TOWER CRANE INSPECTION CHECKLIST
(To be completed on daily basis)
Page 1 of 1 Form # HSEQ-TCI (Rev 2 - Mar 23)
Project Information
Project Name: Tower Crane No:
Location: Date :
3rd Party Inspection of Tower
crane valid till:
3rd Party certificate of
operator valid till:
Shift: (This checklist to be completed for both Shifts)
Sr. Description Yes No N/A Comments
1. Foundation bolts/ anchors
2. Main power disconnect switch
3. Hook sheaves/ swivel
4. Access ladders/ platforms
5. Section connecting bolts/ pins
6. Communication device (walkie talkie available/ working)
7. Hydraulic hoses for leaks
8. Gear boxes for oil level/ leaks
9. Slewing ring bolts
10. Counter weights secured
11. Wire rope condition
12. Control function
13. Hoist limits and breaks functioning
14. Booms lights working
15. Load chart
16. Fire extinguisher
17. Aircraft warning lights working
18. Sign boards secured
19. Radius mark signs secured
20. Anti-collision system working
21. Swivel Brakes removed before end of shift/ high wind
22. Riggers available
23. Condition of lifting tools ensured through riggers
24. Others ( Specify)
Remarks:
This checklist to be completed for both Shifts
Operator Name: Signature:
Reviewed By HSE Manager / In charge : Signature:

TOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI Rev 2 -.docx

  • 1.
    1 TOWER CRANE INSPECTIONCHECKLIST (To be completed on daily basis) Page 1 of 1 Form # HSEQ-TCI (Rev 2 - Mar 23) Project Information Project Name: Tower Crane No: Location: Date : 3rd Party Inspection of Tower crane valid till: 3rd Party certificate of operator valid till: Shift: (This checklist to be completed for both Shifts) Sr. Description Yes No N/A Comments 1. Foundation bolts/ anchors 2. Main power disconnect switch 3. Hook sheaves/ swivel 4. Access ladders/ platforms 5. Section connecting bolts/ pins 6. Communication device (walkie talkie available/ working) 7. Hydraulic hoses for leaks 8. Gear boxes for oil level/ leaks 9. Slewing ring bolts 10. Counter weights secured 11. Wire rope condition 12. Control function 13. Hoist limits and breaks functioning 14. Booms lights working 15. Load chart 16. Fire extinguisher 17. Aircraft warning lights working 18. Sign boards secured 19. Radius mark signs secured 20. Anti-collision system working 21. Swivel Brakes removed before end of shift/ high wind 22. Riggers available 23. Condition of lifting tools ensured through riggers 24. Others ( Specify) Remarks: This checklist to be completed for both Shifts Operator Name: Signature: Reviewed By HSE Manager / In charge : Signature: