SlideShare a Scribd company logo
Managing Risk Attitude
Working with various stakeholders risk profiles
Frédéric Casagrande, PMP
Director, Program Management Office
Interoute
Prague, June 10th 2008
Agenda
• Introduction
• The Project
• The Recovery
• The Risk Profiles Matrix
• The Result
• Q&A
Introduction
• What simple tools can you use when
your company has no Project Risk
Management capabilities?
• Corporate example: A company
integration Project, where the PMO
has been brought into half way
through execution
The Project
• A paneuropean telecommunication
provider has bought an ISP with
hosting and security capabilities in
October 2005
• Integration started as a « network &
CRM migration », with a limited
scope identified and no Project
Manager assigned
The Project
• People in charge of the integration
program were running one single big
« status report meeting » on a
regular basis, with *all* involved
(and identified) stakeholders
• Stakeholders from all areas were
pushing for the project to stop…
The Recovery
• In July 2007, a PMO has been
created to improve Interoute’s
maturity in Project and Program
Management
• The PMO then started to get involved
in the recovery of a large, complex,
transformational program: the
integration of the ISP…
The Recovery
The PMO focused on the Stakeholders:
– Scope Definition & Clarification
• 1.5 years after the launch…
– Breakdown of the communication
• in smaller Groups
– Continuous Stakeholder Identification
• Definition of Risk Profiles
• Identification of all Stakeholders Risk
Profiles…
The Risk Profiles Matrix
• Grading the Risk Profiles
– Highly Risk Averse (Red)
– Moderately Risk Averse (Orange)
– Moderately Risk Tolerant (Yellow)
– Highly Risk Tolerant (Green)
The Risk Profiles Matrix
• Assigning a Risk Profile to a
Stakeholder group:
– You need to build a relevant
questionnaire
– You need to spend time with your
stakeholders
– You need to ensure both the
questionnaire, the matrix, and the
classification evolve over time
The Risk Profiles Matrix
• Mapping the Risk Profiles
– Assign a Risk Profile to each stakeholder
group
– Develop a behaviour (more than « just
a process ») for each Risk Profile
ALL RISK PROFILES NEED ATTENTION
STAKEHOLDERS MAY CHANGE PROFILE
The Risk Profiles Matrix
Finance Operations IT/IS Sales
Germany
Highly
Averse
Moderately
Tolerant
N/A
Moderately
Averse
Netherlands
Moderately
Averse
Moderately
Tolerant
N/A
Moderately
Tolerant
Czech
Republic
Moderately
Averse
Highly
Tolerant
Moderately
Tolerant
N/A
The Result
• Stakeholders have recovered
confidence in the Project
• The scope has been managed
properly
• The Execution has continued
• The Program has been closed in April
2008
Questions
& Answers
Frédéric Casagrande
frederic@casagrande.la
http://casagrande.blogs.com

More Related Content

What's hot

Maximising value to stakeholders through risk management
Maximising value to stakeholders through risk managementMaximising value to stakeholders through risk management
Maximising value to stakeholders through risk management
Association for Project Management
 
Agile Network India | Risk Management in VUCA World | Ashwinee Singh
Agile Network India | Risk Management in VUCA World | Ashwinee SinghAgile Network India | Risk Management in VUCA World | Ashwinee Singh
Agile Network India | Risk Management in VUCA World | Ashwinee Singh
AgileNetwork
 
Identifying and addressing common project challenges
Identifying and addressing common project challengesIdentifying and addressing common project challenges
Identifying and addressing common project challenges
Paul Welty
 
Equipping Programme Managers for Global Success - The PMO – Organisational gl...
Equipping Programme Managers for Global Success - The PMO – Organisational gl...Equipping Programme Managers for Global Success - The PMO – Organisational gl...
Equipping Programme Managers for Global Success - The PMO – Organisational gl...
Association for Project Management
 
Risk Management as an enabler for project success
Risk Management as an enabler for project successRisk Management as an enabler for project success
Risk Management as an enabler for project success
Association for Project Management
 
A Career in Project Management
A Career in Project ManagementA Career in Project Management
A Career in Project Management
Association for Project Management
 
