Maged Tadros NashedR e s u m e
P E R S O N A L I N F O R M A T I O N
Full Name: Maged Tadros Nashed Social Status: Married
Nationality: Egyptian Place of Birth: Cairo
Date of Birth: 13 December 1981
Permanent Address: 21, Ebn El Rashid st, Shobra st, Cairo, Egypt
Residence Address in UAE: Icon tower 1, JLT, Dubai
Driving licenses: UAE and Egypt
Phone: {Egypt} 0020 2 – 24607804 & 02-0123928904
{UAE} +971- 050 2711307
Military Service: Deferred.
E-mail address: mtadros05@yahoo.com
University: Helwan university Degree: B.Sc
Major: Civil Engineering Date of Graduation: May 2003
Project Graduation: Design of steel structures
Appreciate of Graduation: V. Good
Appreciate of Project Graduation: Distention
Completion the preliminary year for post graduated session 2005 in Ain shams university.
Membership of American Welding Society AWS and certifies that
ASSOCIATE WELDING INSPETOR
Good studying and practices works of AWS D1.1 and API codes.
Membership of PMI-PMP
The Graduation Project
The project “Multi- Story Factory & Office Building”
Preparing the structural statically system
Preparing all calculated sheet design for main element & design connection.
Making all details drawing (Layout, connection & shop drawing)
Supplementary courses / Tests
Course
/ Test Obtained From
MS Office (Word & Office) College Saint Gorge
AutoCAD 2000 Autodesk Centre
Finite Element Program “SAP 2000”. Armed Forced College
Primavera Project Planner College Saint Gorge
Pro-Steel (3D Detailing Program) DSD- FERROMETALICO CO.
SAP “ SYSTEM,APPLICATION AND
PROCEDURE” GULF PIPING CO., one of group IMCC
PMP “Project Management Professional” Cambridge Institute
2 Maged Tadros NashedR e s u m e
Current Job / Job Details:
Package Manager:
Dutco Balfour Beatty CO., {Dubai-UAE}
From 01/04/2014 till now
Client : EMAAR- Dubai Mall
Project Management: Turner
Structural Engineer: WSP
Architectural Engineer: DP Architectural
Project :THE DUBAI MALL FASHION AVENUE EXPANSION-PHASE II
Package of The Structural Works:
- Steel Structure Work: Co-ordination with Subcontractor “Tiger Steel Co.,”
- Post Tensioning Work: Co-ordination with subcontractor “Inter-Span Co.,”
- Demolition Work: Co-ordination with subcontractor “GTS & WEM Cos.,”
- Strengthening Structural Work: Co-ordination with sub-contractor “Structural Co.,”
- Repairing and remedial Work: Co-ordination with sub-contractor “DicoTech Co.,”
- Utilities Services work: Etisalat and Du Cos.,
- BMU System Work: Co-ordination with sub-contractor “COX Co.,”
-MEP Work: Co-ordination with sub-contractor “BKG Co.,
Duties Responsibilities:
Reviewing the signed contract and project specifications.
Reviewing IFC architectural, structural, MEP design drawings.
Raising RFI’s and FCN in case incomplete design information’s / main
contractor proposals of works
Co-ordination with engineering department of drawings / materials
submissions E1&E2 logs.
Reviewing the steel structural shop drawings and design connections with
considering full co-ordinations with all architectural / MEP / structural
glazing /BMU packages.
Reviewing the design of post tensioning and co-ordination with the
construction team of prioritize the casting slab upon the timing schedule.
Preparing / Reviewing / checking all materials / ITP / Method statement /
RA submissions.
Preparing and co-ordinations with construction team regarding the
openings required of installation methodology for tower cranes, placing
booms, hoist and steel structure works.
Co-ordination the weekly progress meeting with all sub-contractors above.
Co-ordination workshop technical meeting with consultant / subcontractors.
Co-ordination with Dubai Mall Facility Management for diversion the
existing services “Etisalat, DU &DEWA” prior to demolition works and re-
routing MEP services.
Co-ordination and following the construction progress with construction
team upon the time frame.
3 Maged Tadros NashedR e s u m e
Project Engineer in “Technical Office Dept. ”
SIX CONTRUCTION CO.,
{Dubai-UAE}
From 01/03/2012 till now
Project :DUBAI TRAM
BESIX and ALSTOM CONSOTUIM PROJECT.
Consultant: SYSTRA ENG.,
Client: RTA-Dubai.
Reviewing the structural design drawings’ and design notes for all grade stations.
