SlideShare a Scribd company logo
1
KHALID KHAN
Cell: +971-562922073 email: khalidgeo@hotmail.com
Profession
 Engineering
Geologist/Geotechnic
al Engineer
Position
 Assistant Resident
Engineer
Nationality
 Pakistani
Qualifications
 1995 –M.Sc,
Engineering Geology,
University of A.J. K,
Azad Kashmir,
Pakistan
 1993 – BSc (Hons)
Applied Geological
Engineering,
University of A.J. K,
Azad Kashmir,
Pakistan
Memberships
 2004 — Member of
Geological Society of
Pakistan
Areas of Expertise
Key Experience and Background
Working as Senior Engineering Geologist / Geotechnical Engineer for
Hyder Consulting Middle East Limited based in Dubai. Having over 18
years of professional experience in Geological, Geotechnical, Material
Engineering and Highway Engineering in UAE, Bahrain, Qatar,
Sultanate of Oman and Pakistan.
Responsible for the technical supervision of pile construction and
testing, G.I Works, Anchor Installation and testing, Ground
Improvement and testing, earthworks, shoring works, excavation /
backfilling and dewatering. Construction and supervision of Sub
grade, Sub-base, Aggregate Base course, Asphalt works and
Construction of Embankment.
Professional History
Year Position Company Country
2012 – Date Engineering
Geologist
Arcadis / Hyder
Consulting
Middle East
Limited
UAE
2008 – 2012 Assistant
Resident
Engineer
Hyder Consulting
Middle East
Limited
Bahrain
2005 – 2008 Engineering
Geologist
Hyder Consulting
Middle East
Limited
UAE
2004 – 2005 Engineering
Geologist
Matrix Laboratory UAE
2
Professional History (continued)
Year Position Company Country
2003 – 2004 Engineering Geologist Arab Centre for
Engineering Studies
UAE
2000 – 2002 Engineering Geologist Swis-Tech Engineering
and Contractors
Pakistan
1996 – 1999 Site Supervisor High Technology
Engineering
Pakistan
Project Summary
2005 – Date Hyder Consulting Middle East Limited, UAE – Assistant Resident
Engineer/Geotechnical Engineer /Material Engineer
Assist the Resident Engineer to manage engineering discipline of the project
to meet time, cost, and quality requirements. Review contractor’s technical
submittals and RFI’s for compliance with the design intent and coordinate with
other disciplines. Witness testing and inspect and approve works during
construction and on completion. Provide QS technical assistance on
variations / claims issues. Verify measures of works completed assist in the
preparation of monthly reports, progress vs. programme. Prepare and issue
supplementary construction information as required. Co-ordinate forward
planning & resolve issues in a timely manner. Liaison with other discipline
leaders, ensuring all parties are kept informed of all relevant matters in
relation to the discipline. Liaise with authorities and ensure NOC’s are
obtained and maintained. Detect non-conformance in construction and
manage remedial works. Role of H&S site representative, Liaise with all
parties to ensure work is undertaken safely and follow up identified risks,
conduct safety inspections.
Quality control and Geotechnical supervision of major projects to ensure that
the project is implemented in accordance with the approved design. The role
entails the monitoring of the site construction activities of the contractor to
ensure compliance with the design and certify the execution of the works.
Projects Include:
Construction of Water Security Mega Reservoirs, Doha, Qatar: Working as a
designated Geotechnical Engineer for the site works for the supervision and
construction and testing of 15000 Piles having different diameter and depths,
Earth works (Excavation, Backfilling and Shoring), micro-tunnelling and
Horizontal Directional Drilling (HDD) for the Installation of HDPE Fibre Optic
Ducts works for 5 – Reservoirs and 4 – Pipelines Packages. Review of
contractor’s technical submittals and RFI’s. Detection of non-conformance in
construction and manage remedial works. The project entails construction of
five potable water mega reservoirs sites and interconnecting network of large
diameter water pipelines. Each reservoirs site will ultimately comprise up to
3
five reservoirs, each of which will be the largest of their type in the world.
North Orbital Highway (NOH2), Doha Qatar: Working as Designer’s Site
Representative (DSR) is to ensure that the project is implemented in
accordance with the approved design. The role entails the monitoring of the
site construction activities of the contractor to ensure compliance with the
design and certify the execution of the works.
DSR’s responsibilities;
1. Issue Designer’s Site Instructions.
2. Sign off Execution and Post Execution Certificates
3. Review Method Statements prepared by contractor for works to be
carried out.
4. Check Inspection and Test Plans (ITPs) prepared by contractor prior
to any work taking place.
5. Attend approx. 5% of Inspection requests and sign off on all hold
points.
6. Periodically monitor the works to check compliance with the
specification, drawings and method statements.
7. Issue observation notes and NCRs as may be necessary.
8. Advise the Contractor of improvements in his QA/QC works.
Residential Blocks (City Walk), Dubai: Responsible for the supervision and
management of Soil improvement by Installation of stone columns/Dynamic
Compaction and verification by zone load test, CPT, plate load test and
Pressure meter Test and all earthworks (Excavation & Backfilling).
Area 3 Doha North, Doha, Qatar: working as a designated Geotechnical
