MODERN METHODS
OF CONSTRUCTION
PART 3
helpdesk@construction-productivity.co.uk
htt://www.construction-productivity.co.uk
MODERN METHODS OF
CONSTRUCTION
MODERN METHODS OF
CONSTRUCTION
 MMC is the term used to embrace a range of
technologies and processes involving various
forms of supply chain specifications,
prefabrication and off-site assembly.
MMC:
 Makes use of more effective materials
 Speeds up housing delivery
 Enables high standards of design quality
 Helps to reduce resource consumption.
MODERN METHODS OF
CONSTRUCTION
MODERN METHODS OF
CONSTRUCTION
MODERN METHODS OF
CONSTRUCTION
Volumetric pre-fabricated
Volumetric pre-fabricated
Volumetric pre-fabricated
MODERN METHODS OF
CONSTRUCTION
MODERN METHODS OF
CONSTRUCTION
MODERN METHODS OF
CONSTRUCTION
Panelised construction
Services, windows, doors,
internal finishes and external
cladding may also be
incorporated.
Panelised construction
Panelised construction
Panelised construction
Open panel system where wall panels are
assembled in a factory environment
The window and door openings are pre-
framed, and the exterior sheathing is
already applied.
Panelised construction
Panelised construction
MODERN METHODS OF
CONSTRUCTION
MODERN METHODS OF
CONSTRUCTION
MODERN METHODS OF
CONSTRUCTION
MODERN METHODS OF
CONSTRUCTION
MODERN METHODS OF
CONSTRUCTION
 The National Audit Office report 
Homebuilding: Measuring Construction 
Performance (June 2007), recommends that 
performance measures should be: 
1. Comprehensive
2. covering business efficiency
3. quality of the building
4. environmental performance and customer 
satisfaction. 
MODERN METHODS OF
CONSTRUCTION
 This is a theme also emphasised by the The 
Callcutt Review of House building Delivery.
 The challenge of climate change requires a 
step change in construction practice through 
innovation and new technologies.
 This can best be achieved through a more 
rigorous approach to the construction 
process.
MODERN METHODS OF
CONSTRUCTION
MODERN METHODS OF
CONSTRUCTION
Construction process criteria assessed by the
DfM Competition included:
1. Manufacturing, supply and construction 
programme
2. Supply chain management
3. Continuous improvement
4. Innovation risk management
5. Construction cost target.
MODERN METHODS OF
CONSTRUCTION
 The quality and depth of the approach was 
then judged as part of the proposed 
second level of assessment.
 Developers were encouraged to adopt the 
Constructing Excellence/Housing Forum 
key performance indicators (KPIs) during 
the development of projects.
MODERN METHODS OF
CONSTRUCTION
Developers had to show evidence 
that buildings will be capable of 
attracting lending and insurance 
cover and will provide consumers 
with adequate post sale 
warranties.
MODERN METHODS OF
CONSTRUCTION
Developers were asked to adopt an 
open book approach with English 
Partnerships.
Including the collection and 
publication of data.
Assessment at the first stage will 
review the scope of the statement in 
addressing the key issues. 

075 Modern Methods of Construction