Preparing and reviewing all concrete and reinforcements shop drawings.
Preparing BBS list and ordering the rebar by GAMMA-Pro.
Preparing the method statements for all remedial works and materials submittal.
Reviewing all waterproofing shop drawings’ and materials submittal.
Preparing the block works shop drawings’ and materials submittal.
Coordinating with construction team and sub-contractors to solve all issues.
Preparing all shop drawings’ of all service works such as Etisalat, Du ducts.
Following the fabrication of steel structures works for all stations and Depot.
Co-ordinate with all steel sub-contractors e.g. Khansaheb, Cleveland Bridge and
GEW to follow the target works and schedule of delivery.
Reviewing the design drawings and shop drawings as well for all structures buildings.
Following the installation at site.
Co-ordinates with Dubai Metro Operation “SERCO” to connect the metro-links at
JLT and Marina stations to link the Tram with Metro-stations.
Prepare all design and construction NOC along with method statements to forward to
RTA.
Project :SEWAGE TREATMENT PLANT
JV BESIX and SANOTEC PROJECT.
Consultant: HALCROW INTERNATIONAL Co.,
Client: Sharjah Municipality.
Reviewing the structural design drawings’ and design notes for all buildings such as
STB, MCC, Pretreatment I&II, Biological tanks I&II, tanker discharge plant and
administration buildings.
Preparing and reviewing all concrete and reinforcements shop drawings.
Preparing BBS list and ordering the rebar by GAMMA-Pro.
Preparing the method statements for all repairing works.
Reviewing all waterproofing shop drawings’ and materials submittal.
Preparing the block works shop drawings’ and materials submittal.
Coordinating with construction team and sub-contractors to solve all issues.
Preparing the method statements of water tightness test for biological tanks
Repairing all concrete cracks.
Coordinating with mechanical company “SANOTEC” to install all equipments and
mechanical systems.
4 Maged Tadros NashedR e s u m e
Sr. Project Engineer in “ Project Management”
Oil & Gas Works
GULF PIPING Co., one of group International Management &Construction Co.,
{Abu Dhabi-UAE}
From 01/05/2009 to 01/01/2012
Project :TDS-2000 LONE-STAR, Semi-submersible floating drilling rig 01
Client: single buoy mooring ”SBM” off shore
Location: Sail away to Brazil
Studying the engineering and fabrication drawings for all items such as “pontoon tanks,
port/fwd ,port/aft, stbd/fwd and stbd/aft ,main deck ,below main deck ,living quarters,
derrick floor, engine mud house, subsea pod shop and helideck”.
Co-ordination with E&I, piping and equipment teams to follow up the outstanding issue
by ABS and SBM.
Co-ordination with subcontractors to follow up the finishing works, HVAC and
electrical works.
Follow up and closing all site instructions comments and extra works.
Co-ordination with operation team and engineering during the fabrication period.
Preparation and organization to fabricate COFFER DAM.
Organization with QC team to close all punch list comments which it was related to
welding, painting and sign off all documentation by ABS and SBM.
Preparing daily progress schedule with SBM and organization with planning team to
close all issue.
Raising TQR which it was related to design works.
Closing ITR’s for all the areas of rig and sign off by client
Raising the PR. And MR. by SAP program for all the required items of rig 01
Controlling the man-hours’ for all the workers
Organization with divers team before sail away of rig to zaid port to install the thruster
motors
Preparation the test for B.O.P load test and lifeboat platform.
Organization with FUJRO team and divers for marking the seabed by fixing buoys to
guide the crane operator during deployment the thruster motors.
Mooring the RIG 01 AND 02 in position above the thruster motors.
Lifting the thruster motor by H.S JACKS to fix the motors underneath the pontoon.
Preparing the test for port/stbd deck crane.
Preparing the rope reeving for drill floor and raiser tensionner.
Closing all outstanding points related to painting scope
5 Maged Tadros NashedR e s u m e
QA/QC Engineer in “QA/QC Department”
DUTCO BALFOUR BEATTY CO. {Dubai-UAE}
From 26/07/2007 to 05/04/09
Project : Burj Dubai Development
THE DUBAI MALL PROJECT- LARGEST WORLDS MALL
DBB and CCC main contractor join venture
Location: Dubai-UAE
E.g.(Entertainment Roof, ice skating, star roof, north and south carnival rock wall and
retractable Roof).
Studying and following the ITP system for Dubai Mall Project.
Studying the engineering, fabrication and welding drawings to achieve all the inspection as
per AWS D1.1 AND API.
