SlideShare a Scribd company logo
CURRICULUM VITAE
SUMMARY
Over 26 years of construction experience, in various cross functional leadership roles with all
major construction delivery systems, including general contracting, construction management
and design/build projects. Experience includes large variety of projects for private and
government clients. Thorough understanding of construction management, project controls,
supervision, and contract administration. Specializing in planning, constructability,
construction management, field organization, and field execution backed by strong credentials
and a proven history of on-time, on-budget and high-quality project completions. World-class
experience in construction of urban infrastructure projects such as elevated road/metro
projects.
EXPERIENCE SUMMARY
Total years of experience is 26 years
Joined M/s. AFCONS INFRASTRUCTURE LIMITED (A Shapoorji Pallonji Group Company )
FROM JANUARY ‘1991 TO TILL DATE.
Present designation is Project Manager (Dy. General Manager -Projects)
PROJECT MANAGEMENT ATTRIBUTES
• Good track record of managing complex multifunctional projects in various
environments.
• Creating effective, informed and highly motivated teams focused on delivery.
• Comprehensive understanding of project management methodologies.
• Successful and demonstrable delivery of results.
• Excellent customer facing skills.
• Accurately identifying clients key requirements.
• Managing and supporting the implementation of business initiatives.
• Experience of development of new business or marketing projects.
PERSONAL ATTRIBUTES
• Possessing a responsible attitude, tact, patience, and courtesy.
• Comfortable working on numerous, smaller size pieces of work.
• Ability to operate under pressure and deliver to demanding deadlines.
• Achieving results through others.
• Able to self start own improvement initiatives.
• Good team player.
• Capable of working under limited supervision.
• Motivating Project teams to own and complete tasks assigned to them.
• Conflict management and prioritisation skills.
ACHIEVEMENTS:
• Worked as Construction Head in Bara Khamba Underground Metro Station by top down
method which is first time in India.
• Worked as Project Manager in Mukerba Chowk Flyover project- awarded 1st
. prize
for best project completed during 2009-10 by CPWD.
• Worked as Project Manager in Ghazipur Grade separator project- awarded as best
project in the category of Road & Bridges by EPC World awards 2011 at
Bangalore.
DETAILS OF EXPERIENCE :
Project : Barapulla Elevated Corridor Phase – II(7.6 KM), Delhi.
Client : PWD, DELHI.
Period : 2013 TO TlLL DATE
Project Value : Rs. 500 CRORES (Approx)
Position Held : Project Manager
Details of work : Sub-structure including Piling (2000 Nos.), Casting and Erection
of Segment & Pre-tension I girder, Solid Slab, Voided Slab, PSC
Solid / Voided Slab, Cast-in Situ Box girder, Special Span using
Bridge Builder, Steel Arch Bridge, Slab with Steel Plate Girder,
Foot Over Bridge.
Project : Chennai Metro Package UAA- 01
Client : Chennai Metro Rail Corporation
Period : 2011 to 2013 .
Project Value : Rs.475 Crores(Only for Chennai Central Underground Metro Station)
Position Held : Incharge of Chennai Central Underground Metro Station .
Details of work : Construction of Underground Metro Station at Chennai Central using
Diaphragm Wall with Top Down Method. Plunge Column, Station Top
Slab, Con-course Slab, Base Slab including Platform, Entry – Exit
Structure etc.
Project : Construction of Grade separator at Ghazipur, Delhi.
Client : PWD , Delhi.
Period : Oct’2009 to April 2011 .
Project Value : Rs. 230 Crores.
Position Held : Project Manager
Details of work : Construction of Main flyover, Underpass, Slip roads, BOD
,FOB, Bus bays, Cycle Tracks, Drainage, Electrical, landscaping
and Allied works.
Project : Construction of Grade separator at Mukerba Chowk, Delhi.
Client : PWD of Delhi
Period : Oct’2007 to Sep’2009.
Project Value : Rs. 210 Crores.
Position Held : Project Manager
Details of work : Construction of Main Flyover including Loops, Slip Road, Bridges,
Subway, Bus Bays, Cycle Tracks, Drainage Electrical, Landscaping
and Allied Works.
Project : Construction of elevated viaduct of length 5.222 KM on
Vishwa Vidyalaya – Jahangirpuri Corridor.
Client :DELHI METRO RAIL CORPORATION , DELHI.
Period : Jan’2006 to Sep’2007.
Project Value : Rs. 165 Crores.
Position Held : Construction Head
Details of work : Construction of elevated viaduct about 5222m including Ramp
for 192m. -Segmental construction of 136 numbers of spans and
numbers of Cast-In-Situ Spans. -Construction of piles, pile cap,
pier and pier caps, portal beams, bearing pedestal, shear key,
