Why projects fail?
July 26, 2014
Why projects fail?
2
3
Project success factors
1. Meet an agreed budget (Cost)
2. Deliver on time (Time)
3. Meet quality requirements (Quality)
4. Meet the project's objectives/requirements (Scope)
4
What projects are considered successful?
Long story short – successful project is the one meeting stakeholder’ expectations
5
Reason 1: Insufficient stakeholders management
Common mistakes:
1. Not all the project stakeholders are identified
2. Stakeholders are not analyzed from the perspective of their influence and interest in the
project
3. Failure to view the project through the eyes of the project stakeholders, as the result no
accurate understanding how the project will impact the stakeholders or how they will
react to the project’s results
4. Failure to identify and meet the needs of all stakeholders, allowing one stakeholder
group to dominate the project while completely ignoring the needs of other groups
5. Failure to establish effective communication channels between different stakeholders
6
Who are your stakeholders?
7
Stakeholders Management
1. Identify Stakeholders – identifying everyone affected by the work or its outcomes
2. Plan Stakeholder Management – deciding how you will engage with the stakeholders
3. Manage Stakeholder Engagement – communicating with stakeholders and ensuring
appropriate stakeholder engagement
4. Control Stakeholder Engagement – monitoring the overall relationships and adjusting
your strategies and plans as needed
8
Stakeholders influence on the project
9
Reason 2: Inefficient communication
10
Common mistakes:
1. No time is spent on development of a communication plan
2. No identified and approved escalation boundaries and related rules (when and to whom
to escalate issues)
3. Roles and responsibilities are not identified or are not clearly communicated to all the
stakeholders
4. Priorities of different communication channels are not identified (when to email, to call, to
use Skype, etc.)
5. No records for oral communication (no meeting minutes)
6. National specifics and corporate culture are not taken into account (when to CC
management, whether it is appropriate to CC senior management, whether Manager in
CC is treated as an escalation or you just want to keep other stakeholders informed, etc.)
7. Manager blocks direct effective communication between technical specialists
8. Bad news are glossed over when being presented to customers, managers and
stakeholders
9. Too much meetings, unnecessary people are invited to the meetings
10. Meetings are not effective (no goal set, no agenda, etc.) 11
Common communication mistakes
12
Reason 3: No sufficient project initiation and planning
phases
Common mistakes:
1. No project initiation and/or planning phases at all
2. Working under constant schedule pressure, not spending enough time and efforts to plan
the project
3. Assuming effort estimates can be directly equated to elapsed task durations without any
buffers or room for non-productive time, unforeseen tasks, etc.
4. Planning is done based on 8 h/day team availability for planned tasks
5. Planning is seen as the project manager’s responsibility rather than a team activity
6. Failure to break a large scale master plan into more manageable pieces that can be
delivered incrementally
7. No milestones and deadlines are set
8. Unclear roles and responsibilities led to confusion and gaps
9. Un-prioritized requirements resulting in team focusing energies on lower priority items
instead of high priority work
10.Change requests are handled informally without analysis and management of their
implication to the project plan 13
Reason 4: Project constraints are not identified
Common mistakes:
1. Project constraints (Scope, Time, Budget, Quality) are not identified and discussed with
the client
2. Project constraints are not taken into consideration during the project initiation and
planning phases
3. Project constraints matrix is not created and not discussed with the stakeholders
14
Constraints Matrix
15
Reason 5: Poor product requirements
Common mistakes:
1. Product development starts without requirements  It happens!
2. Requirements are not Unitary, Complete, Consistent, Current, Verifiable, Unambiguous,
Traceable, Prioritized
3. Requirements are not tested
4. Lack of formality in the scope definition results in different people having different
understanding of what is in and what is out of scope
5. Open ended requirements (such that end with “etc.”)
6. Failure to fully understand the “big picture” - the operational context in which the product
being produced needs to function once the project is over
7. No or lack involvement of those who will eventually use the product during the
requirements development
8. Individual requirements are never checked against the project’s overall objectives to
ensure each requirement supports the project’s objective
9. The project requirements are written based on the assumptions
16
17
18
Why projects fail according to Gartner research
Source: Gartner Survey, Analyst : Lars Mieritz. Published: 1 June 2012 ID:G00231952
19
Reason 6: Inaccurate estimates
Common mistakes:
1. Failure to not involve those who will actually perform the work to the estimating process
2. Forcing the team to provide estimate without a defined scope
3. Forcing the team to cut the estimate in order to secure a contract or make a project more
attractive
4. Estimation is done based on insufficient information or analysis
5. The assumptions used for estimation preparation are not documented, discussed or
validated
6. Big items are estimated, but because they are less visible, the smaller scale activities are
omitted
7. Estimation is done without analysis of the historical data collected from previous similar