Preparing the WIR and MIR for inspection the steel on site with subcontractor and offering
to consultant.
Organization with construction team and operation to close the consultant comments.
Checking the fit up, welding process, visual welding inspection and NDT reports”UT, MPI
AND RT”.
Checking the welder’s qualification, welding machines, WSP and thermal oven of welding
electrode.
Checking the erection procedure on site and survey reports to achieve the tolerance as per
BS 5950.
Inspect of the raw materials before the fabrication period and follow up cutting process, fit
up, assembly procedure, pre-camber, welding, NDT and blasting, painting procedures in
workshop.
Raising FCR to consultant which it was related to design and welding proposal due to
comment by third party and consultant such as “kink, misalignment and out of plumb”.
Retractable roof inspections: +_2mm tolerance.
Checking the bogie supports reports and random inspections for welding joints which it
was delivered from ROMANIA.
Checking the rail supports which it was delivered from GERMANY.
Inspect the rolled pipe and checking all the fabrication works in RASSAN STEEL CO.
and AL REYAMI STEEL CO., and NDT reports to sign off all WIR, MIR by consultant.
Structural Engineer in “Roof Management”
Checking the canopies on site and railing alignment.
Assembly the canopy on site and checking the bolts tighten.
Install the canopies on rail as per method statements from AL FARD REIN GERMANY.
Organization with ALICO to erect and fabricate the structural glazing and roof cladding
Co-ordinate with MEP teams to install, control and termination the power stations and
switches remote control to connect to canopies.
6 Maged Tadros NashedR e s u m e
Structural Engineering in “Technical Office Department”
TECHNICAL GLASS & ALUMINIUM CO. L.L.C. {Dubai-UAE}
From 01/04/2006 to 24/07/07
Project : Al- Fardan Towers(Apartment & Office towers)
Location: Doha- Qatar
Design of steel structures trusses for podium roof to fix the structures glazing.
Design of sun breakers sheds.
Design of steel connection according to BS 5950 code.
Preparing of all shop drawings.
Preparing of all erection drawings.
Project : Al- Wahda Mall
Location: Abu Dhabi
Design of wind towers steel structures & steel structures trusses to fix the
curtain wall and structure glazing.
Design of steel connection according to BS 5950 code.
Preparing of all shop drawings.
Participation in prepare the fabrication and erection period.
Project : Commercial Residential Complex
Location :Khalidya- Abu Dhabi
Design of steel structures canopy for roof building.
Design of steel connection according to BS 5950 code.
Preparing of all shop drawings.
Project : MAG Tower
Location :Dubai
Design of monorails for loading the cradle & glass panels.
Design of steel structures canopy.
Preparing of all shop drawings.
Project : AL Salam Bank
Location :Sudan
Checking of shop drawings for sky light.
Preparing of shop drawings of cladding soffit.
Good Knowledge for design of glass (structures glazing).
7 Maged Tadros NashedR e s u m e
Structural Engineering in “Steel & Mechanical Division”
TORONTO PETROLEUM CO. {Doha-Qatar}
From 13/09/2005 to 20/03/2006
Project : Qatargas II- Camp Facilities
Location: Ras Laffan
Construction of ” multi- purpose Building”
Material Take Off from design and tender drawings.
Preparing the purchase order for all consumed materials.
Preparing the cutting list, completion all missing details in shop drawing.
Participation in prepare the fabrication period.
Preparing all erection drawings
Structural Engineering in “Technical Office Department”
L A N G U A G E S
Arabic: Excellent knowledge and native language.
English: Very good.
DSD-FERROMETALICO CO. Egyptian-Germany co. for high quality steel structure. {Cairo-Egypt}
From 8/1/2004 to 8/9/2005
Project : Nubaria Power Station
Location: Alexandria Town
Construction of ” multi- purpose Building”
E.g. {Steam Turbine Generation, Pipe Rack, Equipment pipe support, etc} building.
Material Take Off from design and tender drawings.
Preparing all Shop drawing for above mentioned building by using “Pro-Steel 3D detailing
program.
Design of connection according to AISC code with team work group.
Preparing all erection drawing.
Participation with project management teams to prepare the invoice.
Project : Hot & Cold Rolling
Location: Abu Zaable-Cairo
Preparing all Shop drawing for the final part of building by using “AutoCAD”
Project: Sardinia Radio Telescope
Location: Italy.
Material Take Off from design and tender drawings.
Preparing some Shop drawing.
Preparing all erection drawing for assembly main elements.