installation of shear key devises, Elastomeric bearings.
Construction of 4 elevated stations including Raft and footing
foundation, concourse level and platform level slab, Approach
Span, Masonry work, Stair cases, Escalators, lifts, Crash barrier,
Grade slab, water tank and sump.- Entry / Exit structures.
Project : Construction of Underground portion including Barakhamba
Road Underground staion on Barakhamba Road - Connaught
Place - Dwarka Section (Line No.3).
Client : DELHI METRO RAIL CORPORATION, DELHI.
Consultant : General Consultants PCI PBI JARTS TONICHI RITES
Period : Apr’2003 to Jan’2006.
Project Value : Rs. 182 Crores.
Position Held : Construction Head (Cut & Cover)
Details of work :Construction of Underground Station (243m), Construction of
Tunnel (79m and 309m). Relocation of all utilities fouling in the
project, Construction of structures using D'Walls. Retaining walls
by cut and cover method including all temporary works.
All station Substructures including platforms/staircases/doors/
window & Architectural finishes, water supply and pumping,
drainage system, Entry/Exit structure.
Project : Construction of Elevated Corridor from Tis Hazari to
Trinagar (Inderlok)
Client : DELHI METRO RAIL CORPORATION, DELHI.
Consultant : General Consultants PCI PBI JARTS TONICHI RITES
Period : Oct’2000 to Mar’2003.
Position Held : Construction Head (Insitu Works / Finishing works)
Details of work : Construction of 13 In-situ (Max. length span 65mtr.) Over heavy
Traffic Delhi Roads Construction of 2 In-situ Bridge Builder spans
65 mtr. each finishing works.
Project : Construction of Oil Jetty at Paradip Port Trust
Client : Paradip Port Trust
Period : June’1999 to Oct’2000
Position Held : Construction Head (In-situ Works / Finishing works)
Details of work : Execution of Marine Piles (900, 1200, 1300 & 1500 Dia) by
Rolling Gantry and by Fix Platform Method. Execution of Mooring
Dolphins, Berthing Dolphins, Service Platforms. Fixing of Bollards
& Fenders.
Project : Construction of Mechanized Coal Handling Wharf at Paradip
Port (ADB Project)
Consultant & Client :BKJV-KINHILL Australia & Paradip Port Trust
Period : Aug’1997 to June’1999
Details of work : Execution of Marine Steel Piles of 1000 Dia by ICE Diesel
Hammer Model 100s and Vibro Hammer PTC France make
including Raker Pile 1000 Dia (1:7 & 1:5). Erection of Precast
Beams, Insitu Pile Cap, Cast-in-situ, Beams, Slabs, Fixing of
fender and Bollards.
Project : Construction of Bulk Cargo Berth at Pipavav Port
Consultant : RITES, FPPL (Gujarat)
Period : Mar’1995 to Aug’1997
Details of work : Planning & Execution of Marine Piles (1000, 750) by Gantry and
by Fix Platform method and by Floating arrangement. Pile Cap &
Pile muff erection of Precast Units. Cast-in-situ work including
fixing of fender & Bollards, rails etc.
Project : Construction of Intake Channel Jetty Nellore.
Consultant : International Design Associates, Delhi
Period : Feb’1994 to Mar’1995
Details of work : Planning & Execution of Marine Piles (760 & 1000 Dia) by Gantry
Pile Cap Erection of Precast unit and cast-in-situ work including
Deck Slab Channel Wall, Pump house etc.
Project : Construction of General Cargo Berth for Okha Port.
Consultant : RITES & Gujarat Marine Time Board
Period : Nov’1992 to Feb’1994
Details of work : Execution of Marine Piles (1000, 760 Dia) by rolling Gantry by Fix
Platform Method by Floating arrangement method. Raker pile of
Dia 760 (1:4:5) Erection of Precast Unit and Cast-in-Situ work
(Qty.6500 M3) including fixing of Boalllards and Fenders.
Project : Construction of Crude Oil Tank for BPCL at Mumbai.
Consultant : RITES & BPCL Mumbai
Period : Jan’1992 to Nov’1992
Details of work : Planning & Contractor’s Billing. Concrete Mix Design, Erection of
Piles (1000 & 1200 Dia) by DMRC METHOD,Cast-in-situ work
including Pile Cap, Deck Slabs etc.
Project : Construction of Railway Bridge for TISCO at Jamshedpur.
Consultant of Client : IRCON & TISCO
Period : Jan’1991 to Jan’1992
Details of work : Pilling 1200 dia & Sub-Structure Works.
PERSONAL DETAILS:
NAME : SINGH SANJAY KUMAR
FATHER’S NAME : SHRI SINGH G.P.
DATE OF BIRTH : 11TH
JULY’1965
PASSPORT NO. : A-444 8085
CORRESPONDANCE ADD. : FLAT NO.- 09084, ATS – ADVANTAGE, AHINSHA KHAND-
1, INDIRA PURAM, GHAZIABAD – 201014 (UP).
MOBILE : +91 96430 01444
Email-ID : asingh807803@gmail.com
NATIONALITY : INDIAN
MARITAL STATUS : MARRIED
EDUCATIONAL QUALIFICATION : a) B.E.CIVIL PASSED IN 1989
b) GRADUATE DIPLOMA IN MANAGEMENT STUDIES IN
2004
DECLARATION :
I do here by declare that all the above information furnished are true to best of my knowledge
and belief.
Date:…………..
Place:…………. (SANJAY KUMAR SINGH)

