: Hot Work( Grinding,Welding,Gas cutting)
• Eye irritation/ Chronic effects of
eyes.
• Lung diseases
• Electrocution
• Personnel injury
• Fire
• Burn Injury
Hazard Identification and Risk Assessment (HIRA)
Welding
2
(Your Company Name)
BASE LINE RISK RESIDUAL RISK
STEP
No
Activity HAZARD
CONSEQUENCES, PEOPLE,
ENVIRONMENT, ASSETS,
REPUTATION
CONTROLS PREVENT, DETECT, CONTROL, MITIGATE
: (Write your Job engineer, supervisor, HSE & Workers participants Name)
Responsibility
TASK DESCRIPTION
HIRA TEAM MEMBERS
• Welding face shield to be worn by welder & BL-5C or similar
type glass to be used by the welder’s helper while carried out
the welding activities.
• Use of proper PPEs, like safety helmet, ear plug, safety
shoes, Leather hand gloves, leather apron, Leather hand
sleeves, welding face shield, etc.
• All mobile electrical equipment shall be fitted with appropriate
ELCB
• Use approved cable joints for joining cables
• Arrangement to be done for exhausts the welding fumes.
• Hot work booth to be made by the fire retardant tarpaulin/ GI
sheet for welding activities.
• Don't use damaged electrical cables.
• Visual inspection to be carried out prior to start the welding.
• Authorized welders should do welding works.
• Welding buds to be collected and returned to store.
• X-ray test to be carried out for the welders.
• Don’t touch hot metal with bared hand. Use leather hand
gloves for the same.
(Project Name & Number)
Engineer & Job
Supervisor
Engineer & Job
Supervisor
1
2 1 L
Grinding. • Grinding without Face shield.
• Cable joints
• Improper size of grinding wheel.
• Excess pressure on wheel.
• Broken grinding wheel.
• Flying particles
• Noise
• Availability of combustible materials nearby.
• Eye injury
• Electrocution
• Personnel Injury
• Ear irritation due to continuous
noise/ Hearing loss
• Fire
• Follow and obtain the PTW system.
• TBT to be conducted prior to start the activities.
• Portable grinding machine shall be well insulated while
mounting the grinding wheel on portable grinder.
• Check all the electric cables prior to use.
• Same capacity grinding wheel to be used.
• Check physical damage to the wheel before mounting.
• Check expiry date of grinding wheel.
• Use of proper PPEs, like safety helmet, ear plug, safety
shoes, Leather hand gloves, leather apron, face shield, etc.
• Provide fire extinguisher nearby.
• Use fire blanket to cover nearby vents, drains, and open ends
of pipes.
• Ensure proper tightening of wheel.
• Use of correct size spacer washers.
• Only allow experienced/ trained person to operate the angle
grinder.
• Flammable material shall be removed from the area
• Guards shall be fitted to grinders
• Machine shall be isolated from power source while carrying
out maintenance
• Maintain good cable management
4 3 M
• Welding rays and lights
• Welding fumes
• Hot spatter fell on the body
• Damaged electrical cables.
• Hot welding holder/ hot metal
• Earthing
• Loose earth connections
• Welding in congested
• spaces
• Cable joint
• Combustible material
Put Your
Logo
Put Your
Client Logo
HIRA No.: 10005
Rev No. : 1
Date : 16.05.2022
S: Severity, P: Probability, R: Risk www.safetydocument.com, email: contactus@safetydocument.com Page 1 of 2
S P R S P R
BASE LINE RISK RESIDUAL RISK
STEP
No
Activity HAZARD
CONSEQUENCES, PEOPLE,
ENVIRONMENT, ASSETS,
REPUTATION
CONTROLS PREVENT, DETECT, CONTROL, MITIGATE Responsibility
3 Gas Cutting • Naked flame
• Smoke
• Compressed gas cylinder
• Hot Metal
• Back fire
• Improper cylinder storage
• Combustible materials
• Leakage/Cuts in hose pipe
• Fall of cylinder while shifting/Loading &
unloading
• Physical injury’s
• Eye irritation
• Lungs diseases
• Burn injury’s
• Explosion / Injury to personal
3 3 M • Experienced/ trained gas cutter to be deployed.
• Cutting goggles to be worn by the gas cutter.
• Arrangement to be done for exhausts the fumes.
• Proper gas cylinder storage should be arranged.
• All gas cylinders shall be fitted with approved & certified gas
regulators with valid calibration certificates.
• Standard FBA shall be used
• Flash back arrester should be fixed on both sides of the set
(Torch & Cylinder side).
• Trained fire watcher should available at workplace.
• Fire extinguisher to be kept nearby.
• Workplace shall clear from combustibles.
• Ensure cylinder trolley and cylinder to be tied with metallic
chain.
• Cylinder hose and regulators shall be in good condition.
• Leak test to be carried out with soap solution prior to use.
• Avoid cylinder direct under sunlight.
• Kept compressed gas cylinder upright position.
• Don’t drag or roll the cylinder while shifting. Use cylinder
trolley for the same.
• Double pressure gauge to be fitted with both the cylinder.
• Daily checklist to be filled by the gas cutter.
2 2 L Engineer & Job
Supervisor
eyes.
• Lung diseases
• Electrocution
• Personnel injury
• Fire
• Burn Injury
type glass to be used by the welder’s helper while carried out
the welding activities.
• Use of proper PPEs, like safety helmet, ear plug, safety
shoes, Leather hand gloves, leather apron, Leather hand
sleeves, welding face shield, etc.
• All mobile electrical equipment shall be fitted with appropriate
ELCB
• Use approved cable joints for joining cables
• Arrangement to be done for exhausts the welding fumes.
• Hot work booth to be made by the fire retardant tarpaulin/ GI
sheet for welding activities.
• Don't use damaged electrical cables.
• Visual inspection to be carried out prior to start the welding.
• Authorized welders should do welding works.
• Welding buds to be collected and returned to store.
• X-ray test to be carried out for the welders.
• Don’t touch hot metal with bared hand. Use leather hand
gloves for the same.
• All combustible material shall be removed from welding
operation
• Fire extinguishers shall be provided next to welding site
• Ensure All earth connections are proper
• Adequate ventilation shall be provided
• Non-involved persons shall be kept away from the area
Supervisor
• Welding fumes
• Hot spatter fell on the body
• Damaged electrical cables.
• Hot welding holder/ hot metal
• Earthing
• Loose earth connections
• Welding in congested
• spaces
• Cable joint
• Combustible material
S: Severity, P: Probability, R: Risk www.safetydocument.com, email: contactus@safetydocument.com Page 2 of 2