projects or phases of the existing project
20
Reason 7: No streamlined software development
process
Common mistakes:
1. No methodology is used (as is or tailored to project specifics)
2. The project plan is published but there is no follow up or tracking to allow issues to be
surfaced and addressed early
3. Believing that although the team is behind schedule, they will catch up later
4. Schedule and budget become the driving force
5. Project is tracked based on large work items rather than smaller increments
6. Failure to monitor team performance on a regular basis
7. Believing that a task reported by a team member as 90% done really is 90% done 
8. Believing that because a person was told something once (weeks or months ago), they
will remember what they were asked to do and when they were supposed to do it
9. No recurring review and demonstration of the work done
10. No value increment is added on recurring basis
11. No retrospective of the process and no analysis of its gaps and required improvements
21
How often do PMs use a project management methodology on
successful and failed projects?
Source: KPMG Project Management Survey 2013
22
23
24
Reason 8: No risk management
Common mistakes:
1. Failure to think ahead and to foresee and address potential problems
2. Risk management is seen as an independent activity rather than an integral part of the
planning process and execution process
3. Risk, problems and issues become confused as a result team isn’t really doing risk
management
25
26
Reason 9: Insufficient quality assurance (not to be
mixed up with software testing)
1. No quality assurance activities are planned, only software testing activities are performed
2. No systematic activities are performed to evaluate quality of the development process used to
produce a product
3. Failure to plan into the project appropriate reviews, tests or checkpoints at which quality can be
verified
4. Quality requirements are never discussed, thereby allowing different people to have different
expectations of what is being produced and the quality standards to be achieved
5. Quality is viewed simply in terms of testing rather than a culture of working
6. The team developing the project’s deliverables sees quality as the responsibility of the Quality
Assurance group rather than a shared responsibility
7. Testing in a test environment that is configured differently from the target production, or
operational environment in which the project’s deliverables will be used
8. Testing with a test data only
9. No proactive measures to prevent bugs from occurring in a product being developed, only
reactive measures to address found issues
27
Reason 10: Decision making problems
1. Decision makers and areas of responsibility are not identified
2. Key decisions are made by people who lack the subject matter expertise to be making the
decision
3. Expert advice is not requested when making key project decisions
4. Lack of situational awareness results in ineffective decisions being made
5. Failure to bring closure to a critical decision results in delays, unused time, team demotivation
6. Team avoids the difficult decisions because some stakeholders maybe unhappy with the
outcome
7. Team is not involved into the decision making process (when appropriate)
8. Key decisions are made without identifying or considering alternatives
9. Decision fragments are left unanswered (what to be done, how to be done, when to be done,
who are performers, who IS responsible for the outcome, etc.)
10. Failure to establish clear ownership of decisions and responsible people
28
10 reasons why projects fail?
1. Insufficient stakeholders management
2. Inefficient communication
3. No sufficient project initiation and planning phases
4. Project constraints are not identified
5. Poor product requirements
6. Inaccurate estimates
7. No streamlined software development process
8. No risk management
9. Insufficient quality assurance (not to be mixed up with software testing)
10. Decision making problems
29
10 rules to make your projects succeed!
1. Identify and manage project stakeholders and their expectations
2. Setup effective communication channels and escalation boundaries, run effective
meetings, always keep records
3. Do spend time on the project initiation and planning phases
4. Identify project constraints with stakeholders and document those, always keep them in
mind through the project length
5. Do no start software development with poor product requirements and not defined scope
6. Learn how to improve accuracy of estimates, collect and analyze historical data and
previous experience
7. Follow software development methodology – tailor the existing one or develop you own.
The process should be defined and streamlined to be controlled!
8. Do risk management, foresee problems and address potential problems
9. Software testing is not enough, do quality assurance activities and make quality a
working culture
10. Make decisions fast and smart
30
… and a piece of advice 
1. Any experience, including failures and mistakes, is your chance to learn and self-develop
2. When you enjoy what you are doing you are way more effective and productive
3. Something interesting and challenging can be found in any assignment if you keep being
positive, open-minded and creative
4. Thinking out of the box helps to find good and new solutions
5. When you are working hard and doing your best, people around respect you and
appreciate what you are doing
6. Positive attitude always help to find the right solution
7. People are over process  - respect yourself, your colleagues and clients
31
Thank you!
Dev-Pro.net 7260 W. Azure Dr Suite 140-829, Las Vegas, NV 89130 USA
©2014 Dev-Pro.net, Inc. All Rights Reserved
32