More Related Content

What's hot

piping foreman resume
piping foreman resumepiping foreman resume
piping foreman resume
Sivakumar krishnamurthi
 
Romy George civil site engineer.
Romy George civil site engineer.Romy George civil site engineer.
Romy George civil site engineer.
Romy george
 
Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)
karthikeyan ramamoorthy
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
Gowrijayashankar S V
 
Land Surveyor cv Masood ( ls-ok - j16-1)
Land Surveyor cv Masood  ( ls-ok - j16-1)Land Surveyor cv Masood  ( ls-ok - j16-1)
Land Surveyor cv Masood ( ls-ok - j16-1)
muhammadmasood75
 
Precast Concrete QA/QC CV
Precast Concrete QA/QC CVPrecast Concrete QA/QC CV
Precast Concrete QA/QC CV
Anwardeen Jawaharlal
 
Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)
RAJA KUMAR .R
 
C v surveyor( Mumtaz )
C v surveyor( Mumtaz )C v surveyor( Mumtaz )
C v surveyor( Mumtaz )
Mumtaz Ahmad
 
Infrastructure engineer. CV
Infrastructure engineer. CVInfrastructure engineer. CV
Infrastructure engineer. CV
Masood Baig Mirza
 
Ali Raza Land surveyor (1)
Ali Raza Land surveyor (1)Ali Raza Land surveyor (1)
Ali Raza Land surveyor (1)
ALI RZA
 
Civil engineer Resume 24.2.16
Civil engineer Resume  24.2.16Civil engineer Resume  24.2.16
Civil engineer Resume 24.2.16
Udhaya Kumar
 
Civil Engineer Resume
 Civil Engineer Resume Civil Engineer Resume
Civil Engineer Resume
Ravi Kumar
 
Resume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC InspectorResume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC Inspector
M.ZUBAIR KHAN
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated Resume
Murugan murugan
 
ihsan CV - structural design engineer
ihsan CV - structural design engineerihsan CV - structural design engineer
ihsan CV - structural design engineer
ihsan ullah
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
Delfim Moreira
 
Resume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D KulkarniResume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D Kulkarni
Prasad Kulkarni
 
CV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-CivilCV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-Civil
Alagusundaram PatchaiMuthukkon
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
Rajesh Ramu
 
Project Manager CV -Rev
Project Manager CV -RevProject Manager CV -Rev
Project Manager CV -Rev
Thanki M.L
 

What's hot (20)

piping foreman resume
piping foreman resumepiping foreman resume
piping foreman resume
 
Romy George civil site engineer.
Romy George civil site engineer.Romy George civil site engineer.
Romy George civil site engineer.
 
Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
 
Land Surveyor cv Masood ( ls-ok - j16-1)
Land Surveyor cv Masood  ( ls-ok - j16-1)Land Surveyor cv Masood  ( ls-ok - j16-1)
Land Surveyor cv Masood ( ls-ok - j16-1)
 
Precast Concrete QA/QC CV
Precast Concrete QA/QC CVPrecast Concrete QA/QC CV
Precast Concrete QA/QC CV
 
Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)
 
C v surveyor( Mumtaz )
C v surveyor( Mumtaz )C v surveyor( Mumtaz )
C v surveyor( Mumtaz )
 
Infrastructure engineer. CV
Infrastructure engineer. CVInfrastructure engineer. CV
Infrastructure engineer. CV
 
Ali Raza Land surveyor (1)
Ali Raza Land surveyor (1)Ali Raza Land surveyor (1)
Ali Raza Land surveyor (1)
 
Civil engineer Resume 24.2.16
Civil engineer Resume  24.2.16Civil engineer Resume  24.2.16
Civil engineer Resume 24.2.16
 
Civil Engineer Resume
 Civil Engineer Resume Civil Engineer Resume
Civil Engineer Resume
 
Resume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC InspectorResume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC Inspector
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated Resume
 
ihsan CV - structural design engineer
ihsan CV - structural design engineerihsan CV - structural design engineer
ihsan CV - structural design engineer
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
 
Resume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D KulkarniResume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D Kulkarni
 
CV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-CivilCV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-Civil
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
Project Manager CV -Rev
Project Manager CV -RevProject Manager CV -Rev
Project Manager CV -Rev
 

Viewers also liked

Top down construction presentation
Top down construction presentationTop down construction presentation
Top down construction presentation
HERITAGE INFRASPACE INDIA PRIVATE LIMITED
 
Diaphragm Wall Presentation By Gagan
Diaphragm Wall Presentation By GaganDiaphragm Wall Presentation By Gagan
Diaphragm Wall Presentation By Gagan
HERITAGE INFRASPACE INDIA PRIVATE LIMITED
 
Top down construction
Top down constructionTop down construction
Top down construction
Amulya Kansal
 
DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)
Sukhdarshan Singh
 
Diaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignDiaphragm wall: Construction and Design
Diaphragm wall: Construction and Design
Umer Farooq
 
Summer training DMRC ppt
Summer training DMRC pptSummer training DMRC ppt
Summer training DMRC ppt
Vimal Maurya
 
Top Down Construction Presentation.
Top Down Construction Presentation.Top Down Construction Presentation.
Top Down Construction Presentation.
HERITAGE INFRASPACE INDIA PRIVATE LIMITED
 

Viewers also liked (7)

Top down construction presentation
Top down construction presentationTop down construction presentation
Top down construction presentation
 
Diaphragm Wall Presentation By Gagan
Diaphragm Wall Presentation By GaganDiaphragm Wall Presentation By Gagan
Diaphragm Wall Presentation By Gagan
 
Top down construction
Top down constructionTop down construction
Top down construction
 
DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)
 
Diaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignDiaphragm wall: Construction and Design
Diaphragm wall: Construction and Design
 
Summer training DMRC ppt
Summer training DMRC pptSummer training DMRC ppt
Summer training DMRC ppt
 
Top Down Construction Presentation.
Top Down Construction Presentation.Top Down Construction Presentation.
Top Down Construction Presentation.
 

Similar to Revised Resume

MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
MERAJUL ULHUDA
 
MCV
MCVMCV
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ Engineer
Ajay Sankar
 
13.ICON Brochure
13.ICON Brochure13.ICON Brochure
13.ICON Brochure
Zobed Hossen
 
NEW CV AMIT NIRWAN
NEW CV AMIT NIRWANNEW CV AMIT NIRWAN
NEW CV AMIT NIRWAN
0064 nirwan
 
SYED NAVEED AHMED 1
SYED NAVEED AHMED 1SYED NAVEED AHMED 1
SYED NAVEED AHMED 1
naveed ahmed
 
Resume
ResumeResume
Resume
Anand Dubey
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
Nedunuri Amarnath
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
Nedunuri Amarnath
 
jainco
jaincojainco
jainco
rama trivedi
 
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
Vinodg Kumar
 
Ahmd Mahmoud c.v
Ahmd Mahmoud c.vAhmd Mahmoud c.v
Ahmd Mahmoud c.v
Ahmed Mahmoud
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16
SHYAM NIKESH
 
Mohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oilMohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oil
Mohammad Ghayoor khan
 
Cv aniruddha
Cv aniruddhaCv aniruddha
Cv aniruddha
Aniruddha Hati
 
Resume
ResumeResume
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
Mahmoud Fareed alsheick Hussain
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
Mohamad Safarudin
 
CV Abdul Saeed
CV Abdul SaeedCV Abdul Saeed
CV Abdul Saeed
Abdul Saeed
 
izharul_cv_updated (1) - Copy - Copy - Copy (3) - Copy
izharul_cv_updated (1) - Copy - Copy - Copy (3) - Copyizharul_cv_updated (1) - Copy - Copy - Copy (3) - Copy
izharul_cv_updated (1) - Copy - Copy - Copy (3) - Copy
izharul haque
 

Similar to Revised Resume (20)

MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
MCV
MCVMCV
MCV
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ Engineer
 
13.ICON Brochure
13.ICON Brochure13.ICON Brochure
13.ICON Brochure
 
NEW CV AMIT NIRWAN
NEW CV AMIT NIRWANNEW CV AMIT NIRWAN
NEW CV AMIT NIRWAN
 
SYED NAVEED AHMED 1
SYED NAVEED AHMED 1SYED NAVEED AHMED 1
SYED NAVEED AHMED 1
 
Resume
ResumeResume
Resume
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
jainco
jaincojainco
jainco
 
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
 
Ahmd Mahmoud c.v
Ahmd Mahmoud c.vAhmd Mahmoud c.v
Ahmd Mahmoud c.v
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16
 
Mohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oilMohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oil
 
Cv aniruddha
Cv aniruddhaCv aniruddha
Cv aniruddha
 
Resume
ResumeResume
Resume
 
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
CV Abdul Saeed
CV Abdul SaeedCV Abdul Saeed
CV Abdul Saeed
 
izharul_cv_updated (1) - Copy - Copy - Copy (3) - Copy
izharul_cv_updated (1) - Copy - Copy - Copy (3) - Copyizharul_cv_updated (1) - Copy - Copy - Copy (3) - Copy
izharul_cv_updated (1) - Copy - Copy - Copy (3) - Copy
 