Engineer for the site works for the construction and supervision of
Embankment, Sub grade, Sub base, Aggregate base course and Asphalt
works. Was also responsible for the supervision and management of ground
investigation.
Contract 2 – GEC Framework Contract for local roads and Drainage,
Qatar: Part of the team responsible for the supervision of site works. The
investigation comprised pressuremeter testing, geophysical testing,
permeability testing as well as standard laboratory testing.
PJ 20017 – Dubai Frame, Dubai: Managing the enabling works including
preliminary piles testing, excavation works and dewatering systems.
Construction and static load testing of main Piles for the Iconic Structure to be
built in Zabeel Park, Dubai.
Muharraq STP and Flow Conveyance, Bahrain: Ground investigation
supervision for onshore and offshore (Sea outfall) for proposed sewer tunnel
project located in Muharraq district of Bahrain. The contract comprises the
design of approximately 16 kilometres tunnel of Deep Gravity Sewer and
Sewerage Treatment Plant with TSE outfall. G.I consists of approximately 70
boreholes with Pressure Meter, Permeability and Geophysical testing.
2008-2011, Grade Separated Junction, Isa Town Gate, Bahrain:
As ARE (Roads) is Responsible for the overall daily management and
coordination of the activities performed by the supervision team, Monitoring
the works progress, preparing changes to design, attending meetings, Review
and approval of drawings and submittals from contractor and suppliers, site
clearance, Earth works, Sub base, Asphalt , Street lighting, Kerbing, Precast
4
concrete paving blocks, Crash barrier, Stone revetment, Traffic signs, Road
marking, protection and Realignment of existing services, laying of water
mains, Liaison with utility authorities, Quality control, Checking of quantities,
conduct practical completion inspections.
As a GEOTECHNICAL ENGINEER was Responsible for the supervision of
construction of all piles, sonic tests, Pile Load Test, Soil investigation for the
confirmation of tentative pile tip levels. Supervision of pressure grouting on
601 permanent ground Anchor locations to fill subsurface interconnected
cavities in highly weathered and fractured Limestone. Responsible for the
installation of permanent ground Anchors for underpass. Supervision of the
proof load , suitability and acceptance test for anchors having configuration
600k N, 720k N and 1200k N.
2007-2008, Palazzo Versace, Dubai: Palazzo Versace Hotel will include 213
suites, a spa, restaurants, and 188 luxury villas with 80 levels of D1 tower.
Works on the project include bored cast-in-situ piles 750mm, 900mm 1.2m,
1.5m and 1.8m dia. piles, 55m deep; bored pile wall (Secant Piles) 750, 900
mm dia, 22 m deep with anchors and dewatering-deep wells.
2007, Bay Central, Marina- Dubai: Managing the enabling works including
preliminary piles testing, shoring wall with anchors and bracing system,
excavation works and dewatering system. Construction and static load testing
of main Piles for the Tower.
2007, Pentominium Tower Dubai Marina: 120 levels of luxurious penthouse
living in Dubai marina, includes 250 piles of 1.5m dia, 55m deep, Preliminary
piles testing using 'O'cell up to 13500 tons, shoring diaphragm wall 800mm
width with anchors and struts and dewatering systems, responsible for
supervision works.
2006-2007, DIFC central park-08, Dubai: Supervision of pile construction to
the main structure comprises residential and office tower, more than 1250
piles having different diameter and depths.
2005-2006, Dubai Metro Project, Dubai: Responsible for supervision of
ground investigation, includes drilling of investigatory boreholes, insitue
testing (pressure meter test, minard test, permeability test, down hole
geophysical test and pumping test), Cone penetration test (CPT) and
installation of piezometers and incline meters to record the movement of
excavated wall face and ground water record in underground and elevated
sections (Red Lines).
2005, Al-Khaleej Sugar Mills, Jabel Ali, Dubai: Supervision of ground
investigation, ground improvement (with Vibro-Compaction and stone
columns), and construction of piles for the Quayside Crane Foundation.
2004 – 2005 Matrix Laboratory – Engineering Geologist
Responsible for the assessment and management of ground investigation
and compilation of geotechnical interpretative reports .Grading analysis of
cement bonded gravel base, sub base and asphalt materials
2003 – 2004 Arab Centre for Engineering Studies – Engineering Geologist
5
Responsible for supervision of soil investigation, drilling of boreholes
(on-shore and off-shore), subsurface logging and description, sample
preservation, institute testing including pressure meter, packer, vein shear,
standard penetration, and pressure grouting. Wire line logging in UAE and
Oman.
Projects:
 Fuel Bunkering Facility at Salalah Port, Sultanate of Oman.
 The Palm Island (Wonder in the world)
 Railway Network in Dubai (under municipality supervision)
 World Tallest Tower (Burj Dubai)
2000 – 2002 Swis-Tech Engineering and Contractors – Engineering Geologist
Management and supervision of geotechnical investigation, preparation
and compilation of factual reports by data collected from investigation and
laboratory testing. Supervision of pressure grouting in the weaker zones
at dam sites, pumping tests and material testing in the field laboratory.
1996 – 1999 High Technology Engineering – Site Supervisor

