SlideShare a Scribd company logo
ICON ENGINEERING SERVICES
P R O F I L E
2 IES
C O N T E N T S
Vision 4
Philosophy and Mission 5
History 6
About CEO 8
Activities at a glance 10
Equipment 12
Bored Pile 22
Driven Concrete Pile 30
Pile Load Test 34
High Strain Dynamic Testing of Pile 38
Pile Integrity Testing Work 44
Geotechnical Investigation Work 45
List of few major clients 46
4 IES
Our vision is to be a vanguard of comprehensive
geotechnical engineering service provider in
the country by power of knowledge, technology,
machinery and human resources. Our prime vision is
to develop present geotechnical engineering practice
by incorporating modern technology practiced
in developed world and to improve skills of local
engineers and entrepreneurs.
We believe in commitment to the profession,
advancement of technology and provide the best
services to the client.
Vision
Bridge 01, Hatirjheel Intregrated Development Project
1200φ Depth-32m, Nos-86 bored RC pile constructed by IES
5 IES
Long back, in mid fifties of the last century, geotechnical
engineering services i.e. soil investigation and bored pile
construction has been introduced in the then East Pakistan
under the entrepreneurship of Swiss Boring, later, the
company switched over to Soiltech International Ltd in
the year of 1971, just after independence of the country.
Other than Soiltech International Ltd, few other company
grew under the leadership of local engineer, and started
practicing geotechnical engineering in real life project. But
work volume failed to attract others to this profession.
Over time, economy of the country gained momentum and
development work volume amplified but this specialized
geotechnical engineering did not move forward, rather, we
want to say,quality and services declined.Non-professionals
dominated the industry and in most cases people took it
simply as business. Now it's time to set a new benchmark
and set on our missions are to:
•	 Incorporate updated technology.
•	 Procure modern equipment and instrument.
•	 Improve skills of local engineers and entrepreneur.
•	 Develop human resources.
Philosophy & Mission
6 IES
Setting Up: 1991- 1997
IES launched late in 1991 by Engr. Abu Mohammed
Masud, without any financial investment and
without any employee on payroll. Onset a very small
geotechnical laboratory setup in a rented garage.
In early 1992, Beximco Engineering Ltd awarded
a small contract of bored pile work for Rangunia –
Hathazaree electrical transmission line at Chittagong.
That was the beginning and later in following years
IES did many small diameter bored pile construction
project and completed successfully. Few of them are
can mentioned here- UGC building,laundry building
of Hotel Sonergaon, Parishankhyan Bhaban at
Agargaon,Twin tower, Concord Grand at Shantinagar,
Concord Regency at Panthapath, Golf Heights at
Banani, ShundarbanTechnopark at Darussalam etc
and many other small building projects.
Decade for Stabilization: 1998- 2007
Onset IES faced a lot of troubles due to faulty
workmanship of out sourced mechanical work
that resulted in huge backlog and idle time. To
overcome the crisis, IES set-up one mechanical
workshop and started repair and maintenance of
their own equipment and machines and IES got new
momentum in site works.
During this period we have constructed bored
pile by conventional method for many prestigious
projects having national importance. Off them we
may mentioned bored pile for Hatubhanga bridge
on Bangshi river at Mirzapore, Crown Cement Ltd
at Mukterpur, Dhaka-Sylhet highway under Ircon
International Ltd, Hz Shah Paran Bridge on Sylhet
bi-pass road, Lafarge Surma Cement plant at Chattak
under Lerson &Toubru Ltd, Kin Bridge Sylhet etc and
many other projects.
During this period IES also started non-destructive
pile testing work – PIT, Pile integrity test and PDA,
High Strain DynamicTesting for quality assurance test
of pile foundation.Also,procured equipment for high
tonnage pile load test work and conducted many pile
load test having test load more than 500 ton.
Stage of Development: 2007-2012
In 2007, we had under taken a large diameter bored
pile work for Arch bridge on Gulshan Lake between
Banani and Gulshan.Technical specification restricted
the rotary boring method to follow. IES have rented
one table drive rotary drilling rig for the work but
failed to accomplish drilling. As a result, engineers
and workers had been humiliated and insulted by
the client and consultant. IES took that as challenge
and started brain storming to develop a machine to
accomplish the job.Finally,collected old components
from Dholaykhal and assembled in their own
workshop to make a drilling machine and finally
succeeded and finished the piling work by newly
developed rotary boring machine.This is a mile stone
development of IES which boosted engineers and
workers to go ahead. Presently, IES have big fleet of
History
7 IES
mechanical rotary boring machine for bored pile
construction and successfully used in many prestigious
projects of the country like- Hatirjheel integrated
development project, Mirpur-airport road flyover, box
girder bridge on river Brhammaputra at Gaffargaon,
Y-bridge on river Titas at Bancharampur, bridges on
Mahananda at Chapai, Gangachara bridge on river Teesta
in Rangpur etc.
Another new division started on by procuring new diesel
hammers and pile drivers to undertake many projects.
Such as the 22,000 Flat construction project of RAJUK. IES
procured new diesel hammers from Delmag, and now,
have a fleet of diesel hammers ranging from D22 to D46
with pile drivers and are on the top of the list of contractors
having highest number and heaviest diesel hammers and
pile drivers.
During this time IES have widened and introduced
High Strain Dynamic Pile Test by procuring two sets of
Pile Driving Analyzers and Pile Integrity Testers from
Pile Dynamics Inc, USA and engineers and technicians
obtained certification from overseas training and
proficiency test from PDCA & PDI.
IES, procured 2500 ton and 1500 ton test setups and
expanded their ability to conduct static pile load test up to
2500 ton.IES also procured half dozen vibrating wire load
cells, displacement transducers, 16 channel data loger,
readout unit fot instrumentation of static pile load test.
This is anew horizon and IES become only service provider
for instrumented pile load test.
Advancement with New Technology: 2013 onward
Since inception IES always looked forward with a vision
to utilize modern machineries and practices essential for
geotechnical engineering; and develop human resources
on par with the international geotechnical sector. All their
focuses are being collectively directed to become a leader
of this nation’s geotechnical service providers. This has
already been achieved and become the only piling and
testing contractor in the country, who have introduced:
Hydraulic drilling rig for bored cast-in-situ pile; fleet
of new diesel hammers; CFA piling; performing static
axial load tests using the most sophisticated and precise
instruments—displacement transducers and load cell; and
introducing dynamic testing of piles.
IES have also taken initiatives to modernize the nation’s
geotechnical investigation sector. At present, IES is the
only geotechnical firm to implement the usage of auto-
trip hammer to carryout standard penetration test (SPT)
and developed double tube thin walled vacuum sampler
for collection of undisturbed soil samples. In addition,
the entire operation is digitally recorded and submitted
to our clients. In the process, the quality assurance is
also guaranteed. Furthermore, it is also in our intention
to introduce internationally accepted CPT; and seismic
survey to clearly map out geotechnical features of a
particular location.
8 IES
Obtained graduation degree in civil engineering from Rajshahi
Engineering College, Rajshahi, Bangladesh and started career
as junior engineer for construction of slipway for Chittagong
Port Authority and then joined specialized geotechnical
engineering German company, Soiltech International Ltd,
pioneer of geotechnical engineering in Bangladesh. During
four and half years service in Soiltech International Ltd he
himself experienced boring and installation of water wells,
constructionofboredpile,drivencast-inplacepile,geotechnical
investigation, pile load testing work done for different project
and started career as geotechnical engineer.
Then, went abroad worked in a geotechnical investigation and
material testing laboratory in Jeddah, KSA. He was responsible
there for doing geotechnical investigation work, asphalt mix
design, compaction test, CBR test, Marshall stability and flow
test on asphalt concrete, non-destructive concrete testing by
using ultra-sonic pulse machine and Schmidt hammer and
other routine concrete testing in laboratory.
After returning home he joined DRILLTECH and did ground
improvement work such as dynamic consolidation, ground
improvement by sand injection, construction of stone column,
determination of lateral deformation of soil by using pressure
meter, boring and installation of water well for drinking
purposes etc. During the period he became experienced in
developing equipment for different purposes.
Started his own business in 1991 under the banner of ICON
ENGINEERING SERVICES based only on past experience and
personal contact. Construction of bored RC pile, geotechnical
investigation, pile load test and driving pre-cast concrete pile
works were the main stream of the business at the beginning.
About CEO
Abu Mohammed Masud
B Sc Engg (Civil), FIEB
9 IES
10 IES
Activitiesat a glance
Summary Activities
• Large Diameter Bored Casi-in-situ Pile, Especially Deep Piles.
Capable to install any diameter bored pile at any depth.
• Driving & Construction of Concrete Driven Piles.
Capable to undertake project of any size.
• Static Compression, Uplift and Lateral Pile Load Test.
Capable to conduct pile load test up to 2500 ton.
• Dynamic Pile Load Test & Pile Itegrity Test.
Capable to test any size of pile.
• Geotechnical Investigation/ Survey.
For reliable, authentic and precise services.
Mile Stone Projects Acomplished
• Padma Bridge, Janjeera Aproach.
Bored Pile- 1200φ 40m
Static Compression Pile Load test- 1350t
