the acquisition of
content can be differentiated by attending to:
•students’ readiness or current level of
knowledge/skills
•students’ interests
•how students prefer to learn content
Authentic assessment is a term used to describe
methods for providing students with multiple ways to
demonstrate their mastery of content knowledge.
According to Burke, there are several methods for
incorporating authentic assessment including
• portfolios
• performances and exhibitions
• learning logs and journals
• observation checklists
• graphic organizers
• interviews and conferences
Adjusting environmental factors
· (Dunn, Thies & Honigsfeld, 2001)
•When presenting material, use visual displays.
•Allow students to select where they will sit.
•Permit students to choose where they wish to sit.
•Provide adequate structure for both short-term and
long-range assignments.
Dunn R., Thies A. & Honigsfeld, A. (2001) Synthesis of the Dunn and Dunn learning-style model research: Analysis from a neuropsychological perspective.
Jamaica, NY: St. John’s University School of Education and Human Services
· Bernice McCarthy (1987), 4MAT
1. Innovative learners
2. Analytic learners
3. Common sense learners
4. Dynamic learners
https://allthingslearning.files.wordpress.com/2012/08/4mat-model-tg-ver.png
· Howard Gardner’s Work on Multiple
Intelligences
http://www.thephuketnews.com/photo/listing/1364782980_1.jpg
Teacher as a role model
of learning and excitement.
· Corno(2001) , McCaslin (2006)
‘Self-monitoring protects
concentration and motivation
when intrusions arise
in the outer (task) environment,
or internally (e.g. as when
interest or mood shifts.’
“Rewards are one proven way to motivate students
to put forth effort, especially when the rewards are
offered in advance as incentives for striving to reach
specified levels of performance.” (Good & Brophy,
1994)
Have Learning Goals Related
to Their
Interests and Choices
Studies suggest that students prefer instructional
methods supportive of their special interests
and needs (Davidson, 1999) and when these are
implemented, students who have a history of
somewhat low achievement can be very successful.
Make Class Interesting for
Students Through
•Group work
•Personalizing the content by connecting it to
students’ life experiences and interests
•Involving students in sharing their ideas, planning,
and making choices.
Some Methods to Increase
Students’ Motivation and
Learning
Some Methods to Increase
Students’ Motivation and Learning
• Have students build a list of things they would like
to learn about.
• Create opportunities for structured sharing.
• Have students develop special-interest days or
weeks.
• Develop future plans.
• Utilize thematic units
• Involve students in academic goal setting.
Have Time to Integrate
Learning
Receive Realistic and
Immediate Feedback that
Enhances Self-Efficacy
• Effective feedback provides students with important
benchmarks
• It enables students to understand where they are in
relation to achieving goals, the amount of progress
they have made toward a goal, and what they need to
do continue or improve on their progress.
Negative Feedback
Positive Feedback
Students with Special Needs
Why do we need to know
working with Special
Educational Services?
•Cultural backgrounds
•Students who have special
education services
•Students who are not identified as
disabled children
•Learning differences
What Really Matters for Struggling Readers: Designing Research-based Programs Second edition, 2006 Richard L. Allington
Students with Special Needs
All public schools are required to provide a
free and appropriate public education.
What Really Matters for Struggling Readers: Designing Research-based Programs Second edition, 2006 Richard L. Allington
How many disabilities are
there?
1. Autism
2. Deaf
3. Emotional disturbance
4. Hearing impairment
5. Learning disabilities
6. Mental reterdation
7. Multiple disabilities
8. Orthopedic disabilities
9. Speech or Language disorder
What Really Matters for Struggling Readers: Designing Research-based Programs Second edition, 2006 Richard L. Allington
What should you do if you
have concers about students’
learning and behaviours?
•Communicating with parents
•Documenting the process
•Discuss the student’s situation with the school’s
special education team.