Karl Riley PwC analysis from their 4th global PPM
Karl Riley PwC analysis from their 4th global PPMKarl Riley PwC analysis from their 4th global PPM
Karl Riley PwC analysis from their 4th global PPM
Association for Project Management
 
Turning projects around from red to black presentation
Turning projects around from red to black presentationTurning projects around from red to black presentation
Turning projects around from red to black presentation
Association for Project Management
 
Introduction program management
Introduction program managementIntroduction program management
Introduction program management
Djoni Wibisono, MBA, PgMP, PMP, CSM
 
Factsheet_PM_0.2_printversie
Factsheet_PM_0.2_printversieFactsheet_PM_0.2_printversie
Factsheet_PM_0.2_printversie
Marc Ouwehand
 
APM Benefits Summit 2017 - From ambition to delivery: Don't just do something...
APM Benefits Summit 2017 - From ambition to delivery: Don't just do something...APM Benefits Summit 2017 - From ambition to delivery: Don't just do something...
APM Benefits Summit 2017 - From ambition to delivery: Don't just do something...
Association for Project Management
 
Cipfa Workshops Scotland
Cipfa Workshops ScotlandCipfa Workshops Scotland
Cipfa Workshops Scotland
Dr David Hancock
 
Building better business cases - Nick Wensley
Building better business cases - Nick WensleyBuilding better business cases - Nick Wensley
Building better business cases - Nick Wensley
Association for Project Management
 
Workshop F, A healthy respect for benefits by David Waller and Hugo Minney
Workshop F, A healthy respect for benefits by David Waller and Hugo MinneyWorkshop F, A healthy respect for benefits by David Waller and Hugo Minney
Workshop F, A healthy respect for benefits by David Waller and Hugo Minney
Association for Project Management
 
Pmo
PmoPmo
APM Portfolio Management SIG survey 2020 results
APM Portfolio Management SIG survey 2020 resultsAPM Portfolio Management SIG survey 2020 results
APM Portfolio Management SIG survey 2020 results
Association for Project Management
 
Developing Compelling Business Cases: a product and a process- Webinar
Developing Compelling Business Cases: a product and a process- WebinarDeveloping Compelling Business Cases: a product and a process- Webinar
Developing Compelling Business Cases: a product and a process- Webinar
Association for Project Management
 
Portfolio management perspectives on governance and risk- two big challenges
Portfolio management perspectives on governance and risk-  two big challenges Portfolio management perspectives on governance and risk-  two big challenges
Portfolio management perspectives on governance and risk- two big challenges
Association for Project Management
 
Effective GOVERNANCE in Project Portfolio Management
Effective GOVERNANCE in Project Portfolio ManagementEffective GOVERNANCE in Project Portfolio Management
Effective GOVERNANCE in Project Portfolio Management
Michal Augustini
 
Benefits and better business cases_Alan Brown and Stefan Sanchez
Benefits and better business cases_Alan Brown and Stefan SanchezBenefits and better business cases_Alan Brown and Stefan Sanchez
Benefits and better business cases_Alan Brown and Stefan Sanchez
Association for Project Management
 

What's hot (20)

Maximising value to stakeholders through risk management
Maximising value to stakeholders through risk managementMaximising value to stakeholders through risk management
Maximising value to stakeholders through risk management
 
Agile Network India | Risk Management in VUCA World | Ashwinee Singh
Agile Network India | Risk Management in VUCA World | Ashwinee SinghAgile Network India | Risk Management in VUCA World | Ashwinee Singh
Agile Network India | Risk Management in VUCA World | Ashwinee Singh
 
Identifying and addressing common project challenges
Identifying and addressing common project challengesIdentifying and addressing common project challenges
Identifying and addressing common project challenges
 
Equipping Programme Managers for Global Success - The PMO – Organisational gl...
Equipping Programme Managers for Global Success - The PMO – Organisational gl...Equipping Programme Managers for Global Success - The PMO – Organisational gl...
Equipping Programme Managers for Global Success - The PMO – Organisational gl...
 