Geotechnical Investigation
• 22000 flat project of RAJUK
Driving and constrction of concrete 28 to 33 m
long 400mm square pre-cast pile.
Static Compression Pile Load test.
Dynamic load test, PDA
Geotechnical Investigation
• Maghbazer-Mouchack Flyover
Static Compression Pile Load Test-650t
Dynamic Load Test, PDA- 1500t
Geotechnical Investigation
• Ashugonj 450 CC Pwer Plant
Static Pile Load Test,Anchor Method-1265t max
• Saidabad Water Treatment Plant Phase-II
Static Compression Pile Load test-800t max
Pile Uplift Test- 250t
Pile Dynamic Load Test, PDA
Cross-hole Sonic Logging
• Mirpur-Airport Road Flyover
Bored Pile-1000φ 43m
• Hatirjheel Integrated Development Project
Bored Pile-1000φ & 750φ
Pile Dynamic Load Test, PDA
Static Compression Pile Load test 550t max
• Mayor Hanif Flyover
Pile Dynamic Load Test, PDA
Pile Integrity Test, PIT
• Laferge Shurma Cemement Plant
Bored Pile
Pile Dynamic Load Test, PDA- 1200t
Exceptional Activities
Bored Pile Work
Introduced few activities to improve bored pile qualities.
• Driving long (15m max) temporary steel casing by vibro-hammer.
• Drilling by hydraulic rig.
• Borehole cleaning just before pouring concrete under suction by air lift pumping.
• Impact flashing of borehole by using a seperator.
Driven Pile Work
• Drivavility analysis for driven concrete and steel pile.
• Hammer performance analysis.
• Introduced brand new single acting diesel hammer.
• Automatic blow count by ESAXIMETER.
Pile Load Test Work
• Load measurement by vibrating wire load cell.
• Settlement meassured by dispalcement transducer.
• Digital data collection by 16-channel data logger.
• Concrete strain monitoring by embeded strain gauges.
• Capable to conduct 2,500t static compression pile load test.
• Capable to conduct 1,200t uplift pile load test.
• Having 1,500t concrete block
Quality Assurance of Pile
• Dynamic pile load test and dynamic analysis by PAX-8 PDA analyser.
• Test done by certified engineers having profficiency certification by PDCA & PDI, USA.
Geotechnical Investigation
• Use hydraulic cat head to carryout SPT – the most perfect technique.
• Introduced auto-trip gear for conducting Standard Penetration Test, SPT.
• Authentic SPT blow count- each & every operation captured by video footage.
• Capable to drill upto 250m by using rotary boring machine.
• Static sounding by electronic CPT.
11 IES
12 IES
Equipment
Sl Item Qty
Boredpiledivision
1 Hydraulic rotary boring rig for construction of large diameter bored
RC pile - Soilmec SR-30
One
2 Hydraulic rotary boring rig for construction of large diameter bored RC pile - MAIT HR-180 One
3 Hydraulic powered double clamped vibrotary Hammer (300 HP) - ICE model 1423C One
4 Mechanical table drive rotary boring machine for construction of large diameter
bored RC pile, diameter upto 1500 mm
Nine set
5 Tripod and winch based percussion boring machine for bored RC pile Nine set
6 Drum type motorised bentonyte mixing cyclone complete Four set
7 Screw type air compressor AIRMAN PDS125S,Japan Two set
8 Vacuum priming centrifugal pump for RCD drilling One set
Drivenpiledivision
1 Open ended single acting diesel hammer
1.1 Delmag D 46, Germany Two set
1.2 WICE D 46, ICE Netherland One set
1.3 WICE D 36, ICE Netherland Two set
1.4 Delmag D 30, Germany One set
1.5 Delmag D 36, Germany One set
1.6 K35, Kobe Japan Two set
1.7 K25, Kobe Japan One set
1.8 IDH22, IHI Netherland One set
2 Pile driver
2.1 Skid mounted Pile driver Six set
2.2 Footstep hydraulic pile driver TDJB62B, NHM China One set
3 E-SAXIMETER: for hammer blow count during pile driving, PDI USA One
Own plant and machinery
13 IES
StaticPileloadtest
1 2500 ton capacity 1700x12000 Plate Girder One set
2 1500 ton capacity 1320x8000 Plate Girder One set
3 Hot rolled standard I-Beam 150 ton
4 Hydraullic jack 800 ton capacity, India One
5 Hydraullic jack 800 ton capacity, CSLS-80012, Singapore Two
6 Hydraullic jack 100-600 ton capacity Eight
7 Vibrating-wire Load Cells 100-2000 ton capacity, 4900 Geokon USA Five
8 Automatic datalogger CR 800 model 8025-3X, Geokon USA One
9 Readout unit GK-405, Geokon USA One
10 Displacement transducer 4450-1, Geokon USA Ten
11 Concrete embedment Strain Gauge 4200 A-2, Geokon USA
12 Concrete blocks for counterweight 1600 ton
13 Concrete cribbing block 200 ton
Non-destructivetesting
1 High strain dynamic pile test, PDA
1.1 Pile driving analyser, PDA including radio device etc plus software: CAPWAP, ICAP , GRL
WEAP & PDI plot, model PAX-8 & PAX-4, pile dynamics inc, USA
Two set
1.2 Hammer, guide, trip gear etc. Four set
2 Pile integrity tester, PIT, model PIT-V, pile dynamics inc, USA One unit
3 SPT-Analyzer One set
14 IES
Concreteeqpt
1 Greaves 65XL concrete transit mixture truck,TATA 2516, 7 m3
capacity
Two set
2 SIMEM JUMPER 750 batching plant, 30 m3/hr One
3 Putzmeister concrete pump-BSA 1407 One
4 LIUGONG CLG 853 Wheel loader, 3 ton capacity One
5 Concrete mixture machine Sixteen
Powergenerator
Electrical Power Generator
1 150 KVA diesel generator model P-150E, FG Wilson, England One
2 100 KVA diesel generator model P-100, FG Wilson,England Two set
3 30 KVA diesel generator, SDMO & FG Wilson Five
4 Diesel engine powered A/C generator. Ten unit
5 Diesel engine powered DC arc welding mc Tow unit
6 Welding transformers 200 amps Twelve set
Vehicles
1 Sedan Car Two
2 Pickup Trucks Three
3 Motor bike Six
Geotechnicalsurvey
1 Spindle type rotary boring machine
1.1 Model TBM-88,Toney Boring Japan Two
1.2 Model YBM-2Z,Japan One
1.3 Model IES-100 One
2 Cable tool/percussion boring equipment Ten unit
3 Plate bearing (surface) testing equipment- including bearing plate, hydraulic jack, dial
gauges, reaction frame.
Two set
4 Dynamic cone penetration testing equipment. Two set
5 Leveling machine Sokia-B20 One unit
6 Complete soil machineries laboratory One lot
15 IES
Hydraulic rotary boring rig for construction
of large diameter bored RC pile
soilmec SR-30, Italy
Hydraulic rotary boring rig for construction
of large diameter bored RC pile
MAIT HR-180, Italy
DMS control pannel of hydraulic rig
soilmec SR-30
16 IES
Hydraulic powered double
clamped vibrotary hammer
model ICE 1423C, Netherland
Motorized Hydraulic power pack
model ICE 300PP, Netherland
Air compressor (screw type)
AIRMAN model PDS125S, Japan
17 IES
Footstep hydraulic pile driver
model TDJB62B, NHM China
Open ended single acting diesel hammer
for driving pre-cast concrete pile
DELMAG model D36, Germany
Concrete batching plant, capacity 30 m3/hr SIMEM JUMPER 750, Italy
18 IES
Concrete stationarty pump,
Putzmeister model 1407C, Germany
Wheel loader, LIUGONG
model CLG853, China
Concrete transit mixture truck capacity
7cem on TATA carrier and drum GREAVES
model 65XL, India
19 IES
Mechanical Table drive rotary boring
machine for construction for construction
of large diameter bored RC pile
Spindle type rotary drilling machine for deep
boring and coring,Toney Boring
model TBM-88, Japan
Steel plate girder, 1700mm X 12000mm
for pile load test
Spindle type rotary drilling
machine for deep boring and
coring model IES-100
Spindle type rotary drilling
machine for deep boring and
coring YBM Boring Co.
model YBM-2Z, Japan
20 IES
Pile integrity tester
PDI model PIT-V, USA
Pile signal analizer, TDR2, UK
PDA hardware set; Data acquisition unit
model PAX-8 & PAX-4, with accelerometer, strain
gauges and accessories, Pile Dynamic Inc, USA
Pocket penetrometer
21 IES
800 ton capacity singel acting
hydraulic jack with spherical seat
SUNRUN model CSLS-80012,Taiwan
Impact hammer blow counter
SAXIMETER, Pile Dynamics Inc., USA
Motorized hydraulic power pack, 40 L tank
SUNRUN model SPE-2,Taiwan
Vibrating-wire load cells, data logger, readout unit,
strain gauges displacement transducer
and accessories (100-2000ton)
GEOKON, USA, 4900
22 IES22
BoredPile Bored cast-in-situ RC pile technology is the most popular
deep foundation construction method, which introduced
in the country, by few foreign companies, since mid fifties
of last century. Unfortunately, no significant advancement
have been accomplished to improve quality, rather than
acquire few hydraulic powered rotary boring rig by general
contractors in last three to four years. Introduction of such
sophisticated hydraulic rigs is definitely a forward step but
machines by themselves do not ensure good quality.
We are Emphasising on the construction technique that
may ensure quality of bored pile as well as the economy.
We feel that quality of bored pile can be ensured by adding
a few activities in methodology such as skills of worker,
overall management and few techniques. Based on our
past experience and knowledge, we have developed and
established following activities, which can improve quality of
bored pile substantially.
Essence of our services:
•	 Develop proper methodology.
•	 Use proper equipment.
•	 Central quality control management.
•	 Proper borehole flashing technique.
•	 Proper concrete pouring technique.
Name of few completed Bored Pile works
2013-14
1200φ & 1000φ bored pile for Gangachara bridge over river
Teesta at Rangpur under LGED. Main contractor- WMCE-
NAVANA JV.
1000φ bored pile for Khilgaon Flyover loop atKhilgaon,
Dhaka under LGED. Main contractor- WMCE-NAVANA JV
1200φ & 1000φ bored pile for bridge over river Kaliganga at
Manikgonj under LGED. Main contractor- WMCE-NAVANA JV
1200φ & 1000φ bored pile for bridges at different location
Comilla under Eastern Bangladesh Bridge Improvement
Project of RHD contract CP-03. Main contractor- Monico-
DIENCO JV
2012-2013
1000φ 45m deep bored pile for bridge on river Mahananda
at Chapai Nawabgonj under LGED. Main contractor- WMCE-
NAVANA JV
1200φ & 1000φ 52m deep bored pile for bridge on
river Titash at Bancharampur Comilla under LGED. Main
contractor- WMCE-NAVANA JV
23 IES
Hazrat Shah Paran Bridge on Sylhet Bypass,
pile foundation constructed by IES
2011-2012
1250φ & 750φ 52m deep bored pile for Gaffargaon-Shaltia
bridge at Gaffargaon, Mymensingh under LGED. Main
contractor- Mir Akhter Husssin Ltd
1000φ & 750φ 43m deep bored pile for Mirpur-Airport
Road Flyover, Dhaka under 16 ECB, Corp of Engineers
Bangladesh Army. Main contractor- Mir Akhter Hossain Ltd
2010-11
900φ & 750φ 33m deep bored pile for bridge- at Uttara 3rd
Dhaka, Phase under RAJUK. Main contractor- Monico Ltd
		
1000φ 28m deep bored pile for bridge number: 01, 03,
04 for Hatirjheel- Begunbari Khal Intigrated Development
Project, Dhaka under 16 ECB, Corp of Engineers
Bangladesh Army.
		
2009-10
900φ & 1000φ 30m deep pile for clinker silo at
Meghnaghat, Narayengonj. Client- Unique Cement Ltd
		
2007-08
1200φ 58m deep pile for Kanaighat bridge of LGED over
river Surma at Sylhet. Main contractor- Abdul Monem Ltd,
Bangladesh
900φ 30m deep pile for Banani-Gulshan link bridge LGED
on Banani-Gulshan road, Dhaka. Main contractor- Abdul
Monem Ltd, Bangladesh		
2006-07
1000φ 33m deep pile for Kin Bridge of RHD over river
Surma at Sylhet. Main contractor- Abdul Monem Ltd,
Bangladesh
	
2003-04
750φ 28m deep pile for 3rd Surma Shah Paran Bridge over
river Surma at Sylhet under STJRIP project of RHD. Main
contractor- Monico Ltd
750φ 27m deep pile for 225m long Hatubhanga RC
Guarder Bridge over river Bangshi at Mirzapore. Main
contractor- Monico Ltd
2003-04
1000φ & 600φ 25m deep pile for LAFARGE SURMA
CEMENT PLNT at Chattak, Sylhet. Main contractor- Laersen &
Toubro Ltd, India
2002-03
900φ & 750φ pile for Dhaka-Sylhet Road Project Contract
1-B Aushkandi-Sylhet Section under RRMP-III Project of
RHD. IRCON International Ltd, India
24 IES
Construction work of 450 MW combined cycle power plant (north),Ashugonj
600φ Depth -30m bore RC pile constructed by IES
25 IES
Construction work of PGCB Head Office building, Dhaka
1000φ Depth -44m Nos-330 bore RC pile constructed by IES
810m PC box girder bridge, Gaforgaon, Mymensingh
700φ & 1250φ, Depth-38m & 52m Nos-203 bored RC pile constructed by IES
26 IES
Bridge No-4, Hatirjheel Integrated Development Project, Dhaka
900φ, Depth-26m, Nos-91 bored RC pile constructed by IES
Bridge 01, Hatirjheel Intregrated Development Project, Dhaka
1200φ Depth-32m, Nos-86 bored RC Pile constructed by IES
Banani-Gulshan link bridge LGED on Banani-Gulshan road, Dhaka
900φ, Depth-30m bored RC pile constructed by IES
27 IES
Mirpur-Airpoet Road & Overpass at
Banani Rail Corssing (part-1)
1000φ, Depth-43m, Nos-243
bored RC pile constructed by IES
Mohanondha Bridge, Chapainawabgong
1000φ, Depth -45m
Nos-54 constructed by IES
Construction work of PGCB Head Office building, Dhaka
1000φ Depth -44m borehole flashing by air lift pumping
under reverse flow done by IES
28 IES
Clinker SILO, Fresh Cement, Meghna Ghat, Narayangonj
1000φ, Depth- 27.50m
Nos-132 bored RC pile constructed by IES
Overpass-02, Hatirjheel Integrated Development Project Dhaka
750φ Depth-26m, Nos-96 bored RC pile constructed by IES
Bridge no-10, 3rd phase of Uttara Model Town, Dhaka
900φ & 1000φ, Depth-32m,
Nos-118 bored RC pile constructed by IES
29 IES
Construction work of PGCB
Head Office building, Dhaka
7 m long casing driving
vibratory hammer done by IES
Permanent casing driving for
1000φ bored RC pile at bridge over
Kaliganga river, Manikgonj done by IES
New Academy Building,
American International School Dhaka
750φ, Depth-14m
Nos-42 bore RC pile constructed by IES
30 IES
DrivenConcretePile
Timber trunks were used as foundation piles in ancient times
but, with time, steel and concrete took over as the preferred
materials. Driven pile technology was first introduced in
Bangladesh for the first sea port in Chittagong. Large steam
and pneumatic hammers were used in that project. But after
independence of Bangladesh in 1971, the technology not
moved forward.
Currently, Public Works Department and other government
and private organizations emphasis the use of concrete
pre-cast driven piles for building foundations. Considering
the market demand, IES procured numbers of new and
refurbished open end diesel hammers and pile drivers. At
the moment, IES has a fleet of diesel hammer based pile
drivers and skilled workers.
IES, also equipped with sophisticated software GRL WEAP
for drivability analysis and automatic hammer blow counter
ESAXIMETER of Pile Dynamics Inc, USA. Drivability analysis
and hammer performance test enable piling contractor to
select most appropriate hammer for driving piles.
31 IES
Major work done Driven Pile
2013-2014
	 350mm square 18m long 650 nos pre-cast pile for Judicial
Complex, Laksmipur under Public Works Department.
		
	 350mm square 33m long 2500 nos pre-cast pile for Shahid
Sayed Najrul Islam Medical College Hospital, Kishoregonj
Public Works Department.
		
2012-2013
	 400 mm square 35 m long 3800 nos pre-cast pile for Uttara
Apartment Project under RAJUK, Dhaka.
		
2011-2012
	 350mm square 15m long 617 nos pre-cast pile for Baridhara
Crown, Baridhara, Dhaka. Main contractor-
		
2010-2011
	 375mm square 19m long pre-cast pile for RAB-7 Head
Quarter Patenga,Chittagong under Public Works Department,
Chittagong.
		
2010-2011
	 350mm square 23m long 200 nos pre-cast pile for Jessore
Madical College Hospital,Jessore under Public Works
Department.
		
2009-2010
	 350mm square 15m long 1100 nos pre-cast pile for Advance
Police Town at Saver, Gazipur
		
2010-2011
	 375mm square 18m long pre-cast pile for Petromax Refinary
at Mongla, Bagerhat.
		
