1. CURRICULUM VITAE
Career Objective:
Looking for a challengingpositionwhere Icanutilize mypotential toitsfull extentandwhere there is a
needtoshare broadco-operative effortsthroughsoundplanning,creativityforthe sounddevelopment
of the companyina professional wayandtobe part of an esteemedandprosperousorganizationthat
providesopportunitiesforlongtermcareer,growthanddevelopment.
Summary:
Young anddynamicwithmotivation,confidentialandexcellentinmechanical andpipingfabrication&
erectionwith 17 yearsof experience.Idothe jobwithsense of responsibilityandalwaysexpecttomake
positive contributiontothe organizationthatemploysme. Workedinknownorganizationswithrelated
experience gatheredinIndiaandAbroad.
Educational Qualification:
S.S.C. fromBihar EducationBoardIndiain the year(1983)& secured63%.
H.S.C.from BiharIntermediateboard ,Patna . In the years(1986) & secured73%.
Technical Qualification:
Diplomainmechanical GovernmentPolytechniccollege Muzafferpur,Bihar.
Diplomaincomputer:Ms-Office withMs-word,Ms-Excel,Ms-Access.
Summary of Training Course:
SupervisorTrainingat supervisorTrainingCenterBPCL(R) Mumbai, India.
SupervisorSpecificSafetyTrainingatOSHO Center,Habshan AbuDhabi (U.A.E.).
Successfullycompletedacourse inGASCO permittowork (PICWS) whichisprovidedby National
TrainingCenterAbu-Dhabi (U.A.E.).
Successfully completedacourse of PermitReceiverinSARQ,IBIN-SINHA, SIPCHEMProjectat
Jubail , (Saudi Arabia) .
Passport Details:
Passport No: F-8037952. Date of issue: 23 June 2006.
Date of expiry: 22 June 2016. Place of issue:Patna ,BIHAR.
2. Mailing address :
Permanent address Temporary address
Name:Birendra KumarSingh. Name:Birendra KumarSingh.#23288.
Village:Karmainigaji. AYTB CO.Ltd.
P.O: Nechua Jalalpur. P.O.Box: 10270,
Dist: Gopal ganj.(Bihar). Jubal Industrial City31961.
PinCode;841503. Kingdomof Saudi Arabia.
INDIA Email: birendrakumar.singh8@Gmail.com.
Birendrakumarsingh59@yahoo.com.
Mobil no: +918804369651. Mobil no: 0564734832.
Working Experience :
1. Position: FOREMEN (Piping&Mechanical).
Duration: 07 august 2010. To Continues.
Organization: Al-YUSR TOWNSEND& BOTTUM CO.LTD, JUBAIL (Saudi Arabia).
Project: SARQ, SIPCHEM .
Job Responsibility:Responsible forvariousfabrications includingall relevantPipe lines
and machining componentsfor various plants. Preparingmaterial listand fabricationdrawing
with spool marking on IsometricDrawings.Fabrication and Erection ofspools &supports
(structure) as perrelated drawings,like plan, ISO, P&ID,GA,& Skid drawing. Fabrication of
temporary spoolsfor chemical cleaning&pre-commissioningpreparation.Supervisingof
fabrication groups and carries out various fabrication and erectionof piping&structure with
quality.HydroTestingof piping system,columns,vessel,Furnas Tube &Exchangers.AirBlowing,
Waterflushingofpipe line and leaktest by Air and Nitrogen.
2. Position: Piping supervisor.
Duration: 13 Nov2006 to 16 Nov 2009 .
Organization: CONSOLIDATED CONTRACTOR INTERNATIONAL CO. SAL (CCIC) ABU-DHABI .
Project: HGCE,GASCO,OAG ,Habshan ,Abu-Dhabi .
Principal Clint: ABU-DHABI GASINDUSTRIES LTD. (GASCO).
Main Contractor: FLUOR MIDEAST LIMITED.
Job Responsibility :Pipingfabrication and erection. Pre-fabrication,workshop
inspectionto ensure the working crew is followingspecifiedworkingprocedures.Monitoring
3. of welderperformance by preparingwelderrepair charts .Carry out InspectionwithQC for
pipinginstallation, Hydro testand cleaningpunch itemof test pack .
3. Position: Piping supervisor.
Duration: 09 March 2007 to 31 May 2007 .( Shut-down).