More Related Content

What's hot

13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates
Dwarika Bhushan Sharma
 
WORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docx
WORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docxWORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docx
WORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docx
Dwarika Bhushan Sharma
 
22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates
Dwarika Bhushan Sharma
 
18 Laying blockwork with access scaffolding Risk Assessment Templates.docx
18 Laying blockwork with access scaffolding Risk Assessment Templates.docx18 Laying blockwork with access scaffolding Risk Assessment Templates.docx
18 Laying blockwork with access scaffolding Risk Assessment Templates.docx
Dwarika Bhushan Sharma
 
LADDER INSPECTION Form # HSEQ - LI Rev 2.docx
LADDER INSPECTION Form # HSEQ - LI  Rev 2.docxLADDER INSPECTION Form # HSEQ - LI  Rev 2.docx
LADDER INSPECTION Form # HSEQ - LI Rev 2.docx
Dwarika Bhushan Sharma
 
Method of works install stator generator+strand jack + 07 july2015
Method of works install stator generator+strand jack + 07 july2015Method of works install stator generator+strand jack + 07 july2015
Method of works install stator generator+strand jack + 07 july2015
HaGun Gunawan
 
Work Permit System.pptx
Work Permit System.pptxWork Permit System.pptx
Work Permit System.pptx
ssuserb8f3fd2
 
31 ndrc operations within excavations (temporary works) risk assessment templ...
31 ndrc operations within excavations (temporary works) risk assessment templ...31 ndrc operations within excavations (temporary works) risk assessment templ...
31 ndrc operations within excavations (temporary works) risk assessment templ...
Dwarika Bhushan Sharma
 