Project: Torrovaldalga Nord Power Plant
Location: Italy.
Material Take Off from design and tender drawings.
Preparing Shop drawing for main building by using “Pro-Steel 3D detailing program”.
Preparing all erection drawing.
8 Maged Tadros NashedR e s u m e

r_1

  • 1.
    Maged Tadros NashedRe s u m e P E R S O N A L I N F O R M A T I O N Full Name: Maged Tadros Nashed Social Status: Married Nationality: Egyptian Place of Birth: Cairo Date of Birth: 13 December 1981 Permanent Address: 21, Ebn El Rashid st, Shobra st, Cairo, Egypt Residence Address in UAE: Icon tower 1, JLT, Dubai Driving licenses: UAE and Egypt Phone: {Egypt} 0020 2 – 24607804 & 02-0123928904 {UAE} +971- 050 2711307 Military Service: Deferred. E-mail address: mtadros05@yahoo.com University: Helwan university Degree: B.Sc Major: Civil Engineering Date of Graduation: May 2003 Project Graduation: Design of steel structures Appreciate of Graduation: V. Good Appreciate of Project Graduation: Distention Completion the preliminary year for post graduated session 2005 in Ain shams university. Membership of American Welding Society AWS and certifies that ASSOCIATE WELDING INSPETOR Good studying and practices works of AWS D1.1 and API codes. Membership of PMI-PMP The Graduation Project The project “Multi- Story Factory & Office Building” Preparing the structural statically system Preparing all calculated sheet design for main element & design connection. Making all details drawing (Layout, connection & shop drawing) Supplementary courses / Tests Course / Test Obtained From MS Office (Word & Office) College Saint Gorge AutoCAD 2000 Autodesk Centre Finite Element Program “SAP 2000”. Armed Forced College Primavera Project Planner College Saint Gorge Pro-Steel (3D Detailing Program) DSD- FERROMETALICO CO. SAP “ SYSTEM,APPLICATION AND PROCEDURE” GULF PIPING CO., one of group IMCC PMP “Project Management Professional” Cambridge Institute
  • 2.
    2 Maged TadrosNashedR e s u m e Current Job / Job Details: Package Manager: Dutco Balfour Beatty CO., {Dubai-UAE} From 01/04/2014 till now Client : EMAAR- Dubai Mall Project Management: Turner Structural Engineer: WSP Architectural Engineer: DP Architectural Project :THE DUBAI MALL FASHION AVENUE EXPANSION-PHASE II Package of The Structural Works: - Steel Structure Work: Co-ordination with Subcontractor “Tiger Steel Co.,” - Post Tensioning Work: Co-ordination with subcontractor “Inter-Span Co.,” - Demolition Work: Co-ordination with subcontractor “GTS & WEM Cos.,” - Strengthening Structural Work: Co-ordination with sub-contractor “Structural Co.,” - Repairing and remedial Work: Co-ordination with sub-contractor “DicoTech Co.,” - Utilities Services work: Etisalat and Du Cos., - BMU System Work: Co-ordination with sub-contractor “COX Co.,” -MEP Work: Co-ordination with sub-contractor “BKG Co., Duties Responsibilities: Reviewing the signed contract and project specifications. Reviewing IFC architectural, structural, MEP design drawings. Raising RFI’s and FCN in case incomplete design information’s / main contractor proposals of works Co-ordination with engineering department of drawings / materials submissions E1&E2 logs. Reviewing the steel structural shop drawings and design connections with considering full co-ordinations with all architectural / MEP / structural glazing /BMU packages. Reviewing the design of post tensioning and co-ordination with the construction team of prioritize the casting slab upon the timing schedule. Preparing / Reviewing / checking all materials / ITP / Method statement / RA submissions. Preparing and co-ordinations with construction team regarding the openings required of installation methodology for tower cranes, placing booms, hoist and steel structure works. Co-ordination the weekly progress meeting with all sub-contractors above. Co-ordination workshop technical meeting with consultant / subcontractors. Co-ordination with Dubai Mall Facility Management for diversion the existing services “Etisalat, DU &DEWA” prior to demolition works and re- routing MEP services. Co-ordination and following the construction progress with construction team upon the time frame.
  • 3.