Risk Management as an enabler for project success
Risk Management as an enabler for project successRisk Management as an enabler for project success
Risk Management as an enabler for project success
 
A Career in Project Management
A Career in Project ManagementA Career in Project Management
A Career in Project Management
 
Karl Riley PwC analysis from their 4th global PPM
Karl Riley PwC analysis from their 4th global PPMKarl Riley PwC analysis from their 4th global PPM
Karl Riley PwC analysis from their 4th global PPM
 
Turning projects around from red to black presentation
Turning projects around from red to black presentationTurning projects around from red to black presentation
Turning projects around from red to black presentation
 
Introduction program management
Introduction program managementIntroduction program management
Introduction program management
 
Factsheet_PM_0.2_printversie
Factsheet_PM_0.2_printversieFactsheet_PM_0.2_printversie
Factsheet_PM_0.2_printversie
 
APM Benefits Summit 2017 - From ambition to delivery: Don't just do something...
APM Benefits Summit 2017 - From ambition to delivery: Don't just do something...APM Benefits Summit 2017 - From ambition to delivery: Don't just do something...
APM Benefits Summit 2017 - From ambition to delivery: Don't just do something...
 
Cipfa Workshops Scotland
Cipfa Workshops ScotlandCipfa Workshops Scotland
Cipfa Workshops Scotland
 
Building better business cases - Nick Wensley
Building better business cases - Nick WensleyBuilding better business cases - Nick Wensley
Building better business cases - Nick Wensley
 
Workshop F, A healthy respect for benefits by David Waller and Hugo Minney
Workshop F, A healthy respect for benefits by David Waller and Hugo MinneyWorkshop F, A healthy respect for benefits by David Waller and Hugo Minney
Workshop F, A healthy respect for benefits by David Waller and Hugo Minney
 
Pmo
PmoPmo
Pmo
 
APM Portfolio Management SIG survey 2020 results
APM Portfolio Management SIG survey 2020 resultsAPM Portfolio Management SIG survey 2020 results
APM Portfolio Management SIG survey 2020 results
 
Developing Compelling Business Cases: a product and a process- Webinar
Developing Compelling Business Cases: a product and a process- WebinarDeveloping Compelling Business Cases: a product and a process- Webinar
Developing Compelling Business Cases: a product and a process- Webinar
 
Portfolio management perspectives on governance and risk- two big challenges
Portfolio management perspectives on governance and risk-  two big challenges Portfolio management perspectives on governance and risk-  two big challenges
Portfolio management perspectives on governance and risk- two big challenges
 
Effective GOVERNANCE in Project Portfolio Management
Effective GOVERNANCE in Project Portfolio ManagementEffective GOVERNANCE in Project Portfolio Management
Effective GOVERNANCE in Project Portfolio Management
 
Benefits and better business cases_Alan Brown and Stefan Sanchez
Benefits and better business cases_Alan Brown and Stefan SanchezBenefits and better business cases_Alan Brown and Stefan Sanchez
Benefits and better business cases_Alan Brown and Stefan Sanchez
 

Viewers also liked

Working capital management 1
Working capital management 1Working capital management 1
Working capital management 1
RS P
 
Working capital management
Working capital managementWorking capital management
Working capital management
Saran Pankhuri
 
Cash Discounts
Cash DiscountsCash Discounts
Cash Discounts
Mohit Amitabh
 
Bridge finance ppt
Bridge finance pptBridge finance ppt
Bridge finance ppt
Naga Pradyumna Reddy
 
Working capital
Working capitalWorking capital
Working capital
Suresh Thengumpallil
 
Invoice generation system
Invoice generation systemInvoice generation system
Invoice generation system
Saugata Palit
 
Chapter 8
Chapter 8Chapter 8
Chapter 8
ysitko2
 
Introduction To Risk Aversion
Introduction To Risk AversionIntroduction To Risk Aversion
Introduction To Risk Aversion
txslr
 
3. systematic unsystematic risks - 1
3. systematic unsystematic risks - 13. systematic unsystematic risks - 1
3. systematic unsystematic risks - 1
sartaj hussain
 
Working Capital Management
Working Capital ManagementWorking Capital Management
Working Capital Management
12inch
 