Organization CONSOLIDATED CONTRACTOR (I) CO. KUWAIT.
Project: OL2K Equate Ethylene .
Principal Client: Technip.
Main Contractor: FLUOR.
Job Responsibility:Responsible formonitoringthe shut- down programme activitiesand work
planningof the schedule. Fabricationof Blinds , fixingof blinding ,De-BlindingandBolt tourquoin
.Moly-cotting .Valve Removing&installing.Hydro testing.Chemical Cleaning.Reportto site
engineerorSection engineeraboutproblemrelatedmaterial, tools,manpowerand progress.
4. Position: Piping supervisor.
Duration: 08 August 2005to 25May 2006.
Organization: LAHOUD ENGINEERING CO. LTD, DOHA QATAR .
Project: ORYX GTL , DOHA QATAR .
Principal client: CHIUDA .
Main Client : Tech nip .
Job Responsibility: Responsible for various fabrication includingall relevantpipe linesand
machiningcomponents for various plants .Upgrading the projectpossibilityschedule .Carried
numberof manpower as per requiredby Company . Highly Co-operate ofthe safetyrules&
regulationsof Company .
5. Position : Supervisor.
Duration : 16 April ,2004 to 18 July, 2004 . (SHORT TURN ).
Organization : OLAYAN DESCON ,SAUDI ARABIA .
Project : SAUDI METHANOL JUBAIL CO, (SIPCHEM ) .JUBAIL,K.S.A.
Main Client: CHIUDA.
Job Responsibility:- Instruction and Co –ordination with fabrication & erectionteam
.Attendsafety meetingeveryday with colleagues.
6. Position : Piping supervisor.
Duration : 21 August , 2000 to 17 Oct , 2002 .
Organization : DODSAL PTE CO. LTD , DOHA QATAR .
Project : Q- CHEM ETHYLENE .
Main Client : KBRT .
Job Responsibility:- Responsible forfabricationand erectionwork .Preparingmaterial list and
fabrication drawing with spool marking on isometricdrawings . Monitoring ofwelder
performance by preparing welderrepaircharts .Fabrication and erectionof spool
&supports(structure) asper relateddrawing , like that ISO ,P&ID , GA & Skid drawings .Hydro
testingof pipingsystem , Columnsvessel ,FurnasTube & Exchangers . Air Blowing , Water
4. flushingofpipe line and Leak Test by air and nitrogen.Carry out inspectionwithQC for piping
installation, hydro test and clearing,Punch itemof Test pack. Prepare daily progressreport.
7. Position: Pipingsupervisor.
Duration: 09 July 1998 to 15 May 1999 .
Organization : LAHOUD ENGINEERING CO. LTD ,DUBAI (UAE).
Project : ENOC .
Main Contractor: TECHNIP PETROL .
Job Responsibility:- HighlyCo-operationofthe safety rules®ulations.Highlyproficient in
fabrication and erection drawing interpretation.Preparingthe material requestingand daily
work progress completion. Responsible forvarious fabrication&erectionwork.
8. Position : Supervisor.
Duration : 22 May 1996 to 06 March 1998 .
Organization : BRIDGE & ROOF CO. (I ) LTD ,MUMBAI( INDIA ).
Project : BHARAT PETROLIUM CO.LTD (REFINERING) ,CHEMBUR ,MUMBAI(INDIA ).
Main Contractor : ENGINEER INDIA LTD . (EIL ) .
Job Responsibility:- Responsible forvarious fabrication and erectionwork .Carriednumber
of manpower as requiredfor the Site & Fab shop. Upgradingthe projectpossibilityschedule
.HighlyCo-operate of the Safety rulesand regulationof Company .
NOTE : Recently working in the SATORP PLANT as a fabrication Foreman underKBR-AYTB JV.
Personal Details :
Date of Birth : 01 Jan 1969 . FathersName : Shoe Raj Singh .
Place ofBirth : Karmainigaji . Status : Married.
Religion: Hindu. Languages Known : English , Arabic ,Urdu& Hindi .
Declaration:
I do hereby declare that all the information furnished above is true and complete to the best of
my knowledge . I am confident that will be fully conformable in your demand . I shall be
grateful to you and oblige .
Thanking You .With Regards .
Date: Signature.