More Related Content

What's hot

CV - NAZEER AHMED -Oversees
CV - NAZEER AHMED -OverseesCV - NAZEER AHMED -Oversees
CV - NAZEER AHMED -OverseesNazir Ahmed
 
Cv Thenappan
Cv ThenappanCv Thenappan
Cv Thenappan
THENAPPAN KUMARAPPAN
 
Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)Guntur Rudy
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
Mohamad Safarudin
 
cv of suresh latest (4) (1)
cv of suresh latest (4) (1)cv of suresh latest (4) (1)
cv of suresh latest (4) (1)Suresh Singh
 
Resume of Mr. Villasis Nelson P. 2016 r1
Resume of Mr. Villasis Nelson P. 2016 r1Resume of Mr. Villasis Nelson P. 2016 r1
Resume of Mr. Villasis Nelson P. 2016 r1Nelson Villasis
 
WHYTE-Jan2016 Final
WHYTE-Jan2016 FinalWHYTE-Jan2016 Final
WHYTE-Jan2016 FinalGary Whyte
 
QA/QC Inspector or Engineer
QA/QC Inspector or EngineerQA/QC Inspector or Engineer
QA/QC Inspector or Engineer
Alfredo Tendero Alata Jr.
 
Philip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhilip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhil Karow
 
M.Udayakumar CV (1)
M.Udayakumar CV (1)M.Udayakumar CV (1)
M.Udayakumar CV (1)Udaya Kumar
 

What's hot (18)

13.ICON Brochure
13.ICON Brochure13.ICON Brochure
13.ICON Brochure
 
CV - NAZEER AHMED -Oversees
CV - NAZEER AHMED -OverseesCV - NAZEER AHMED -Oversees
CV - NAZEER AHMED -Oversees
 
Cv Thenappan
Cv ThenappanCv Thenappan
Cv Thenappan
 
Siemens_CV1
Siemens_CV1Siemens_CV1
Siemens_CV1
 
Resume
Resume Resume
Resume
 
Poornesha Shetty-QA QC
Poornesha Shetty-QA QCPoornesha Shetty-QA QC
Poornesha Shetty-QA QC
 
Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
cv of suresh latest (4) (1)
cv of suresh latest (4) (1)cv of suresh latest (4) (1)
cv of suresh latest (4) (1)
 
Arun Resume .
Arun Resume .Arun Resume .
Arun Resume .
 