    3 Maged TadrosNashedR e s u m e Project Engineer in “Technical Office Dept. ” SIX CONTRUCTION CO., {Dubai-UAE} From 01/03/2012 till now Project :DUBAI TRAM BESIX and ALSTOM CONSOTUIM PROJECT. Consultant: SYSTRA ENG., Client: RTA-Dubai. Reviewing the structural design drawings’ and design notes for all grade stations. Preparing and reviewing all concrete and reinforcements shop drawings. Preparing BBS list and ordering the rebar by GAMMA-Pro. Preparing the method statements for all remedial works and materials submittal. Reviewing all waterproofing shop drawings’ and materials submittal. Preparing the block works shop drawings’ and materials submittal. Coordinating with construction team and sub-contractors to solve all issues. Preparing all shop drawings’ of all service works such as Etisalat, Du ducts. Following the fabrication of steel structures works for all stations and Depot. Co-ordinate with all steel sub-contractors e.g. Khansaheb, Cleveland Bridge and GEW to follow the target works and schedule of delivery. Reviewing the design drawings and shop drawings as well for all structures buildings. Following the installation at site. Co-ordinates with Dubai Metro Operation “SERCO” to connect the metro-links at JLT and Marina stations to link the Tram with Metro-stations. Prepare all design and construction NOC along with method statements to forward to RTA. Project :SEWAGE TREATMENT PLANT JV BESIX and SANOTEC PROJECT. Consultant: HALCROW INTERNATIONAL Co., Client: Sharjah Municipality. Reviewing the structural design drawings’ and design notes for all buildings such as STB, MCC, Pretreatment I&II, Biological tanks I&II, tanker discharge plant and administration buildings. Preparing and reviewing all concrete and reinforcements shop drawings. Preparing BBS list and ordering the rebar by GAMMA-Pro. Preparing the method statements for all repairing works. Reviewing all waterproofing shop drawings’ and materials submittal. Preparing the block works shop drawings’ and materials submittal. Coordinating with construction team and sub-contractors to solve all issues. Preparing the method statements of water tightness test for biological tanks Repairing all concrete cracks. Coordinating with mechanical company “SANOTEC” to install all equipments and mechanical systems.
  • 4.
    4 Maged TadrosNashedR e s u m e Sr. Project Engineer in “ Project Management” Oil & Gas Works GULF PIPING Co., one of group International Management &Construction Co., {Abu Dhabi-UAE} From 01/05/2009 to 01/01/2012 Project :TDS-2000 LONE-STAR, Semi-submersible floating drilling rig 01 Client: single buoy mooring ”SBM” off shore Location: Sail away to Brazil Studying the engineering and fabrication drawings for all items such as “pontoon tanks, port/fwd ,port/aft, stbd/fwd and stbd/aft ,main deck ,below main deck ,living quarters, derrick floor, engine mud house, subsea pod shop and helideck”. Co-ordination with E&I, piping and equipment teams to follow up the outstanding issue by ABS and SBM. Co-ordination with subcontractors to follow up the finishing works, HVAC and electrical works. Follow up and closing all site instructions comments and extra works. Co-ordination with operation team and engineering during the fabrication period. Preparation and organization to fabricate COFFER DAM. Organization with QC team to close all punch list comments which it was related to welding, painting and sign off all documentation by ABS and SBM. Preparing daily progress schedule with SBM and organization with planning team to close all issue. Raising TQR which it was related to design works. Closing ITR’s for all the areas of rig and sign off by client Raising the PR. And MR. by SAP program for all the required items of rig 01 Controlling the man-hours’ for all the workers Organization with divers team before sail away of rig to zaid port to install the thruster motors Preparation the test for B.O.P load test and lifeboat platform. Organization with FUJRO team and divers for marking the seabed by fixing buoys to guide the crane operator during deployment the thruster motors. Mooring the RIG 01 AND 02 in position above the thruster motors. Lifting the thruster motor by H.S JACKS to fix the motors underneath the pontoon. Preparing the test for port/stbd deck crane. Preparing the rope reeving for drill floor and raiser tensionner. Closing all outstanding points related to painting scope
  • 5.