2009-2010
	 400mm square 18m long pre-cast pile for bridge- at
Keranigonj,Dhaka, under In Land Container Terminal (ICT) at
Pangaon, Dhaka of BIWTA.
32 IES
Uttara Apartment Project, Dhaka
400mm square, 35m long, Nos-3800
pre-cast pile, D46 diesel hammer in operation
Lifting of 350mm square 23m long
pre-cast concrete pile to check the damage
detected by high strain dynamic test of pile
33 IES
Syed Nazrul Islam Medical College, Kishoregonj
350mm square 33m long,
Nos-2800 pre-cast pile constructed by IES
Petromax Refinery Project, Mongla
350mm square, 15m long,
Nos- 590 pre-cast pile
K35 diesel hammer in operation
34 IES
PileLoadTest To evaluate movement and deformation of pile
shaft under load are the main objectives of pile load
test. During early stages, IES started pile load test
work, their 1st job was to conduct pile load test in
compression on a pre-cast concrete pile for a bridge
at Talma, PS- Boda, District- Panchagar under Local
Government Engineering Department. Journey
started at Talma with a 60t static axial pile load test,
presently capable and equipped to conduct very high
tonnage load test, up to 2500 ton test.We are now on
the top of the list of pile load testing contractor of the
country.
Apart from these, IES is now fully equipped with all
the latest technology and devices used in industrially
and technologically advanced countries.Very recently,
IES has introduced instrumented pile load test. Few of
them are mentioned below:
•	 Measuring applied load by load cell, up to 2000
ton,
•	 Pile movement measured by displacement
transducer.
•	 Use of hemi-spherical seat to minimize eccentric
load.
•	 Data logger and electric readout unit for electronic
data acquisition.
•	 Measuring deformation of concrete pile shaft
by using onetime concrete embedment strain
gauges at different level of pile shaft.
Presently, following pile load test services available
with us:
•	 High tonnage static axial compression pile load
test by kentledge method using concrete block.
•	 High tonnage static axial compression pile load
test by anchor method.
•	 High tonnage static axial uplift/ tensile pile load
test.
•	 Lateral pile load test.
1350 ton compressive load test by kent ledge method with
1500 ton surchange load capacity concrete block at
Zanjira approach road & selected bridge end facilities ICB:
PMB/Approach Road/01 Project done by IES
Few Major Works
Test Load	 Project/Year		 Qty.
900-1350 ton	 Padma Bridge Approach Road- 2014	 10
750-1250 ton	 450 MW Ashugonj South TPP - 2013	 6
550 ton	 Khilgaon Flyover Loop- 2013	 1	
650 ton	 Mogbazar-Mouchak Flyover- 2013	 1
350- 550 ton	 Eastern bridge Project, Comilla	 10
350- 550 ton	 Eastern bridge Project, Chittagong	 10
550- 800 ton	 Mirpur-Airport Road Flyover	 3
35 IES
Dhaka-Chittagong railway development project
(Truck doubling between Laksham-Chinki Astana)
700 ton compressive load test
by anchor method done by IES
450 MW combined cycle
power plant (south),Ashugonj
1250 ton compressive load
test by anchore method done by IES
Upgradation of Khulna 225 MW
combined cycle power plant, Khulna
600 ton compressive load
test by anchore method done by IES
36 IES
Vibrating-wire load cells, data logger, readout unit, strain gauges
displacement transducer and accessories (100-2000ton) GEOKON, USA, 4900
Saidabad water treatment plant project phase-II
250 ton uplift test done by IES
Hydraulic jack, dial gauges placement for
1350 ton compressive load test at
Zanjira approach road & selected bridge end facilities
ICB: PMB/Approach Road/01 project done by IES
37 IES
Bibiyana Expansion Project
Vertical Compression Load test
by Anchore Method done by IES
2nd Titas along with approach rail line
with all other related work
750 ton compressive load test
by kent ledge method done by IES
Moghbazar-Mouchak Flyover Project.WO-06
625 ton compressive load test
by kent ledge method done by IES
38 IES
HighStrainDynamicTestingofPile
Estimation of pile capacity by using driving formula
were introduced in early 1940s by very prominent
engineer including Karl Terzhaghi.About a decade
later EA Smith of Raymond Pile Driving Company
developed a numerical method to estimate pile
capacity using wave propagation. Dynamic formulas
have largely been replaced by more accurate wave
equation analysis and high strain dynamic testing,
although formulas are still occasionally used in spite
of their inaccuracies and the fact that they cannot
predict stresses during driving.
Now a day, the PILE DRIVING ANALYZER system
(PDA) is the most widely employed system for
Dynamic Load Testing and pile driving monitoring
worldwide to asses the capacity of piles, PDA also
evaluates resistance profile, skin and toe resistance.
shaft integrity and investigates driving stresses and
hammer performance during pile installation.
IES procured two PDA hardware set (PAX-8 & PAX-4)
and software and have been practicing since last
few years. Few of IES engineers also took overseas
training to obtain proficiency certificate, please visit
www.pdaproficiencytest.com to see proficiency
level. Since the beginning we did PDA for projects
like, Lafarge Surma Cement Plant, 150 MW
Shikolbaha Picking Power Plant, Mayor Hanif Flyover
project, Saidabad Water Treatment Plant, Dhaka,
Hatirjheel project, 334 MW Duel Fuel Power Plant
at Meghnaghat, 443 MW Bibiana II Power Plant,
Mogbazar-Mouchak Flyover, 22000 Flat Project of
RAJUK and many more.
PAX pile driving analyzer used in high
strain dynamic testing of pile
39 IES
Major PDA work finished
•	 Syed Nazrul Islam Medical College, Kishoreganj
•	 250 MW Power Plant, Burhanuddin, Bhola
•	 443 MW Power Plant Bibiana-II,
•	 334 MW Duel Fuel Power Plant, Meghnaghat, Narayengonj
•	 22000 apartment project at Uttara 3rd phase, Dhaka
•	 Mayor Hanif Flyover, Dhaka
•	 Hatirjheel Integrated Development project, Dhaka
Equipment for PDA
•	 Pile Dynamic Analyzer model PAX-8 and PAX-4 of Pile Dynamics Inc, USA
•	 Smart strain gauges
•	 Accelerometer piezoelectric and piezoresistive
Please visit www.pdaproficiencytest.com to see the list of certified Engineers for PDA Worldwide
Engineer's proficiency certificate for high
strain dynamic testing of pile
40 IES
Strain transducer and accelerometer setting
during high strain dynamic testing of pile
Construction of 102m long Arch Bridge, Dhaka
cantonment- high strain dynamic testing of pile done by IES
Eastern bridge project contract-3, Kawtali bridge
high strain dynamic testing of pile done by IES
41 IES
Bridge over Shikolbaha river, Chittagong
high strain dynamic testing of pile done by IES
Dhaka-Chittagong Railway Development Project (DCRDP) Track
doubling between Laksham and Chinki Astana
high strain dynamic testing of pile done by IES
Moghbazar-Mouchak Flyover Project.WO-06
high strain dynamic testing of pile done by IES
42 IES
546.600m long pre-stressed Girder Bridge over
Mohanondha river, Chapainawabgonj
high strain dynamic testing of pile done by IES
Sayed Nazrul Islam Medical College, Kishoregonj
high strain dynamic testing of pile work done by IES
Force vs Velocity Graph shown after
high strain dynamic testing of pile field work
43 IES
344.908 MW (MET) Gas Fired combined
cycle power plant, Bibiyana (II)
high strain dynamic testing work
of pile done by IES
Zanjira approach road & selected
bridge facilities ICB: PMB/01
high strain dynamic testing work
of pile done by IES
Saidabad water treatment plant phase-II
Dhaka high strain dynamic
testing of pile done by IES
44 IES
PileIntegrityTestingWork A pile integrity test is a method of testing deep
foundation to asses the defects, faults, change in
diameter of the pile shaft. The method also known as
low strain dynamic test,sonic echo test,and low strain
integrity test.
The technique is developed based on wave
propagation theory. A light impact is applied to a pile
top that produce a low strain. The impact produces
a compression wave that travels down the pile at a
constant wave speed and reflects when encounter a
change in cross sectional area or void/crack in material
or weak concrete.
Thisprocedureisperformedwithahandheldhammer
to generate an impact, an accelerometer or geophone
placed on top of the pile to be tested to measure
the response to the hammer impact, and a data
acquisition and interpretation electronic instrument.
The test works well in concrete or timber foundations
that are not excessively slender.Usually the method is
applied to recently constructed piles that are not yet
connected to a structure
Thismethodisstandardizedby ASTMwithdesignation
D5882 “Standard Test Method for Low Strain Integrity
Testing of Piles”.
Pile Integrity tester, PDI, USA
Field PC
Geophone
3.7kg Rubber Mallet
1.7kg Rubber Mallet
45 IES
GeotechnicalInvestigationWork
Geotechnical investigation is an engineering practice
toevaluatesoilandrockparametersthosearerequired
for design a appropriate foundation of engineering
structure. Comprehensive, precise, detail and reliable
investigation can reduce construction cost, time
and human safety substantially. On the other hand
improper geotechnical investigation always deceives
or betrays engineers and entrepreneurs. Most of the
foundation designs are being done in Bangladesh
on the basis of SPT N-value. Many design engineers
need only SPT N-value. Due to versatility of SPT, many
correlations are available, which enables engineers
to estimate soil parameters like shear strength, unit
weight, relative density, volume compressibility etc. It
is very important to determine SPT N-value correctly,
precisely without forgery and fraudulent. Improper
instruments, instrumental error, human error,
deliberate intentions, fabrication of data in the field
by manipulation are the major cause of unreliable
SPT N-values. Upon pin pointing the causes, IES
introduced following activities in geotechnical
investigation, which can reduce un-reliabilities:
•	 Auto trip gear for releasing hammer- ensures
requsit energy and precludes human error.
•	 Proper instrument- precludes instrumental error.
•	 Capturization video footage of SPT activity by
digital camera- precludes data fabrication in field.
•	 SPT N-values re-counted from captured movie.
•	 Reliable lab test.
Oedometer for one dimensional
consolidation test
Unconfined compression test apparatus
46 IES
Overseas Clients
MTHojgaard as, Demark
Geotechnical Investigation, Static compression
& uplift pile load test, crosshole sonic logging,
Pile integrity test and Pile dynamic test PDA for
Saidabad Water Treatment Plant Phase-II of Dhk
WASA
Simplex Infra Structure Ltd, India
Testing Work Gulistan-Jatrabari Flyover, Dhaka
Japan Weather Association, Japan
Rader station at Khepupara, Cox'sbaxer and
Moulavibazer
Siam Tone Co., Ltd,Thailand
Rader station at Khepupara, Cox'sbaxer and
Moulavibazer
Larsen & Toubro Ltd, India
Lafarge Surma Cement Plant at Chattak
IRCON International Ltd, India
Dhaka-Sylhet Road Project
The TATA Power Company Ltd, India
Ishwardi-Khulna Power Transmission Project
China Geo Engineering Co, China
Dhaka-Sylhet Road Project
China Harbor Engineering Co, Chaina
Atrai river bridge on Hatikumrul-Banpara Road
project
The First Northeast Electric Power Enginering
Company (NEPC)
344.908 MW (NET) gas fired combined cycle
power station at Bibiyana-II, Bangladesh
337 MW/350 MW (NET) duel fuel combined cycle
power plant Meghana Ghat, Bangladesh
LTL Global Engineering Services (Pvt.) Limited,
Srilanka
Constructio of 52.2 MW RAJ-LANKA power plant,
Nator, Rajshahi, Bangladesh
50 MW duel fuel (HFO/GAS) fired power plant,
Jangalia, Comilla
Shimizu Corporation
Construction of public food storage under Peoples
Republic of Bangladesh
HIFAB International AB
Sub regional Transport Project Preparatory Facility
(Road Component: Package-2)
Rosatom Group, Russia
Drilling works at Rooppur Nuclear Power Plant
LIST OF FEW MAJOR
CLIENTS
47 IES
Bangladesh Clients
Navana Construction Ltd.
Monico Ltd.
Mir Akter Hossain Ltd.
Bangladesh Railway
Abdul Monem Ltd (AML)
Islam Trading Consortium Ltd. (ITCL)
Al-Amin Construction Ltd.
United Group
Rangs Group
Concord Engineering & Construction Ltd.
Bangladesh Erectors Ltd.
Pubali International Ltd.
Square Pharmaceuticals Ltd.
The ACME Laboratories Ltd.
MI Cement Factory Ltd.
Ruby Cement Heidelberg Cement Group
Building for Future Ltd. (BFL)
Hamid Construction Ltd. (HCL)
Orion Group
Spectra Engineers Ltd.
Bengle Development Corporation (BDC)
National Civil Engineers
MAX Automobile
Toma Construction & Co. Ltd.
Advanced Development Technologies
M.M Builders & Engineers Ltd.
Meghna Group of Industries Limited
National Development Engineers Ltd. (NDE)
Square Consumer Product Ltd.
Dulal Brothers Ltd.
Walton Hi-Tech Industries Ltd.
ACI Ltd.
Local Government Engineering Department (LGED)
Public Works Department (PWD)
Raod and Highways Department (RHD)
Engineering Construction Battalion, Bangladesh Army
Bridge No-4, Hatirjheel Integrated Development Project, Dhaka
900φ, Depth-26m, Nos-91 bored RC pile constructed by IES
48 IES
Diesel hammer working principle
Cylinder
Fuel Pump
Strike Plate
Tripping Explosion Exhaust Scavanging
Ram
Air under
compression
Exhaust port
Anvil
Hammar cushion
Design: Nipun/Drik
Photo: Wahid Adnan/Drik
Production: Drik, (publication@drik.net)
Icon Engineering Services
49/1A, Purana Paltan Line, Purana Paltan
Dhaka-1000, Bangladesh
Phone: +880 (2) 8319710, 9336764 Fax: 9336764
Email: info@iconengg.com
www.iconengg.com

More Related Content

What's hot

TAHRER C.V on 30-07-2015 -link
TAHRER C.V  on 30-07-2015 -linkTAHRER C.V  on 30-07-2015 -link
TAHRER C.V on 30-07-2015 -linkTahrer Abu Yousef
 
Civil-Report on industrial training at URCC
Civil-Report on industrial training at URCCCivil-Report on industrial training at URCC
Civil-Report on industrial training at URCC
Rakshita Raghunath
 
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTINGNATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NationalLaboratory
 
cv of suresh latest (4) (1)
cv of suresh latest (4) (1)cv of suresh latest (4) (1)
cv of suresh latest (4) (1)Suresh Singh
 
resume-Sept 2016 Mazlan Alias
resume-Sept 2016 Mazlan Aliasresume-Sept 2016 Mazlan Alias
resume-Sept 2016 Mazlan AliasMazlan Alias
 
CV Abd. Hadi Ahmad
CV Abd. Hadi AhmadCV Abd. Hadi Ahmad
CV Abd. Hadi AhmadAhmad Hadi
 
Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)Guntur Rudy
 
Karl Luke's Resume Doc
Karl Luke's Resume DocKarl Luke's Resume Doc
Karl Luke's Resume Dockarl luke
 

What's hot (20)

MURUGU SUNDARAN - CV
MURUGU SUNDARAN - CVMURUGU SUNDARAN - CV
MURUGU SUNDARAN - CV
 
Tony gee asia_brochure
Tony gee asia_brochureTony gee asia_brochure
Tony gee asia_brochure
 
TAHRER C.V on 30-07-2015 -link
TAHRER C.V  on 30-07-2015 -linkTAHRER C.V  on 30-07-2015 -link
TAHRER C.V on 30-07-2015 -link
 
BIO DATA
BIO DATABIO DATA
BIO DATA
 
r_1
r_1r_1
r_1
 
CV
CVCV
CV
 
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
 
pipeline foreman
pipeline foremanpipeline foreman
pipeline foreman
 
Civil-Report on industrial training at URCC
Civil-Report on industrial training at URCCCivil-Report on industrial training at URCC
Civil-Report on industrial training at URCC
 
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTINGNATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
 
cv of suresh latest (4) (1)
cv of suresh latest (4) (1)cv of suresh latest (4) (1)
cv of suresh latest (4) (1)
 
Resume-10
Resume-10Resume-10
Resume-10
 
CV D Schroeder 2016
CV D Schroeder 2016CV D Schroeder 2016
CV D Schroeder 2016
 
resume-Sept 2016 Mazlan Alias
resume-Sept 2016 Mazlan Aliasresume-Sept 2016 Mazlan Alias
resume-Sept 2016 Mazlan Alias
 
CV_SHIBU.NS_19-01-2016
CV_SHIBU.NS_19-01-2016CV_SHIBU.NS_19-01-2016
CV_SHIBU.NS_19-01-2016
 
CV Abd. Hadi Ahmad
CV Abd. Hadi AhmadCV Abd. Hadi Ahmad
CV Abd. Hadi Ahmad
 
Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)
 
M SUBBA RAO CV latest
M SUBBA RAO CV latestM SUBBA RAO CV latest
M SUBBA RAO CV latest
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
Karl Luke's Resume Doc
Karl Luke's Resume DocKarl Luke's Resume Doc
Karl Luke's Resume Doc
 

Viewers also liked

Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Presentation on Flyover at Aziz Cross on GT Road GujranwalaPresentation on Flyover at Aziz Cross on GT Road Gujranwala
Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Rubnawaz Bhatti
 
flyover internship 2
flyover internship 2flyover internship 2
flyover internship 2Ravi Mehta
 