Ravi's CV
Ravi's CVRavi's CV
Ravi's CV
 
Resume of Mr. Villasis Nelson P. 2016 r1
Resume of Mr. Villasis Nelson P. 2016 r1Resume of Mr. Villasis Nelson P. 2016 r1
Resume of Mr. Villasis Nelson P. 2016 r1
 
WHYTE-Jan2016 Final
WHYTE-Jan2016 FinalWHYTE-Jan2016 Final
WHYTE-Jan2016 Final
 
SUNDAR CV.
SUNDAR CV.SUNDAR CV.
SUNDAR CV.
 
QA/QC Inspector or Engineer
QA/QC Inspector or EngineerQA/QC Inspector or Engineer
QA/QC Inspector or Engineer
 
Philip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhilip Karow_FinalResumeJL
Philip Karow_FinalResumeJL
 
M.Udayakumar CV (1)
M.Udayakumar CV (1)M.Udayakumar CV (1)
M.Udayakumar CV (1)
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 

Similar to Khalid Khan-Geo (5-10-16)

Ghullam murtaza cv (1)
Ghullam murtaza cv (1)Ghullam murtaza cv (1)
Ghullam murtaza cv (1)
Ghullam Murtaza Dahri
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3Moayad Qblawi
 
Site civil engineer fiazuddin
Site civil engineer fiazuddinSite civil engineer fiazuddin
Site civil engineer fiazuddin
Fiazuddin Memon
 
CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)Joedon Cunanan
 
CV of Rafi jadeed01
CV of Rafi jadeed01CV of Rafi jadeed01
CV of Rafi jadeed01RafiUllah U
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERSajjad Ali
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CVvimal nc
 

Similar to Khalid Khan-Geo (5-10-16) (20)

Mohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oilMohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oil
 
Ghullam murtaza cv (1)
Ghullam murtaza cv (1)Ghullam murtaza cv (1)
Ghullam murtaza cv (1)
 
cv for Project Engineer
cv for Project Engineercv for Project Engineer
cv for Project Engineer
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
CV Updated
CV UpdatedCV Updated
CV Updated
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Site civil engineer fiazuddin
Site civil engineer fiazuddinSite civil engineer fiazuddin
Site civil engineer fiazuddin
 
Hamdi.62016.PDF
Hamdi.62016.PDFHamdi.62016.PDF
Hamdi.62016.PDF
 
jainco
jaincojainco
jainco
 
CV
CVCV
CV
 
CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)
 
CV of Rafi jadeed01
CV of Rafi jadeed01CV of Rafi jadeed01
CV of Rafi jadeed01
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
Amitabha Chattopadhyay latest
Amitabha Chattopadhyay latest Amitabha Chattopadhyay latest
Amitabha Chattopadhyay latest
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
 
UPDATE CV 2015
UPDATE CV 2015UPDATE CV 2015
UPDATE CV 2015
 

Khalid Khan-Geo (5-10-16)