What Really Matters for Struggling Readers: Designing Research-based Programs Second edition, 2006 Richard L. Allington
Some difficulties
•Working with parents
•Working with systems
•Working with students
•Insufficient resources
What Really Matters for Struggling Readers: Designing Research-based Programs Second edition, 2006 Richard L. Allington
BRAINSTORMING
FISHBONE DIAGRAM
Teacher Parents
Pyhsical environment
Students
Curriculum
Lack of content knowledge
Attitude
Uncaring
Abuse
Violence
Ignorance
Special needs
Friends
Irrelevant content Materials
Classroom arrangment
Exams
Low motivation level
Why some students’
motivation level is
low compared to
their classmates in
Turkey?
MATRIX DIAGRAM
Parent Teacher Curriculum Physical Environment Student
Büşra 4 7 3 2 5
Meltem 5 7 4 3 6
Merve 5 7 3 2 6
Muzaffer 6 6 3 3 4
Pelin 4 7 3 2 6
Veli 4 6 4 3 5
Total 28 40 20 15 32
Percentage 19% 30% 15% 12% 24%
METHODS FOR ENHANCING
STUDENTS’ MOTIVATION TO
LEARN
•Cooperative Learning
•Peer Tutoring
COOPERATIVE LEARNING
About the Cooperative
Learning
•Most popular and effective method for meeting
students’ varied learning style
•Students involve actively in the learning process
•According to survey that is done by Antil, Jenkins,
Wayne and Vadasy, it enhances students’ progress
toward both academic and social learning.
•Lotan (2006) says that face to face social
interaction becomes a necessary condition to
develop conceptual understanding, problem solving
and critical thinking.
Lotan, R.A. (2006) Managing groupwork in the heterogeneous classroom. In C.M. Evertson & C.S. Weinstein, (Eds.) Handbook of classroom
management. (pp. 525-540). Mahwah, NJ: Lawrence Erlbaum Associates.
Simple Structure Activities
It refers to activities that teachers can use periodically
to stimulate discussion and review materials.
•Roundable
•Number Heads Together
•Stars
Process Approach
According to David and Roger Johnson,
1.Positive Interdependence
2.Individual Accountability
3.Face to Face Interaction
4.Teaching Collaborative Skills
5.Processing Group Skills
Johnson, R.T & Johnson, D.W. An Overview of Cooperative Learning. Published Electronically, http://www.clcrc.com/ 2001
PEER TUTORING
Benefits
•Encourage positive behaviors
•Provide competence and personal worth
•Increase learning
•Help teacher
Methods
•Show green or red card
•Assign assistant student
•Arrange students’ desks
Teaching subject is
understood by the
teacher
Passive learners
Teacher is unsure of
the content
Students are involved
Postman and Weingartner(1969) stated that:
Postman, N., & Weingartner, C. (1969). N. Postman, & C. Weingartner içinde, Teaching As a Subversive Activity.
Another popular approach is creating support group.
Sullivan (1988) reported that support group helps
students who have the ability to complete their
work but who have experienced serious
achievement problems to success the task or pass
the course.
Sullivan, M. E. (1988). Peer and self assessment during problem-based tutorials. The American Journal of Surgery, 177(3), 266-269.
Programs
oClasswide Peer Tutoring (CPT)
oPeer Assisted Learning Strategies (PALS)
oCooperative Homework Teams (CHT)
oCooperative Learning Groups (CLG)
oCooperative Integrated Reading and Composition
(CIRC)
SURVEY
• 50 Teachers who work at private and state schools.
• 40 Students who study at mostly private schools.
Question 1
Student Teacher
• Getting feedback immediately
from teacher increases my
motivation.
• Giving feedback immediately
increases students’ motivation.
Question 2
Student Teacher
• I am more interested in
lessons when teacher uses
different kind of materials and
teaching methods.
• Students are more interested
in lessons when teacher uses
different kind of materails and
teaching techniques.
Question 3
Student Teacher
• Working with a group
increases my motivation level.
• Working with a group increases
students’ motivation level.
Question 4
Student Teacher
• When the teacher is
motivated for lesson, my
motivation is increasing.
• When the teacher’s motivation
increase, motivation of the
student affects positively.