Schedule Y
Schedule YSchedule Y
Schedule Y
Fardan Qadeer
 
What are the Different Investment Types?
What are the Different Investment Types?What are the Different Investment Types?
What are the Different Investment Types?
Raerev Services
 
Working Capital Management
Working Capital ManagementWorking Capital Management
Working Capital Management
Dayasagar S
 
Chapter 41 yield
Chapter 41 yieldChapter 41 yield
Chapter 41 yield
Dr. Sunil Kumar
 
14521044 inventory-valuation-methods
14521044 inventory-valuation-methods14521044 inventory-valuation-methods
14521044 inventory-valuation-methods
sweetpankaj
 
Working capital management
Working capital managementWorking capital management
Working capital management
Shwetanshu Gupta
 
Liquidity Risk
Liquidity RiskLiquidity Risk
Liquidity Risk
nikatmalik
 
Classification of working capital
Classification of working capitalClassification of working capital
Classification of working capital
ALEENACHACKOCHAN
 
Cash Discount and Trade Discount
Cash Discount and Trade DiscountCash Discount and Trade Discount
Cash Discount and Trade Discount
Polytechnic University of the Philippines
 
Commercial papers
Commercial papersCommercial papers
Commercial papers
Tata Mutual Fund
 

Viewers also liked (20)

Working capital management 1
Working capital management 1Working capital management 1
Working capital management 1
 
Working capital management
Working capital managementWorking capital management
Working capital management
 
Cash Discounts
Cash DiscountsCash Discounts
Cash Discounts
 
Bridge finance ppt
Bridge finance pptBridge finance ppt
Bridge finance ppt
 
Working capital
Working capitalWorking capital
Working capital
 
Invoice generation system
Invoice generation systemInvoice generation system
Invoice generation system
 
Chapter 8
Chapter 8Chapter 8
Chapter 8
 
Introduction To Risk Aversion
Introduction To Risk AversionIntroduction To Risk Aversion
Introduction To Risk Aversion
 
3. systematic unsystematic risks - 1
3. systematic unsystematic risks - 13. systematic unsystematic risks - 1
3. systematic unsystematic risks - 1
 
Working Capital Management
Working Capital ManagementWorking Capital Management
Working Capital Management
 
Schedule Y
Schedule YSchedule Y
Schedule Y
 
What are the Different Investment Types?
What are the Different Investment Types?What are the Different Investment Types?
What are the Different Investment Types?
 
Working Capital Management
Working Capital ManagementWorking Capital Management
Working Capital Management
 
Chapter 41 yield
Chapter 41 yieldChapter 41 yield
Chapter 41 yield
 
14521044 inventory-valuation-methods
14521044 inventory-valuation-methods14521044 inventory-valuation-methods
14521044 inventory-valuation-methods
 
Working capital management
Working capital managementWorking capital management
Working capital management
 
Liquidity Risk
Liquidity RiskLiquidity Risk
Liquidity Risk
 
Classification of working capital
Classification of working capitalClassification of working capital
Classification of working capital
 
Cash Discount and Trade Discount
Cash Discount and Trade DiscountCash Discount and Trade Discount
Cash Discount and Trade Discount
 
Commercial papers
Commercial papersCommercial papers
Commercial papers
 

Similar to Managing Risk Attitude

Enterprise risk management presentation to APM SWWE branch
Enterprise risk management presentation to APM SWWE branchEnterprise risk management presentation to APM SWWE branch
Enterprise risk management presentation to APM SWWE branch
Association for Project Management
 
Agile pgm
Agile pgmAgile pgm
Agile pgm
Dr. Frank Stumpe
 
Introduction to ict project management
Introduction to ict project managementIntroduction to ict project management
Introduction to ict project management
manproy
 
Cvjj portal english
Cvjj portal englishCvjj portal english
Cvjj portal english
mariaescribanodiez
 
Dov Nimratz, Outsource People_2016_Minsk
Dov Nimratz, Outsource People_2016_MinskDov Nimratz, Outsource People_2016_Minsk
Dov Nimratz, Outsource People_2016_Minsk
OutsourcePeopleConference
 