  • 1. 1 KHALID KHAN Cell: +971-562922073 email: khalidgeo@hotmail.com Profession  Engineering Geologist/Geotechnic al Engineer Position  Assistant Resident Engineer Nationality  Pakistani Qualifications  1995 –M.Sc, Engineering Geology, University of A.J. K, Azad Kashmir, Pakistan  1993 – BSc (Hons) Applied Geological Engineering, University of A.J. K, Azad Kashmir, Pakistan Memberships  2004 — Member of Geological Society of Pakistan Areas of Expertise Key Experience and Background Working as Senior Engineering Geologist / Geotechnical Engineer for Hyder Consulting Middle East Limited based in Dubai. Having over 18 years of professional experience in Geological, Geotechnical, Material Engineering and Highway Engineering in UAE, Bahrain, Qatar, Sultanate of Oman and Pakistan. Responsible for the technical supervision of pile construction and testing, G.I Works, Anchor Installation and testing, Ground Improvement and testing, earthworks, shoring works, excavation / backfilling and dewatering. Construction and supervision of Sub grade, Sub-base, Aggregate Base course, Asphalt works and Construction of Embankment. Professional History Year Position Company Country 2012 – Date Engineering Geologist Arcadis / Hyder Consulting Middle East Limited UAE 2008 – 2012 Assistant Resident Engineer Hyder Consulting Middle East Limited Bahrain 2005 – 2008 Engineering Geologist Hyder Consulting Middle East Limited UAE 2004 – 2005 Engineering Geologist Matrix Laboratory UAE
  • 2. 2 Professional History (continued) Year Position Company Country 2003 – 2004 Engineering Geologist Arab Centre for Engineering Studies UAE 2000 – 2002 Engineering Geologist Swis-Tech Engineering and Contractors Pakistan 1996 – 1999 Site Supervisor High Technology Engineering Pakistan Project Summary 2005 – Date Hyder Consulting Middle East Limited, UAE – Assistant Resident Engineer/Geotechnical Engineer /Material Engineer Assist the Resident Engineer to manage engineering discipline of the project to meet time, cost, and quality requirements. Review contractor’s technical submittals and RFI’s for compliance with the design intent and coordinate with other disciplines. Witness testing and inspect and approve works during construction and on completion. Provide QS technical assistance on variations / claims issues. Verify measures of works completed assist in the preparation of monthly reports, progress vs. programme. Prepare and issue supplementary construction information as required. Co-ordinate forward planning & resolve issues in a timely manner. Liaison with other discipline leaders, ensuring all parties are kept informed of all relevant matters in relation to the discipline. Liaise with authorities and ensure NOC’s are obtained and maintained. Detect non-conformance in construction and manage remedial works. Role of H&S site representative, Liaise with all parties to ensure work is undertaken safely and follow up identified risks, conduct safety inspections. Quality control and Geotechnical supervision of major projects to ensure that the project is implemented in accordance with the approved design. The role entails the monitoring of the site construction activities of the contractor to ensure compliance with the design and certify the execution of the works. Projects Include: Construction of Water Security Mega Reservoirs, Doha, Qatar: Working as a designated Geotechnical Engineer for the site works for the supervision and construction and testing of 15000 Piles having different diameter and depths, Earth works (Excavation, Backfilling and Shoring), micro-tunnelling and Horizontal Directional Drilling (HDD) for the Installation of HDPE Fibre Optic Ducts works for 5 – Reservoirs and 4 – Pipelines Packages. Review of contractor’s technical submittals and RFI’s. Detection of non-conformance in construction and manage remedial works. The project entails construction of five potable water mega reservoirs sites and interconnecting network of large diameter water pipelines. Each reservoirs site will ultimately comprise up to
  • 3. 3 five reservoirs, each of which will be the largest of their type in the world. North Orbital Highway (NOH2), Doha Qatar: Working as Designer’s Site Representative (DSR) is to ensure that the project is implemented in accordance with the approved design. The role entails the monitoring of the site construction activities of the contractor to ensure compliance with the design and certify the execution of the works. DSR’s responsibilities; 1. Issue Designer’s Site Instructions. 2. Sign off Execution and Post Execution Certificates 3. Review Method Statements prepared by contractor for works to be carried out. 4. Check Inspection and Test Plans (ITPs) prepared by contractor prior to any work taking place. 5. Attend approx. 5% of Inspection requests and sign off on all hold points. 6. Periodically monitor the works to check compliance with the specification, drawings and method statements. 7. Issue observation notes and NCRs as may be necessary. 