More Related Content

What's hot

Project Management and Process
Project Management and ProcessProject Management and Process
Project Management and Process
Muhammad Rehman
 
Introduction to Project Management (workshop) - v.2
Introduction to Project Management (workshop) - v.2Introduction to Project Management (workshop) - v.2
Introduction to Project Management (workshop) - v.2
Mena M. Eissa
 
Project management
Project managementProject management
Project management
Al Amin Neaz Ahmed
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
Jeremy Jay V. Lim, MBB, PMP
 
Practical Project Management - full course
Practical Project Management - full coursePractical Project Management - full course
Practical Project Management - full course
Marten Schoonman
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
cgautam
 
Final Project Closing
Final Project ClosingFinal Project Closing
Final Project Closing
megat zainurul anuar
 
Project Planning and Management
Project Planning and Management Project Planning and Management
Project Planning and Management
PiyushKumar621
 
Project management
Project managementProject management
Project management
Susmitha RANGU
 
Project management
Project managementProject management
Project management
Jay Raval
 
Top Ten Reasons For Project Failure - PMP Webinar
Top Ten Reasons For Project Failure - PMP WebinarTop Ten Reasons For Project Failure - PMP Webinar
Top Ten Reasons For Project Failure - PMP Webinar
Whizlabs
 
Project management tools and techniques
Project management tools and techniquesProject management tools and techniques
Project management tools and techniques
Tata Dinyuy
 
Project Planning, Design and Management
Project Planning, Design and ManagementProject Planning, Design and Management
Project Planning, Design and Management
Silver Mustard International
 
7 Steps Project Execution Process
7 Steps Project Execution Process7 Steps Project Execution Process
7 Steps Project Execution Process
C K Vishwakarma
 
project management concepts
project management conceptsproject management concepts
project management concepts
Aswin prakash i , Xantus Technologies
 
Project Planning & Management
Project Planning & ManagementProject Planning & Management
Project Planning & Management
Engr.Muhammad Zaroon
 
5 phases of project management
5 phases of project management5 phases of project management
5 phases of project management
Jared C. Powell
 
An introduction to project management: Learning the basics
An introduction to project management:  Learning the basicsAn introduction to project management:  Learning the basics
An introduction to project management: Learning the basics
Paul Di Gangi
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
Slav Karaslavov
 
Project Mangement
Project MangementProject Mangement
Project Mangement
Gaurav Shrivastava
 

What's hot (20)

Project Management and Process
Project Management and ProcessProject Management and Process
Project Management and Process
 
Introduction to Project Management (workshop) - v.2
Introduction to Project Management (workshop) - v.2Introduction to Project Management (workshop) - v.2
Introduction to Project Management (workshop) - v.2
 
Project management
Project managementProject management
Project management
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
Practical Project Management - full course
Practical Project Management - full coursePractical Project Management - full course
Practical Project Management - full course
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Final Project Closing
Final Project ClosingFinal Project Closing
Final Project Closing
 
Project Planning and Management
Project Planning and Management Project Planning and Management
Project Planning and Management
 
Project management
Project managementProject management
Project management
 
Project management
Project managementProject management
Project management
 
Top Ten Reasons For Project Failure - PMP Webinar
Top Ten Reasons For Project Failure - PMP WebinarTop Ten Reasons For Project Failure - PMP Webinar
Top Ten Reasons For Project Failure - PMP Webinar
 
Project management tools and techniques
Project management tools and techniquesProject management tools and techniques
Project management tools and techniques
 
Project Planning, Design and Management
Project Planning, Design and ManagementProject Planning, Design and Management
Project Planning, Design and Management
 
7 Steps Project Execution Process
7 Steps Project Execution Process7 Steps Project Execution Process
7 Steps Project Execution Process
 
project management concepts
project management conceptsproject management concepts
project management concepts
 