Line of fire
Line of fireLine of fire
Line of fire
Winarso Arso
 
Working at heights training powerpoint
Working at heights training powerpointWorking at heights training powerpoint
Working at heights training powerpoint
Jomish John
 
PRESSURE TESTING PERMIT Form # HSEQ - PTP Rev 2 -.docx
PRESSURE TESTING PERMIT Form # HSEQ - PTP Rev 2 -.docxPRESSURE TESTING PERMIT Form # HSEQ - PTP Rev 2 -.docx
PRESSURE TESTING PERMIT Form # HSEQ - PTP Rev 2 -.docx
Dwarika Bhushan Sharma
 
18 laying blockwork with access scaffolding risk assessment templates
18 laying blockwork with access scaffolding risk assessment templates18 laying blockwork with access scaffolding risk assessment templates
18 laying blockwork with access scaffolding risk assessment templates
Dwarika Bhushan Sharma
 
27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates
Dwarika Bhushan Sharma
 
Weekly first aid room checklist
Weekly first aid room checklistWeekly first aid room checklist
Weekly first aid room checklist
Azmeel Contracting Company
 
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docxFIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
Dwarika Bhushan Sharma
 
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
Dwarika Bhushan Sharma
 
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx
Dwarika Bhushan Sharma
 
21 confined space working risk assessment templates
21 confined space working risk assessment templates21 confined space working risk assessment templates
21 confined space working risk assessment templates
Dwarika Bhushan Sharma
 
Portable tools risk assessment
Portable tools risk assessment Portable tools risk assessment
Portable tools risk assessment
Nidhin Sajeevan
 

What's hot (20)

13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates
 
WORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docx
WORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docxWORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docx
WORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docx
 
22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates
 
18 Laying blockwork with access scaffolding Risk Assessment Templates.docx
18 Laying blockwork with access scaffolding Risk Assessment Templates.docx18 Laying blockwork with access scaffolding Risk Assessment Templates.docx
18 Laying blockwork with access scaffolding Risk Assessment Templates.docx
 
LADDER INSPECTION Form # HSEQ - LI Rev 2.docx
LADDER INSPECTION Form # HSEQ - LI  Rev 2.docxLADDER INSPECTION Form # HSEQ - LI  Rev 2.docx
LADDER INSPECTION Form # HSEQ - LI Rev 2.docx
 
Method of works install stator generator+strand jack + 07 july2015
Method of works install stator generator+strand jack + 07 july2015Method of works install stator generator+strand jack + 07 july2015
Method of works install stator generator+strand jack + 07 july2015
 
Work Permit System.pptx
Work Permit System.pptxWork Permit System.pptx
Work Permit System.pptx
 
31 ndrc operations within excavations (temporary works) risk assessment templ...
31 ndrc operations within excavations (temporary works) risk assessment templ...31 ndrc operations within excavations (temporary works) risk assessment templ...
31 ndrc operations within excavations (temporary works) risk assessment templ...
 
Hira
HiraHira
Hira
 
Line of fire
Line of fireLine of fire
Line of fire
 
Working at heights training powerpoint
Working at heights training powerpointWorking at heights training powerpoint
Working at heights training powerpoint
 
PRESSURE TESTING PERMIT Form # HSEQ - PTP Rev 2 -.docx
PRESSURE TESTING PERMIT Form # HSEQ - PTP Rev 2 -.docxPRESSURE TESTING PERMIT Form # HSEQ - PTP Rev 2 -.docx
PRESSURE TESTING PERMIT Form # HSEQ - PTP Rev 2 -.docx
 
18 laying blockwork with access scaffolding risk assessment templates
18 laying blockwork with access scaffolding risk assessment templates18 laying blockwork with access scaffolding risk assessment templates
18 laying blockwork with access scaffolding risk assessment templates
 
27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates
 
Weekly first aid room checklist
Weekly first aid room checklistWeekly first aid room checklist
Weekly first aid room checklist
 