Piling of a flyover (AUST 2.2 A)
Piling of a flyover (AUST 2.2 A)Piling of a flyover (AUST 2.2 A)
Piling of a flyover (AUST 2.2 A)
Shakhawat Hossain Mehran
 
CONSTRUCTION; A406 FLYOVER
CONSTRUCTION; A406 FLYOVERCONSTRUCTION; A406 FLYOVER
CONSTRUCTION; A406 FLYOVERSyed Rizvi
 
Escuela normal urbana federal cuautladesventajas
Escuela normal urbana federal cuautladesventajasEscuela normal urbana federal cuautladesventajas
Escuela normal urbana federal cuautladesventajas
marianagladis
 
Aiims flyover presentation
Aiims flyover presentationAiims flyover presentation
Aiims flyover presentation
Tryambakesh Shukla
 
Supervision of piling works, ACES, 2011, Singapore
Supervision of piling works, ACES, 2011, SingaporeSupervision of piling works, ACES, 2011, Singapore
Supervision of piling works, ACES, 2011, SingaporeTong Seng Chua
 
Design of bridge component by vikas dhawan
Design of bridge component by vikas dhawanDesign of bridge component by vikas dhawan
Design of bridge component by vikas dhawan
Ali Ishaqi
 
Flyover construction
Flyover constructionFlyover construction
Flyover construction
Akhilesh Kumar
 
Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD
Alok Mishra
 

Viewers also liked (10)

Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Presentation on Flyover at Aziz Cross on GT Road GujranwalaPresentation on Flyover at Aziz Cross on GT Road Gujranwala
Presentation on Flyover at Aziz Cross on GT Road Gujranwala
 
flyover internship 2
flyover internship 2flyover internship 2
flyover internship 2
 
Piling of a flyover (AUST 2.2 A)
Piling of a flyover (AUST 2.2 A)Piling of a flyover (AUST 2.2 A)
Piling of a flyover (AUST 2.2 A)
 
CONSTRUCTION; A406 FLYOVER
CONSTRUCTION; A406 FLYOVERCONSTRUCTION; A406 FLYOVER
CONSTRUCTION; A406 FLYOVER
 
Escuela normal urbana federal cuautladesventajas
Escuela normal urbana federal cuautladesventajasEscuela normal urbana federal cuautladesventajas
Escuela normal urbana federal cuautladesventajas
 
Aiims flyover presentation
Aiims flyover presentationAiims flyover presentation
Aiims flyover presentation
 
Supervision of piling works, ACES, 2011, Singapore
Supervision of piling works, ACES, 2011, SingaporeSupervision of piling works, ACES, 2011, Singapore
Supervision of piling works, ACES, 2011, Singapore
 
Design of bridge component by vikas dhawan
Design of bridge component by vikas dhawanDesign of bridge component by vikas dhawan
Design of bridge component by vikas dhawan
 
Flyover construction
Flyover constructionFlyover construction
Flyover construction
 
Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD
 

Similar to 13.ICON Brochure

V.BASKAR CV
V.BASKAR CVV.BASKAR CV
V.BASKAR CVBaskar v
 
Khalid Khan-Geo (5-10-16)
Khalid Khan-Geo (5-10-16)Khalid Khan-Geo (5-10-16)
Khalid Khan-Geo (5-10-16)Khalid Khan
 
Muhammad Aamir Javed
Muhammad Aamir JavedMuhammad Aamir Javed
Muhammad Aamir JavedAamir Javed
 
CONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGECONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGEAnkit Gautam
 
internship report report
internship report reportinternship report report
internship report report
Mohan Sai G
 
Azhar bajwa
Azhar bajwaAzhar bajwa
Azhar bajwa
Azhar Naveed Bajwa
 
Amjad Bacha CV Apr 2014 (1)
Amjad Bacha CV Apr 2014 (1)Amjad Bacha CV Apr 2014 (1)
Amjad Bacha CV Apr 2014 (1)Syed Shah
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-NewManish Sabane
 
CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16Iain Cameron
 

Similar to 13.ICON Brochure (20)

Revised Resume
Revised ResumeRevised Resume
Revised Resume
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
V.BASKAR CV
V.BASKAR CVV.BASKAR CV
V.BASKAR CV
 
Khalid Khan-Geo (5-10-16)
Khalid Khan-Geo (5-10-16)Khalid Khan-Geo (5-10-16)
Khalid Khan-Geo (5-10-16)
 
Muhammad Aamir Javed
Muhammad Aamir JavedMuhammad Aamir Javed
Muhammad Aamir Javed
 
master_En
master_Enmaster_En
master_En
 
Shib
ShibShib
Shib
 
CONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGECONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGE
 
Resume - Raveendra S
Resume - Raveendra SResume - Raveendra S
Resume - Raveendra S
 
CV PM-KJH
CV PM-KJHCV PM-KJH
CV PM-KJH
 
jainco
jaincojainco
jainco
 
internship report report
internship report reportinternship report report
internship report report
 
Azhar bajwa
Azhar bajwaAzhar bajwa
Azhar bajwa
 
Amjad Bacha CV Apr 2014 (1)
Amjad Bacha CV Apr 2014 (1)Amjad Bacha CV Apr 2014 (1)
Amjad Bacha CV Apr 2014 (1)
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
MCV
MCVMCV
MCV
 