Project Planning & Management
Project Planning & ManagementProject Planning & Management
Project Planning & Management
 
5 phases of project management
5 phases of project management5 phases of project management
5 phases of project management
 
An introduction to project management: Learning the basics
An introduction to project management:  Learning the basicsAn introduction to project management:  Learning the basics
An introduction to project management: Learning the basics
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Project Mangement
Project MangementProject Mangement
Project Mangement
 

Viewers also liked

Project Management (PMP Material)
Project Management (PMP Material)Project Management (PMP Material)
Project Management (PMP Material)
VR M
 
Project Success/Failure
Project Success/FailureProject Success/Failure
Project Success/Failure
Peter Salmon
 
Factors for Successful Projects
Factors for Successful ProjectsFactors for Successful Projects
Factors for Successful Projects
Trevor Roberts
 
The Project Management Process - Week 6 Leadership
The Project Management Process - Week 6   LeadershipThe Project Management Process - Week 6   Leadership
The Project Management Process - Week 6 Leadership
Craig Brown
 
Standish Chaos Report - Cercle de Discussion - PMI Branche Midi-Pyrénées (Vi...
Standish Chaos Report  - Cercle de Discussion - PMI Branche Midi-Pyrénées (Vi...Standish Chaos Report  - Cercle de Discussion - PMI Branche Midi-Pyrénées (Vi...
Standish Chaos Report - Cercle de Discussion - PMI Branche Midi-Pyrénées (Vi...
Vincent Dumain
 
Challenges of Project Management “Communication & Collaboration-VSR
Challenges of Project Management “Communication & Collaboration-VSRChallenges of Project Management “Communication & Collaboration-VSR
Challenges of Project Management “Communication & Collaboration-VSR
VSR *
 
Successful Project Presentation
Successful Project PresentationSuccessful Project Presentation
Successful Project Presentation
Colin Sullivan
 
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...Critical Success Factors Affecting Project Performance in Turkish IT Sector -...
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...
systred
 
Pmi - Project Management Professional (Pmp) Certification Study Guide
Pmi - Project Management Professional (Pmp)   Certification Study GuidePmi - Project Management Professional (Pmp)   Certification Study Guide
Pmi - Project Management Professional (Pmp) Certification Study Guide
robsonnasc
 
Top Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects FailTop Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects Fail
jpstewar
 
The Project Management Process - Week 1
The Project Management Process -  Week 1The Project Management Process -  Week 1
The Project Management Process - Week 1
Craig Brown
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
Rodolfo Siles
 
Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)
Jeremy Jay Lim
 

Viewers also liked (13)

Project Management (PMP Material)
Project Management (PMP Material)Project Management (PMP Material)
Project Management (PMP Material)
 
Project Success/Failure
Project Success/FailureProject Success/Failure
Project Success/Failure
 
Factors for Successful Projects
Factors for Successful ProjectsFactors for Successful Projects
Factors for Successful Projects
 
The Project Management Process - Week 6 Leadership
The Project Management Process - Week 6   LeadershipThe Project Management Process - Week 6   Leadership
The Project Management Process - Week 6 Leadership
 
Standish Chaos Report - Cercle de Discussion - PMI Branche Midi-Pyrénées (Vi...
Standish Chaos Report  - Cercle de Discussion - PMI Branche Midi-Pyrénées (Vi...Standish Chaos Report  - Cercle de Discussion - PMI Branche Midi-Pyrénées (Vi...
Standish Chaos Report - Cercle de Discussion - PMI Branche Midi-Pyrénées (Vi...
 
Challenges of Project Management “Communication & Collaboration-VSR
Challenges of Project Management “Communication & Collaboration-VSRChallenges of Project Management “Communication & Collaboration-VSR
Challenges of Project Management “Communication & Collaboration-VSR
 
Successful Project Presentation
Successful Project PresentationSuccessful Project Presentation
Successful Project Presentation
 
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...Critical Success Factors Affecting Project Performance in Turkish IT Sector -...
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...
 