EN Resume Ricardo González - April 2016 v22
EN Resume Ricardo González - April 2016 v22EN Resume Ricardo González - April 2016 v22
EN Resume Ricardo González - April 2016 v22
Ricardo Gonzalez, CGEIT, CRISC
 
AEC product presentation EN 1.4
AEC product presentation EN 1.4AEC product presentation EN 1.4
AEC product presentation EN 1.4
Kees Wiegmans
 
DaKiRy_PMStandUp_Дов Німрац "Risk management"
DaKiRy_PMStandUp_Дов Німрац "Risk management"DaKiRy_PMStandUp_Дов Німрац "Risk management"
DaKiRy_PMStandUp_Дов Німрац "Risk management"
Dakiry
 
Risk analysis and management
Risk analysis and managementRisk analysis and management
Risk analysis and management
Ivo Andreev
 
SAP Project Delivery during a Global Pandemic
SAP Project Delivery during a Global PandemicSAP Project Delivery during a Global Pandemic
SAP Project Delivery during a Global Pandemic
Richard Williams
 
1. introduction
1. introduction1. introduction
1. introduction
BhuWan Khadka
 
Managing Risk And Opportunity In IT Projects
Managing Risk And Opportunity In IT ProjectsManaging Risk And Opportunity In IT Projects
Managing Risk And Opportunity In IT Projects
slideshare_venr
 
Aegon hiek van der scheer
Aegon hiek van der scheerAegon hiek van der scheer
Aegon hiek van der scheer
BigDataExpo
 
Risk management in_the_ESS_Vision_2020v3
Risk management in_the_ESS_Vision_2020v3Risk management in_the_ESS_Vision_2020v3
Risk management in_the_ESS_Vision_2020v3
Светла Иванова
 
EES White Paper Project Management of IT Moves LR
EES White Paper Project Management of IT Moves LREES White Paper Project Management of IT Moves LR
EES White Paper Project Management of IT Moves LR
Vicky Killian
 
Developing a Project Logic/Results Framework - Session 9 Managing Project Pre...
Developing a Project Logic/Results Framework - Session 9 Managing Project Pre...Developing a Project Logic/Results Framework - Session 9 Managing Project Pre...
Developing a Project Logic/Results Framework - Session 9 Managing Project Pre...
UNDP Climate
 
Sustain it Sample of Project References
Sustain it Sample of Project ReferencesSustain it Sample of Project References
Sustain it Sample of Project References
Laurent Janssens
 
Enterprise 360 degree risk management
Enterprise 360 degree risk managementEnterprise 360 degree risk management
Enterprise 360 degree risk management
Infosys
 
Challenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementChallenging Aspects of Modern Project Management
Challenging Aspects of Modern Project Management
Yamanta Raj Niroula, PMP
 
lfatrainingday1slides.pdf
lfatrainingday1slides.pdflfatrainingday1slides.pdf
lfatrainingday1slides.pdf
wisdomkhwalala2
 

Similar to Managing Risk Attitude (20)

Enterprise risk management presentation to APM SWWE branch
Enterprise risk management presentation to APM SWWE branchEnterprise risk management presentation to APM SWWE branch
Enterprise risk management presentation to APM SWWE branch
 
Agile pgm
Agile pgmAgile pgm
Agile pgm
 
Introduction to ict project management
Introduction to ict project managementIntroduction to ict project management
Introduction to ict project management
 
Cvjj portal english
Cvjj portal englishCvjj portal english
Cvjj portal english
 
Dov Nimratz, Outsource People_2016_Minsk
Dov Nimratz, Outsource People_2016_MinskDov Nimratz, Outsource People_2016_Minsk
Dov Nimratz, Outsource People_2016_Minsk
 
EN Resume Ricardo González - April 2016 v22
EN Resume Ricardo González - April 2016 v22EN Resume Ricardo González - April 2016 v22
EN Resume Ricardo González - April 2016 v22
 
AEC product presentation EN 1.4
AEC product presentation EN 1.4AEC product presentation EN 1.4
AEC product presentation EN 1.4
 