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docxFIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
 
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
 
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx
 
21 confined space working risk assessment templates
21 confined space working risk assessment templates21 confined space working risk assessment templates
21 confined space working risk assessment templates
 
Portable tools risk assessment
Portable tools risk assessment Portable tools risk assessment
Portable tools risk assessment
 

Similar to 10005-HOT-work.pdf

Hot work training - Welding and cutting based on IOGP
Hot work training - Welding and cutting based on IOGPHot work training - Welding and cutting based on IOGP
Hot work training - Welding and cutting based on IOGP
LogendranRaj1
 
Welding and Cutting | Gaurav Singh Rajput
Welding and Cutting | Gaurav Singh RajputWelding and Cutting | Gaurav Singh Rajput
Welding and Cutting | Gaurav Singh Rajput
Gaurav Singh Rajput
 
PPE for welders
PPE for weldersPPE for welders
PPE for welders
ANUJA DHAKAL
 
Welding and cutting safety
Welding and cutting safetyWelding and cutting safety
Welding and cutting safetyYAWAR HASSAN
 
safety induction furnace.pdf
safety induction furnace.pdfsafety induction furnace.pdf
safety induction furnace.pdf
KKKMETALPSGCT
 
Creating safe welding environment
Creating safe welding environmentCreating safe welding environment
Creating safe welding environment
brayan peter
 
Vinnu palaparthi r&ac(foundation) ppt 2018.
Vinnu palaparthi r&ac(foundation) ppt 2018.Vinnu palaparthi r&ac(foundation) ppt 2018.
Vinnu palaparthi r&ac(foundation) ppt 2018.
vinnupalaparthi
 
Industrial safety.pptx
Industrial safety.pptxIndustrial safety.pptx
Industrial safety.pptx
amarnadh307
 
Introduction to Mech MH safety.ppt
Introduction to Mech MH safety.pptIntroduction to Mech MH safety.ppt
Introduction to Mech MH safety.ppt
DMuthuRajan
 
Step 2 preparation & safety starters
Step 2 preparation & safety startersStep 2 preparation & safety starters
Step 2 preparation & safety startersfqf383
 
Hot Work Safety IOAGPL.pptx
Hot Work Safety IOAGPL.pptxHot Work Safety IOAGPL.pptx
Hot Work Safety IOAGPL.pptx
KritarthSrivastav2
 
Training module welding.pptx
Training module welding.pptxTraining module welding.pptx
Training module welding.pptx
VinayakGouda5
 
Abrasive wheel 2022.pptx
Abrasive wheel 2022.pptxAbrasive wheel 2022.pptx
Abrasive wheel 2022.pptx
Nigel Brown
 
welding-safety Training
welding-safety Trainingwelding-safety Training
welding-safety TrainingMudasar Qamar
 
Workplace Safety
Workplace SafetyWorkplace Safety
Module 1 Workplace Safety
Module 1 Workplace SafetyModule 1 Workplace Safety
Module 1 Workplace Safety
Central Carolina Technical College
 
PPE
PPE PPE

Similar to 10005-HOT-work.pdf (20)

Hot work training - Welding and cutting based on IOGP
Hot work training - Welding and cutting based on IOGPHot work training - Welding and cutting based on IOGP
Hot work training - Welding and cutting based on IOGP
 
Welding and Cutting | Gaurav Singh Rajput
Welding and Cutting | Gaurav Singh RajputWelding and Cutting | Gaurav Singh Rajput
Welding and Cutting | Gaurav Singh Rajput
 
PPE for welders
PPE for weldersPPE for welders
PPE for welders
 
Welding and cutting safety
Welding and cutting safetyWelding and cutting safety
Welding and cutting safety
 
Welding and cutting safety
Welding and cutting safetyWelding and cutting safety
Welding and cutting safety
 
safety induction furnace.pdf
safety induction furnace.pdfsafety induction furnace.pdf
safety induction furnace.pdf
 
Creating safe welding environment
Creating safe welding environmentCreating safe welding environment
Creating safe welding environment
 
Vinnu palaparthi r&ac(foundation) ppt 2018.
Vinnu palaparthi r&ac(foundation) ppt 2018.Vinnu palaparthi r&ac(foundation) ppt 2018.
Vinnu palaparthi r&ac(foundation) ppt 2018.
 
Industrial safety.pptx
Industrial safety.pptxIndustrial safety.pptx
Industrial safety.pptx
 
Introduction to Mech MH safety.ppt
Introduction to Mech MH safety.pptIntroduction to Mech MH safety.ppt
Introduction to Mech MH safety.ppt
 
Step 2 preparation & safety starters
Step 2 preparation & safety startersStep 2 preparation & safety starters
Step 2 preparation & safety starters
 
Hot Work Safety IOAGPL.pptx
Hot Work Safety IOAGPL.pptxHot Work Safety IOAGPL.pptx
Hot Work Safety IOAGPL.pptx
 
Training module welding.pptx
Training module welding.pptxTraining module welding.pptx
Training module welding.pptx
 
welding
weldingwelding
welding
 
welding
weldingwelding
welding
 
Abrasive wheel 2022.pptx
Abrasive wheel 2022.pptxAbrasive wheel 2022.pptx
Abrasive wheel 2022.pptx
 
welding-safety Training
welding-safety Trainingwelding-safety Training
welding-safety Training
 
Workplace Safety
Workplace SafetyWorkplace Safety
Workplace Safety
 
Module 1 Workplace Safety
Module 1 Workplace SafetyModule 1 Workplace Safety
Module 1 Workplace Safety
 
PPE
PPE PPE
PPE
 

Recently uploaded

TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptxTOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
nikitacareer3
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
Kamal Acharya
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Self-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptxSelf-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptx
iemerc2024
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
manasideore6
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 

Recently uploaded (20)

TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptxTOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Self-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptxSelf-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptx
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 