Pmi - Project Management Professional (Pmp) Certification Study Guide
Pmi - Project Management Professional (Pmp)   Certification Study GuidePmi - Project Management Professional (Pmp)   Certification Study Guide
Pmi - Project Management Professional (Pmp) Certification Study Guide
 
Top Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects FailTop Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects Fail
 
The Project Management Process - Week 1
The Project Management Process -  Week 1The Project Management Process -  Week 1
The Project Management Process - Week 1
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)
 

Similar to 10 reasons why projects fail or common mistakes to avoid

project management 1.docx
project management 1.docxproject management 1.docx
project management 1.docx
MARYJULDULAGAN
 
Top 10 project mgt. problems
Top 10 project mgt. problemsTop 10 project mgt. problems
Top 10 project mgt. problems
Maksudul Munna
 
Are you making any of these 10 project management mistakes
Are you making any of these 10 project management mistakesAre you making any of these 10 project management mistakes
Are you making any of these 10 project management mistakes
Orangescrum
 
A fresh look on projects: An introductory overview of project circle planning...
A fresh look on projects: An introductory overview of project circle planning...A fresh look on projects: An introductory overview of project circle planning...
A fresh look on projects: An introductory overview of project circle planning...
ramsey20
 
Many organizations invest substantial resources in creating their ow.pdf
Many organizations invest substantial resources in creating their ow.pdfMany organizations invest substantial resources in creating their ow.pdf
Many organizations invest substantial resources in creating their ow.pdf
federaleyecare
 
10 Project Management Mistakes
10 Project Management Mistakes10 Project Management Mistakes
10 Project Management Mistakes
Orangescrum
 
Project Outcomes
Project OutcomesProject Outcomes
Project Outcomes
Baker Khader Abdallah, PMP
 
Shot note about project management
Shot note about project managementShot note about project management
Shot note about project management
AHM Pervej Kabir
 
Project audit and closure
Project audit and closureProject audit and closure
Project audit and closure
Velita Furtado
 
Successful pm
Successful pmSuccessful pm
Successful pm
Danie Mouton
 
MODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptx
MdAliMujawar1
 
2 project management-level 1
2 project management-level 12 project management-level 1
2 project management-level 1
Juwad AlOmari
 
PRESTO @ SUPSI
PRESTO @ SUPSIPRESTO @ SUPSI
PRESTO @ SUPSI
Andrew Lenti
 
Project Management-Concept & Case Study.pptx
Project Management-Concept & Case Study.pptxProject Management-Concept & Case Study.pptx
Project Management-Concept & Case Study.pptx
amit229530
 
3.7 developing ict solutions
3.7 developing ict solutions3.7 developing ict solutions
3.7 developing ict solutions
mrmwood
 
questions-just-that.pdf.civil engineering
questions-just-that.pdf.civil engineeringquestions-just-that.pdf.civil engineering
questions-just-that.pdf.civil engineering
mocr84810
 
Project Management Toolkit
Project Management ToolkitProject Management Toolkit
Project Management Toolkit
Learning and Development Freelancer
 
Project management for technologies MGT410
Project management for technologies   MGT410Project management for technologies   MGT410
Project management for technologies MGT410
Saqib Imran
 
Critical success factors in effective project implementation
Critical success factors in effective project implementationCritical success factors in effective project implementation
Critical success factors in effective project implementation
Sk. Mohtasim Billah
 
Project management slide show
Project management slide showProject management slide show
Project management slide show
Tanvir Anwar
 

Similar to 10 reasons why projects fail or common mistakes to avoid (20)

project management 1.docx
project management 1.docxproject management 1.docx
project management 1.docx
 
Top 10 project mgt. problems
Top 10 project mgt. problemsTop 10 project mgt. problems
Top 10 project mgt. problems
 
Are you making any of these 10 project management mistakes
Are you making any of these 10 project management mistakesAre you making any of these 10 project management mistakes
Are you making any of these 10 project management mistakes
 
A fresh look on projects: An introductory overview of project circle planning...
A fresh look on projects: An introductory overview of project circle planning...A fresh look on projects: An introductory overview of project circle planning...
A fresh look on projects: An introductory overview of project circle planning...
 