DaKiRy_PMStandUp_Дов Німрац "Risk management"
DaKiRy_PMStandUp_Дов Німрац "Risk management"DaKiRy_PMStandUp_Дов Німрац "Risk management"
DaKiRy_PMStandUp_Дов Німрац "Risk management"
 
Risk analysis and management
Risk analysis and managementRisk analysis and management
Risk analysis and management
 
SAP Project Delivery during a Global Pandemic
SAP Project Delivery during a Global PandemicSAP Project Delivery during a Global Pandemic
SAP Project Delivery during a Global Pandemic
 
1. introduction
1. introduction1. introduction
1. introduction
 
Managing Risk And Opportunity In IT Projects
Managing Risk And Opportunity In IT ProjectsManaging Risk And Opportunity In IT Projects
Managing Risk And Opportunity In IT Projects
 
Aegon hiek van der scheer
Aegon hiek van der scheerAegon hiek van der scheer
Aegon hiek van der scheer
 
Risk management in_the_ESS_Vision_2020v3
Risk management in_the_ESS_Vision_2020v3Risk management in_the_ESS_Vision_2020v3
Risk management in_the_ESS_Vision_2020v3
 
EES White Paper Project Management of IT Moves LR
EES White Paper Project Management of IT Moves LREES White Paper Project Management of IT Moves LR
EES White Paper Project Management of IT Moves LR
 
Developing a Project Logic/Results Framework - Session 9 Managing Project Pre...
Developing a Project Logic/Results Framework - Session 9 Managing Project Pre...Developing a Project Logic/Results Framework - Session 9 Managing Project Pre...
Developing a Project Logic/Results Framework - Session 9 Managing Project Pre...
 
Sustain it Sample of Project References
Sustain it Sample of Project ReferencesSustain it Sample of Project References
Sustain it Sample of Project References
 
Enterprise 360 degree risk management
Enterprise 360 degree risk managementEnterprise 360 degree risk management
Enterprise 360 degree risk management
 
Challenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementChallenging Aspects of Modern Project Management
Challenging Aspects of Modern Project Management
 
lfatrainingday1slides.pdf
lfatrainingday1slides.pdflfatrainingday1slides.pdf
lfatrainingday1slides.pdf
 

Recently uploaded

Enriching engagement with ethical review processes
Enriching engagement with ethical review processesEnriching engagement with ethical review processes
Enriching engagement with ethical review processes
strikingabalance
 
Addiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdfAddiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdf
Bill641377
 
12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve
Pierre E. NEIS
 
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptxGanpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
GanpatiKumarChoudhar
 
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
tdt5v4b
 
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Dr. Nazrul Islam
 
All the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/BozenAll the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/Bozen
Alberto Brandolini
 
Sethurathnam Ravi: A Legacy in Finance and Leadership
Sethurathnam Ravi: A Legacy in Finance and LeadershipSethurathnam Ravi: A Legacy in Finance and Leadership
Sethurathnam Ravi: A Legacy in Finance and Leadership
Anjana Josie
 
Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...
Ram V Chary
 
Credit Management training seminar power point presentation
Credit Management training seminar power point presentationCredit Management training seminar power point presentation
Credit Management training seminar power point presentation
bernanbumatay1
 
Conflict resololution,role of hr in resolution
Conflict resololution,role of hr in resolutionConflict resololution,role of hr in resolution
Conflict resololution,role of hr in resolution
Dr. Christine Ngari ,Ph.D (HRM)
 
Employment Practices Regulation and Multinational Corporations
Employment PracticesRegulation and Multinational CorporationsEmployment PracticesRegulation and Multinational Corporations
Employment Practices Regulation and Multinational Corporations
RoopaTemkar
 
Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™
Alexey Krivitsky
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
tdt5v4b
 
一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理
8p28uk6g
 
20240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 202420240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 2024
Matthew Sinclair
 
innovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptxinnovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptx
TulsiDhidhi1
 
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
William (Bill) H. Bender, FCSI
 
Risk-Management-presentation for cooperatives
Risk-Management-presentation for cooperativesRisk-Management-presentation for cooperatives
Risk-Management-presentation for cooperatives
bernanbumatay1
 