Question 5
Student Teacher
• My motivation level is low
when lesson is not interactive.
• Interactive lessons make
students approach to the lesson
positively.
Question 6
Student Teacher
• 40 minutes is enough for a
lesson to learn effectively.
• 40 minutes is enough for a
lesson to teach effectively.
Question 7
Teacher
• I think that students with special needs should attain same class
with others.
Question 8
Teacher
• Have you ever met a student who needs special education? What
did you do to increase his/her motivation.
Question 9
Student
• Could you tell about your memory that your motivation level is
too low? What was effective in decreasing your motivation?
Question 10
Student
• Could you tell about your memory that your motivation level is
too high? What was effective in increasing your motivation?
DATA ANALYSIS
We conclude that the approaches of both students
and teachers are similar to the each other about the
factors that affect students’ motivation.
SUGGESTIONS
• Teachers’ motivation should be increased
• Teachers should use different methods and materials to reach all
students who have different learning skills.
• The number of group works should be increased since students
can be motivated easily within friends.
• Class hours should be arranged according to the content.
• All education faculties in Turkey should give more spesific
courses related to the special education.
• The government should increase the budget of all education
needs.
LIMITATIONS
•Limited number of schools
•Demographical similar regions
REFERENCES
• IMECE Circles @ Dr. Hayal KÖKSAL
• Dunn R., Thies A. & Honigsfeld, A. (2001) Synthesis of the Dunn and Dunn learning-style model research:
Analysis from a neuropsychological perspective. Jamaica, NY: St. John’s University School of Education and
Human Services
• What Really Matters for Struggling Readers: Designing Research-based Programs Second edition, 2006
Richard L. Allington
• Lotan, R.A. (2006) Managing groupwork in the heterogeneous classroom. In C.M. Evertson & C.S. Weinstein,
(Eds.) Handbook of classroom management. (pp. 525-540). Mahwah, NJ: Lawrence Erlbaum Associates.
• Johnson, R.T & Johnson, D.W. An Overview of Cooperative Learning. Published Electronically,
http://www.clcrc.com/ 2001
• Postman, N., & Weingartner, C. (1969). N. Postman, & C. Weingartner içinde, Teaching As a Subversive
Activity.
• Sullivan, M. E. (1988). Peer and self assessment during problem-based tutorials. The American Journal of
Surgery, 177(3), 266-269.
• ED401 Classroom Management Textbook, 2015-2016 Fall
SPECIAL THANKS TO
HAYAL KÖKSAL

2016 leading seagulls 17 rainbow

  • 1.
  • 2.
    RAINBOW VELİ AKDENİZ -MERVENUR KURT - MELTEM PERÇEMLİ - PELİN HAYRAT - BÜŞRA AVŞAR - MUZAFFER AYDIN
  • 3.
    GROUP MOTTO Motivation isthe breakfast of the champions.
  • 4.
    CONTENT • Meeting dates •Gantt card • Literature & Chapter 7 review • Brainstorming • Fishbone diagram • Matrix diagram • Focussing on the main problem • Survey • Data analysis • Suggestions • Limitation • References
  • 5.
    MEETING DATES 12.10.2015 21.10.2015 25.10.2015 27.10.201502.11.2015 04.11.2015 06.11.2015 08.11.2015
  • 6.
    GANTT CARD TASKS 12.10.201521.10.2015 25.10.2015 27.10.2015 02.11.2015 04.11.2015 06.11.2015 08.11.2015 09.11.2015 PLAN Topic Selection Determinatio n of problem Literature reviews Identifying targets DO Survey data Interview data CHECK Causes of problem Interview data Survey data Self assessment ACT PPT presentation EXPECTED OBSERVED
  • 7.
    Lets watch ourinterviews
  • 8.
  • 9.
    “If school isnot inviting, if the tasks are not clear, interesting, and at an appropriate level, how can we expect pupils to be on task?” William Morse (1987)
  • 10.
    Effectively planned, well-paced,relevant, and interesting instruction is a key aspect of effective classroom management.
  • 11.
    Key Issues inStudent Motivation to Learn Understanding the research on motivation and its relationship to student academic needs enables teachers to implement instruction that results in virtually all students’ obtaining feeling of worth within the school setting.
  • 12.
    motivation = expectationx value x climate
  • 13.
    Students Academic Needs Accordingto Eugene Garcia, teachers behavior should include •focusing instruction to some degree on what has meaning to students •using a thematic approach to instruction •implementing cooperative/collaborative learning activities •developing warm, caring relationships with students •creating opportunities for cross-age tutoring
  • 14.
    Understand and Valuethe Learning Goal “ The quality of the time students spend engaged in academic work depends on the tasks they are expected to accomplish and extend to which students understand what they are doing.” Walter Doyle (1983)
  • 15.
    Understand the Learning Process •Developa functional definition of learning •Appreciate and use one’s special abilities •Learn how to study efficiently
  • 16.
    Be Actively Involvedin the Learning Process According to some studies, researchers indicated that majority of students spend their time in noninteractive activities such as listening the lectures but not involving the lectures. However, when they are engaged in interactive activities, their success are higher.
  • 17.
  • 18.
    Differentiated Instruction is acurrently popular term for developing classroom instructional activities that enable all students to experience academic success.
  • 19.
    According to CarolTomlinson, the acquisition of content can be differentiated by attending to: •students’ readiness or current level of knowledge/skills •students’ interests •how students prefer to learn content
  • 20.
    Authentic assessment isa term used to describe methods for providing students with multiple ways to demonstrate their mastery of content knowledge. According to Burke, there are several methods for incorporating authentic assessment including • portfolios • performances and exhibitions • learning logs and journals • observation checklists • graphic organizers • interviews and conferences
  • 21.
    Adjusting environmental factors ·(Dunn, Thies & Honigsfeld, 2001) •When presenting material, use visual displays. •Allow students to select where they will sit. •Permit students to choose where they wish to sit. •Provide adequate structure for both short-term and long-range assignments. Dunn R., Thies A. & Honigsfeld, A. (2001) Synthesis of the Dunn and Dunn learning-style model research: Analysis from a neuropsychological perspective. Jamaica, NY: St. John’s University School of Education and Human Services
  • 22.
    · Bernice McCarthy(1987), 4MAT 1. Innovative learners 2. Analytic learners 3. Common sense learners 4. Dynamic learners https://allthingslearning.files.wordpress.com/2012/08/4mat-model-tg-ver.png
  • 23.
    · Howard Gardner’sWork on Multiple Intelligences http://www.thephuketnews.com/photo/listing/1364782980_1.jpg
  • 24.
    Teacher as arole model of learning and excitement.
  • 25.
    · Corno(2001) ,McCaslin (2006) ‘Self-monitoring protects concentration and motivation when intrusions arise in the outer (task) environment, or internally (e.g. as when interest or mood shifts.’
  • 26.
    “Rewards are oneproven way to motivate students to put forth effort, especially when the rewards are offered in advance as incentives for striving to reach specified levels of performance.” (Good & Brophy, 1994)
  • 27.
    Have Learning GoalsRelated to Their Interests and Choices Studies suggest that students prefer instructional methods supportive of their special interests and needs (Davidson, 1999) and when these are implemented, students who have a history of somewhat low achievement can be very successful.
  • 28.
    Make Class Interestingfor Students Through •Group work •Personalizing the content by connecting it to students’ life experiences and interests •Involving students in sharing their ideas, planning, and making choices.
  • 29.
    Some Methods toIncrease Students’ Motivation and Learning
  • 30.
    Some Methods toIncrease Students’ Motivation and Learning • Have students build a list of things they would like to learn about. • Create opportunities for structured sharing. • Have students develop special-interest days or weeks. • Develop future plans. • Utilize thematic units • Involve students in academic goal setting.
  • 31.
    Have Time toIntegrate Learning
  • 32.
    Receive Realistic and ImmediateFeedback that Enhances Self-Efficacy
  • 33.