Many organizations invest substantial resources in creating their ow.pdf
Many organizations invest substantial resources in creating their ow.pdfMany organizations invest substantial resources in creating their ow.pdf
Many organizations invest substantial resources in creating their ow.pdf
 
10 Project Management Mistakes
10 Project Management Mistakes10 Project Management Mistakes
10 Project Management Mistakes
 
Project Outcomes
Project OutcomesProject Outcomes
Project Outcomes
 
Shot note about project management
Shot note about project managementShot note about project management
Shot note about project management
 
Project audit and closure
Project audit and closureProject audit and closure
Project audit and closure
 
Successful pm
Successful pmSuccessful pm
Successful pm
 
MODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptx
 
2 project management-level 1
2 project management-level 12 project management-level 1
2 project management-level 1
 
PRESTO @ SUPSI
PRESTO @ SUPSIPRESTO @ SUPSI
PRESTO @ SUPSI
 
Project Management-Concept & Case Study.pptx
Project Management-Concept & Case Study.pptxProject Management-Concept & Case Study.pptx
Project Management-Concept & Case Study.pptx
 
3.7 developing ict solutions
3.7 developing ict solutions3.7 developing ict solutions
3.7 developing ict solutions
 
questions-just-that.pdf.civil engineering
questions-just-that.pdf.civil engineeringquestions-just-that.pdf.civil engineering
questions-just-that.pdf.civil engineering
 
Project Management Toolkit
Project Management ToolkitProject Management Toolkit
Project Management Toolkit
 
Project management for technologies MGT410
Project management for technologies   MGT410Project management for technologies   MGT410
Project management for technologies MGT410
 
Critical success factors in effective project implementation
Critical success factors in effective project implementationCritical success factors in effective project implementation
Critical success factors in effective project implementation
 
Project management slide show
Project management slide showProject management slide show
Project management slide show
 

Recently uploaded

Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...
Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...
Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...
ssuserf63bd7
 
Project Management Infographics . Power point projet
Project Management Infographics . Power point projetProject Management Infographics . Power point projet
Project Management Infographics . Power point projet
SAMIBENREJEB1
 
All the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/BozenAll the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/Bozen
Alberto Brandolini
 
innovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptxinnovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptx
TulsiDhidhi1
 
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Dr. Nazrul Islam
 
A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...
A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...
A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...
Samirsinh Parmar
 
Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
Alexey Krivitsky
 
一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理
8p28uk6g
 
Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024
stuwilson.co.uk
 
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
dsnow9802
 
From Concept to reality : Implementing Lean Managements DMAIC Methodology for...
From Concept to reality : Implementing Lean Managements DMAIC Methodology for...From Concept to reality : Implementing Lean Managements DMAIC Methodology for...
From Concept to reality : Implementing Lean Managements DMAIC Methodology for...
Rokibul Hasan
 
Leading Change_ Unveiling the Power of Transformational Leadership Style.pdf
Leading Change_ Unveiling the Power of Transformational Leadership Style.pdfLeading Change_ Unveiling the Power of Transformational Leadership Style.pdf
Leading Change_ Unveiling the Power of Transformational Leadership Style.pdf
Enterprise Wired
 

Recently uploaded (12)

Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...
Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...
Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...
 
Project Management Infographics . Power point projet
Project Management Infographics . Power point projetProject Management Infographics . Power point projet
Project Management Infographics . Power point projet
 
All the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/BozenAll the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/Bozen
 
innovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptxinnovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptx
 
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
 
A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...
A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...
A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...
 
Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
 
一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理
 
Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024
 
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
 
From Concept to reality : Implementing Lean Managements DMAIC Methodology for...
From Concept to reality : Implementing Lean Managements DMAIC Methodology for...From Concept to reality : Implementing Lean Managements DMAIC Methodology for...
From Concept to reality : Implementing Lean Managements DMAIC Methodology for...
 
Leading Change_ Unveiling the Power of Transformational Leadership Style.pdf
Leading Change_ Unveiling the Power of Transformational Leadership Style.pdfLeading Change_ Unveiling the Power of Transformational Leadership Style.pdf
Leading Change_ Unveiling the Power of Transformational Leadership Style.pdf
 