Revised Resume

  • 1. CURRICULUM VITAE SUMMARY Over 26 years of construction experience, in various cross functional leadership roles with all major construction delivery systems, including general contracting, construction management and design/build projects. Experience includes large variety of projects for private and government clients. Thorough understanding of construction management, project controls, supervision, and contract administration. Specializing in planning, constructability, construction management, field organization, and field execution backed by strong credentials and a proven history of on-time, on-budget and high-quality project completions. World-class experience in construction of urban infrastructure projects such as elevated road/metro projects. EXPERIENCE SUMMARY Total years of experience is 26 years Joined M/s. AFCONS INFRASTRUCTURE LIMITED (A Shapoorji Pallonji Group Company ) FROM JANUARY ‘1991 TO TILL DATE. Present designation is Project Manager (Dy. General Manager -Projects) PROJECT MANAGEMENT ATTRIBUTES • Good track record of managing complex multifunctional projects in various environments. • Creating effective, informed and highly motivated teams focused on delivery. • Comprehensive understanding of project management methodologies. • Successful and demonstrable delivery of results. • Excellent customer facing skills. • Accurately identifying clients key requirements. • Managing and supporting the implementation of business initiatives. • Experience of development of new business or marketing projects.
  • 2. PERSONAL ATTRIBUTES • Possessing a responsible attitude, tact, patience, and courtesy. • Comfortable working on numerous, smaller size pieces of work. • Ability to operate under pressure and deliver to demanding deadlines. • Achieving results through others. • Able to self start own improvement initiatives. • Good team player. • Capable of working under limited supervision. • Motivating Project teams to own and complete tasks assigned to them. • Conflict management and prioritisation skills. ACHIEVEMENTS: • Worked as Construction Head in Bara Khamba Underground Metro Station by top down method which is first time in India. • Worked as Project Manager in Mukerba Chowk Flyover project- awarded 1st . prize for best project completed during 2009-10 by CPWD. • Worked as Project Manager in Ghazipur Grade separator project- awarded as best project in the category of Road & Bridges by EPC World awards 2011 at Bangalore. DETAILS OF EXPERIENCE : Project : Barapulla Elevated Corridor Phase – II(7.6 KM), Delhi. Client : PWD, DELHI. Period : 2013 TO TlLL DATE Project Value : Rs. 500 CRORES (Approx) Position Held : Project Manager Details of work : Sub-structure including Piling (2000 Nos.), Casting and Erection of Segment & Pre-tension I girder, Solid Slab, Voided Slab, PSC Solid / Voided Slab, Cast-in Situ Box girder, Special Span using Bridge Builder, Steel Arch Bridge, Slab with Steel Plate Girder,
  • 3. Foot Over Bridge. Project : Chennai Metro Package UAA- 01 Client : Chennai Metro Rail Corporation Period : 2011 to 2013 . Project Value : Rs.475 Crores(Only for Chennai Central Underground Metro Station) Position Held : Incharge of Chennai Central Underground Metro Station . Details of work : Construction of Underground Metro Station at Chennai Central using Diaphragm Wall with Top Down Method. Plunge Column, Station Top Slab, Con-course Slab, Base Slab including Platform, Entry – Exit Structure etc. Project : Construction of Grade separator at Ghazipur, Delhi. Client : PWD , Delhi. Period : Oct’2009 to April 2011 . Project Value : Rs. 230 Crores. Position Held : Project Manager Details of work : Construction of Main flyover, Underpass, Slip roads, BOD ,FOB, Bus bays, Cycle Tracks, Drainage, Electrical, landscaping and Allied works. Project : Construction of Grade separator at Mukerba Chowk, Delhi. Client : PWD of Delhi Period : Oct’2007 to Sep’2009. Project Value : Rs. 210 Crores. Position Held : Project Manager Details of work : Construction of Main Flyover including Loops, Slip Road, Bridges, Subway, Bus Bays, Cycle Tracks, Drainage Electrical, Landscaping and Allied Works.