    • Effective feedbackprovides students with important benchmarks • It enables students to understand where they are in relation to achieving goals, the amount of progress they have made toward a goal, and what they need to do continue or improve on their progress.
  • 34.
  • 35.
  • 36.
  • 37.
    Why do weneed to know working with Special Educational Services? •Cultural backgrounds •Students who have special education services •Students who are not identified as disabled children •Learning differences What Really Matters for Struggling Readers: Designing Research-based Programs Second edition, 2006 Richard L. Allington
  • 38.
    Students with SpecialNeeds All public schools are required to provide a free and appropriate public education. What Really Matters for Struggling Readers: Designing Research-based Programs Second edition, 2006 Richard L. Allington
  • 39.
    How many disabilitiesare there? 1. Autism 2. Deaf 3. Emotional disturbance 4. Hearing impairment 5. Learning disabilities 6. Mental reterdation 7. Multiple disabilities 8. Orthopedic disabilities 9. Speech or Language disorder What Really Matters for Struggling Readers: Designing Research-based Programs Second edition, 2006 Richard L. Allington
  • 40.
    What should youdo if you have concers about students’ learning and behaviours? •Communicating with parents •Documenting the process •Discuss the student’s situation with the school’s special education team. What Really Matters for Struggling Readers: Designing Research-based Programs Second edition, 2006 Richard L. Allington
  • 41.
    Some difficulties •Working withparents •Working with systems •Working with students •Insufficient resources What Really Matters for Struggling Readers: Designing Research-based Programs Second edition, 2006 Richard L. Allington
  • 42.
  • 43.
    FISHBONE DIAGRAM Teacher Parents Pyhsicalenvironment Students Curriculum Lack of content knowledge Attitude Uncaring Abuse Violence Ignorance Special needs Friends Irrelevant content Materials Classroom arrangment Exams Low motivation level Why some students’ motivation level is low compared to their classmates in Turkey?
  • 44.
    MATRIX DIAGRAM Parent TeacherCurriculum Physical Environment Student Büşra 4 7 3 2 5 Meltem 5 7 4 3 6 Merve 5 7 3 2 6 Muzaffer 6 6 3 3 4 Pelin 4 7 3 2 6 Veli 4 6 4 3 5 Total 28 40 20 15 32 Percentage 19% 30% 15% 12% 24%
  • 45.
    METHODS FOR ENHANCING STUDENTS’MOTIVATION TO LEARN •Cooperative Learning •Peer Tutoring
  • 46.
  • 47.
    About the Cooperative Learning •Mostpopular and effective method for meeting students’ varied learning style •Students involve actively in the learning process •According to survey that is done by Antil, Jenkins, Wayne and Vadasy, it enhances students’ progress toward both academic and social learning. •Lotan (2006) says that face to face social interaction becomes a necessary condition to develop conceptual understanding, problem solving and critical thinking. Lotan, R.A. (2006) Managing groupwork in the heterogeneous classroom. In C.M. Evertson & C.S. Weinstein, (Eds.) Handbook of classroom management. (pp. 525-540). Mahwah, NJ: Lawrence Erlbaum Associates.
  • 48.
    Simple Structure Activities Itrefers to activities that teachers can use periodically to stimulate discussion and review materials. •Roundable •Number Heads Together •Stars
  • 49.
    Process Approach According toDavid and Roger Johnson, 1.Positive Interdependence 2.Individual Accountability 3.Face to Face Interaction 4.Teaching Collaborative Skills 5.Processing Group Skills Johnson, R.T & Johnson, D.W. An Overview of Cooperative Learning. Published Electronically, http://www.clcrc.com/ 2001
  • 51.
  • 52.
    Benefits •Encourage positive behaviors •Providecompetence and personal worth •Increase learning •Help teacher
  • 53.
    Methods •Show green orred card •Assign assistant student •Arrange students’ desks
  • 54.