10 reasons why projects fail or common mistakes to avoid

  • 3. 3
  • 4. Project success factors 1. Meet an agreed budget (Cost) 2. Deliver on time (Time) 3. Meet quality requirements (Quality) 4. Meet the project's objectives/requirements (Scope) 4
  • 5. What projects are considered successful? Long story short – successful project is the one meeting stakeholder’ expectations 5
  • 6. Reason 1: Insufficient stakeholders management Common mistakes: 1. Not all the project stakeholders are identified 2. Stakeholders are not analyzed from the perspective of their influence and interest in the project 3. Failure to view the project through the eyes of the project stakeholders, as the result no accurate understanding how the project will impact the stakeholders or how they will react to the project’s results 4. Failure to identify and meet the needs of all stakeholders, allowing one stakeholder group to dominate the project while completely ignoring the needs of other groups 5. Failure to establish effective communication channels between different stakeholders 6
  • 7. Who are your stakeholders? 7
  • 8. Stakeholders Management 1. Identify Stakeholders – identifying everyone affected by the work or its outcomes 2. Plan Stakeholder Management – deciding how you will engage with the stakeholders 3. Manage Stakeholder Engagement – communicating with stakeholders and ensuring appropriate stakeholder engagement 4. Control Stakeholder Engagement – monitoring the overall relationships and adjusting your strategies and plans as needed 8
  • 10. Reason 2: Inefficient communication 10
  • 11. Common mistakes: 1. No time is spent on development of a communication plan 2. No identified and approved escalation boundaries and related rules (when and to whom to escalate issues) 3. Roles and responsibilities are not identified or are not clearly communicated to all the stakeholders 4. Priorities of different communication channels are not identified (when to email, to call, to use Skype, etc.) 5. No records for oral communication (no meeting minutes) 6. National specifics and corporate culture are not taken into account (when to CC management, whether it is appropriate to CC senior management, whether Manager in CC is treated as an escalation or you just want to keep other stakeholders informed, etc.) 7. Manager blocks direct effective communication between technical specialists 8. Bad news are glossed over when being presented to customers, managers and stakeholders 9. Too much meetings, unnecessary people are invited to the meetings 10. Meetings are not effective (no goal set, no agenda, etc.) 11 Common communication mistakes
  • 12. 12
  • 13. Reason 3: No sufficient project initiation and planning phases Common mistakes: 1. No project initiation and/or planning phases at all 2. Working under constant schedule pressure, not spending enough time and efforts to plan the project 3. Assuming effort estimates can be directly equated to elapsed task durations without any buffers or room for non-productive time, unforeseen tasks, etc. 4. Planning is done based on 8 h/day team availability for planned tasks 5. Planning is seen as the project manager’s responsibility rather than a team activity 6. Failure to break a large scale master plan into more manageable pieces that can be delivered incrementally 7. No milestones and deadlines are set 8. Unclear roles and responsibilities led to confusion and gaps 9. Un-prioritized requirements resulting in team focusing energies on lower priority items instead of high priority work 10.Change requests are handled informally without analysis and management of their implication to the project plan 13
  • 14. Reason 4: Project constraints are not identified Common mistakes: 1. Project constraints (Scope, Time, Budget, Quality) are not identified and discussed with the client 2. Project constraints are not taken into consideration during the project initiation and planning phases 3. Project constraints matrix is not created and not discussed with the stakeholders 14
  • 16. Reason 5: Poor product requirements Common mistakes: 1. Product development starts without requirements  It happens! 2. Requirements are not Unitary, Complete, Consistent, Current, Verifiable, Unambiguous, Traceable, Prioritized 3. Requirements are not tested 4. Lack of formality in the scope definition results in different people having different understanding of what is in and what is out of scope 5. Open ended requirements (such that end with “etc.”) 6. Failure to fully understand the “big picture” - the operational context in which the product being produced needs to function once the project is over 7. No or lack involvement of those who will eventually use the product during the requirements development 8. Individual requirements are never checked against the project’s overall objectives to ensure each requirement supports the project’s objective 9. The project requirements are written based on the assumptions 16
  • 17. 17
  • 18. 18
  • 19. Why projects fail according to Gartner research Source: Gartner Survey, Analyst : Lars Mieritz. Published: 1 June 2012 ID:G00231952 19
  • 20. Reason 6: Inaccurate estimates Common mistakes: 1. Failure to not involve those who will actually perform the work to the estimating process 2. Forcing the team to provide estimate without a defined scope 3. Forcing the team to cut the estimate in order to secure a contract or make a project more attractive 4. Estimation is done based on insufficient information or analysis 5. The assumptions used for estimation preparation are not documented, discussed or validated 6. Big items are estimated, but because they are less visible, the smaller scale activities are omitted 7. Estimation is done without analysis of the historical data collected from previous similar projects or phases of the existing project 20