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
dsnow9802
 

Recently uploaded (20)

Enriching engagement with ethical review processes
Enriching engagement with ethical review processesEnriching engagement with ethical review processes
Enriching engagement with ethical review processes
 
Addiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdfAddiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdf
 
12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve
 
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptxGanpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
 
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
 
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
 
All the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/BozenAll the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/Bozen
 
Sethurathnam Ravi: A Legacy in Finance and Leadership
Sethurathnam Ravi: A Legacy in Finance and LeadershipSethurathnam Ravi: A Legacy in Finance and Leadership
Sethurathnam Ravi: A Legacy in Finance and Leadership
 
Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...
 
Credit Management training seminar power point presentation
Credit Management training seminar power point presentationCredit Management training seminar power point presentation
Credit Management training seminar power point presentation
 
Conflict resololution,role of hr in resolution
Conflict resololution,role of hr in resolutionConflict resololution,role of hr in resolution
Conflict resololution,role of hr in resolution
 
Employment Practices Regulation and Multinational Corporations
Employment PracticesRegulation and Multinational CorporationsEmployment PracticesRegulation and Multinational Corporations
Employment Practices Regulation and Multinational Corporations
 
Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
 
一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理
 
20240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 202420240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 2024
 
innovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptxinnovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptx
 
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
 
Risk-Management-presentation for cooperatives
Risk-Management-presentation for cooperativesRisk-Management-presentation for cooperatives
Risk-Management-presentation for cooperatives
 
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
 

Managing Risk Attitude

  • 1. Managing Risk Attitude Working with various stakeholders risk profiles Frédéric Casagrande, PMP Director, Program Management Office Interoute Prague, June 10th 2008
  • 2. Agenda • Introduction • The Project • The Recovery • The Risk Profiles Matrix • The Result • Q&A
  • 3. Introduction • What simple tools can you use when your company has no Project Risk Management capabilities? • Corporate example: A company integration Project, where the PMO has been brought into half way through execution
  • 4. The Project • A paneuropean telecommunication provider has bought an ISP with hosting and security capabilities in October 2005 • Integration started as a « network & CRM migration », with a limited scope identified and no Project Manager assigned
  • 5. The Project • People in charge of the integration program were running one single big « status report meeting » on a regular basis, with *all* involved (and identified) stakeholders • Stakeholders from all areas were pushing for the project to stop…
  • 6. The Recovery • In July 2007, a PMO has been created to improve Interoute’s maturity in Project and Program Management • The PMO then started to get involved in the recovery of a large, complex, transformational program: the integration of the ISP…
  • 7. The Recovery The PMO focused on the Stakeholders: – Scope Definition & Clarification • 1.5 years after the launch… – Breakdown of the communication • in smaller Groups – Continuous Stakeholder Identification • Definition of Risk Profiles • Identification of all Stakeholders Risk Profiles…
  • 8. The Risk Profiles Matrix • Grading the Risk Profiles – Highly Risk Averse (Red) – Moderately Risk Averse (Orange) – Moderately Risk Tolerant (Yellow) – Highly Risk Tolerant (Green)
  • 9. The Risk Profiles Matrix • Assigning a Risk Profile to a Stakeholder group: – You need to build a relevant questionnaire – You need to spend time with your stakeholders – You need to ensure both the questionnaire, the matrix, and the classification evolve over time
  • 10. The Risk Profiles Matrix • Mapping the Risk Profiles – Assign a Risk Profile to each stakeholder group – Develop a behaviour (more than « just a process ») for each Risk Profile ALL RISK PROFILES NEED ATTENTION STAKEHOLDERS MAY CHANGE PROFILE
  • 11. The Risk Profiles Matrix Finance Operations IT/IS Sales Germany Highly Averse Moderately Tolerant N/A Moderately Averse Netherlands Moderately Averse Moderately Tolerant N/A Moderately Tolerant Czech Republic Moderately Averse Highly Tolerant Moderately Tolerant N/A
  • 12. The Result • Stakeholders have recovered confidence in the Project • The scope has been managed properly • The Execution has continued • The Program has been closed in April 2008