Resume
ResumeResume
Resume
 
CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16
 

13.ICON Brochure

  • 2.
  • 3.
  • 5. C O N T E N T S Vision 4 Philosophy and Mission 5 History 6 About CEO 8 Activities at a glance 10 Equipment 12 Bored Pile 22 Driven Concrete Pile 30 Pile Load Test 34 High Strain Dynamic Testing of Pile 38 Pile Integrity Testing Work 44 Geotechnical Investigation Work 45 List of few major clients 46
  • 6. 4 IES Our vision is to be a vanguard of comprehensive geotechnical engineering service provider in the country by power of knowledge, technology, machinery and human resources. Our prime vision is to develop present geotechnical engineering practice by incorporating modern technology practiced in developed world and to improve skills of local engineers and entrepreneurs. We believe in commitment to the profession, advancement of technology and provide the best services to the client. Vision Bridge 01, Hatirjheel Intregrated Development Project 1200φ Depth-32m, Nos-86 bored RC pile constructed by IES
  • 7. 5 IES Long back, in mid fifties of the last century, geotechnical engineering services i.e. soil investigation and bored pile construction has been introduced in the then East Pakistan under the entrepreneurship of Swiss Boring, later, the company switched over to Soiltech International Ltd in the year of 1971, just after independence of the country. Other than Soiltech International Ltd, few other company grew under the leadership of local engineer, and started practicing geotechnical engineering in real life project. But work volume failed to attract others to this profession. Over time, economy of the country gained momentum and development work volume amplified but this specialized geotechnical engineering did not move forward, rather, we want to say,quality and services declined.Non-professionals dominated the industry and in most cases people took it simply as business. Now it's time to set a new benchmark and set on our missions are to: • Incorporate updated technology. • Procure modern equipment and instrument. • Improve skills of local engineers and entrepreneur. • Develop human resources. Philosophy & Mission
  • 8. 6 IES Setting Up: 1991- 1997 IES launched late in 1991 by Engr. Abu Mohammed Masud, without any financial investment and without any employee on payroll. Onset a very small geotechnical laboratory setup in a rented garage. In early 1992, Beximco Engineering Ltd awarded a small contract of bored pile work for Rangunia – Hathazaree electrical transmission line at Chittagong. That was the beginning and later in following years IES did many small diameter bored pile construction project and completed successfully. Few of them are can mentioned here- UGC building,laundry building of Hotel Sonergaon, Parishankhyan Bhaban at Agargaon,Twin tower, Concord Grand at Shantinagar, Concord Regency at Panthapath, Golf Heights at Banani, ShundarbanTechnopark at Darussalam etc and many other small building projects. Decade for Stabilization: 1998- 2007 Onset IES faced a lot of troubles due to faulty workmanship of out sourced mechanical work that resulted in huge backlog and idle time. To overcome the crisis, IES set-up one mechanical workshop and started repair and maintenance of their own equipment and machines and IES got new momentum in site works. During this period we have constructed bored pile by conventional method for many prestigious projects having national importance. Off them we may mentioned bored pile for Hatubhanga bridge on Bangshi river at Mirzapore, Crown Cement Ltd at Mukterpur, Dhaka-Sylhet highway under Ircon International Ltd, Hz Shah Paran Bridge on Sylhet bi-pass road, Lafarge Surma Cement plant at Chattak under Lerson &Toubru Ltd, Kin Bridge Sylhet etc and many other projects. During this period IES also started non-destructive pile testing work – PIT, Pile integrity test and PDA, High Strain DynamicTesting for quality assurance test of pile foundation.Also,procured equipment for high tonnage pile load test work and conducted many pile load test having test load more than 500 ton. Stage of Development: 2007-2012 In 2007, we had under taken a large diameter bored pile work for Arch bridge on Gulshan Lake between Banani and Gulshan.Technical specification restricted the rotary boring method to follow. IES have rented one table drive rotary drilling rig for the work but failed to accomplish drilling. As a result, engineers and workers had been humiliated and insulted by the client and consultant. IES took that as challenge and started brain storming to develop a machine to accomplish the job.Finally,collected old components from Dholaykhal and assembled in their own workshop to make a drilling machine and finally succeeded and finished the piling work by newly developed rotary boring machine.This is a mile stone development of IES which boosted engineers and workers to go ahead. Presently, IES have big fleet of History
  • 9. 7 IES mechanical rotary boring machine for bored pile construction and successfully used in many prestigious projects of the country like- Hatirjheel integrated development project, Mirpur-airport road flyover, box girder bridge on river Brhammaputra at Gaffargaon, Y-bridge on river Titas at Bancharampur, bridges on Mahananda at Chapai, Gangachara bridge on river Teesta in Rangpur etc. Another new division started on by procuring new diesel hammers and pile drivers to undertake many projects. Such as the 22,000 Flat construction project of RAJUK. IES procured new diesel hammers from Delmag, and now, have a fleet of diesel hammers ranging from D22 to D46 with pile drivers and are on the top of the list of contractors having highest number and heaviest diesel hammers and pile drivers. During this time IES have widened and introduced High Strain Dynamic Pile Test by procuring two sets of Pile Driving Analyzers and Pile Integrity Testers from Pile Dynamics Inc, USA and engineers and technicians obtained certification from overseas training and proficiency test from PDCA & PDI. IES, procured 2500 ton and 1500 ton test setups and expanded their ability to conduct static pile load test up to 2500 ton.IES also procured half dozen vibrating wire load cells, displacement transducers, 16 channel data loger, readout unit fot instrumentation of static pile load test. This is anew horizon and IES become only service provider for instrumented pile load test. Advancement with New Technology: 2013 onward Since inception IES always looked forward with a vision to utilize modern machineries and practices essential for geotechnical engineering; and develop human resources on par with the international geotechnical sector. All their focuses are being collectively directed to become a leader of this nation’s geotechnical service providers. This has already been achieved and become the only piling and testing contractor in the country, who have introduced: Hydraulic drilling rig for bored cast-in-situ pile; fleet of new diesel hammers; CFA piling; performing static axial load tests using the most sophisticated and precise instruments—displacement transducers and load cell; and introducing dynamic testing of piles. IES have also taken initiatives to modernize the nation’s geotechnical investigation sector. At present, IES is the only geotechnical firm to implement the usage of auto- trip hammer to carryout standard penetration test (SPT) and developed double tube thin walled vacuum sampler for collection of undisturbed soil samples. In addition, the entire operation is digitally recorded and submitted to our clients. In the process, the quality assurance is also guaranteed. Furthermore, it is also in our intention to introduce internationally accepted CPT; and seismic survey to clearly map out geotechnical features of a particular location.
  • 10. 8 IES Obtained graduation degree in civil engineering from Rajshahi Engineering College, Rajshahi, Bangladesh and started career as junior engineer for construction of slipway for Chittagong Port Authority and then joined specialized geotechnical engineering German company, Soiltech International Ltd, pioneer of geotechnical engineering in Bangladesh. During four and half years service in Soiltech International Ltd he himself experienced boring and installation of water wells, constructionofboredpile,drivencast-inplacepile,geotechnical investigation, pile load testing work done for different project and started career as geotechnical engineer. Then, went abroad worked in a geotechnical investigation and material testing laboratory in Jeddah, KSA. He was responsible there for doing geotechnical investigation work, asphalt mix design, compaction test, CBR test, Marshall stability and flow test on asphalt concrete, non-destructive concrete testing by using ultra-sonic pulse machine and Schmidt hammer and other routine concrete testing in laboratory. After returning home he joined DRILLTECH and did ground improvement work such as dynamic consolidation, ground improvement by sand injection, construction of stone column, determination of lateral deformation of soil by using pressure meter, boring and installation of water well for drinking purposes etc. During the period he became experienced in developing equipment for different purposes. Started his own business in 1991 under the banner of ICON ENGINEERING SERVICES based only on past experience and personal contact. Construction of bored RC pile, geotechnical investigation, pile load test and driving pre-cast concrete pile works were the main stream of the business at the beginning. About CEO Abu Mohammed Masud B Sc Engg (Civil), FIEB
  • 11. 9 IES
  • 12. 10 IES Activitiesat a glance Summary Activities • Large Diameter Bored Casi-in-situ Pile, Especially Deep Piles. Capable to install any diameter bored pile at any depth. • Driving & Construction of Concrete Driven Piles. Capable to undertake project of any size. • Static Compression, Uplift and Lateral Pile Load Test. Capable to conduct pile load test up to 2500 ton. • Dynamic Pile Load Test & Pile Itegrity Test. Capable to test any size of pile. • Geotechnical Investigation/ Survey. For reliable, authentic and precise services. Mile Stone Projects Acomplished • Padma Bridge, Janjeera Aproach. Bored Pile- 1200φ 40m Static Compression Pile Load test- 1350t Geotechnical Investigation • 22000 flat project of RAJUK Driving and constrction of concrete 28 to 33 m long 400mm square pre-cast pile. Static Compression Pile Load test. Dynamic load test, PDA Geotechnical Investigation • Maghbazer-Mouchack Flyover Static Compression Pile Load Test-650t Dynamic Load Test, PDA- 1500t Geotechnical Investigation • Ashugonj 450 CC Pwer Plant Static Pile Load Test,Anchor Method-1265t max • Saidabad Water Treatment Plant Phase-II Static Compression Pile Load test-800t max Pile Uplift Test- 250t Pile Dynamic Load Test, PDA Cross-hole Sonic Logging • Mirpur-Airport Road Flyover Bored Pile-1000φ 43m • Hatirjheel Integrated Development Project Bored Pile-1000φ & 750φ Pile Dynamic Load Test, PDA Static Compression Pile Load test 550t max • Mayor Hanif Flyover Pile Dynamic Load Test, PDA Pile Integrity Test, PIT • Laferge Shurma Cemement Plant Bored Pile Pile Dynamic Load Test, PDA- 1200t
  • 13. Exceptional Activities Bored Pile Work Introduced few activities to improve bored pile qualities. • Driving long (15m max) temporary steel casing by vibro-hammer. • Drilling by hydraulic rig. • Borehole cleaning just before pouring concrete under suction by air lift pumping. • Impact flashing of borehole by using a seperator. Driven Pile Work • Drivavility analysis for driven concrete and steel pile. • Hammer performance analysis. • Introduced brand new single acting diesel hammer. • Automatic blow count by ESAXIMETER. Pile Load Test Work • Load measurement by vibrating wire load cell. • Settlement meassured by dispalcement transducer. • Digital data collection by 16-channel data logger. • Concrete strain monitoring by embeded strain gauges. • Capable to conduct 2,500t static compression pile load test. • Capable to conduct 1,200t uplift pile load test. • Having 1,500t concrete block Quality Assurance of Pile • Dynamic pile load test and dynamic analysis by PAX-8 PDA analyser. • Test done by certified engineers having profficiency certification by PDCA & PDI, USA. Geotechnical Investigation • Use hydraulic cat head to carryout SPT – the most perfect technique. • Introduced auto-trip gear for conducting Standard Penetration Test, SPT. • Authentic SPT blow count- each & every operation captured by video footage. • Capable to drill upto 250m by using rotary boring machine. • Static sounding by electronic CPT. 11 IES
  • 14. 12 IES Equipment Sl Item Qty Boredpiledivision 1 Hydraulic rotary boring rig for construction of large diameter bored RC pile - Soilmec SR-30 One 2 Hydraulic rotary boring rig for construction of large diameter bored RC pile - MAIT HR-180 One 3 Hydraulic powered double clamped vibrotary Hammer (300 HP) - ICE model 1423C One 4 Mechanical table drive rotary boring machine for construction of large diameter bored RC pile, diameter upto 1500 mm Nine set 5 Tripod and winch based percussion boring machine for bored RC pile Nine set 6 Drum type motorised bentonyte mixing cyclone complete Four set 7 Screw type air compressor AIRMAN PDS125S,Japan Two set 8 Vacuum priming centrifugal pump for RCD drilling One set Drivenpiledivision 1 Open ended single acting diesel hammer 1.1 Delmag D 46, Germany Two set 1.2 WICE D 46, ICE Netherland One set 1.3 WICE D 36, ICE Netherland Two set 1.4 Delmag D 30, Germany One set 1.5 Delmag D 36, Germany One set 1.6 K35, Kobe Japan Two set 1.7 K25, Kobe Japan One set 1.8 IDH22, IHI Netherland One set 2 Pile driver 2.1 Skid mounted Pile driver Six set 2.2 Footstep hydraulic pile driver TDJB62B, NHM China One set 3 E-SAXIMETER: for hammer blow count during pile driving, PDI USA One Own plant and machinery
  • 15. 13 IES StaticPileloadtest 1 2500 ton capacity 1700x12000 Plate Girder One set 2 1500 ton capacity 1320x8000 Plate Girder One set 3 Hot rolled standard I-Beam 150 ton 4 Hydraullic jack 800 ton capacity, India One 5 Hydraullic jack 800 ton capacity, CSLS-80012, Singapore Two 6 Hydraullic jack 100-600 ton capacity Eight 7 Vibrating-wire Load Cells 100-2000 ton capacity, 4900 Geokon USA Five 8 Automatic datalogger CR 800 model 8025-3X, Geokon USA One 9 Readout unit GK-405, Geokon USA One 10 Displacement transducer 4450-1, Geokon USA Ten 11 Concrete embedment Strain Gauge 4200 A-2, Geokon USA 12 Concrete blocks for counterweight 1600 ton 13 Concrete cribbing block 200 ton Non-destructivetesting 1 High strain dynamic pile test, PDA 1.1 Pile driving analyser, PDA including radio device etc plus software: CAPWAP, ICAP , GRL WEAP & PDI plot, model PAX-8 & PAX-4, pile dynamics inc, USA Two set 1.2 Hammer, guide, trip gear etc. Four set 2 Pile integrity tester, PIT, model PIT-V, pile dynamics inc, USA One unit 3 SPT-Analyzer One set
  • 16. 14 IES Concreteeqpt 1 Greaves 65XL concrete transit mixture truck,TATA 2516, 7 m3 capacity Two set 2 SIMEM JUMPER 750 batching plant, 30 m3/hr One 3 Putzmeister concrete pump-BSA 1407 One 4 LIUGONG CLG 853 Wheel loader, 3 ton capacity One 5 Concrete mixture machine Sixteen Powergenerator Electrical Power Generator 1 150 KVA diesel generator model P-150E, FG Wilson, England One 2 100 KVA diesel generator model P-100, FG Wilson,England Two set 3 30 KVA diesel generator, SDMO & FG Wilson Five 4 Diesel engine powered A/C generator. Ten unit 5 Diesel engine powered DC arc welding mc Tow unit 6 Welding transformers 200 amps Twelve set Vehicles 1 Sedan Car Two 2 Pickup Trucks Three 3 Motor bike Six Geotechnicalsurvey 1 Spindle type rotary boring machine 1.1 Model TBM-88,Toney Boring Japan Two 1.2 Model YBM-2Z,Japan One 1.3 Model IES-100 One 2 Cable tool/percussion boring equipment Ten unit 3 Plate bearing (surface) testing equipment- including bearing plate, hydraulic jack, dial gauges, reaction frame. Two set 4 Dynamic cone penetration testing equipment. Two set 5 Leveling machine Sokia-B20 One unit 6 Complete soil machineries laboratory One lot
  • 17. 15 IES Hydraulic rotary boring rig for construction of large diameter bored RC pile soilmec SR-30, Italy Hydraulic rotary boring rig for construction of large diameter bored RC pile MAIT HR-180, Italy DMS control pannel of hydraulic rig soilmec SR-30
  • 18. 16 IES Hydraulic powered double clamped vibrotary hammer model ICE 1423C, Netherland Motorized Hydraulic power pack model ICE 300PP, Netherland Air compressor (screw type) AIRMAN model PDS125S, Japan
  • 19. 17 IES Footstep hydraulic pile driver model TDJB62B, NHM China Open ended single acting diesel hammer for driving pre-cast concrete pile DELMAG model D36, Germany Concrete batching plant, capacity 30 m3/hr SIMEM JUMPER 750, Italy
  • 20. 18 IES Concrete stationarty pump, Putzmeister model 1407C, Germany Wheel loader, LIUGONG model CLG853, China Concrete transit mixture truck capacity 7cem on TATA carrier and drum GREAVES model 65XL, India
  • 21. 19 IES Mechanical Table drive rotary boring machine for construction for construction of large diameter bored RC pile Spindle type rotary drilling machine for deep boring and coring,Toney Boring model TBM-88, Japan Steel plate girder, 1700mm X 12000mm for pile load test Spindle type rotary drilling machine for deep boring and coring model IES-100 Spindle type rotary drilling machine for deep boring and coring YBM Boring Co. model YBM-2Z, Japan
  • 22. 20 IES Pile integrity tester PDI model PIT-V, USA Pile signal analizer, TDR2, UK PDA hardware set; Data acquisition unit model PAX-8 & PAX-4, with accelerometer, strain gauges and accessories, Pile Dynamic Inc, USA Pocket penetrometer
  • 23. 21 IES 800 ton capacity singel acting hydraulic jack with spherical seat SUNRUN model CSLS-80012,Taiwan Impact hammer blow counter SAXIMETER, Pile Dynamics Inc., USA Motorized hydraulic power pack, 40 L tank SUNRUN model SPE-2,Taiwan Vibrating-wire load cells, data logger, readout unit, strain gauges displacement transducer and accessories (100-2000ton) GEOKON, USA, 4900
  • 24. 22 IES22 BoredPile Bored cast-in-situ RC pile technology is the most popular deep foundation construction method, which introduced in the country, by few foreign companies, since mid fifties of last century. Unfortunately, no significant advancement have been accomplished to improve quality, rather than acquire few hydraulic powered rotary boring rig by general contractors in last three to four years. Introduction of such sophisticated hydraulic rigs is definitely a forward step but machines by themselves do not ensure good quality. We are Emphasising on the construction technique that may ensure quality of bored pile as well as the economy. We feel that quality of bored pile can be ensured by adding a few activities in methodology such as skills of worker, overall management and few techniques. Based on our past experience and knowledge, we have developed and established following activities, which can improve quality of bored pile substantially. Essence of our services: • Develop proper methodology. • Use proper equipment. • Central quality control management. • Proper borehole flashing technique. • Proper concrete pouring technique. Name of few completed Bored Pile works 2013-14 1200φ & 1000φ bored pile for Gangachara bridge over river Teesta at Rangpur under LGED. Main contractor- WMCE- NAVANA JV. 1000φ bored pile for Khilgaon Flyover loop atKhilgaon, Dhaka under LGED. Main contractor- WMCE-NAVANA JV 1200φ & 1000φ bored pile for bridge over river Kaliganga at Manikgonj under LGED. Main contractor- WMCE-NAVANA JV 1200φ & 1000φ bored pile for bridges at different location Comilla under Eastern Bangladesh Bridge Improvement Project of RHD contract CP-03. Main contractor- Monico- DIENCO JV 2012-2013 1000φ 45m deep bored pile for bridge on river Mahananda at Chapai Nawabgonj under LGED. Main contractor- WMCE- NAVANA JV 1200φ & 1000φ 52m deep bored pile for bridge on river Titash at Bancharampur Comilla under LGED. Main contractor- WMCE-NAVANA JV
  • 25. 23 IES Hazrat Shah Paran Bridge on Sylhet Bypass, pile foundation constructed by IES 2011-2012 1250φ & 750φ 52m deep bored pile for Gaffargaon-Shaltia bridge at Gaffargaon, Mymensingh under LGED. Main contractor- Mir Akhter Husssin Ltd 1000φ & 750φ 43m deep bored pile for Mirpur-Airport Road Flyover, Dhaka under 16 ECB, Corp of Engineers Bangladesh Army. Main contractor- Mir Akhter Hossain Ltd 2010-11 900φ & 750φ 33m deep bored pile for bridge- at Uttara 3rd Dhaka, Phase under RAJUK. Main contractor- Monico Ltd 1000φ 28m deep bored pile for bridge number: 01, 03, 04 for Hatirjheel- Begunbari Khal Intigrated Development Project, Dhaka under 16 ECB, Corp of Engineers Bangladesh Army. 2009-10 900φ & 1000φ 30m deep pile for clinker silo at Meghnaghat, Narayengonj. Client- Unique Cement Ltd 2007-08 1200φ 58m deep pile for Kanaighat bridge of LGED over river Surma at Sylhet. Main contractor- Abdul Monem Ltd, Bangladesh 900φ 30m deep pile for Banani-Gulshan link bridge LGED on Banani-Gulshan road, Dhaka. Main contractor- Abdul Monem Ltd, Bangladesh 2006-07 1000φ 33m deep pile for Kin Bridge of RHD over river Surma at Sylhet. Main contractor- Abdul Monem Ltd, Bangladesh 2003-04 750φ 28m deep pile for 3rd Surma Shah Paran Bridge over river Surma at Sylhet under STJRIP project of RHD. Main contractor- Monico Ltd 750φ 27m deep pile for 225m long Hatubhanga RC Guarder Bridge over river Bangshi at Mirzapore. Main contractor- Monico Ltd 2003-04 1000φ & 600φ 25m deep pile for LAFARGE SURMA CEMENT PLNT at Chattak, Sylhet. Main contractor- Laersen & Toubro Ltd, India 2002-03 900φ & 750φ pile for Dhaka-Sylhet Road Project Contract 1-B Aushkandi-Sylhet Section under RRMP-III Project of RHD. IRCON International Ltd, India
  • 26. 24 IES Construction work of 450 MW combined cycle power plant (north),Ashugonj 600φ Depth -30m bore RC pile constructed by IES
  • 27. 25 IES Construction work of PGCB Head Office building, Dhaka 1000φ Depth -44m Nos-330 bore RC pile constructed by IES 810m PC box girder bridge, Gaforgaon, Mymensingh 700φ & 1250φ, Depth-38m & 52m Nos-203 bored RC pile constructed by IES
  • 28. 26 IES Bridge No-4, Hatirjheel Integrated Development Project, Dhaka 900φ, Depth-26m, Nos-91 bored RC pile constructed by IES Bridge 01, Hatirjheel Intregrated Development Project, Dhaka 1200φ Depth-32m, Nos-86 bored RC Pile constructed by IES Banani-Gulshan link bridge LGED on Banani-Gulshan road, Dhaka 900φ, Depth-30m bored RC pile constructed by IES
  • 29. 27 IES Mirpur-Airpoet Road & Overpass at Banani Rail Corssing (part-1) 1000φ, Depth-43m, Nos-243 bored RC pile constructed by IES Mohanondha Bridge, Chapainawabgong 1000φ, Depth -45m Nos-54 constructed by IES Construction work of PGCB Head Office building, Dhaka 1000φ Depth -44m borehole flashing by air lift pumping under reverse flow done by IES
  • 30. 28 IES Clinker SILO, Fresh Cement, Meghna Ghat, Narayangonj 1000φ, Depth- 27.50m Nos-132 bored RC pile constructed by IES Overpass-02, Hatirjheel Integrated Development Project Dhaka 750φ Depth-26m, Nos-96 bored RC pile constructed by IES Bridge no-10, 3rd phase of Uttara Model Town, Dhaka 900φ & 1000φ, Depth-32m, Nos-118 bored RC pile constructed by IES
  • 31. 29 IES Construction work of PGCB Head Office building, Dhaka 7 m long casing driving vibratory hammer done by IES Permanent casing driving for 1000φ bored RC pile at bridge over Kaliganga river, Manikgonj done by IES New Academy Building, American International School Dhaka 750φ, Depth-14m Nos-42 bore RC pile constructed by IES
  • 32. 30 IES DrivenConcretePile Timber trunks were used as foundation piles in ancient times but, with time, steel and concrete took over as the preferred materials. Driven pile technology was first introduced in Bangladesh for the first sea port in Chittagong. Large steam and pneumatic hammers were used in that project. But after independence of Bangladesh in 1971, the technology not moved forward. Currently, Public Works Department and other government and private organizations emphasis the use of concrete pre-cast driven piles for building foundations. Considering the market demand, IES procured numbers of new and refurbished open end diesel hammers and pile drivers. At the moment, IES has a fleet of diesel hammer based pile drivers and skilled workers. IES, also equipped with sophisticated software GRL WEAP for drivability analysis and automatic hammer blow counter ESAXIMETER of Pile Dynamics Inc, USA. Drivability analysis and hammer performance test enable piling contractor to select most appropriate hammer for driving piles.
  • 33. 31 IES Major work done Driven Pile 2013-2014 350mm square 18m long 650 nos pre-cast pile for Judicial Complex, Laksmipur under Public Works Department. 350mm square 33m long 2500 nos pre-cast pile for Shahid Sayed Najrul Islam Medical College Hospital, Kishoregonj Public Works Department. 2012-2013 400 mm square 35 m long 3800 nos pre-cast pile for Uttara Apartment Project under RAJUK, Dhaka. 2011-2012 350mm square 15m long 617 nos pre-cast pile for Baridhara Crown, Baridhara, Dhaka. Main contractor- 2010-2011 375mm square 19m long pre-cast pile for RAB-7 Head Quarter Patenga,Chittagong under Public Works Department, Chittagong. 2010-2011 350mm square 23m long 200 nos pre-cast pile for Jessore Madical College Hospital,Jessore under Public Works Department. 2009-2010 350mm square 15m long 1100 nos pre-cast pile for Advance Police Town at Saver, Gazipur 2010-2011 375mm square 18m long pre-cast pile for Petromax Refinary at Mongla, Bagerhat. 2009-2010 400mm square 18m long pre-cast pile for bridge- at Keranigonj,Dhaka, under In Land Container Terminal (ICT) at Pangaon, Dhaka of BIWTA.
  • 34. 32 IES Uttara Apartment Project, Dhaka 400mm square, 35m long, Nos-3800 pre-cast pile, D46 diesel hammer in operation Lifting of 350mm square 23m long pre-cast concrete pile to check the damage detected by high strain dynamic test of pile