10005-HOT-work.pdf

  • 1. S P R S P R 3 4 M 2 2 L 3 : Hot Work( Grinding,Welding,Gas cutting) • Eye irritation/ Chronic effects of eyes. • Lung diseases • Electrocution • Personnel injury • Fire • Burn Injury Hazard Identification and Risk Assessment (HIRA) Welding 2 (Your Company Name) BASE LINE RISK RESIDUAL RISK STEP No Activity HAZARD CONSEQUENCES, PEOPLE, ENVIRONMENT, ASSETS, REPUTATION CONTROLS PREVENT, DETECT, CONTROL, MITIGATE : (Write your Job engineer, supervisor, HSE & Workers participants Name) Responsibility TASK DESCRIPTION HIRA TEAM MEMBERS • Welding face shield to be worn by welder & BL-5C or similar type glass to be used by the welder’s helper while carried out the welding activities. • Use of proper PPEs, like safety helmet, ear plug, safety shoes, Leather hand gloves, leather apron, Leather hand sleeves, welding face shield, etc. • All mobile electrical equipment shall be fitted with appropriate ELCB • Use approved cable joints for joining cables • Arrangement to be done for exhausts the welding fumes. • Hot work booth to be made by the fire retardant tarpaulin/ GI sheet for welding activities. • Don't use damaged electrical cables. • Visual inspection to be carried out prior to start the welding. • Authorized welders should do welding works. • Welding buds to be collected and returned to store. • X-ray test to be carried out for the welders. • Don’t touch hot metal with bared hand. Use leather hand gloves for the same. (Project Name & Number) Engineer & Job Supervisor Engineer & Job Supervisor 1 2 1 L Grinding. • Grinding without Face shield. • Cable joints • Improper size of grinding wheel. • Excess pressure on wheel. • Broken grinding wheel. • Flying particles • Noise • Availability of combustible materials nearby. • Eye injury • Electrocution • Personnel Injury • Ear irritation due to continuous noise/ Hearing loss • Fire • Follow and obtain the PTW system. • TBT to be conducted prior to start the activities. • Portable grinding machine shall be well insulated while mounting the grinding wheel on portable grinder. • Check all the electric cables prior to use. • Same capacity grinding wheel to be used. • Check physical damage to the wheel before mounting. • Check expiry date of grinding wheel. • Use of proper PPEs, like safety helmet, ear plug, safety shoes, Leather hand gloves, leather apron, face shield, etc. • Provide fire extinguisher nearby. • Use fire blanket to cover nearby vents, drains, and open ends of pipes. • Ensure proper tightening of wheel. • Use of correct size spacer washers. • Only allow experienced/ trained person to operate the angle grinder. • Flammable material shall be removed from the area • Guards shall be fitted to grinders • Machine shall be isolated from power source while carrying out maintenance • Maintain good cable management 4 3 M • Welding rays and lights • Welding fumes • Hot spatter fell on the body • Damaged electrical cables. • Hot welding holder/ hot metal • Earthing • Loose earth connections • Welding in congested • spaces • Cable joint • Combustible material Put Your Logo Put Your Client Logo HIRA No.: 10005 Rev No. : 1 Date : 16.05.2022 S: Severity, P: Probability, R: Risk www.safetydocument.com, email: contactus@safetydocument.com Page 1 of 2
  • 2. S P R S P R BASE LINE RISK RESIDUAL RISK STEP No Activity HAZARD CONSEQUENCES, PEOPLE, ENVIRONMENT, ASSETS, REPUTATION CONTROLS PREVENT, DETECT, CONTROL, MITIGATE Responsibility 3 Gas Cutting • Naked flame • Smoke • Compressed gas cylinder • Hot Metal • Back fire • Improper cylinder storage • Combustible materials • Leakage/Cuts in hose pipe • Fall of cylinder while shifting/Loading & unloading • Physical injury’s • Eye irritation • Lungs diseases • Burn injury’s • Explosion / Injury to personal 3 3 M • Experienced/ trained gas cutter to be deployed. • Cutting goggles to be worn by the gas cutter. • Arrangement to be done for exhausts the fumes. • Proper gas cylinder storage should be arranged. • All gas cylinders shall be fitted with approved & certified gas regulators with valid calibration certificates. • Standard FBA shall be used • Flash back arrester should be fixed on both sides of the set (Torch & Cylinder side). • Trained fire watcher should available at workplace. • Fire extinguisher to be kept nearby. • Workplace shall clear from combustibles. • Ensure cylinder trolley and cylinder to be tied with metallic chain. • Cylinder hose and regulators shall be in good condition. • Leak test to be carried out with soap solution prior to use. • Avoid cylinder direct under sunlight. • Kept compressed gas cylinder upright position. • Don’t drag or roll the cylinder while shifting. Use cylinder trolley for the same. • Double pressure gauge to be fitted with both the cylinder. • Daily checklist to be filled by the gas cutter. 2 2 L Engineer & Job Supervisor eyes. • Lung diseases • Electrocution • Personnel injury • Fire • Burn Injury type glass to be used by the welder’s helper while carried out the welding activities. • Use of proper PPEs, like safety helmet, ear plug, safety shoes, Leather hand gloves, leather apron, Leather hand sleeves, welding face shield, etc. • All mobile electrical equipment shall be fitted with appropriate ELCB • Use approved cable joints for joining cables • Arrangement to be done for exhausts the welding fumes. • Hot work booth to be made by the fire retardant tarpaulin/ GI sheet for welding activities. • Don't use damaged electrical cables. • Visual inspection to be carried out prior to start the welding. • Authorized welders should do welding works. • Welding buds to be collected and returned to store. • X-ray test to be carried out for the welders. • Don’t touch hot metal with bared hand. Use leather hand gloves for the same. • All combustible material shall be removed from welding operation • Fire extinguishers shall be provided next to welding site • Ensure All earth connections are proper • Adequate ventilation shall be provided • Non-involved persons shall be kept away from the area Supervisor • Welding fumes • Hot spatter fell on the body • Damaged electrical cables. • Hot welding holder/ hot metal • Earthing • Loose earth connections • Welding in congested • spaces • Cable joint • Combustible material S: Severity, P: Probability, R: Risk www.safetydocument.com, email: contactus@safetydocument.com Page 2 of 2