8. Advise the Contractor of improvements in his QA/QC works. Residential Blocks (City Walk), Dubai: Responsible for the supervision and management of Soil improvement by Installation of stone columns/Dynamic Compaction and verification by zone load test, CPT, plate load test and Pressure meter Test and all earthworks (Excavation & Backfilling). Area 3 Doha North, Doha, Qatar: working as a designated Geotechnical Engineer for the site works for the construction and supervision of Embankment, Sub grade, Sub base, Aggregate base course and Asphalt works. Was also responsible for the supervision and management of ground investigation. Contract 2 – GEC Framework Contract for local roads and Drainage, Qatar: Part of the team responsible for the supervision of site works. The investigation comprised pressuremeter testing, geophysical testing, permeability testing as well as standard laboratory testing. PJ 20017 – Dubai Frame, Dubai: Managing the enabling works including preliminary piles testing, excavation works and dewatering systems. Construction and static load testing of main Piles for the Iconic Structure to be built in Zabeel Park, Dubai. Muharraq STP and Flow Conveyance, Bahrain: Ground investigation supervision for onshore and offshore (Sea outfall) for proposed sewer tunnel project located in Muharraq district of Bahrain. The contract comprises the design of approximately 16 kilometres tunnel of Deep Gravity Sewer and Sewerage Treatment Plant with TSE outfall. G.I consists of approximately 70 boreholes with Pressure Meter, Permeability and Geophysical testing. 2008-2011, Grade Separated Junction, Isa Town Gate, Bahrain: As ARE (Roads) is Responsible for the overall daily management and coordination of the activities performed by the supervision team, Monitoring the works progress, preparing changes to design, attending meetings, Review and approval of drawings and submittals from contractor and suppliers, site clearance, Earth works, Sub base, Asphalt , Street lighting, Kerbing, Precast
  • 4. 4 concrete paving blocks, Crash barrier, Stone revetment, Traffic signs, Road marking, protection and Realignment of existing services, laying of water mains, Liaison with utility authorities, Quality control, Checking of quantities, conduct practical completion inspections. As a GEOTECHNICAL ENGINEER was Responsible for the supervision of construction of all piles, sonic tests, Pile Load Test, Soil investigation for the confirmation of tentative pile tip levels. Supervision of pressure grouting on 601 permanent ground Anchor locations to fill subsurface interconnected cavities in highly weathered and fractured Limestone. Responsible for the installation of permanent ground Anchors for underpass. Supervision of the proof load , suitability and acceptance test for anchors having configuration 600k N, 720k N and 1200k N. 2007-2008, Palazzo Versace, Dubai: Palazzo Versace Hotel will include 213 suites, a spa, restaurants, and 188 luxury villas with 80 levels of D1 tower. Works on the project include bored cast-in-situ piles 750mm, 900mm 1.2m, 1.5m and 1.8m dia. piles, 55m deep; bored pile wall (Secant Piles) 750, 900 mm dia, 22 m deep with anchors and dewatering-deep wells. 2007, Bay Central, Marina- Dubai: Managing the enabling works including preliminary piles testing, shoring wall with anchors and bracing system, excavation works and dewatering system. Construction and static load testing of main Piles for the Tower. 2007, Pentominium Tower Dubai Marina: 120 levels of luxurious penthouse living in Dubai marina, includes 250 piles of 1.5m dia, 55m deep, Preliminary piles testing using 'O'cell up to 13500 tons, shoring diaphragm wall 800mm width with anchors and struts and dewatering systems, responsible for supervision works. 2006-2007, DIFC central park-08, Dubai: Supervision of pile construction to the main structure comprises residential and office tower, more than 1250 piles having different diameter and depths. 2005-2006, Dubai Metro Project, Dubai: Responsible for supervision of ground investigation, includes drilling of investigatory boreholes, insitue testing (pressure meter test, minard test, permeability test, down hole geophysical test and pumping test), Cone penetration test (CPT) and installation of piezometers and incline meters to record the movement of excavated wall face and ground water record in underground and elevated sections (Red Lines). 2005, Al-Khaleej Sugar Mills, Jabel Ali, Dubai: Supervision of ground investigation, ground improvement (with Vibro-Compaction and stone columns), and construction of piles for the Quayside Crane Foundation. 2004 – 2005 Matrix Laboratory – Engineering Geologist Responsible for the assessment and management of ground investigation and compilation of geotechnical interpretative reports .Grading analysis of cement bonded gravel base, sub base and asphalt materials 2003 – 2004 Arab Centre for Engineering Studies – Engineering Geologist
  • 5. 5 Responsible for supervision of soil investigation, drilling of boreholes (on-shore and off-shore), subsurface logging and description, sample preservation, institute testing including pressure meter, packer, vein shear, standard penetration, and pressure grouting. Wire line logging in UAE and Oman. Projects:  Fuel Bunkering Facility at Salalah Port, Sultanate of Oman.  The Palm Island (Wonder in the world)  Railway Network in Dubai (under municipality supervision)  World Tallest Tower (Burj Dubai) 2000 – 2002 Swis-Tech Engineering and Contractors – Engineering Geologist Management and supervision of geotechnical investigation, preparation and compilation of factual reports by data collected from investigation and laboratory testing. Supervision of pressure grouting in the weaker zones at dam sites, pumping tests and material testing in the field laboratory. 1996 – 1999 High Technology Engineering – Site Supervisor