  • 21. Reason 7: No streamlined software development process Common mistakes: 1. No methodology is used (as is or tailored to project specifics) 2. The project plan is published but there is no follow up or tracking to allow issues to be surfaced and addressed early 3. Believing that although the team is behind schedule, they will catch up later 4. Schedule and budget become the driving force 5. Project is tracked based on large work items rather than smaller increments 6. Failure to monitor team performance on a regular basis 7. Believing that a task reported by a team member as 90% done really is 90% done  8. Believing that because a person was told something once (weeks or months ago), they will remember what they were asked to do and when they were supposed to do it 9. No recurring review and demonstration of the work done 10. No value increment is added on recurring basis 11. No retrospective of the process and no analysis of its gaps and required improvements 21
  • 22. How often do PMs use a project management methodology on successful and failed projects? Source: KPMG Project Management Survey 2013 22
  • 23. 23
  • 24. 24
  • 25. Reason 8: No risk management Common mistakes: 1. Failure to think ahead and to foresee and address potential problems 2. Risk management is seen as an independent activity rather than an integral part of the planning process and execution process 3. Risk, problems and issues become confused as a result team isn’t really doing risk management 25
  • 26. 26
  • 27. Reason 9: Insufficient quality assurance (not to be mixed up with software testing) 1. No quality assurance activities are planned, only software testing activities are performed 2. No systematic activities are performed to evaluate quality of the development process used to produce a product 3. Failure to plan into the project appropriate reviews, tests or checkpoints at which quality can be verified 4. Quality requirements are never discussed, thereby allowing different people to have different expectations of what is being produced and the quality standards to be achieved 5. Quality is viewed simply in terms of testing rather than a culture of working 6. The team developing the project’s deliverables sees quality as the responsibility of the Quality Assurance group rather than a shared responsibility 7. Testing in a test environment that is configured differently from the target production, or operational environment in which the project’s deliverables will be used 8. Testing with a test data only 9. No proactive measures to prevent bugs from occurring in a product being developed, only reactive measures to address found issues 27
  • 28. Reason 10: Decision making problems 1. Decision makers and areas of responsibility are not identified 2. Key decisions are made by people who lack the subject matter expertise to be making the decision 3. Expert advice is not requested when making key project decisions 4. Lack of situational awareness results in ineffective decisions being made 5. Failure to bring closure to a critical decision results in delays, unused time, team demotivation 6. Team avoids the difficult decisions because some stakeholders maybe unhappy with the outcome 7. Team is not involved into the decision making process (when appropriate) 8. Key decisions are made without identifying or considering alternatives 9. Decision fragments are left unanswered (what to be done, how to be done, when to be done, who are performers, who IS responsible for the outcome, etc.) 10. Failure to establish clear ownership of decisions and responsible people 28
  • 29. 10 reasons why projects fail? 1. Insufficient stakeholders management 2. Inefficient communication 3. No sufficient project initiation and planning phases 4. Project constraints are not identified 5. Poor product requirements 6. Inaccurate estimates 7. No streamlined software development process 8. No risk management 9. Insufficient quality assurance (not to be mixed up with software testing) 10. Decision making problems 29
  • 30. 10 rules to make your projects succeed! 1. Identify and manage project stakeholders and their expectations 2. Setup effective communication channels and escalation boundaries, run effective meetings, always keep records 3. Do spend time on the project initiation and planning phases 4. Identify project constraints with stakeholders and document those, always keep them in mind through the project length 5. Do no start software development with poor product requirements and not defined scope 6. Learn how to improve accuracy of estimates, collect and analyze historical data and previous experience 7. Follow software development methodology – tailor the existing one or develop you own. The process should be defined and streamlined to be controlled! 8. Do risk management, foresee problems and address potential problems 9. Software testing is not enough, do quality assurance activities and make quality a working culture 10. Make decisions fast and smart 30
  • 31. … and a piece of advice  1. Any experience, including failures and mistakes, is your chance to learn and self-develop 2. When you enjoy what you are doing you are way more effective and productive 3. Something interesting and challenging can be found in any assignment if you keep being positive, open-minded and creative 4. Thinking out of the box helps to find good and new solutions 5. When you are working hard and doing your best, people around respect you and appreciate what you are doing 6. Positive attitude always help to find the right solution 7. People are over process  - respect yourself, your colleagues and clients 31
  • 32. Thank you! Dev-Pro.net 7260 W. Azure Dr Suite 140-829, Las Vegas, NV 89130 USA ©2014 Dev-Pro.net, Inc. All Rights Reserved 32