  • 4. Project : Construction of elevated viaduct of length 5.222 KM on Vishwa Vidyalaya – Jahangirpuri Corridor. Client :DELHI METRO RAIL CORPORATION , DELHI. Period : Jan’2006 to Sep’2007. Project Value : Rs. 165 Crores. Position Held : Construction Head Details of work : Construction of elevated viaduct about 5222m including Ramp for 192m. -Segmental construction of 136 numbers of spans and numbers of Cast-In-Situ Spans. -Construction of piles, pile cap, pier and pier caps, portal beams, bearing pedestal, shear key, installation of shear key devises, Elastomeric bearings. Construction of 4 elevated stations including Raft and footing foundation, concourse level and platform level slab, Approach Span, Masonry work, Stair cases, Escalators, lifts, Crash barrier, Grade slab, water tank and sump.- Entry / Exit structures. Project : Construction of Underground portion including Barakhamba Road Underground staion on Barakhamba Road - Connaught Place - Dwarka Section (Line No.3). Client : DELHI METRO RAIL CORPORATION, DELHI. Consultant : General Consultants PCI PBI JARTS TONICHI RITES Period : Apr’2003 to Jan’2006. Project Value : Rs. 182 Crores. Position Held : Construction Head (Cut & Cover) Details of work :Construction of Underground Station (243m), Construction of Tunnel (79m and 309m). Relocation of all utilities fouling in the project, Construction of structures using D'Walls. Retaining walls by cut and cover method including all temporary works. All station Substructures including platforms/staircases/doors/ window & Architectural finishes, water supply and pumping, drainage system, Entry/Exit structure.
  • 5. Project : Construction of Elevated Corridor from Tis Hazari to Trinagar (Inderlok) Client : DELHI METRO RAIL CORPORATION, DELHI. Consultant : General Consultants PCI PBI JARTS TONICHI RITES Period : Oct’2000 to Mar’2003. Position Held : Construction Head (Insitu Works / Finishing works) Details of work : Construction of 13 In-situ (Max. length span 65mtr.) Over heavy Traffic Delhi Roads Construction of 2 In-situ Bridge Builder spans 65 mtr. each finishing works. Project : Construction of Oil Jetty at Paradip Port Trust Client : Paradip Port Trust Period : June’1999 to Oct’2000 Position Held : Construction Head (In-situ Works / Finishing works) Details of work : Execution of Marine Piles (900, 1200, 1300 & 1500 Dia) by Rolling Gantry and by Fix Platform Method. Execution of Mooring Dolphins, Berthing Dolphins, Service Platforms. Fixing of Bollards & Fenders. Project : Construction of Mechanized Coal Handling Wharf at Paradip Port (ADB Project) Consultant & Client :BKJV-KINHILL Australia & Paradip Port Trust Period : Aug’1997 to June’1999 Details of work : Execution of Marine Steel Piles of 1000 Dia by ICE Diesel Hammer Model 100s and Vibro Hammer PTC France make including Raker Pile 1000 Dia (1:7 & 1:5). Erection of Precast Beams, Insitu Pile Cap, Cast-in-situ, Beams, Slabs, Fixing of fender and Bollards. Project : Construction of Bulk Cargo Berth at Pipavav Port Consultant : RITES, FPPL (Gujarat) Period : Mar’1995 to Aug’1997 Details of work : Planning & Execution of Marine Piles (1000, 750) by Gantry and
  • 6. by Fix Platform method and by Floating arrangement. Pile Cap & Pile muff erection of Precast Units. Cast-in-situ work including fixing of fender & Bollards, rails etc. Project : Construction of Intake Channel Jetty Nellore. Consultant : International Design Associates, Delhi Period : Feb’1994 to Mar’1995 Details of work : Planning & Execution of Marine Piles (760 & 1000 Dia) by Gantry Pile Cap Erection of Precast unit and cast-in-situ work including Deck Slab Channel Wall, Pump house etc. Project : Construction of General Cargo Berth for Okha Port. Consultant : RITES & Gujarat Marine Time Board Period : Nov’1992 to Feb’1994 Details of work : Execution of Marine Piles (1000, 760 Dia) by rolling Gantry by Fix Platform Method by Floating arrangement method. Raker pile of Dia 760 (1:4:5) Erection of Precast Unit and Cast-in-Situ work (Qty.6500 M3) including fixing of Boalllards and Fenders. Project : Construction of Crude Oil Tank for BPCL at Mumbai. Consultant : RITES & BPCL Mumbai Period : Jan’1992 to Nov’1992 Details of work : Planning & Contractor’s Billing. Concrete Mix Design, Erection of Piles (1000 & 1200 Dia) by DMRC METHOD,Cast-in-situ work including Pile Cap, Deck Slabs etc. Project : Construction of Railway Bridge for TISCO at Jamshedpur. Consultant of Client : IRCON & TISCO Period : Jan’1991 to Jan’1992 Details of work : Pilling 1200 dia & Sub-Structure Works.
  • 7. PERSONAL DETAILS: NAME : SINGH SANJAY KUMAR FATHER’S NAME : SHRI SINGH G.P. DATE OF BIRTH : 11TH JULY’1965 PASSPORT NO. : A-444 8085 CORRESPONDANCE ADD. : FLAT NO.- 09084, ATS – ADVANTAGE, AHINSHA KHAND- 1, INDIRA PURAM, GHAZIABAD – 201014 (UP). MOBILE : +91 96430 01444 Email-ID : asingh807803@gmail.com NATIONALITY : INDIAN MARITAL STATUS : MARRIED EDUCATIONAL QUALIFICATION : a) B.E.CIVIL PASSED IN 1989 b) GRADUATE DIPLOMA IN MANAGEMENT STUDIES IN 2004 DECLARATION : I do here by declare that all the above information furnished are true to best of my knowledge and belief. Date:………….. Place:…………. (SANJAY KUMAR SINGH)