  • 35. 33 IES Syed Nazrul Islam Medical College, Kishoregonj 350mm square 33m long, Nos-2800 pre-cast pile constructed by IES Petromax Refinery Project, Mongla 350mm square, 15m long, Nos- 590 pre-cast pile K35 diesel hammer in operation
  • 36. 34 IES PileLoadTest To evaluate movement and deformation of pile shaft under load are the main objectives of pile load test. During early stages, IES started pile load test work, their 1st job was to conduct pile load test in compression on a pre-cast concrete pile for a bridge at Talma, PS- Boda, District- Panchagar under Local Government Engineering Department. Journey started at Talma with a 60t static axial pile load test, presently capable and equipped to conduct very high tonnage load test, up to 2500 ton test.We are now on the top of the list of pile load testing contractor of the country. Apart from these, IES is now fully equipped with all the latest technology and devices used in industrially and technologically advanced countries.Very recently, IES has introduced instrumented pile load test. Few of them are mentioned below: • Measuring applied load by load cell, up to 2000 ton, • Pile movement measured by displacement transducer. • Use of hemi-spherical seat to minimize eccentric load. • Data logger and electric readout unit for electronic data acquisition. • Measuring deformation of concrete pile shaft by using onetime concrete embedment strain gauges at different level of pile shaft. Presently, following pile load test services available with us: • High tonnage static axial compression pile load test by kentledge method using concrete block. • High tonnage static axial compression pile load test by anchor method. • High tonnage static axial uplift/ tensile pile load test. • Lateral pile load test. 1350 ton compressive load test by kent ledge method with 1500 ton surchange load capacity concrete block at Zanjira approach road & selected bridge end facilities ICB: PMB/Approach Road/01 Project done by IES Few Major Works Test Load Project/Year Qty. 900-1350 ton Padma Bridge Approach Road- 2014 10 750-1250 ton 450 MW Ashugonj South TPP - 2013 6 550 ton Khilgaon Flyover Loop- 2013 1 650 ton Mogbazar-Mouchak Flyover- 2013 1 350- 550 ton Eastern bridge Project, Comilla 10 350- 550 ton Eastern bridge Project, Chittagong 10 550- 800 ton Mirpur-Airport Road Flyover 3
  • 37. 35 IES Dhaka-Chittagong railway development project (Truck doubling between Laksham-Chinki Astana) 700 ton compressive load test by anchor method done by IES 450 MW combined cycle power plant (south),Ashugonj 1250 ton compressive load test by anchore method done by IES Upgradation of Khulna 225 MW combined cycle power plant, Khulna 600 ton compressive load test by anchore method done by IES
  • 38. 36 IES Vibrating-wire load cells, data logger, readout unit, strain gauges displacement transducer and accessories (100-2000ton) GEOKON, USA, 4900 Saidabad water treatment plant project phase-II 250 ton uplift test done by IES Hydraulic jack, dial gauges placement for 1350 ton compressive load test at Zanjira approach road & selected bridge end facilities ICB: PMB/Approach Road/01 project done by IES
  • 39. 37 IES Bibiyana Expansion Project Vertical Compression Load test by Anchore Method done by IES 2nd Titas along with approach rail line with all other related work 750 ton compressive load test by kent ledge method done by IES Moghbazar-Mouchak Flyover Project.WO-06 625 ton compressive load test by kent ledge method done by IES
  • 40. 38 IES HighStrainDynamicTestingofPile Estimation of pile capacity by using driving formula were introduced in early 1940s by very prominent engineer including Karl Terzhaghi.About a decade later EA Smith of Raymond Pile Driving Company developed a numerical method to estimate pile capacity using wave propagation. Dynamic formulas have largely been replaced by more accurate wave equation analysis and high strain dynamic testing, although formulas are still occasionally used in spite of their inaccuracies and the fact that they cannot predict stresses during driving. Now a day, the PILE DRIVING ANALYZER system (PDA) is the most widely employed system for Dynamic Load Testing and pile driving monitoring worldwide to asses the capacity of piles, PDA also evaluates resistance profile, skin and toe resistance. shaft integrity and investigates driving stresses and hammer performance during pile installation. IES procured two PDA hardware set (PAX-8 & PAX-4) and software and have been practicing since last few years. Few of IES engineers also took overseas training to obtain proficiency certificate, please visit www.pdaproficiencytest.com to see proficiency level. Since the beginning we did PDA for projects like, Lafarge Surma Cement Plant, 150 MW Shikolbaha Picking Power Plant, Mayor Hanif Flyover project, Saidabad Water Treatment Plant, Dhaka, Hatirjheel project, 334 MW Duel Fuel Power Plant at Meghnaghat, 443 MW Bibiana II Power Plant, Mogbazar-Mouchak Flyover, 22000 Flat Project of RAJUK and many more. PAX pile driving analyzer used in high strain dynamic testing of pile
  • 41. 39 IES Major PDA work finished • Syed Nazrul Islam Medical College, Kishoreganj • 250 MW Power Plant, Burhanuddin, Bhola • 443 MW Power Plant Bibiana-II, • 334 MW Duel Fuel Power Plant, Meghnaghat, Narayengonj • 22000 apartment project at Uttara 3rd phase, Dhaka • Mayor Hanif Flyover, Dhaka • Hatirjheel Integrated Development project, Dhaka Equipment for PDA • Pile Dynamic Analyzer model PAX-8 and PAX-4 of Pile Dynamics Inc, USA • Smart strain gauges • Accelerometer piezoelectric and piezoresistive Please visit www.pdaproficiencytest.com to see the list of certified Engineers for PDA Worldwide Engineer's proficiency certificate for high strain dynamic testing of pile
  • 42. 40 IES Strain transducer and accelerometer setting during high strain dynamic testing of pile Construction of 102m long Arch Bridge, Dhaka cantonment- high strain dynamic testing of pile done by IES Eastern bridge project contract-3, Kawtali bridge high strain dynamic testing of pile done by IES
  • 43. 41 IES Bridge over Shikolbaha river, Chittagong high strain dynamic testing of pile done by IES Dhaka-Chittagong Railway Development Project (DCRDP) Track doubling between Laksham and Chinki Astana high strain dynamic testing of pile done by IES Moghbazar-Mouchak Flyover Project.WO-06 high strain dynamic testing of pile done by IES
  • 44. 42 IES 546.600m long pre-stressed Girder Bridge over Mohanondha river, Chapainawabgonj high strain dynamic testing of pile done by IES Sayed Nazrul Islam Medical College, Kishoregonj high strain dynamic testing of pile work done by IES Force vs Velocity Graph shown after high strain dynamic testing of pile field work
  • 45. 43 IES 344.908 MW (MET) Gas Fired combined cycle power plant, Bibiyana (II) high strain dynamic testing work of pile done by IES Zanjira approach road & selected bridge facilities ICB: PMB/01 high strain dynamic testing work of pile done by IES Saidabad water treatment plant phase-II Dhaka high strain dynamic testing of pile done by IES
  • 46. 44 IES PileIntegrityTestingWork A pile integrity test is a method of testing deep foundation to asses the defects, faults, change in diameter of the pile shaft. The method also known as low strain dynamic test,sonic echo test,and low strain integrity test. The technique is developed based on wave propagation theory. A light impact is applied to a pile top that produce a low strain. The impact produces a compression wave that travels down the pile at a constant wave speed and reflects when encounter a change in cross sectional area or void/crack in material or weak concrete. Thisprocedureisperformedwithahandheldhammer to generate an impact, an accelerometer or geophone placed on top of the pile to be tested to measure the response to the hammer impact, and a data acquisition and interpretation electronic instrument. The test works well in concrete or timber foundations that are not excessively slender.Usually the method is applied to recently constructed piles that are not yet connected to a structure Thismethodisstandardizedby ASTMwithdesignation D5882 “Standard Test Method for Low Strain Integrity Testing of Piles”. Pile Integrity tester, PDI, USA Field PC Geophone 3.7kg Rubber Mallet 1.7kg Rubber Mallet
  • 47. 45 IES GeotechnicalInvestigationWork Geotechnical investigation is an engineering practice toevaluatesoilandrockparametersthosearerequired for design a appropriate foundation of engineering structure. Comprehensive, precise, detail and reliable investigation can reduce construction cost, time and human safety substantially. On the other hand improper geotechnical investigation always deceives or betrays engineers and entrepreneurs. Most of the foundation designs are being done in Bangladesh on the basis of SPT N-value. Many design engineers need only SPT N-value. Due to versatility of SPT, many correlations are available, which enables engineers to estimate soil parameters like shear strength, unit weight, relative density, volume compressibility etc. It is very important to determine SPT N-value correctly, precisely without forgery and fraudulent. Improper instruments, instrumental error, human error, deliberate intentions, fabrication of data in the field by manipulation are the major cause of unreliable SPT N-values. Upon pin pointing the causes, IES introduced following activities in geotechnical investigation, which can reduce un-reliabilities: • Auto trip gear for releasing hammer- ensures requsit energy and precludes human error. • Proper instrument- precludes instrumental error. • Capturization video footage of SPT activity by digital camera- precludes data fabrication in field. • SPT N-values re-counted from captured movie. • Reliable lab test. Oedometer for one dimensional consolidation test Unconfined compression test apparatus
  • 48. 46 IES Overseas Clients MTHojgaard as, Demark Geotechnical Investigation, Static compression & uplift pile load test, crosshole sonic logging, Pile integrity test and Pile dynamic test PDA for Saidabad Water Treatment Plant Phase-II of Dhk WASA Simplex Infra Structure Ltd, India Testing Work Gulistan-Jatrabari Flyover, Dhaka Japan Weather Association, Japan Rader station at Khepupara, Cox'sbaxer and Moulavibazer Siam Tone Co., Ltd,Thailand Rader station at Khepupara, Cox'sbaxer and Moulavibazer Larsen & Toubro Ltd, India Lafarge Surma Cement Plant at Chattak IRCON International Ltd, India Dhaka-Sylhet Road Project The TATA Power Company Ltd, India Ishwardi-Khulna Power Transmission Project China Geo Engineering Co, China Dhaka-Sylhet Road Project China Harbor Engineering Co, Chaina Atrai river bridge on Hatikumrul-Banpara Road project The First Northeast Electric Power Enginering Company (NEPC) 344.908 MW (NET) gas fired combined cycle power station at Bibiyana-II, Bangladesh 337 MW/350 MW (NET) duel fuel combined cycle power plant Meghana Ghat, Bangladesh LTL Global Engineering Services (Pvt.) Limited, Srilanka Constructio of 52.2 MW RAJ-LANKA power plant, Nator, Rajshahi, Bangladesh 50 MW duel fuel (HFO/GAS) fired power plant, Jangalia, Comilla Shimizu Corporation Construction of public food storage under Peoples Republic of Bangladesh HIFAB International AB Sub regional Transport Project Preparatory Facility (Road Component: Package-2) Rosatom Group, Russia Drilling works at Rooppur Nuclear Power Plant LIST OF FEW MAJOR CLIENTS
  • 49. 47 IES Bangladesh Clients Navana Construction Ltd. Monico Ltd. Mir Akter Hossain Ltd. Bangladesh Railway Abdul Monem Ltd (AML) Islam Trading Consortium Ltd. (ITCL) Al-Amin Construction Ltd. United Group Rangs Group Concord Engineering & Construction Ltd. Bangladesh Erectors Ltd. Pubali International Ltd. Square Pharmaceuticals Ltd. The ACME Laboratories Ltd. MI Cement Factory Ltd. Ruby Cement Heidelberg Cement Group Building for Future Ltd. (BFL) Hamid Construction Ltd. (HCL) Orion Group Spectra Engineers Ltd. Bengle Development Corporation (BDC) National Civil Engineers MAX Automobile Toma Construction & Co. Ltd. Advanced Development Technologies M.M Builders & Engineers Ltd. Meghna Group of Industries Limited National Development Engineers Ltd. (NDE) Square Consumer Product Ltd. Dulal Brothers Ltd. Walton Hi-Tech Industries Ltd. ACI Ltd. Local Government Engineering Department (LGED) Public Works Department (PWD) Raod and Highways Department (RHD) Engineering Construction Battalion, Bangladesh Army Bridge No-4, Hatirjheel Integrated Development Project, Dhaka 900φ, Depth-26m, Nos-91 bored RC pile constructed by IES
  • 50. 48 IES Diesel hammer working principle Cylinder Fuel Pump Strike Plate Tripping Explosion Exhaust Scavanging Ram Air under compression Exhaust port Anvil Hammar cushion
  • 51. Design: Nipun/Drik Photo: Wahid Adnan/Drik Production: Drik, (publication@drik.net)
  • 52. Icon Engineering Services 49/1A, Purana Paltan Line, Purana Paltan Dhaka-1000, Bangladesh Phone: +880 (2) 8319710, 9336764 Fax: 9336764 Email: info@iconengg.com www.iconengg.com