    Teaching subject is understoodby the teacher Passive learners Teacher is unsure of the content Students are involved Postman and Weingartner(1969) stated that: Postman, N., & Weingartner, C. (1969). N. Postman, & C. Weingartner içinde, Teaching As a Subversive Activity.
  • 55.
    Another popular approachis creating support group. Sullivan (1988) reported that support group helps students who have the ability to complete their work but who have experienced serious achievement problems to success the task or pass the course. Sullivan, M. E. (1988). Peer and self assessment during problem-based tutorials. The American Journal of Surgery, 177(3), 266-269.
  • 56.
    Programs oClasswide Peer Tutoring(CPT) oPeer Assisted Learning Strategies (PALS) oCooperative Homework Teams (CHT) oCooperative Learning Groups (CLG) oCooperative Integrated Reading and Composition (CIRC)
  • 57.
    SURVEY • 50 Teacherswho work at private and state schools. • 40 Students who study at mostly private schools.
  • 58.
    Question 1 Student Teacher •Getting feedback immediately from teacher increases my motivation. • Giving feedback immediately increases students’ motivation.
  • 59.
    Question 2 Student Teacher •I am more interested in lessons when teacher uses different kind of materials and teaching methods. • Students are more interested in lessons when teacher uses different kind of materails and teaching techniques.
  • 60.
    Question 3 Student Teacher •Working with a group increases my motivation level. • Working with a group increases students’ motivation level.
  • 61.
    Question 4 Student Teacher •When the teacher is motivated for lesson, my motivation is increasing. • When the teacher’s motivation increase, motivation of the student affects positively.
  • 62.
    Question 5 Student Teacher •My motivation level is low when lesson is not interactive. • Interactive lessons make students approach to the lesson positively.
  • 63.
    Question 6 Student Teacher •40 minutes is enough for a lesson to learn effectively. • 40 minutes is enough for a lesson to teach effectively.
  • 64.
    Question 7 Teacher • Ithink that students with special needs should attain same class with others.
  • 65.
    Question 8 Teacher • Haveyou ever met a student who needs special education? What did you do to increase his/her motivation.
  • 66.
    Question 9 Student • Couldyou tell about your memory that your motivation level is too low? What was effective in decreasing your motivation?
  • 67.
    Question 10 Student • Couldyou tell about your memory that your motivation level is too high? What was effective in increasing your motivation?
  • 68.
    DATA ANALYSIS We concludethat the approaches of both students and teachers are similar to the each other about the factors that affect students’ motivation.
  • 69.
    SUGGESTIONS • Teachers’ motivationshould be increased • Teachers should use different methods and materials to reach all students who have different learning skills. • The number of group works should be increased since students can be motivated easily within friends. • Class hours should be arranged according to the content. • All education faculties in Turkey should give more spesific courses related to the special education. • The government should increase the budget of all education needs.
  • 70.
    LIMITATIONS •Limited number ofschools •Demographical similar regions
  • 71.
    REFERENCES • IMECE Circles@ Dr. Hayal KÖKSAL • Dunn R., Thies A. & Honigsfeld, A. (2001) Synthesis of the Dunn and Dunn learning-style model research: Analysis from a neuropsychological perspective. Jamaica, NY: St. John’s University School of Education and Human Services • What Really Matters for Struggling Readers: Designing Research-based Programs Second edition, 2006 Richard L. Allington • Lotan, R.A. (2006) Managing groupwork in the heterogeneous classroom. In C.M. Evertson & C.S. Weinstein, (Eds.) Handbook of classroom management. (pp. 525-540). Mahwah, NJ: Lawrence Erlbaum Associates. • Johnson, R.T & Johnson, D.W. An Overview of Cooperative Learning. Published Electronically, http://www.clcrc.com/ 2001 • Postman, N., & Weingartner, C. (1969). N. Postman, & C. Weingartner içinde, Teaching As a Subversive Activity. • Sullivan, M. E. (1988). Peer and self assessment during problem-based tutorials. The American Journal of Surgery, 177(3), 266-269. • ED401 Classroom Management Textbook, 2015-2016 Fall
  • 73.