    5 Maged TadrosNashedR e s u m e QA/QC Engineer in “QA/QC Department” DUTCO BALFOUR BEATTY CO. {Dubai-UAE} From 26/07/2007 to 05/04/09 Project : Burj Dubai Development THE DUBAI MALL PROJECT- LARGEST WORLDS MALL DBB and CCC main contractor join venture Location: Dubai-UAE E.g.(Entertainment Roof, ice skating, star roof, north and south carnival rock wall and retractable Roof). Studying and following the ITP system for Dubai Mall Project. Studying the engineering, fabrication and welding drawings to achieve all the inspection as per AWS D1.1 AND API. Preparing the WIR and MIR for inspection the steel on site with subcontractor and offering to consultant. Organization with construction team and operation to close the consultant comments. Checking the fit up, welding process, visual welding inspection and NDT reports”UT, MPI AND RT”. Checking the welder’s qualification, welding machines, WSP and thermal oven of welding electrode. Checking the erection procedure on site and survey reports to achieve the tolerance as per BS 5950. Inspect of the raw materials before the fabrication period and follow up cutting process, fit up, assembly procedure, pre-camber, welding, NDT and blasting, painting procedures in workshop. Raising FCR to consultant which it was related to design and welding proposal due to comment by third party and consultant such as “kink, misalignment and out of plumb”. Retractable roof inspections: +_2mm tolerance. Checking the bogie supports reports and random inspections for welding joints which it was delivered from ROMANIA. Checking the rail supports which it was delivered from GERMANY. Inspect the rolled pipe and checking all the fabrication works in RASSAN STEEL CO. and AL REYAMI STEEL CO., and NDT reports to sign off all WIR, MIR by consultant. Structural Engineer in “Roof Management” Checking the canopies on site and railing alignment. Assembly the canopy on site and checking the bolts tighten. Install the canopies on rail as per method statements from AL FARD REIN GERMANY. Organization with ALICO to erect and fabricate the structural glazing and roof cladding Co-ordinate with MEP teams to install, control and termination the power stations and switches remote control to connect to canopies.
  • 6.
    6 Maged TadrosNashedR e s u m e Structural Engineering in “Technical Office Department” TECHNICAL GLASS & ALUMINIUM CO. L.L.C. {Dubai-UAE} From 01/04/2006 to 24/07/07 Project : Al- Fardan Towers(Apartment & Office towers) Location: Doha- Qatar Design of steel structures trusses for podium roof to fix the structures glazing. Design of sun breakers sheds. Design of steel connection according to BS 5950 code. Preparing of all shop drawings. Preparing of all erection drawings. Project : Al- Wahda Mall Location: Abu Dhabi Design of wind towers steel structures & steel structures trusses to fix the curtain wall and structure glazing. Design of steel connection according to BS 5950 code. Preparing of all shop drawings. Participation in prepare the fabrication and erection period. Project : Commercial Residential Complex Location :Khalidya- Abu Dhabi Design of steel structures canopy for roof building. Design of steel connection according to BS 5950 code. Preparing of all shop drawings. Project : MAG Tower Location :Dubai Design of monorails for loading the cradle & glass panels. Design of steel structures canopy. Preparing of all shop drawings. Project : AL Salam Bank Location :Sudan Checking of shop drawings for sky light. Preparing of shop drawings of cladding soffit. Good Knowledge for design of glass (structures glazing).
  • 7.
    7 Maged TadrosNashedR e s u m e Structural Engineering in “Steel & Mechanical Division” TORONTO PETROLEUM CO. {Doha-Qatar} From 13/09/2005 to 20/03/2006 Project : Qatargas II- Camp Facilities Location: Ras Laffan Construction of ” multi- purpose Building” Material Take Off from design and tender drawings. Preparing the purchase order for all consumed materials. Preparing the cutting list, completion all missing details in shop drawing. Participation in prepare the fabrication period. Preparing all erection drawings Structural Engineering in “Technical Office Department” L A N G U A G E S Arabic: Excellent knowledge and native language. English: Very good. DSD-FERROMETALICO CO. Egyptian-Germany co. for high quality steel structure. {Cairo-Egypt} From 8/1/2004 to 8/9/2005 Project : Nubaria Power Station Location: Alexandria Town Construction of ” multi- purpose Building” E.g. {Steam Turbine Generation, Pipe Rack, Equipment pipe support, etc} building. Material Take Off from design and tender drawings. Preparing all Shop drawing for above mentioned building by using “Pro-Steel 3D detailing program. Design of connection according to AISC code with team work group. Preparing all erection drawing. Participation with project management teams to prepare the invoice. Project : Hot & Cold Rolling Location: Abu Zaable-Cairo Preparing all Shop drawing for the final part of building by using “AutoCAD” Project: Sardinia Radio Telescope Location: Italy. Material Take Off from design and tender drawings. Preparing some Shop drawing. Preparing all erection drawing for assembly main elements. Project: Torrovaldalga Nord Power Plant Location: Italy. Material Take Off from design and tender drawings. Preparing Shop drawing for main building by using “Pro-Steel 3D detailing program”. Preparing all erection drawing.
  • 8.
    8 Maged TadrosNashedR e s u m e